Loading...
HomeMy WebLinkAbout04 - CC-4 - Attachment 2 - 3/3/2015CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF 2/6/15 DATE: 02/03/15 FINAL Payment to: R. J. NOBLE PAGE: 1 OF 3 15505 E. LINCOLN AVE., ORANGE, CA 92865 PROJECT: ARTERIAL STREETS REHABILITATION PROJECT City Project No. 13-08 ITEMBID NO QUANTITY DESCRIPTION UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 1 I LS MOBILIZATION F4,000.00 100.00 % 0.00 % 100.00 % $34,000.00 $0.00 $34,000.00 $34,000.00 2(F) 69,200 SF COLD MILL 2" DEPTH $0.15 423,237.00 SF 0.00 SF 423,237.00 SF $63,485.55 $0.00 $63,485.55 $10,380.00 3 361,000 SF COLD MILL W DEPTH $0.15 0.00 SF 0.00 SF 0.00 SF $0.00 $0.00 $0.00 $54,150.00 4 280 CY UNCLASSIFIED EXCAVATION (ROADWAY ONLY FOR PARTIAL DIGOUTS UP TO 8") $34,00 0.00 CY 0.00 CY 0.00 CY $0.00 $0.00 $0.00 $9,520.00 5 5,650 TON ASPHALT RUBBER HOT MIX (ARHM) SURFACE COURSE $80.00 5,261.15 TON 0.00 TON 5,261.15 TON $420,892.00 $0.00 $420,892.00 $452,000.00 6 2,200 TON IASPHALT CONCRETE AC LEVELING COURSE $78.00 824.42 TON 1,123.08 TON 1,947.50 TON $64304.76 $87,600.00 $151,904.76 $171,600.00 7 450 TON 6" THICK A.C. BASE COURSE AT VARIOUS LOCATIONS FOR PARTIAL DIGOUTS AS DIRECTED BY ENGINEER $67.00 0.00 TON 0.00 TON 0.00 TON $0.00 $0.00 $0.00 $30,150.00 8 21 EA ADJUST MANHOLE FRAME AND COVER TO GRADE $550.00 31.00 EA 0.00 EA 31.00 EA $17,050.00 $0.00 $17,050.00 $11,550.00 9 37 EA ADJUST WATER VALVE CAN AND COVER TO GRADE $525.00 31.00 EA 0.00 EA 31.00 EA $16,275.00 $0.00 $16,275.00 $19,425.00 10 1 FA PROJECT MANAGEMENT $75,000.00 0.00 FA 0.00 FA 0.00 FA $0.00 $0.00 $0.00 $75,000.00 11 1 1 LS ITRAFFIC CONTROL $18,000.00 100.00 % 0.00 % 100.00 % $18,000.00 $0.00 $18,000.00 $18,000.00 12 30 EA BLUE "FIRE HYDRANT' RAISED PAVEMENT MARKERS $11.00 0.00 EA 0.00 EA 0.00 EA $0.00 $0.00 $0.00 $330.00 13 1 LS LANE MARKINGS, LANE STRIPES, PAVEMENT LEGENDS, AND RAISED PAVEMENT MARKERS $35,000.00 100.00 % 0.00 % 100.00 % $35,000.00 $0.00 $35,000.00 $ 35,000.00 14 61 EA INSTALL TRAFFIC LOOP DETECTORS 200.00 159.00 EA 0.00 EA 159.00 EA 31 800.001 $0.001 131,800.00 12 200.00 TOTAL: $700,807.311 $87,600.001 $788,407.31 $933,305.00 CHANGE ORDERS CO 1 1 1 LS Additional Work as follow: to 1 LS R&R in Pavement Lighting Fixtures $14,000.00 100 % 0 % 100 % $14,000.00 $0.00 $14,000.00 1B 1 LS Supervision/Traffic Control $1,995.00 100 % 0 % 0 % $1,995.00 $0.00 $1,995.00 IC 70,831.5 SF 4" Cold Mill $0.33 70,831.52 SF 0 SF 70,831.52 SF $23,374.40 $0.00 $23,374.40 1D 903.4 TON Ra lace 2 AC with Fiber $98.00 903 TON 0.0 TON 903 TON $88,533.20 $0.00 $88,533.20 1 E 9,975.0 SF Santa Ana - 2 Cold Mill 7' Wide $0.28 9,975 SF 0 SF 9,975 SF $2,793.00 $0.00 $2,793.00 1B 139 TON Santa Ana -2"ACPaving $80.00 139.21 TON0 TON 0 TON $11136.80 $0.00 $11,136.80 1 C 17 000.0 SF Santa Ana - Install Petromat $0.15 17,00 SF 0 SF 17 000 SF $2,550.00 $0.00 $2,650.00 CHANGE ORDER NO. 1: $144,382.40 $0.00 $144,382.40 TOTAL: $845,189.71 $87,600.001 $932,789.71 $933,305.00