Loading...
HomeMy WebLinkAbout06 - CC-6 - Attachment 1 - 4/7/2015ATTACHMENT 1 Annual Review of Costa Mesa General Plan (12' Edition) Page 1 Table of Contents Background........................................................................ Page 2 Analysis............................................................................. Page 2 Conclusion......................................................................... Page 4 Table 1 —Annual Review ...................................................... Page 5 Tables A1, and A2 — Annual Building Activity Report .................. Page 25 Table B — Regional Housing Needs Allocation Progress ............ Page 26 Table C — Housing Program Status ........................................ Page 28 Table D — Approved & Completed Residential Units ................... Page 33 Appendix A — General Plan Goals, Objectives, Policies ............... Page 36 Appendix B — Housing Successor Annual Report ..................... Page 37 Annual Review of Costa Mesa General Plan (12th Edition) Page 2 BACKGROUND On June 29, 1953, the City of Costa Mesa was incorporated as a general law city led by a City Council - Manager form of government. The City of Costa Mesa originally consisted of an area of 3.5 square miles and general population of 16,840. The City's current estimated population is 111,846 persons, and it consists of an overall land area of 16.8 square miles. The City adopted its first General Plan in 1957 and its second General Plan in 1970. The General Plan was comprehensively amended in 1981 and again in 1992. Since the 1990 General Plan represented several years of public input and community meetings, the City Council decided to update its technical data and format for the creation of the 2000 General Plan. On January 22, 2002, the City Council adopted the Costa Mesa 2000 General Plan. The 2000 General Plan recognizes the community's diverse evolution of residential neighborhoods, its regional commercial influence, and its recreational amenities. This is an annual report to Planning Commission and City Council as required by state law on the updates of programs and policies of the General Plan. The City is currently undergoing a comprehensive General Plan update that is anticipated to be completed by end of 2015. Following is a summary of the current status of various elements including the latest adopted Housing Element in 2013 of the General Plan: ANALYSIS Government Code Section 65400 State Government Code Section 65400 requires that an annual report be made to the legislative body on the status of the General Plan and progress in its implementation, including activity towards its share of regional housing needs. This is the 12th annual review of the 2000 General Plan. State Law requires the following: Provide by April of each year an annual report to the City Council, the Office of Planning and Research, and the Department of Housing and Community Development that includes all of the following: (A) The status of the plan and progress in its implementation. (B) The progress in meeting its share of regional housing needs determined pursuant to Section 65584 and local efforts to remove governmental constraints to the maintenance, improvement, and development of housing. The housing element portion of the annual report shall include a section that describes the actions taken by the City of Costa Mesa towards completion of the programs and status of the local government's compliance with the deadlines in its housing element. Annual Review of Costa Mesa General Plan (12' Edition) Page 3 Annual Review and Housing Program Summary Report Pursuant to State law, the 2014 Annual Review of the Costa Mesa General Plan reports to the City Council the progress in implementing the General Plan. The 2014 Annual Review includes the following elements: 1. Table 1 (Annual Review Summary) describes the status of the 2000 General Plan goals, objectives, and policies and progress towards implementing the City's blueprint for land use development in 2014. 2. Tables A, 8, and C (Housing Program Status Report) summarizes the City's progress in meeting its share of regional housing needs, pursuant to State Government Code Section 65584 and local efforts to remove governmental constraints to the maintenance, improvement, and development of housing. 3. The conclusion describes the effectiveness of the 2000 General Plan. 2000 General Plan — Goals, Objectives, and Policies The 2000 General Plan goals, objectives, and policies are described in a comprehensive document (attached as Appendix A). • A goal is defined as a broad vision of what the community wants to achieve or provide to residents, landowners, business owners and tourists. It is a statement of a desired condition based on community values. Goals are general in nature and usually timeless. • A policy is a specific statement that guides decision-making. It indicates a commitment of the City to a particular course of action. A policy is based on and helps implement a goal. General Plan Update The State Office of Planning and Research recommends that Cities update their General Plan every 10 years. The City is currently in process of preparing for a General Plan Update in 2015. The General Plan update is an extensive process that involves various public meetings with City commissions and Council and extensive community outreach. The public outreach has been completed and staff is currently preparing a draft land use map and updated Circulation Element. The update will be subject to several public hearings before the Planning Commission and the City Council. Due to the cost and extensive work involved with the update, the task was originally focused on four major elements of the General Plan, planned for a two-year process and budgeted in three fiscal years. In June of 2014, the City Council amended the contract with the consultant to include economic analysis and a comprehensive update to all elements. As part of this update, the City is also complying with the requirements of Assembly Bill 1358 (enacted in 2008), The California Complete Streets Act that requires integrating multimodal transportation network policies into the circulation elements of the general plans. In addition, the Housing Element was updated in January 2014 and compliance was received from the State Department of Housing and Community Development for an eight-year Regional Housing Needs Assessment (RHNA) cycle that ends in 2021. Annual Review of Costa Mesa General Plan (12' Edition) Page 4 CONCLUSION The Costa Mesa 2000 General Plan continues to serve as an effective guide for orderly growth and development, preservation and conservation of open space land and natural resources, and efficient expenditure of public funds. As illustrated in Tables 1, A, B, and C, completed projects are in conformance with the General Plan's goals, objectives, and policies for each respective element. Furthermore, significant