HomeMy WebLinkAbout11 - NB-1 - Award Professional Agreement for Archite - 1/20/2015CITY COUNCIL STUDY
SESSION REPORT
MEETING DATE: JANUARY 20, 2015 ITEM NUMBER: NB -1
SUBJECT: AWARD A PROFESSIONAL SERVICES AGREEMENT FOR
ARCHITECTURAL SERVICES FOR THE DONALD DUNGAN LIBRARY
AND NEIGHBORHOOD COMMUNITY CENTER PRELIMINARY DESIGN
PHASE.
DATE: JANUARY 5, 2015
FROM: THOMAS R. HATCH. CHIEF EXECUTIVE OFFICER
PRESENTATION TAMARA S. LETOURNEAU, ASSISTANT CHIEF EXECUTIVE
BY: OFFICER
FOR FURTHER INFORMATION
CONTACT:
RECOMMENDATION:
ALMA REYES, RECREATION SUPERVISOR
714-754-5636
Authorize the CEO to sign the Professional Services Agreement for an amount not to exceed
$125,125 to Johnson Favaro, 5898 Blackwelder Street, Culver City, CA 90232, for the preliminary
design phase of the Donald Dungan Library and Neighborhood Community Center (NCC)
projects, including the outdoor space surrounding these sites.
BACKGROUND:
At the April 29, 2014, City Council Study Session, the City Council authorized the issuance of a
Request for Proposal for the architectural planning and design of the proposed library at the
Neighborhood Community Center (NCC) facility.
The intent of the proposed project is to improve library services and create quality programming
and event user space necessary to meet the needs of the community. The proposed project will
repurpose both of these facilities which includes relocating the Donald Dungan Library to the
adjacent Neighborhood Community Center building and moving the Neighborhood Community
Center to the current library space. The proposed library will serve as a destination where
learning and technology come together as an environment that promotes community.
One of the primary goals of this project is to work closely with the community and current user
groups to ensure that the new library is adaptable to the community's current and future needs.
Furthermore, that community space is of high priority and shall be incorporated in this project.
ANALYSIS:
On June 6, 2014 the City issued a Request for Proposals (RFP) for the architectural planning and
design for the proposed library at the NCC. The City received six (6) proposals in response to the
RFP. All proposal were reviewed for compliance with the City's RFP process, and the architects
were evaluated based on the following criteria: understanding of the project, depth of experience,
technical expertise, ability to meet the schedule; ability to meet the community outreach
requirement, and associated factors. Of the six (6) firms only four (4) firms were interviewed.
Following a detailed proposal review and interview process, the evaluation team consisting of both
City staff, County staff and a representative from another agency with experience in library
renovations selected Johnson Favaro as the recommended firm to perform the architectural
planning and design services. Johnson Favaro has provided architectural services to various
Southern California cities; most notably the firm specializes in building and renovating library
facilities. The firm has an in depth knowledge of the function of libraries and provides special
expertise in the areas of library program assessment, parks and recreation programming,
facilities/utility and site survey, interiors, graphics and signage, and sustainability. Most
importantly, Johnson Favaro understands the uniqueness of this project and the importance of
creating a project that meets the needs of not just library patrons, but also the community as
whole.
As the renovation of both facilities and plaza are a multi-year project, the proposed Professional
Services Agreement is for Phase I- Preliminary Design of the Donald Dungan Library and the
NCC (Attachment 1). The scope of work includes the following:
• Complete a feasibility study;
• Assess the current open space surrounding these facilities and integrate it into a common
theme that will promote a welcoming and friendly environment that Costa Mesa residents
of all ages can enjoy;
• Complete a stakeholder process to determine the needs of the users/customers and
stakeholders;
• Provide preliminary project cost estimates; and,
• Prepare proposed concept plans.
The proposed Professional Services Agreement is for a one (1) year term for the Preliminary
Design Phase of the Donald Dungan Library and NCC.
