HomeMy WebLinkAbout08 - CC-9 - 2013-14 CDBG Project: Harbor Alley No.16 - 2/17/2015CITY COUNCIL AGENDA REPORT MEETING DATE: FEBRUARY 17, 2015 ITEM NUMBER: CC -9 SUBJECT: 2013-2014 COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT: HARBOR BOULEVARD ALLEY (ALLEY NO. 16) AND BERNARD STREET ALLEY (ALLEY NO. 17 EAST) IMPROVEMENT - CITY PROJECT NO. 14-09 DATE: FEBRUARY 5, 2015 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: ERNESTO MUNOZ, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: FARIBA FAZELI, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by Kalban, Inc., and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On September 16, 2014, a construction contract in the amount of $110,329.65 was awarded to Kalban, Inc. 9075 Glenoaks Boulevard, Sun Valley, CA 91352. This project consisted of rehabilitation of the following alleys (Attachment No. 1): 1. Harbor Boulevard Alley (Alley No. 16), located west of Harbor Boulevard, north of Bernard Street, and east of Charlie Street. 2. Bernard Street Alley (Alley No. 17 East), located west of Harbor Boulevard and just south of Bernard Street. The rehabilitation of these two alleys consisted of the removal of the existing asphalt concrete alley sections, the construction of new Portland Cement Concrete (PCC) pavement sections, and other incidental work needed to complete the project in accordance with the contract documents. Before Improvements Improvements Completed 1 ANALYSIS: The work required by the contract documents was completed on December 1, 2014, to the satisfaction of the City Engineer. The final contract cost amounted to $109,712.13. A report of the final costs is included herein as Attachment No. 2. A summary of the costs is as follows: Original Contract Cost: Final Quantity Adjustments: Final Contract Cost: $110,329.65 ($ 617.52) $109,712.13 The final contract price reflects a less than one-half percent (1/2%) decrease to the original contract as a result of the final quantity adjustments. As of this date, there are no Stop Notices filed against the monies due to Kalban, Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: This project was funded from appropriated CDBG funds in the Fiscal Year 2013-2014 budget. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: The 2013-2014 CDBG Project: Harbor Boulevard Alley (Alley No. 16) and Bernard Street Alley (Alley No.17 East) Improvement Project, City Project No. 14-09, has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. ERNESTO MUNOZ FARIBA FAZELI Public Services Director City Engineer ATTACHMENTS: 1- Project Map 2- Cost Summary DISTRIBUTION: Chief Executive Officer Assistant Chief Executive Officer City Attorney City Clerk Staff File 1► CITY OF COSTA MESA PUBLIC SERVICES/ENGINEERING ST. SEAL ST. PROJECT AREA ROSS ST. ATTACHMENT 1 Lu J cf) I SURF ST. w J Q J Q Q J ALLEY #-18 12 J Q = / Q m O i � w