progress on various public works projects or private developments are also in accordance with the 2000 General Plan. The City's legislative bodies have used the 2000 General Plan as the primary source of long-range planning and policy direction. Future work activity that is consistent with these efforts will continue to guide growth and preserve the quality of life within the community. Annual Review of Costa Mesa General Plan (12" Edition) OostaMesa� Table 1 —Annual Review Page 5 General Plan Goal, Objective or Policy Description of City Action LAND USE ELEMENT GOAL LU -1: It is the goal of the City of Costa Mesa to provide its citizens with a balanced community of residential, commercial, industrial, recreational, and institutional uses to satisfy the needs of the social and economic segments of the population and to retain the residential character of the City; to meet the competing demands for alternative developments within each land use classification within reasonable land use intensity limits; and to ensure the long term viability and productivity of the community's natural and man-made environments. Objective LU -1 A: Establish and maintain a balance of land uses throughout the community to preserve the residential character of the City at a level no greater than can be supported by the infrastructure. • Construction of a horizontal mixed use project consisting of 215 -unit senior apartments (1500 Mesa Verde Drive East) was completed in 2014. • A 60 -unit live/work project (132 Industrial Way and 1527 Newport Boulevard) LU -1A.1: Provide for the development of a mix and balance of is currently under construction. m • A 33- unit live/work project (1036 & 1042 W. 18 Street) was completed in housing opportunities, commercial goods and services, and 2014. employment opportunities in consideration of the needs of the business and residential segments of the community. • A 49 -unit live/work project (1677 & 1695 Superior Avenue) is currently under construction. . A 36 -unit project (30 live -work and 6 residential) located at 2023, 2025, and 2027 Placentia Avenue is currently under construction. • A 15 -unit live/work project (2026 Placentia Avenue) is under construction. LU -1A.2: Consider the effects of new employment, particularly in City of Costa Mesa considers and addresses job/housing balance. To expand relation to housing impacts, when new commercial or industrial housing opportunities in areas near schools, jobs, child care, and development is proposed. transportation, the City adopted three Urban Plans in 2006 to encourage mixed-use developments in three distinct areas. Housing needs are addressed in the 2013-2021 Housing Element, which was adopted on January 21, 2014. LU -1A.3: Locate high-intensity developments or high -traffic Traffic impacts are evaluated with each development project with generating uses away from low-density residential in order to buffer consideration to the City's circulation and any potential impacts to residential the more sensitive land uses from the potentially adverse impacts of neighborhoods. the more intense development or uses. LU -1A.4 Strongly encourage the development of low-density Homeownership is encouraged with development of all residential projects, residential uses and owner -occupied housing where feasible to especially small lot subdivisions and in particular in the West Side overlay improve the balance between rental and ownership housing districts. opportunities. LU -1A.5: Provide housing and employment opportunities within The Urban Plan Overlays and the Planned Development Commercial zoning planned development areas to the extent feasible. allow mixed use development. Annual Review of Costa Mesa General Plan (12" Edition) Page 6 General Plan Goal, Objective or Policy Description of City Action LU -1A.6: Aggressively pursue methods to discourage the Ongoing. Most projects in Urban Plan areas are proposed with lot development of multiple units on long, narrow, single parcels. consolidation. Lot consolidation is challenging for developers, but encouraged Possible methods could include a lot combination zoning incentive or for all new developments. the creation of newer lower density zoning to be applied to lots with less than a certain minimum frontage. Objective LU -1 B: Ensure the long-term productivity and viability of the community's economic base. LU -1 B.1: Permit adequate quantities and locations of commercial There were no changes to the General Plan Land designations with respect to land to serve residential neighborhoods commercial development in 2014. Objective LU -11C Promote land use patterns and development which contribute to community and neighborhood identity. LU -1 C.1: Permit the construction of buildings over two stories of 30 Commercial buildings over 30 feet are subject to Planning Commission feet only when it can be shown that the construction of such approval of a variance and considered on a case-by-case basis. There has structures will not adversely impact surrounding developments and been no variance and general plan amendment approval to increase the deprive existing land uses of adequate light, air, privacy, and solar height. Structures in urban overlay plans are typically over 30 feet and are access. evaluated with respect to privacy and shade and shadow impacts. LU -1C.2: Limit building height to four stories above grade south of the A site-specific General Plan Amendment and Zoning Code Amendment was 1-405 Freeway, except for special purpose housing, such as elderly, approved in 2014 to allow a five -story, 240 -unit apartment community (63 -foot affordable, or student housing. An exception is for the Newport Plaza maximum height) and a six -story parking structure (57 -foot maximum height) property at 1901 Newport Boulevard where a five -level parking located at 125 East Baker Street. structure is allowed. LU -1C.3: Prohibit construction of buildings which would present a FAA is notified and reviews all mid -rise and high-rise development. One of the hazard to air navigation as determined by the FAA or independent high-rise projects approved in 2007 (580 Anton Blvd.) was reduced in height to studies by qualified private consultants that have been certified by the a mid -rise development reducing the risk of hazard to air navigation. FAA LU -1C.4: Require building setbacks, structure orientation, and the Ongoing and applicable to all second floor additions and remodels and new placement of windows to consider the privacy of adjacent residential three-story developments structures within the same project and on adjacent properties. LU -1C.5: Develop incentives for lot combination, or disincentives for Ongoing. Developers are consistently encouraged to consolidate parcels for development without lot combination. Consider policies such as better site planning. Incentives include expedited review of planning zoning designations which fall between zones, or