Meeting Room Space
In anticipation of this project, staff has already begun working with the non-profit groups that utilize
the NCC throughout the year. Staff has developed a "Concierge Team" to work with each user to
find the best meeting space during the construction period and post construction. There are 45
annual users that reserve rooms at the NCC and 35 of these are Costa Mesa groups. These
groups utilize different size rooms currently at the NCC. For reference the large meeting room
space at the NCC is 6,994 square feet. The current Library is 7,700 square feet. In addition,
other City facilities that will be available for meeting room space are:
I•
Facility/MeetingFacility/Meeting Room
Square Feet
Balearic Community Center -Adobe Room
1,885
Balearic Community Center - Sierra Room
930
Downtown Recreation Center — Multi Purpose Room
1,409
City Hall — Conference Room 1A
713
Senior Center — Multi Purpose
5,900
Senior Center — Meeting Room
906
Golf Course — Los Lagos
3,100
Golf Course — Mesa Linda
1,300
The Concierge Team will work with each user to determine the meeting room space that best
meets the needs of their organization.
ALTERNATIVES TO CONSIDER:
The City Council could choose not to award a contract for professional services to
Johnson Favaro for the architectural services for the preliminary design phase of the
Donald Dungan Library and the Neighborhood Community Center (NCC).
2. The City Council could review other proposal or reject all proposals and direct staff to re -
advertise the project.
FISCAL REVIEW:
The total cost of the preliminary design of the Library and the Neighborhood Community Center
is $125,125 and funds for this agreement are budgeted in the FY 2014-15 Capital Improvement
Program, item number 29. In order to fully complete this concept of a new central Library and a
new quality Community Center with integrated outdoor space, it could cost approximately
$10,000,000 including total architectural and construction support of $1,400,000.
LEGAL REVIEW:
Upon City Council approval, the City Attorney's office will prepare a Professional Services
Agreement for the preliminary design phase.
CONCLUSION:
In order to enhance the quality of library services by creating a learning destination that provides
access and maximizes facility use and creates a NCC that meets the needs of the community,
staff is recommending that City Council authorize the CEO to sign the Professional Services
Agreement in an amount not to exceed $125,125 to Johnson Favaro, 5898 Blackwelder Street,
Culver City, CA 90232, for architectural services for the preliminary design phase of the Donald
Dungan Library and the Neighborhood Community Center (NCC).
3
TAMARA S. LETOURNEAU THOMAS R. HATCH
Assistant Chief Executive Officer Chief Executive Officer
ALMA REYES
Recreation Supervisor
ATTACHMENTS:
1. Proposal for Preliminary Design Phase submitted by Johnson Favaro
A CD was Provided and Distributed to the Council Members Regarding Proposals for
RFP 1171 — Architectural Planning and Design Services for the New Donald Dungan
Library and Neighborhood Community Center (NEW BUSINESS ITEM #1 - AWARD A
PROFESSIONAL SERVICES AGREEMENT FOR ARCHITECTURAL SERVICES FOR
THE DONALD DUNGAN LIBRARY AND NEIGHBORHOOD COMMUNITY CENTER
PRELIMINARY DESIGN PHASE/Office of the Chief Executive Officer).
The CD Includes 479 pages and will be Made Available for Public View in the City Clerk's
Office. Please Contact the City Clerk's Office for More Information at (714) 754-5225
CITY OF COSTA MESA
Department of Parks and Community Services Recreation
INTEROFFICE MEMORANDUM
TO: Honorable Mayor and City Council
FROM: Tamara Letourneau, Assistant CEOVZ<--.,
DATE: January 16, 2015
SUBJECT: LIBRARY ARCHITECT RFP (SUPPLEMENTAL INFORMATION) -
PROPOSALS FOR ARCHITECTURAL PLANNING AND DESIGN
SERVICES FOR THE NEW DONALD DUNGAN LIBRARY AND NEW
NEIGHBORHOOD COMMUNITY CENTER.
On June 6, 2014 the City issued a Request for Proposal (RFP) for the architectural
planning and design services for the proposed Donald Dungan Library and Neighborhood
Community Center (NCC).
The scope of work for the architect includes: a feasibility study; coordination with City and
County staff to identify current facility uses; holding community meetings to determine
needs of the users/customers and stakeholders; provide preliminary cost estimates; and,
propose concept plan layouts that take into account the proposed uses utilizing current
space design standards. Key strategies proposed include renovation of the existing facility
for greater efficiency of the useable space, consultation with user groups, stake holders,
partners, elected and appointed officials, and staff.
Further, the architect will be required to assess current open space surrounding these
facilities and integrate it into a common theme that will promote a welcoming and friendly
environment that Costa Mesa residents of all ages can enjoy.
The City received a total of six (6) proposals from the following firms
• Dougherty & Dougherty Architects, LLP
• Ethos Architecture
• Johnson Favaro, LLP
• KalArchitects, Inc.
