Loading...
HomeMy WebLinkAbout10 - CC-11 - Wallace Ave Improvements from 19th St - 2/17/2015CITY COUNCIL AGENDA REPORT MEETING DATE: FEBRUARY 17, 2015 ITEM NUMBER: CC -1 1 SUBJECT: WALLACE AVENUE IMPROVEMENTS FROM 19Th STREET TO HAMILTON STREET - CITY PROJECT NO. 14-03 DATE: FEBRUARY 5, 2015 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: ERNESTO MUNOZ, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: FARIBA FAZELI, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by COPP Contracting Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On June 17, 2014, a construction contract in the amount of $366,188.55 was awarded to COPP Contracting Inc., 6751 Stanton Avenue, Buena Park, California 90621 for the construction of the Wallace Avenue Improvements from 19th Street to Hamilton Street. The project map is included herein as Attachment "1 ". Before Improvements Improvements Completed ANALYSIS: The scope of work under this contract consisted of milling the existing pavement and constructing an asphalt concrete overlay over the roadway, removing and reconstructing damaged curb and gutter, driveways, and sidewalks and other incidental work needed to complete the project. All of the work was performed in accordance with the contract documents. This contract positively impacted Wallace Avenue neighborhoods by re -surfacing approximately 65,000 square feet of roadway and reconstructing approximately 3,600 square feet of damaged sidewalk, 3,450 square feet of driveways, and approximately 2,700 linear feet of curb and gutter. The work required by the contract documents was completed on September 17th, 2014, to the satisfaction of the City Engineer. The final contract cost amounted to $360,592.63. A report of the final cost summary is included herein as Attachment "2". A summary of the costs is as follows: Original Contract Cost: Final Quantity Adjustments: Final Contract Cost: $366,188.55 ($5,595.92) $360,592.63 The final contract price reflects a 1.5% decrease to the original contract as a result of the aforementioned final quantity adjustments. As of this date, there are no Stop Notices filed against the monies due to COPP Contracting, Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: This project was funded with Capital Improvement, Measure "M", and Community Development Block Grant (CDBG) funds. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date (less any withholding required to satisfy any outstanding Stop Notices); and release the bonds accordingly. ERNESTO MUNOZ FARIBA FAZELI Public Services Director City Engineer ATTACHMENTS: 1 - Prosect Location Map 2 - Cost Summary DISTRIBUTION: Chief Executive Officer Assistant Chief Executive Officer City Attorney City Clerk Staff File ATTACHMENT 1 LOCATION MAP — City Project No. 14-03 WALLACE AVENUE IMPROVEMENTS FROM 19TH STREET TO HAMILTON STREET LOCATION MAP KNOWELL PL, BAY Si. YORKSHIF ST. w P, I IAAFR cT r ED _ ......... .... ... I VICTORIA ST. a !PLUM PL- LPINE PINE HAM:L7011 Sf. II r; PROJECT AREA ' STERLING AV. a w w _: I i ! Govi S'. x07H ST, s[nL si. I I SURF S• . BEACH Lu 5 x J 2i c, . o ST, I LOCATION MAP KNOWELL PL, BAY Si. YORKSHIF ST. w P, I IAAFR cT r ED CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF: 2312015 4th Payment to: COPP CONTRACTING INC P.O. BOX 457 BUENA PARK, CA 90621-0457 PROJECT: 2013-2014 CDBG PROJECT: WALLACE AVENUE IMPROVEMENTS FROM 19TH ST TO HAMILTON ST City Project 14-03 DATE: 01116115 PAGE: 1 OF 2 ITEm NO elu QUANTITY DESCRIPTION UNIT PRICE ! PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL gl1ANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 2 3 1 500 107855 LS CY SF MOBILIZATION UNCLASSIFIED EXCAVATION (LOCALIZED DIG -OUTS, MAX 6" DEPTH) -ROADWAY ONLY COLD MILL (2" DEPTH) _ $10,000 00, $53 23 $0.18 100 -.. 