development applications. standards which tie density to lot width as well as area. LU -1C.6: Provide assistance to neighborhoods with excessive noise Ongoing. Any new development is subject to compliance with the noise impacts, such as walls for sound attenuation, development of standards and installation of sound walls to protect residential neighborhoods. landscaped greenbelts, etc. Objective LU -1 D: Ensure consideration of utility system capacities in land use planning and development processes. LU -1 D.1: Include an evaluation of impacts on utility systems and Will serve letters from utility companies are required for all projects that could infrastructure in EIRs for all major general plan amendment, rezone, potentially impact the service. and development alications. LU -1 D.2: Phase or restrict future development in the City to that Will serve letters from utility companies are required for all projects that could Annual Review of Costa Mesa General Plan (12" Edition) Page 7 General Plan Goal, Objective or Policy Description of City Action which can be accommodated by infrastructure at the time of potentially impact the service. completion of each phase of a multi -phased project. Objective LU -1 E: Ensure correlation between buildout of the General Plan Land Use Plan Map and the Master Plan of Highways. U-1 E.1: Building densities/intensities for proposed new development a) No General Plan Amendment exceeding the allowable Floor Area Ratio projects shall not exceed the trip budget for applicable land use (FAR) was approved in 2014. classifications, as identified in the Land Use Element. Building intensities for proposed new development projects shall not exceed b) Any intensification of use or additions of floor area for non -conforming the applicable floor area standards, except for the following structures is subject to the zoning development standards and traffic conditions: generation rates. a) Limited deviations from the graduated floor area ratio standards depicted in Tables LU -4 and LU -8 for the commercial and c) There has been no change to the policy. industrial land use designations may be approved through a discretionary review process. No deviation shall exceed 0.05 increase in the FAR in the moderate traffic category, and no deviation shall be allowed in the very -low, low, and high traffic categories. Deviations from the FAR standards shall not cause the daily trip generation for the property to be exceeded when compared to the existing daily trip generation to the site without the proposed project or maximum allowable traffic generation for the Moderate Traffic FAR category, whichever is greater. b) Additions to existing non -conforming non-residential developments may be allowed if the additions do not affect the overall traffic generation characteristics of the development, and, if the additions do not substantially affect the existing height and bulk of the development. Additions to non-residential developments shall be limited to those land uses with traffic generation rates based on variable other than building area square footage. Examples of such additions include, but are not limited to: 1) Hotels/Motels: increases in the size of hotel rooms or lobbies where no increase in the number of rooms is proposed; 2) Theaters: increases to "back -stage" support areas or lobbies where no increase in the total number of seats is proposed. c) In the above conditions, the new development shall be compatible with surrounding land uses. Additional criteria for approving deviations from the FAR standards may be established by policy of the City Council. LU -1 E.2: Development plans shall be required for all phased Ongoing development and approvals and shall be approved by the Planning and Transportation Services Divisions prior to the issuance of Annual Review of Costa Mesa General Plan (12" Edition) Page 8 General Plan Goal, Objective or Policy Description of City Action building permits. LU -1 E.3: Development Plans shall include an overall buildout plan Each project application is reviewed for any potential impacts on the which can demonstrate the ability of the circulation system to support circulation system. Projects with impacts are subject to either traffic the proposed level of development. improvement requirements and or traffic mitigation fees. LU -1 EA: The City shall continue its annual preparation of the The Development Phasing and Performance Monitoring Program (DPPMP) Development Phasing and Performance Monitoring Program. The Report will be prepared in March 2015. annual review will specifically address major intersection operations in any mixed-use overlay area. Objective LU -1 F. Establish policies, standards, and procedures to minimize blighting influences and maintain the integrity of stable neighborhoods. LU -1 F.1: Protect existing stabilized residential neighborhoods, The Anchor Mobile Home Park (1527 Newport Blvd.) was closed in 2013 and including mobile home parks (and manufactured housing parks) from the property is being developed with live/work units consistent with the visions the encroachment of incompatible or potentially disruptive land uses of the West Side Urban Plans. There have been no other development and/or activities. affecting stabilized residential neighborhoods or mobile home parks. The City has taken additional action to protect existing stabilized residential neighborhoods, including: (i) Adoption of a Group Home Ordinance on October 21, 2014 to limit the number and concentration of group homes and sober living facilities; (ii) Extension of a moratorium to prohibit the establishment of new hookah lounges; and (iii) Abatement of a hookah lounge and revocation of a Conditional Use Permit issued to a recycling center due to associated nuisance activities. LU -1 F.2: Actively enforce existing regulations regarding derelict or Ongoing through the implementation and enforcement of Title 20 — Property abandoned vehicles, outdoor storage, and substandard or illegal Maintenance, of the Municipal Code. Title 20 establishes standards to ensure buildings and establish regulations to abate weed -filled yards when proper maintenance, removal of hazardous and improper storage, and any of the above are deemed to constitute a health, safety, or fire removal of weeds and other public nuisances. hazard. LU -1 F.3: Continue code enforcement as a high priority and provide Ongoing adequate funding and staffing to support code enforcement programs. LU -1 F.4: Ensure that residential densities can be supported with the Ongoing and reviewed for all projects. All new development is subject to infrastructure and that high-density residential areas are not submittal of a will serve letter from the utility companies. permitted in areas which cause incompatibility with existing single- family areas. LU -1 F.5: Provide opportunities for the development of well-planned Ongoing. Development of mixed use projects are