• MVE Institutional
• Thirtieth Street Architects, Inc.
The City formed an Evaluation Committee composed of four (4) members that included
City and County staff and a representative from another agency with experience in library
renovations. The Evaluation Committee reviewed and scored the proposals. Of the six
(6) proposing firms, only four (4) were invited to the interview phase. The selected
firms were:
• Dougherty & Dougherty Architects, LLP
• KalArchitects, Inc.
• Johnson Favaro, LLP
• Thirtieth Street Architects
The Evaluation Committee selected Johnson Favaro, LLP as the recommended firm
to perform the architectural planning and design services. Johnson Favaro, LLP has
provided architectural services to various Southern California cities, including three (3)
major library projects in the cities of West Hollywood, Beverly Hills, and Manhattan
Beach. Johnson Favaro, LLP was established in 1989 and has successfully
completed over $300 million worth of construction projects for communities, local
governments, and institutions of higher education in Southern California in the past
ten (10) years. The firm's services include:
• Planning and Design
• Master Planning
• Programming and Feasibility Studies
• Facility Assessment
• Cost Planning and Conceptual Design to Building Design
• Document Production and Construction Administration
The firm specializes in building and renovating library facilities and possess an in-
depth knowledge of the function of libraries. Additionally, the firm provides special
expertise in the areas of library program assessment, parks and recreation
programming, facilities/utility and site survey, interiors, graphics and signage, and
sustainability. More notably, the firm understand the uniqueness of this project and
has demonstrated to have the expertise in crafting an inclusive and authentically
collaborative planning process with the constituents of the community.
Please find enclosed, the Proposal Score sheets and a CD with the six (6) proposals
received.
Should you need additional information, please feel free to contact me.
Thank you.
Cc: Tom Hatch, City CEO
2
ARCHITECTURE PLANNING & DESIGN SERVICES FOR THE
NEW DONALD
DUNGAN LIBRARY AND THE NEW NEIGHBORHOOD COMMUNITY CENTER
Interview & Combined Scores
1
2 3
4
Totals
Rater A
Rater B Rater C
Rater D
15
Grasp of the Project
Dougherty & Dougherty Architects
4
5 5
519
285
Johnson Favaro
3
5 4
5
17
255
KalArchitects
3
3 2
4
12
180
Thirtieth Street Architects, Inc.
4
4 4
5
17
255
25
Approach
Dougherty & Dougherty Architects
3
5 4
3
15
375
Johnson Favaro
4
5 5
5
19
475
KalArchitects
2
2 2
3
9
225
Thirtieth Street Architects, Inc.
4
4 4
4
16
400
25
Qualifications and Experience
Dougherty & Dougherty Architects
4
4 4
4
16
400
Johnson Favaro
5
5 5
5
20
500
KalArchitects
3
3 2
3
11
275
Thirtieth Street Architects, Inc.
4
4 4
5
17
425
20
Communication Skills
Dougherty & Dougherty Architects
5
4 4
4
17
340
Johnson Favaro
5
5 5
5
20
400
KalArchitects
3
3 2
2
10
200
Thirtieth Street Architects, Inc 1
4
4
4
5
17
340
15
Quality of the overall Presentation
Dougherty & Dougherty Architects
3
5 4
4
Johnson Favaro
5
5 5
16
240
KalArchitects
2
3 2
5
20
300
Thirtieth Street Architects, Inc.
4
4
1
8
120
3
3
14
210
Proposers
Interview
Proposal
Total
Rank
Dougherty & Dougherty Architects
1640
1430
3070
3
Johnson Favaro
1930
1290
3220
1
KalArchitects
1000
1440
2440
4
Thinieth Street Architects, Inc.
1630
1460
3000
2
ATTACHMENT 1
A1INI P,III7r-1 It nlAii Ill S 16 I'
) i
S
December 11, 2014
Alma Reyes
Management Analyst
Parks and Community Services Department
City of Costa Mesa
77 Fair Drive
Cost Mesa, CA 92626
Project: Donald Dungan Library and Neighborhood Community Center
PRELIMINARY DESIGN PHASE
Dear Ms. Reyes,
Please accept this proposal for design services in connection with the Project
referenced above. The following describes the scope of work of the Project and
architectural services to be provided by Johnson Favaro (Consultant) to the City of
Costa Mesa (City), fees proposed in compensation for the provision of such services
and the schedule according to which the services will be completed.
