HomeMy WebLinkAbout05 - CC-6 - 2013-14 Community Development Block Gran - 1/20/2015CITY COUNCIL AGENDA REPORT
MEETING DATE: JANUARY 20, 2015
ITEM NUMBER: CC -6
SUBJECT: 2013-2014 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT: BAKER
STREET ALLEY (ALLEY NO. 120) AND LA SALLE AVENUE ALLEY (ALLEY NO. 121)
IMPROVEMENT PROJECT- CITY PROJECT NO. 14-05
DATE: JANUARY 8, 2015
FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION
PRESENTATION BY: ERNESTO MUNOZ, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: FARIBA FAZELI, CITY ENGINEER, (714) 754-5335
RECOMMENDATION:
1. Accept the work performed by Patriot Paving, Inc., and authorize the City Clerk to file the
Notice of Completion.
2. Release the Labor and Material Bond seven (7) months after the filing date; release the
Faithful Performance Bond one (1) year after the filing date; and release the retention monies
35 days after the Notice of Completion filing date.
BACKGROUND:
On June 17, 2014, a construction contract in the amount of $186,603.25 was awarded to Patriot
Paving, Inc., 2300 N. Batavia Street, Orange, California 92865. This project consisted of
rehabilitation of the following alleys (Attachment No. 1):
1. Baker Street Alley (Alley No. 120), located east of Mendoza Drive between Mission Drive and
Baker Street;
2. La Salle Avenue Alley (Alley No. 121), located west of La Salle Avenue between Mission Drive
and Alley No. 120.
The rehabilitation of these two alleys consisted of the removal of the existing asphalt concrete
alley sections, the construction of new Portland Cement Concrete (PCC) pavement sections, and
other incidental work needed to complete the project in accordance with the contract documents.
Before Improvements
Improvements Completed
1
ANALYSIS:
The work required by the contract documents was completed on November 7, 2014, to the
satisfaction of the City Engineer. The final contract cost amounted to $186,006.00. A report of
the final costs is included herein as Attachment 2.
A summary of the costs is as follows:
Original Contract Cost:
Final Quantity Adjustments:
Final Contract Cost:
$186,603.25
($ 597.25)
$186,006.00
The final contract price reflects a less than one percent (1 %) decrease to the original contract as a
result of the final quantity adjustments.
As of this date, there are no Stop Notices filed against the monies due to Patriot Paving, Inc.
ALTERNATIVES CONSIDERED:
There were no alternatives considered for this item.
FISCAL REVIEW:
This project was funded from appropriated CDBG funds in the Fiscal Year 2013-2014 budget.
LEGAL REVIEW:
There is no legal review required on this item.
CONCLUSION:
The 2013-2014 CDBG Project: Baker Street
(Alley No. 121) Improvement Project, City
recommended that the City Council authorize
remaining retention monies 35 days after the
bonds accordingly.
Alley (Alley No. 120) and La Salle Avenue Alley
Project No. 14-05, has been completed. It is
staff to file the Notice of Completion; release the
Notice of Completion filing date; and release the
ERNESTO MUNOZ FARIBA FAZELI
Public Services Director City Engineer
ATTACHMENTS: 1- Project Map
2- Cost Summary
DISTRIBUTION: Chief Executive Officer
Assistant Chief Executive Officer
City Attorney
City Clerk
Staff
File
FA
CITY OF COSTA MESA
PUBLIC ERVI E EN INEE IN
ATrA HMENT l
$ LSF
LL
O a i
J
j
7WE
\(
�a z
PRO4JEM AREA z
Ilia ort �•
=D
3E VA
AMINO UR,
ALLKY
L�4Hh LF#.
snl_'rfiC�R S7•
J
In
W�
m a
a B t
L
t
WORK AREA
sr. CLAIR sT,
- )"fid =Sn�RD.
