Loading...
HomeMy WebLinkAbout05 - CC-6 - 2013-14 Community Development Block Gran - 1/20/2015CITY COUNCIL AGENDA REPORT MEETING DATE: JANUARY 20, 2015 ITEM NUMBER: CC -6 SUBJECT: 2013-2014 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT: BAKER STREET ALLEY (ALLEY NO. 120) AND LA SALLE AVENUE ALLEY (ALLEY NO. 121) IMPROVEMENT PROJECT- CITY PROJECT NO. 14-05 DATE: JANUARY 8, 2015 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: ERNESTO MUNOZ, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: FARIBA FAZELI, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by Patriot Paving, Inc., and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On June 17, 2014, a construction contract in the amount of $186,603.25 was awarded to Patriot Paving, Inc., 2300 N. Batavia Street, Orange, California 92865. This project consisted of rehabilitation of the following alleys (Attachment No. 1): 1. Baker Street Alley (Alley No. 120), located east of Mendoza Drive between Mission Drive and Baker Street; 2. La Salle Avenue Alley (Alley No. 121), located west of La Salle Avenue between Mission Drive and Alley No. 120. The rehabilitation of these two alleys consisted of the removal of the existing asphalt concrete alley sections, the construction of new Portland Cement Concrete (PCC) pavement sections, and other incidental work needed to complete the project in accordance with the contract documents. Before Improvements Improvements Completed 1 ANALYSIS: The work required by the contract documents was completed on November 7, 2014, to the satisfaction of the City Engineer. The final contract cost amounted to $186,006.00. A report of the final costs is included herein as Attachment 2. A summary of the costs is as follows: Original Contract Cost: Final Quantity Adjustments: Final Contract Cost: $186,603.25 ($ 597.25) $186,006.00 The final contract price reflects a less than one percent (1 %) decrease to the original contract as a result of the final quantity adjustments. As of this date, there are no Stop Notices filed against the monies due to Patriot Paving, Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: This project was funded from appropriated CDBG funds in the Fiscal Year 2013-2014 budget. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: The 2013-2014 CDBG Project: Baker Street (Alley No. 121) Improvement Project, City recommended that the City Council authorize remaining retention monies 35 days after the bonds accordingly. Alley (Alley No. 120) and La Salle Avenue Alley Project No. 14-05, has been completed. It is staff to file the Notice of Completion; release the Notice of Completion filing date; and release the ERNESTO MUNOZ FARIBA FAZELI Public Services Director City Engineer ATTACHMENTS: 1- Project Map 2- Cost Summary DISTRIBUTION: Chief Executive Officer Assistant Chief Executive Officer City Attorney City Clerk Staff File FA CITY OF COSTA MESA PUBLIC ERVI E EN INEE IN ATrA HMENT l $ LSF LL O a i J j 7WE \( �a z PRO4JEM AREA z Ilia ort �• =D 3E VA AMINO UR, ALLKY L�4Hh LF#. snl_'rfiC�R S7• J In W� m a a B t L t WORK AREA sr. CLAIR sT, - )"fid =Sn�RD. 2013-2014 CDBG I RGJE_ T. REHABILITATION OF ALES EGOS. 120 AND 121 OffY PR ECT No, 14-05 RAGE 1 OF 1 IF -OR F`AymFHr ON THE 4AWARRAHT L157 Or; IST P&FMenr CO: PATRIOT PAVING. INC. 13% & BATAVIA &TACET, CPMGE, CA 9=5 PROJECT: REK RIUTATION OF ,4L.LEY N0.120 & 121 GIS ftok 't Nob 14-H 1147M4 CITY OF COSTA MESA 1-71L= i IliU 'J PAGE' i OF i ITEM &D L"F PBi11011% QUANTn"y T4TfLCOANTRY PHE419119 P6hOr_ T ,a CANTOar_T pIPTi EsnVATE TO DANE A.W"T TFW E6f im WIT! PN[C i 1 L$ MOBILIZATION 040.04 4 % 8 % 108 % 104 % 100 % $4,00 12.000.04 52 0W.00 2,ODJ.13D $414,1300.00 1 LS GLE4LRWGI EBING $44 $04.00 190 % 4acip 540 ODC1.fl0 U0. BOdAD 31015 SF SAWCUT IL REMOVE EXISTLNG ALLEY & R11ADWAY 83.75 SECTION (7HICJGNESS PER TYPICAL SECTION) & 3 CONSTRUCT W THICK POC O''1ER GOiWACTEDHATfVF 0 SF 213,494 SF 28,4D0 9F V.OD 41w,5moo $1065W.00 $1118,3m.25 "TH 5'W Wi 4Nvi.4 4wmm {PER TYPICAL SECTVJN ON SHT, 7 OF PLANS _ 535 5F SAVVCLJT & REMOVE EXISTING AND CONSTRUCT $' 91200 %N10P A G SLOW PAVING (5" DEEP OVER NA r iviz) D SF 958 SF - 958 $F $0.00 511,472-00 $11,432,00 49,420.00 I EA i .-SAWCUT & REMOVE EXISUNG AND CONSTRUCT r POC 5 A4LLEY INTFR$QCTKM PER SPPWC STO. PLAN 13042 C EA 1 Et 1 f-4 $0.00 #r1,omw 34,000 OD 54,000,46 OVER V CV0 {INCLUDING ExCAYATiON) — — - 75 SF SAWCUT AND REMOVE EXISTING AND CONSTRUCT -" #153)0 - - $ FCC SIDE ULKPER CITY STD PLAN 411 CNER4' FAIN -D 3F 132 SF 132 SF $000 51,98008 $1,gg4,4p $1,170,00 CUR _ 7 1699 LF C.UWiTRUCT PCC aEEF'ENED EDGE PER DETAIL ON SHT $3.00 0 LF 4 LIF 2 OF f LANA � LF W.4D $6.00 $0.00 $1,$07.130 8 ti LS TRAFFIC CONTROL #504.04 D 5S C'3 $500.04 00 A } LS f'RfULLCT6ANAGEM +t, % d Y. d4 00 1 Qp 1 LS P4?6ACorMrbl $949.Ofl 74 104 S6 1Q0 9� $4.44 904190 SFs40.46 1 LS OuerB:Av rains T1.5" 4 {J5 194 % 1� 0.2 $rj.pp $1,smoo 51,500.00 �.3 1 L OG0Gr+¢ lWm- ir'a Mesh -S4 006410 0 16 � #i C % 104 % 104 9o- 1 m % 114 % 30.00 $11.440.04 $+1 DW.06 9,4 1 LS MCI rlSS*d COR For Add111oPS1 Ir14i1c 5 35+L.00 lQ4D #15,95404 .90 $16,954.40 3 900.46 0.6 1 S Pitriar Coll oral Mrk $5 504.04 1130 100 PROJECT TOTAL; $0401 $lN,00$.00 51 ,09414 $19d,s03.25 9 m z i