encouraged by planned and designed projects which, through vertical or horizontal development commercial and overlay zones. integration, provide for the development of compatible residential, commercial, industrial, institutional, or public uses within a single project or nei hborhood. GOAL LU -2: It is the goal of the City of Costa Mesa to establish development policies that will create and maintain an aesthetically pleasing and Annual Review of Costa Mesa General Plan (12" Edition) Page 9 General Plan Goal, Objective or Policy Description of City Action functional environment and minimize impacts on existing physical and social resources. Objective LU -2A. Encourage new development and redevelopment to improve and maintain the quality of the environment. LU -2A.1: Use eminent domain in development project areas when The Redevelopment Agency and its funding has been abolished in 2012. necessary to effect lot combination and to ensure optimum size and configuration of parcels experiencing development pressures. LU -2A.2: Continue to implement, review, and update the The Redevelopment Agency and its funding has been abolished in 2012. redevelopment plan for the adopted project area. LU -2A.3: Prepare a specific plan to ensure that the portion of the The Redevelopment Agency and its funding has been abolished in 2012. Route 55 extension from 19th Street through the Redevelopment Area is compatible with the Redevelopment Area and to review development related issues on the remainder of the alignment. LU -2A.4: In the event of damage or destruction, allow any legal Ongoing. Chapter X of the Zoning Code establishes requirements for conforming use in existence at the time of adoption of the General nonconforming uses, developments and lots. Plan that is located in a nonconforming development to be rebuilt to its original building intensity, as long as any such rebuilding would not increase the development's nonconformity, and the damage or destruction was in no way brought about by intentional acts of any owner of such use or property. LU -2A.5: Develop standards, policies, and other methods to Ongoing, the City adopted the Small Lot Subdivision Ordinance in 2014 to encourage the grouping of individual parcels to eliminate obsolete allow subdivisions of detached residential structures within the density and subdivision patterns and to provide improved living environments zoning requirements of multi -family residential districts. while retaining the single-family zoning or single-family character of such areas in the City. LU -2A.6: Do not allow "rounding up" when calculating the number of Consistently applied in review of development proposals. Densities in excess permitted residential units except for lots existing as of March 15, of General Plan are subject to approval of a General Plan Amendment. 1992, zoned R2 -MD that have less than 7,260 square feet in area, and no less than 6,000 square feet, where density calculation fractions of 1.65 or greater may be rounded up to two units. LU -2A.7: Allow creation of parcels without street frontage if sufficient All common roadway and access in common interest developments are easements are provided for planned developments or common subject to recordation of an easement. interest developments. LU -2A.8: Encourage increased private market investment in declining Ongoing. The City Council adopted Small Lot Ordinance in March 2014 to or deteriorating neighborhoods. encourage fee simple lot subdivisions and reinvestment in older multiple family zoned properties. Several projects approved on Westside has replaced marginal industrial and commercial properties with new housing and live/work developments. LU -2A.9: Pursue maximum use of utility company funds and Ongoing resources in undergrounding existing overhead lines. Annual Review of Costa Mesa General Plan (12" Edition) Page 10 General Plan Goal, Objective or Policy Description of City Action LU -2A.10: Ensure that appropriate watershed protection activities are Ongoing. All development plans are required to submit the appropriate state applied to all new development and significant redevelopment required permits and water quality management plans per local ordinance. projects that are subject to the NPDES Stormwater Permit, during the planning, project review, and permitting processes. LU -2A.11: Avoid conversion of areas particularly susceptible to Ongoing. Erosion control plans are consistently required and reviewed prior to erosion and sediment loss (e.g. steep slopes) and/or establish grading permits. development guidelines that identifies these areas and protects them from erosion or sediment loss. LU -2A.12: Preserve or restore areas that provide water quality Ongoing benefits and/or are necessary to maintain riparian and aquatic biota. LU -2A.13: Promote site development that limits impact on and Ongoing protects the natural integrity of topography, drainage systems, and water bodies. LU -2A.14: Promote integration of stormwater quality protection into Ongoing construction and post -construction activities, as required by the NPDES Stormwater Permit and the City's Local Implementation Plan. GOAL LU -3: It is the goal of the City of Costa Mesa to respond to the needs of its citizens for housing, public services, community facilities, and safety of persons and property, to the extent possible within budgetary constraints, and when deemed appropriate for local government involvement. Objective LU -3A: Ensure availability of adequate community facilities and provision of the highest level of public services possible, taking into consideration budgetary constraints and effects on the surrounding area LU -3A.1: Pursue annexation of certain areas within the City's Sphere On December 15, 2014, a County island was officially annexed into the City's of Influence to control development or uses which may be detrimental jurisdiction. The annexation area contains 54 residential parcels on Colleen to the City. Place, Vista Ba a, Santa Ana Avenue and 22nd Street in Eastside Costa Mesa. LU -3A.2: Strongly encourage protection and preservation of existing, Ongoing but underutilized, school sites for future recreational, social, or educational uses. LU -3A.3: Establish a development impact fee program to fund No new fire impact fees have been established in 2014. additional fire and police personnel, facilities, and equipment to meet the demands of additional growth in the City. LU -3A.4: Require appropriate site and environmental analysis for Currently there are six fire stations operating in the City. The City continues to future fire and police station site locations or for the relocation or monitor fire service needs as the population grows with new residential closure of existing fire and police facilities. development projects. CIRCULATION ELEMENT GOAL CIR-1: TRANSPORTATION- It is the goal of the City of Costa Mesa to provide for a balanced, uncongested, safe