2013-2014 CDBG I RGJE_ T. REHABILITATION OF ALES EGOS. 120 AND 121
OffY PR ECT No, 14-05
RAGE 1 OF 1
IF -OR F`AymFHr ON THE 4AWARRAHT L157 Or;
IST P&FMenr CO: PATRIOT PAVING. INC.
13% & BATAVIA &TACET, CPMGE, CA 9=5
PROJECT: REK RIUTATION OF ,4L.LEY N0.120 & 121
GIS ftok 't Nob 14-H
1147M4
CITY OF COSTA MESA
1-71L= i IliU 'J
PAGE' i OF i
ITEM
&D
L"F
PBi11011%
QUANTn"y
T4TfLCOANTRY
PHE419119
P6hOr_ T
,a
CANTOar_T
pIPTi
EsnVATE
TO DANE
A.W"T
TFW E6f
im WIT!
PN[C
i
1
L$
MOBILIZATION
040.04
4 %
8 %
108 %
104 %
100 %
$4,00
12.000.04
52 0W.00
2,ODJ.13D
$414,1300.00
1
LS
GLE4LRWGI EBING
$44 $04.00
190 %
4acip
540 ODC1.fl0
U0. BOdAD
31015
SF
SAWCUT IL REMOVE EXISTLNG ALLEY & R11ADWAY
83.75
SECTION (7HICJGNESS PER TYPICAL SECTION) &
3
CONSTRUCT W THICK POC O''1ER GOiWACTEDHATfVF
0 SF
213,494 SF
28,4D0 9F
V.OD
41w,5moo
$1065W.00
$1118,3m.25
"TH 5'W Wi 4Nvi.4 4wmm {PER TYPICAL SECTVJN
ON SHT, 7 OF PLANS
_
535
5F
SAVVCLJT & REMOVE EXISTING AND CONSTRUCT $'
91200
%N10P A G SLOW PAVING (5" DEEP OVER NA r iviz)
D SF
958 SF
-
958 $F
$0.00
511,472-00
$11,432,00
49,420.00
I
EA
i
.-SAWCUT & REMOVE EXISUNG AND CONSTRUCT r POC
5
A4LLEY INTFR$QCTKM PER SPPWC STO. PLAN 13042
C EA
1 Et
1 f-4
$0.00
#r1,omw
34,000 OD
54,000,46
OVER V CV0 {INCLUDING ExCAYATiON)
— — -
75
SF
SAWCUT AND REMOVE EXISTING AND CONSTRUCT -"
#153)0
-
-
$
FCC SIDE ULKPER CITY STD PLAN 411 CNER4' FAIN
-D 3F
132 SF
132 SF
$000
51,98008
$1,gg4,4p
$1,170,00
CUR
_
7
1699
LF
C.UWiTRUCT PCC aEEF'ENED EDGE PER DETAIL ON SHT
$3.00
0 LF
4 LIF
2 OF f LANA
� LF
W.4D
$6.00
$0.00
$1,$07.130
8
ti
LS
TRAFFIC CONTROL
#504.04
D 5S
C'3
$500.04
00
A
}
LS
f'RfULLCT6ANAGEM
+t,
%
d Y.
d4
00
1 Qp
1
LS
P4?6ACorMrbl
$949.Ofl
74
104 S6
1Q0 9�
$4.44
904190
SFs40.46
1
LS
OuerB:Av rains
T1.5"
4 {J5
194 %
1�
0.2
$rj.pp
$1,smoo
51,500.00
�.3
1
L
OG0Gr+¢ lWm- ir'a Mesh
-S4 006410
0 16
� #i
C %
104 %
104 9o-
1 m %
114 %
30.00
$11.440.04
$+1 DW.06
9,4
1
LS
MCI rlSS*d COR For Add111oPS1 Ir14i1c
5 35+L.00
lQ4D
#15,95404
.90
$16,954.40
3 900.46
0.6
1 S
Pitriar Coll oral Mrk
$5 504.04
1130
100
PROJECT
TOTAL;
$0401
$lN,00$.00
51 ,09414
$19d,s03.25
9