PROJECT SCOPE
The project includes renovation of the existing 22,742 gross square foot (GSF)
Neighborhood Community Center (NCC) building to be repurposed as the new Donald
Dungan Library. The project also includes renovation of the existing Donald Dungan
Library building (7,700 GSF) to be re -purposed as a new community. center. Both
buildings and the adjacent Downtown Community Recreation Center are located within
the 10 acre Lions Park In Costa Mesa.
The Project construction budget is not established at this time.
The Consultant shall target LEED Silver per the U.S. Green Building Council (USGBC)
rating system. The Consultant shall coordinate with the City to evaluate and
incorporate cost effective elements that will result in this rating.
The proposed construction delivery method is to be Design/Bid/Build
BASIC DESIGN SERVICES
The Consultant as Architect -of -Record will manage and coordinate all design and
document preparation tasks through the Preliminary Design Phase identified below.
The Consultant shall provide the services of external sub -consultants, or professional
expertise from its own staff in the following disciplines:
Library Planning/Programming and Design
6m eseckww� ske wand Floor,"w cH, cA907d2 (ra)316fi 720 (Fm)3105198220 xxw.jdmsoMzrdo oxn
Structural Engineering
Mechanical, Electrical & Plumbing Engineering
Civil Engineering/Utility Mapping
Site Surveyor
Landscape Architecture
Code Consultation
Cost Estimating
PRELIMINARY DESIGNISCOPE & BUDGET CONFIRMATION PHASE
1. The Consultant shall prepare a library/community center program based on a
needs assessment describing room sizes, types and characteristics as the
basis of design for the Project.
2. The Consultant shall meet with City Staff, County Library Staff, neighborhood
and community stakeholders as required to determine the needs, goals and
Project requirements. Three (3) Community/Stakeholder workshops are
proposed for this phase.
3. The Consultant shall complete a site survey for the Project area limited to the
area around and between the existing community center and library buildings
and the existing parking lot adjoining the buildings.
4. The Consultant shall complete a preliminary analysis of the structural,
mechanical, electrical and plumbing systems of the existing buildings and
prepare a report on the status of all systems along with code and budget
implications associated with the proposed renovation.
5. In consultation with the City and County Library stakeholders the Consultant
shall prepare documents illustrating alternate concept design strategies for the
Project. The documents shall include but not be limited to a site plan, floor
plans, concept landscape plans and site and building sections as required to
illustrate the proposed project scope and concept.
6. The Consultant shall prepare and review alternate concepts for implementing
the project whether by phase or by building so as to determine construction
and cost feasibility.
7. The Consultant shall prepare computer generated renderings and project
views to describe the project, including a fly -over simulation.
8. The Consultant shall present to the Parks and Recreation Commission and
the Costa Mesa City Council in order to provide an update on Project design
Page 2 of 6
6
progress, solicit comment and obtain approval of Preliminary Design scope
and Project budget.
9. The City has established a Construction Budget. The Consultant shall use its
expertise and experience to establish an estimate of probable construction
costs (Estimated Project Construction Cost) in a format acceptable to the City.
The Estimated Project Construction Cost shall be required at 100%
completion of Pre -Design documents, the purpose of which is to show the
probable construction cost in relation to the City's Construction Budget. If the
Consultant perceives site considerations or City project requirements which
render the project cost prohibitive, the Consultant shall disclose such
conditions in writing to the City immediately.
10. All cost estimates will be reconciled with a City/Project Management Cost
Estimate developed by an independent third parry cost estimator. The City
shall prepare at City's discretion and at its own expense the independent third
party estimates of probable construction costs. The Consultant shall attend
one (1) cost reconciliation meeting with the third party cost estimator for the
purpose of reconciling the 100% Preliminary Design/Scope and Budget
Confirmation Estimated Project Construction Cost.
11. The City and the Consultant shall meet to review the provisional Preliminary
Design Documents and Cost Estimate and to reach agreement on any City -
authorized adjustment to the approved Project schedule or construction
budget and Identify any necessary clarifications, additions or deletions of
Project scope in order to conform to the City construction budget.
12. If the City has not authorized in writing a revision to the project scope and the
Estimated Project Construction Cost based on Preliminary Design documents
exceeds the City's Construction Budget by more than ten percent (10%), the
City may request the Consultant to amend, at the Consultant's sole cost and
expense, the Preliminary Design Documents In order to meet the City's
Construction Budget.