and energy-efficient transportation system, incorporating all feasible modes of transportation. Objective CIR-1A: To provide specific programs and policies that address multi -modal transportation, multi -agency coordination, mitigation of traffic impacts and the balancing of land uses with transportation systems. Annual Review of Costa Mesa General Plan (12" Edition) Page 11 General Plan Goal, Objective or Policy Description of City Action CIR-1A.1: Develop the Master Plan of Bikeways by pursuing all funding mechanisms and incorporating bikeways into roadway and Received Active Transportation Program (ATP) federal grant funding of $1.7 bridge widening projects. Incorporate bicycle facilities (circulation and million for designing and constructing a bicycle trail from West 19th Street to storage) into the design and development of all new commercial and the Santa Ana River Trail system. industrial projects and public facilities. CIR-1A.2: Require dedication of right-of-way in an equitable manner for completion of adopted bikeway system as condition of Ongoing development of adjacent properties. Initiated SCAG Active Transportation Study to review three corridors for bicycle facility improvement. CIR-1A.3: Coordinate the design and improvement of pedestrian and Initiated update of Bicycle Master Plan as part of the General Plan Update. bicycle ways in major residential, shopping, and employment centers, Completed design phase for implementing electronic speed feedback signs at parks, schools, and other public facilities, public transportation 21 locations throughout the City. Scheduled for construction in May 2015. facilities, and bicycle networks with adjacent cities. Also, bicycle education at 16 elementary schools is scheduled between January and June of 2015. Both these projects are funded through the Bicycle Corridor Improvement Program grant. CIR-1A.4: Include bicycle lanes on all new bridges along Master Plan of Bikeway designated arterials within or adjacent to the City. In cases where bridges are not located within the City, the City should Ongoing exert its influence on responsible agencies to include such bicycle lanes. If provision of bicycle lanes is not feasible, measures should be taken to prohibit bicycle riding on bridge walkways. Improvements at Harbor Boulevard/Adams Avenue intersection — SARX mitigation currently under construction which is projected to be completed by CIR-1A.5: Investigate all available operational measures, including January 2015. the use of one-way streets, to improve traffic circulation and minimize Harbor Boulevard Widening from Law Court to Sunflower Avenue — Initiated delay and congestion on arterials. construction which is projected to be completed by May 2015. Completed design of harbor Boulevard/Gisler Avenue intersection improvements and requested grant funding for the implementing these improvements. CIR-1A.6: Require dedication of right-of-way, in equitable manner, for Ongoing development that increases the intensity of land use. CIR-1A.7: Implement citywide and/or areawide transportation system Approved for Measure M eligibility, the City's Maintenance Effort for Fiscal improvement programs on new development and fee programs for Year 2014-2015 and the City's Seven -Year Capital Improvement Program for new development. Fiscal Year 2014-2015 to 2020-2021. CIR-1A.8: Encourage the integration of compatible land uses and Ongoing housing into major development projects to reduce vehicle use. CIR-1A.9: Encourage permitted General Plan land uses which Ongoing Annual Review of Costa Mesa General Plan (12" Edition) Page 12 General Plan Goal, Objective or Policy Description of City Action generate high traffic volumes to be located near major transportation corridors and public transit facilities to minimize vehicle use, congestion, and delay. CIR-1A.10: Allow the application of transportation management rideshare programs, integration of complementary land uses, and other methods to reduce project related average daily and peak hour Ongoing vehicle trips in order to achieve consistency with allocated trip budgets. CIR-1A.11: Attempt to maintain or improve mobility within the City to achieve a standard level of service not worse than Level of Service Annual review of level of service at all major intersections through "D" at all intersections under the sole control of the City. Intersection Development Phasing and Performance Monitoring Program (DPPMP) level of service analyses for General Plan conditions shall be updated presented to Planning Commission and City Council. periodically and presented to City Council. CIR-1A.12: Cooperate with adjacent jurisdictions to maintain or improve mobility within the City to achieve a standard level of service no worse than "D" at all intersections under State or joint control. Included in the annual DPPMP review. Intersection level of service analyses for General Plan conditions for locations under State or joint control shall be updated periodically and presented to City Council. CIR-1A.13: While the Gisler Road segment, west of Harbor, will exceed its theoretical maximum capacity, the City shall work to Ongoing ensure that the future volume to capacity ratios do not exceed those identified in Table CIR-3 of the General Plan. Design phase of this "Safe Routes to School' project to improve East 19th CIR-1A.14: Reduce or eliminate intrusion of commuter through traffic Street for access to Mariners Elementary School is close to completion. on local streets in residential neighborhoods. Project includes installation of traffic calming devices along East 19th Street. The construction phase is scheduled for August 2015. CIR-1A.15: Prioritize intersection improvements which improve Construction has begun on the replacement of an existing crosswalk with a through traffic flow on major, primary, and secondary arterials, and new flashing crosswalk on Placentia Avenue adjacent to 20th Street. Project reduce impacts on local neighborhood streets with emphasis on also included decorative crosswalk and overhead warning indications. pedestrian safety. CIR-1A.16: Maintain balance between land use and circulation systems by phasing new development to levels that can be Ongoing accommodated by roadways existing or planned to exist at the time of completion of each phase of the project. CIR-1A.17: Work closely with the State of California and other government agencies to control traffic -related impacts of uses on Ongoing State- or other agency -owned land (i.e. Orange County Fairgrounds, Orange Coast College, etc.). Annual Review of Costa Mesa General Plan (12" Edition) Page 13 General Plan Goal, Objective or Policy Description of City Action CIR-1A.18: Council shall review the results and findings of the (SARX) study to delete the Gisler Avenue and 19th Street bridges over the Santa Ana River as needed. Upon completion of the study and approval of the changes to the Orange County