Li w J � BEACH ST. Q Of I EY # 124 19TH ST. w w FQ ATTACHMENT 1 19TH ST. B m PLUMER ST. 2013-2014 CDBG PROJECT: IMPROVEMENTS OF ALLEY NO. 16 AND ALLEY NO. 17 (PROJECT #14-09) LOCATION MAP ALLEY#16 (CHARLE ST TO BERNARD ST) ALLEY#17 (BERNARD ST TO SOUTHERLY END) 1103 WORK AREA PAGE 1 OF 1 Lu J cf) I < w J Of J Q Q J ALLEY #-18 Q = m O i m Of w w FQ Q BERNARD 5T. 19TH ST. B m PLUMER ST. 2013-2014 CDBG PROJECT: IMPROVEMENTS OF ALLEY NO. 16 AND ALLEY NO. 17 (PROJECT #14-09) LOCATION MAP ALLEY#16 (CHARLE ST TO BERNARD ST) ALLEY#17 (BERNARD ST TO SOUTHERLY END) 1103 WORK AREA PAGE 1 OF 1 w < w J w Q J w J Q Q J ALLEY #-18 19TH ST. B m PLUMER ST. 2013-2014 CDBG PROJECT: IMPROVEMENTS OF ALLEY NO. 16 AND ALLEY NO. 17 (PROJECT #14-09) LOCATION MAP ALLEY#16 (CHARLE ST TO BERNARD ST) ALLEY#17 (BERNARD ST TO SOUTHERLY END) 1103 WORK AREA PAGE 1 OF 1 FOR PAYMENT ON THE WARRANT LIST OF: Final Payment to: KALBAN, INC. 9075 GLENOACKS BLVD. SUN VALLEY, CA 91352 11/26/14 CITY OF COSTA MESA PROJECT: 2013-2014 CDBG ALLEY IMPROVMENTS PROJECT OF ALLEY NO. 16 (FROM CHARLE ST TO BERNARD ST) & 17 (FROM BERNARD ST TO S'LY END) City Project No. 14-09 DATE: 12/01114 PAGE: 1 OF 1 ITEM SID UNIT ~PREVIOUS QUANTITY TOTAL QUANIITr PREVIOUS AMOUNT TOTAL CON I RA CI NO QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE 1 1 LS MOBILIZATION $1.500.00 0 % 100 % 100 % $0.00 $1,500.00 $1,500.00 $1,500.00 2 1 LS ICLEARING & GRUBBING $2.000.00 0 % 100 % 100 % $0.00 $2.000.00 $2.000.00 52.000.00 SAWCUT & REMOVE EXISTING ALLEY & ROADWAY 3 8795 SF SECTION & CONSTRUCT 6" PCC OVER COMPACTED $8.27 0 SF 10,862.5 SF 10,863 SF $0.00 $89,832.88 $89,832.88 $72,734.65 NATIVE WITH 6"X6" W1A/W1.4 WWM (PER TYPICAL SECTION) _ 4 1480 SF SAWCUT & REMOVE EXISTING AND CONSTRUCT 6" WIDE $7.25 0 SF 493 SF 493 SF $0.00 $3,574.25 $3,574.25 $10,730.00 A.C. SLOW PAVING (6" DEEP OVER NATIVE) SAWCUT & REMOVEMB EXISTING & CONSTRUCT 6" PCC 5 2 EA ALLEY INTERSECTION PER SPPWC STD PLAN NO. 130-2 $2,750.00 0 EA 2 EA 2 EA $0.00 $5,500.00 $5,500.00 $5,500.00 OVER 8" C SAWCUT AND REMOVE EXISTING AND CONSTRUCT 4" 6 440 SF PCC SIDEWALK PER CITY STD PLAN 411 OVER 4" MIN $10.00 0 SF 60 SF 60 SF $0.00 $600.00 $600.00 $4,400.00 CMB SAWCUT, REMOVE, & REPLACE FULL DEPTH OF 7 340 SF EXISTING A.C. PAVEMENT (3' WIDE) OVER EXISTING $7.25 0 SF 0 SF 0 SF $0.00 $0.00 $0.00 $2,465.00 AGGREGATE SASE 8 1 LS ITRAFFIC CONTROL $1,000.00L 0 % 100 % 100 % $0-00 $1,000.00 $1.000.00 $1.000.00 9 1 FA I ADDITIONAL WORK ITEMS $10.000.001 0 FA 0 FA 0 FA $0.00 $0.00 $0.00 $10,000.00 9A 1 LS C&G ON ALLEY 16 FOR DW ON CHARLE & DW ON $2 205.00 0.00 % 100 % 100.00 $0.00 $2,205.00 $2,205.00 BERNARD BACKFILL & CLEAN-UP ALLEY NO. 17 9B 1 LS EXCAVATION & CONCRETE POUR ON ALLEY NO. 16 - $3,500.00 0.00 % 100.00 % 100.00 % $0.00 $3,500.00 $3,500.00- EAST OF CHARLE ST. PROJECT TOTAL PLUS Co.). $0.001 $109,712-13 $109.712.13 $110.329.65 QD