BASIS OF COMPENSATION
Based on the Scope of Work and Services defined above, Johnson Favaro and its
consulting team propose a Professional Services Fee, of:
ONE HUNDRED TWENTY FIVE THOUSAND ONE HUNDRED AND TWENTY FIVE
DOLLARS ($125,125.00). The fee will be billed monthly in proportion to the work
completed.
Page 3 of 6
7
See below for detailed fee summary by Sub -Consultant of the proposed Professional
Services Fee:
INA W,l3l�Tl���
The City shall reimburse the Consultant a sum for its reasonable out-of-pocket
expenses that are incurred and paid for by the Consultant in furtherance of
performance of its obligations under this agreement. Reimbursables are included in
the Fee for Basic/Authorized Additional Services. The categories of expenses Include:
• Printing and reproduction costs
• Shipping, overnight mail, postage, messenger and other handling of drawings
and documents.
• Long distance telephone calls outside of the 213, 310,562, 626, 323, 714, 949,
951 and 909 area codes.
Page4of6 �_x7
V
• Renderings and special presentation models other than specified In the
Proposal requested by the City.
• Additional Consultants not considered a part of Basic Services
• Fees paid to third parties for securing approval of authorities having jurisdiction
over the project.
PRELIMINARY PROJECT SCHEDULE
For a Summary of the Preliminary Design Phase, see attached Exhibit C.1. For a
detailed schedule of the proposed Pre -Design Phase, see attached Exhibit C.2
The Consultant shall advise the City of any adjustments to the preliminary project
schedule. Evaluation of the project schedule as well as subsequent estimates of the
project schedule prepared by the Consultant, represent the Consultant's best judgment
as a design professional familiar with community planning, design and construction. It
Is recognized, however, that the Consultant has no control over the performance of the
City, the City Project Manager, or the City of Costa Mesa Building Department in
adhering to the project schedule. Accordingly, the Consultant cannot and does not
warrant or represent that the project schedule will not vary from that represented
herein, nor from any schedule estimate or evaluation prepared or agreed to by the
Consultant.
EXCLUSIONS
1. Schematic Design, Design Development, Construction Document, Permit,
Bidding, Construction Administration and Warranty/Record documents/Project
Closeout Phases are excluded.
2. Geotechnical Investigation and report
3. Hazardous materials abatement scope related to survey of existing conditions,
drawings, reports, documents and or specifications.
4. Survey to measure and document existing buildings and building systems In
the event no existing drawings are provided.
5. Multiple bid packages
6. Off-site public Improvements including adjoining street widening.
7. Program relocation drawings/diagrams
8. Physical presentation models
9. Partnering Workshops
10. Additional cost estimates or revisions to completed cost estimates
11. Design/Coordination of a Distributed Antennae System (DAS)
12. Ordering Cable or Satellite N service
13. Design of the Telco utilities
Pages of 9
ADDITIONAL SERVICES
Additional Services shall be provided if authorized or confirmed in writing by the Client.
These services shall be subject to an additional fee. Unless otherwise agreed prior to
the work being carried out, our fees for any additional services will based on time
expended at our normal billing rates prevailing at the time the work is carried out.
Additional Services will be billed on an hourly basis at the rates shown below:
Partners
$216.72
Senior Staff 4
$115.58
Senior Staff 3
$101.14
Senior Staff 2
$ 86.69
Senior Staff 1
$ 72.24
Intermediate Staff 1
$ 72.74
Tech/Admin Staff 1
$ 28.90
any questions regarding these fees, or the scope of our services, please do
contact us.
Favaro
Exhibit C.1: Project Schedule Summary
Exhibit C.2: Project Schedule— Pre -Design Phase Schedule Detail
Page 6 of )D
EXHIBIT rrC.lrr
PHASE CALENDAR START FINISH
GAYS
PRE DESIGN/SCOPE & BUDGET CONFIRMATION 87 days Feb 2, 2015 April 30, 2015
Project Analysis and Review (Programming, Inventory and Assessment)
Site/Building Survey and Utility Investigation
MEP/Structural Systems Preliminary Analysis
(3) Community/Stakeholder Workshops
Conceptual Plans (Site Plans, Floor Plans, Landscape Plans, Building/Site
Sections)
Pre -Design Presentation Documents (Project Views, Renderings and CGI
Video simulation)
Pre -Design Cost Estimate
City Council/Parks & Recreation Commission Pre -Design Presentations
lA