Transportation Authority's (OCTA) Master Plan of Arterial Highways by the OCTA Removal of 19th Street Bridge over Santa Ana River will be considered as part board, the City shall process a General Plan Amendment to delete of General Plan Update. the bridges from the City's Master Plan of Highways. All future development applications submitted to the City shall be reviewed in such a way that the 19th Street and Gisler Avenue bridges will not be included as mitigation measures. CIR-1A.19: Minimize circulation improvements that will necessitate Ongoing the taking of private property on existing developed properties. CIR-1A.20: Encourage Orange County Transportation Authority to downgrade Mesa Verde Drive, Baker Street west of Harbor This will be required in the new General Plan Update. Boulevard, and Gisler Avenue to a designation less than a Collector Street in the Master Plan of Arterial Highways. CIR-1A.21: Encourage Orange County Transportation Authority to downgrade Arlington Avenue between Fairview Road and Newport Completed Boulevard to a Collector Street. CIR-1A.22: Encourage Orange County Transportation Authority to downgrade Baker Street between Redhill Avenue and Bristol Street, Redhill Avenue has been downgraded. and Redhill Avenue between I-405 and Bristol Street to Primary Arterial from current Major Arterial designation. GOAL CIR-2:TRANSPORTATION SYSTEM MANAGEMENT- It is the goal of the City of Costa Mesa to provide for standard service levels at signalized intersections by constructing capacity improvements for all various modes of circulation, adopting land use intensities commensurate with planned circulation improvements and implementing traffic demand reduction programs, thereby creating a more energy efficient transportation system. Objective CIR-2A: To coordinate efforts with other regional agencies and pursue operational improvements towards enhancing the capacity of the system of freeways and arterial highways in the City. CIR-2A.1: Coordinate with Caltrans for future consideration of the Project Study Report is now completed and approved by OCTA Board. Future extension of Route 55 (the Costa Mesa Freeway) from 19th Street to phase is not currently funded. the southern City boundary. Traffic signal coordination efforts: CIR-2A.2: Coordinate with the Orange County Transportation • Traffic Signal upgrades and Synchronization Project is currently underway Authority and adjacent jurisdictions to improve signal timing and along two corridors (Newport Boulevard, and Adams Avenue) —These coordination along major arterials. projects include upgrade and coordination of traffic signals on the two Corridors. 0 Received OCTA Measure M2 grant for traffic signal synchronization and Annual Review of Costa Mesa General Plan (12" Edition) Page 14 General Plan Goal, Objective or Policy Description of City Action upgrade of signals along Bristol Street (joint project with Santa Ana and Newport Beach), Harbor Boulevard (joint project with Santa Ana) and Sunflower Avenue Corridors. CIR-2A.3: Continue to work with Caltrans to synchronize and coordinate traffic signals on arterials at intersections controlled by Ongoing Caltrans. CIR-2A.4: Continue to evaluate and pursue design and operational Received Highway Safety Improvement Program (HSIP) federal funding for improvements (medians, driveway closures, signal synchronization or design and construction of medians along Harbor Boulevard between Wilson phasing, parking or turn restrictions, etc.) to improve the efficiency of Street and 19th Street. intersections. Design underway for three median projects along Bristol Street, Placentia Avenue and Red Hill Avenue. Objective CIR-213: To promote the use of high occupancy vehicular modes of transportation in and through the City. CIR-2B.1: Coordinate with OCTA to construct bus turnouts at appropriate locations with attractive shelters designed for safe and Ongoing comfortable use. Objective CIR-2C: To invest capital via a rationally phased allocation process for implementing transportation projects and programs. CIR-2C.1: Support efforts to design and construct an urban rail Project suspended. project as it extends through Costa Mesa. Citywide Street Rehabilitations: • Completed the rehabilitation of Bristol Street from Anton to the 405 Fwy ramp. CIR-2C.2: Complete and annually maintain a needs assessment for • Completed Airport Area Rehabilitation. •Harbor Boulevard beautification completed. traffic service levels and traffic safety. Develop and annually update a • Anton Blvd rehabilitation completed. priority list of improvement projects, with priorities based on 1) • Victoria Street rehabilitation completed. correcting identified hazards; 2) improving/maintaining peak hour traffic volumes; 3) improving efficiency of existing infrastructure • Sunflower Avenue rehabilitation completed. utilization; and 4) intergovernmental coordination. Citywide Alley Improvements: • Completed the rehabilitation of Alley no's 5,52, 119, 125, 120 and 121 - Approved for Measure M eligibility, the City's Maintenance Effort for Fiscal Year 2014-2015 and the City's Seven -Year Capital Improvement Program for Fiscal Year 2014-2015 to 2020-2021. Objective CIR-2D: To ensure that the transportation related impacts of development projects are mitigated to the fullest extent possible, in conformance with transportation related policies. CIR-2D.1: Circulation improvements required to provide or attain the minimum traffic level of service standard at an intersection to which a Ongoing development project contributes measurable traffic shall be completed within three years of issuance of the first building permit Annual Review of Costa Mesa General Plan (12" Edition) Page 15 General Plan Goal, Objective or Policy Description of City Action for said project, unless additional right-of-way or coordination with other government agencies is required to complete the improvement. Improvements may be required sooner if, because of extraordinary traffic generation characteristics of the project or extraordinary impacts to the surrounding circulation system, such improvements are necessary to prevent significant adverse impacts. CIR-2D.2: Construction of circulation improvements for phased development projects may be constructed commensurate with the Ongoing project construction based upon the findings of the traffic study approved by the City of Costa Mesa. CIR-2D.3: A traffic impact fee shall be maintained for circulation system improvements to the Master Plan of Highways within the Ongoing community and updated annually. CIR-2D.4: Require discussion of transit service needs and site design Ongoing amenities for transit ridership in EIRs for all major projects. CIR-2D.5: Require discussion of transportation system management (TSM) and transportation demand management (TDM) measures in Ongoing all EIRs prepared for major projects. OPEN SPACE/RECREATION ELEMENT ENVIRONMENTAL QUALITY AND