0 0 % CY SF _ 0 _ 0 _ 0 % CY SF 100 0 0 % CY SF $10.000.001 $0.00 $0.00 $0.00 $0.00 $0.00 $10,0W $0.00 $0.00 $10 000,00 $26,615 -DO $19,306.05 4 1500 TON ASPHALT CONCRETE SURFACE COURSE (TYPE III-C3-AR4000) .$69.50 0 TON 0 TON 0 TON $0,00 $0.00 $0.00 $104,250-00 5 750 TON ASPHALT CONCRETE SURFACE COURSE CTYPE III B2-AR4000 .$72.71 0.00 TON 0.00 TON 0.00 TON 0_00 $0.00 813.00 $54.53150 6 8 EA ADJUST MANHOLE TO GRADE7 :00 8. EA 0 EA EA $3,000,00 $0.00. $9 OW40 $3.000.00 i 12 EA ADJUST WATER VALVE TO GRADE $350,00 12 EA 0 ---8 EA 12 EA $4,200.00 $0.00 ;00 $4 OO.00I 8 2454 SF SAEXCAVATION WCUT & REMOVE EXISTING 8 CONSTRUCT NEW 6" PCC DRIVEWAY (INCLUDING 6" CMB & $8.75 3,448,50 SF 0.00 SF 3,448,50 SF $30,174.38 $0.001 $30,174.38 $21,472.50 9 2031 LF SAWCUT & REMOVE EXISTING & CONSTRUCT NEW PCC CURB & GUTTER, TYPE "C-6" INC U ING 6" CMB & EXCAVATION $38.00 2,685 LF 0 LF 2,685 LF $102,030.00 $0,00 $102,030.00 $77,178.00 10 2320 SF SAWCUT & REMOVE EXISTING & CONSTRUCT NEW 4" PCC SIDEWALK (INCLUDING 4" CMB & EXCAVATION $7,00 3,614.75 SF 0 SF 3,614.75 SF $25,30325 $0,00 $25,303.25 $16,240.00 11 1 EA RESET EXISTING SURVEY MONUMENTS AND TIES $800.001 1 : EA 0 EA 1 EA _ $800.00 0.00 $800.00 $800.00 12 1 LS TRAFFIC CONTROL $4,250,00 100 % 0 96 100. °ln $4150.00 $0.00 $4 50.00 $4,250. 13 14 254 1 LF LS IPAINT CURB RED LANE MARKINGS, LANE STRIPES, PAVEMENT LEGENDS, AND RAISED PAVEMENT MARKERS $1.75 $3,900.00 254 100 LF % 0 0 LF % 254 100 LF % $444.50 $3,900.00 $0.00 $0.00 $444.50 $3,900.00 $444.50 $3,900.00 15 1 LS PROJECT MANAGEMENT M.000.00 $20,000-00 15A 1 LS Over Ex Unsuitable Material & Place CMB; Remove Four Driveway Approaches; Relocate Fence $7,880.00 100 % 0 % 100 % $7,880.00 $0.00 $7,880.00 158 1 LS Pavement Notificationof Entre Work Overexcavahon and Relocation of H/C Sin $145400 100% 0 % 100 % $1 454.00 _ $13,00 $1 454.00 15C 1 LS Remove Post and Footin $200.00 0 % 100 % 100 % $0.00 $200.00 5200.00 15D 1 LS Additional AC 4 055.40 0 -1, 1 100 % 100 % $0.00$4 055.40 $4 055.4q TOTAL: $193.436. T, 193 436-13 $4 5-40 25 $197 691.53 $366,1 88.55 PENDING 1 1 LS TREE & STUMP REMOVAL $1,361-32 100 % 0 l 100 % $1 361.32 $0.00 $1 361,32 2 1 LS REMOVE BOLLARDS $400.00 100 % 0 % 100 % $400.00 $0.00 ^$400.00 3 3 EA CURB DRAIN $200.00 15 EA 0 EA 15 EA $3.000.0 $0.00 $3,00000 4 1 LS RELOCATE 1"COPPER BK FL $1,100-00 100 % 0 % 100 % $1100, $0.00 $1,100.00 5 65000 SF GRIND A/C 1.5"-0" _ $0-30 fi 362 SF 0 SF 66,362 SF $0.00 $19,908-60 6 . 375 TDNS 1" LEVEL COURSE _ $88.00 492 TONS 0.00 TONS 492.04 TONS __112_908,6Q $43,299.52 $0.00 $48,299-52 7 1200 TONS 2" A/C/ CAP 2% LATEX $78.00 1203 TONS 0.00 TONS 1.2.02.97 TONS $93.831.66 $0.00 $93.83166 TOTAL PENDING ITEMS: $162,901.101 $0.01JI $162,901.10 $0.00 PROJECT TOTAL tINCLUDING PENDING ITFM,1 $4,269.49J $360,692.6 $366. 88.55 (0