RESOURCE CONSERVATION It is the goal of the City of Costa Mesa to provide its citizens with a high quality environment through the development of recreation resources, and the preservation of open space. Objective OSR-1A. Preserve the City's open space lands and provide additional community and neighborhood parkland in conjunction with future population increases to provide adequate recreational opportunities and relief from the pressures of urban development. OSR-1A.1: Provide a minimum of 5.76 acres of permanent public This requirement is applied to all new development either through providing open space (consisting of 4.26 acres of neighborhood and open space or the park in lieu fees. Even in Urban Plan areas, where only 10 community parks and 1.5 acres in school yards) for every 1,000 percent open space is required for development of live/work units, the residents. developers have been providing more than the minimum requirements in terms of square footage and on-site amenities. OSR-1A.2: Provide maximum visibility and accessibility for future Ongoing public parks by locating such facilities adjacent to existing or planned public streets. OSR-1A.3: Encourage the acquisition of land for neighborhood or Staff continues to seek opportunities to acquire land for active recreational community parks for active recreational use. use. OSR-1A.4: To the extent legally possible, require other local, The City works with all government agencies not only to maintain open space regional, State, or Federal agencies to maintain an adequate lands but to develop joint use agreements whenever feasible. Annual Review of Costa Mesa General Plan (12" Edition) Page 16 General Plan Goal, Objective or Policy Description of City Action inventory of open sace lands within Costa Mesa. OSR-1A.5: Encourage, through development rights transfers or other Developers are encouraged to develop open space and recreation facilities or incentives, the development of private permanent open space, and to pay in -lieu fees to develop these facilities elsewhere in the City. recreation facilities to meet the needs of the City's residents. OSR-1A.6: Encourage, through open space easements, development Ongoing as developments are submitted for approval rights transfers or acquisition, zoning regulations, or other incentives, the long-term maintenance of existing open space lands. OSR-1A.7: Require, through development standards and planned Ongoing as developments are submitted for approval. Approved standards development review criteria, the integration of open space uses include the Streetscape and Median Development Standards. (plazas, courtyards, landscaped areas, etc.) into major commercial and industrial development or redevelopment projects. OSR-1A.8: Continue to require, through development standards, the Ongoing as developments are submitted for approval integration of open space and recreational uses and facilities into all multiple -family residential projects. OSR-1A.9: Review the possibility of incorporating an Arts in Public Ongoing Places program in City parks. OSR-1A.10: Strongly encourage improved maintenance of City and The City actively participates in joint programs with the School District and school district facilities used for recreation and organized sports maintain an active Joint Use Agreement as well as funding mechanism to aid activities. Strongly support recreation programs that benefit the youth with the added maintenance requirements. of the community. OSR-1A.11: Retain all existing open space in Lions Park. A master plan for the south portion of the park is being developed OSR-1A.12: Preserve and enhance existing wetlands areas. Successfully constructed 40 acres of wetlands and riparian habitat. OSR-1A.13: Encourage the preservation of views of coastal Ongoing resources from City and County parkland and public streets within Costa Mesa. OSR-1A.14: Through continued implementation of the Parks, The City successfully acquired 1.3 acres of land adjacent to Brentwood park Recreation and Open Space Master Plan, actively pursue the and incorporated it into a new master plan for the park. acquisition and development of pocket and neighborhood parks within park deficient areas. OSR-1A.15: Update the Parks, Recreation and Open Space Master This is one of the goals for the Parks and Recreation Commission. The update Plan on a regular basis. of the City's General Plan is currently underway and includes updating the Open Space and Recreation element. This update will set the general goals based on the City's current needs and demands. Following the General Plan update is the update of the City's Master Plan of Parks and Recreation. Based on the revised goals from the updated General Plan and supplemented by extensive public outreach, demographic trends, and detailed analysis of all available data, a Needs assessment will be completed and facility and program recommendations will be incorporated into the new Master Plan. The process is estimated to be completed in about one year. City Council is Annual Review of Costa Mesa General Plan (12" Edition) Page 17 General Plan Goal, Objective or Policy Description of City Action scheduled to consider the award of a contract to RJM Design Group on March 17, 2015. OSR-1A.16: Ensure that parks and recreation facilities are developed This goal is being implemented as park and open space projects are with facilities appropriate to all ages, including athletic fields, active developed. Brentwood Park and Smallwood Park have shelf -ready plans and play areas, passive open space, tot lots, and picnic areas. are awaiting funding for the designed elements. GROWTH MANAGEMENT ELEMENT (See Urban Plan documents in Land Use Element section.) (See Urban Plan documents in Land Use Element section.) HOUSING ELEMENT The City adopted 2013-2021 Housing Element on January 24, 2014, which has been certified by State Department of Housing and Community Development. HOU-1.1: Develop standards and/or guidelines for new development Ongoing. This is a standard condition of approval for new multiple family with emphasis on site (including minimum site security lighting) and residential developments. building design to minimize vulnerability to criminal activity. HOU-1.2: Protect existing stabilized residential neighborhoods, The Anchor Mobile Home Park (1527 Newport Blvd.) was closed in 2013 and including but not limited to mobile home parks and manufactured the property is being developed with live/work units consistent with the visions home parks, from the encroachment of incompatible or potentially of the West Side Urban Plans. There have been no other development disruptive land uses and/or activities. affecting stabilized residential neighborhoods or mobile home parks. The City has taken additional action to protect existing stabilized residential neighborhoods, including: (i) Adoption of a Group Home Ordinance on October 21, 2014 to limit the number and concentration of group homes and sober living facilities; (ii) Extension of a moratorium to prohibit the establishment of new hookah lounges; and (iii) Abatement of a hookah lounge and revocation of a Conditional Use Permit issued to a recycling center due to associated nuisance activities. HOU-1.3: Actively enforce existing regulations regarding derelict or Ongoing through the implementation and enforcement of Title 20 — Property abandoned vehicles, outdoor storage, and substandard or illegal Maintenance, of the Municipal Code. Title 20 establishes standards to ensure buildings and establish regulations to abate weed -filled yards when proper maintenance, removal of hazardous and improper storage, and any of the above is deemed to constitute a health, safety or fire removal of weeds and other public nuisances. hazard. HOU-2.1: Encourage concurrent applications (i.e., rezones, tentative Ongoing. Applications for multiple family residential projects requiring multiple tract maps, conditional use permits, variance requests, etc.) if approvals are generally processed concurrently. multiple approvals are required, and if consistent with applicable processing requirements. HOU-2.2: Promote the use of State density bonus provisions to All units under density bonus agreements with the City are monitored on an encourage the development of affordable housing for lower and annual basis. moderate income households, as well as senior housing. Annual Review of Costa Mesa General Plan (12" Edition) Page 18 General Plan Goal, Objective or Policy Description of City Action HOU-2.5: Continue membership in the Orange County Housing Ongoing Authority to provide housing assistance to very low income households. HOU-2.6: Provide clear rules, policies, and procedures, for The Zoning Code includes regulations that address reasonable reasonable accommodation in order to promote equal access to accommodation per State requirements. In March of 2013, the City adopted an housing. Policies and procedures should be ministerial and include Ordinance, in accordance with Senate Bill 2, to permit emergency shelters by but not be limited to identifying who may request a reasonable right in the Planned Development Industrial zone. The Ordinance also created accommodation (i.e., persons with disabilities, family -members, provisions for transitional housing and supportive housing that would allow landlords, etc.), timeframes for decision-making, and provision for these uses to be subject only to those restrictions that apply to other relief from the various land -use, zoning, or building regulations that residential dwellings of the same type in the same zone. may constrain the housing for persons of disabilities. HOU-3.1: Encourage the conversion of existing marginal or vacant Ongoing. In 2006, the City adopted three Urban Plans to encourage the commercial and/or industrial land to residential, where feasible and conversion of existing marginal or vacant industrial land in the West Side to consistent with environmental conditions that are suitable for new mixed-use and residential developments. residential development. HOU-4.2: Continue to provide fair housing and counseling services Ongoing (refer to Table C) for all Costa Mesa residents in an effort to remove barriers and promote access to affordable housing in the City. HOU-4.3: Encourage programs that address the housing needs of The 2013-2021 Housing Element was adopted by City Council on January 21, senior citizens. 2014. The draft was certified by California Department of Housing and Community Development on November 22, 2013 in meeting statuary requirements. The Housing Element includes special programs for special housing needs (i.e., seniors, large families, etc.). HOU-4.4: Encourage and support the construction, maintenance and See above. preservation of residential developments which will meet the needs of families and individuals with specialized housing requirements. CONSERVATION ELEMENT GOAL CON -1 RESOURCE CONSERVATION: It is the goal of the City of Costa Mesa to provide its citizens with a high quality environment through the conservation of resources, including land, water, wildlife, and vegetation; the protection of areas of unique natural beauty; the integration of natural features into the man-made environment. Objective CON -1A: Evaluate the preservation of the City's existing biotic resources in as ecologically viable and natural a condition as possible, and, where feasible, restore and integrate these resources into the urban environment. CON -1 E.1: Participate in the Countywide Air Quality Technical Ongoing Assistance Program and the Orange County Council of Governments Technical Advisory Committee. CON -1A.1: Ensure that all future development will be adequately Ongoing. Reviewed with each new development application. reviewed with regard to possible adverse effects on plant and animal Construction of the East 17th Street streetscape improvements has been Annual Review of Costa Mesa General Plan (12" Edition) Page 19 General Plan Goal, Objective or Policy Description of City Action life and critical wildlife habitat and wetlands, and incorporate feasible completed. mitigation measures into the project design to reduce such effects. CON -1A.2: Encourage sustainable landscapes through landscape Ongoing. All new landscaping in excess of 2,500 SF is subject to Water techniques that conserve, recycle, and reuse valuable resources, Efficient Landscape Guidelines. including the use of native vegetation and drought tolerant landscape materials consistent with the City's landscaping standards set forth in Chapter VII of Costa Mesa Zoning Code. CON -1A.6: Support environmentally acceptable and sustainable Ongoing. Encouraged to be provided or equipped for future installation for new energy sources (especially renewable resources such as solar, wind, developments. hydroelectric, and geothermal resources) for new development and Permit processing for residential solar panels and electric vehicle chargers is significant redevelopment projects. expedited with the one stop plan check system. This program received a Planning Commission Green Award in 2013. CON -1 D.2: Preserve and enhance existing wetland areas. Completed the restoration of approximately 40 acres of wetland and riparian habitat in the northern portion of Fairview Park. Applied for grants for additional preservation and enhancement of existing wetlands. CON -1 E.3: Develop and implement a Reasonable Available Control Traffic signal coordination efforts: Measure Plan (including employee ridesharing, traffic signal . Traffic Signal upgrades and Synchronization Project is currently underway synchronization, bicycle/pedestrian facilities, energy conservation along two corridors (Newport Boulevard, and Adams Avenue) — These street lighting, modified work schedules, preferential carpool parking, projects include upgrade and coordination of traffic signals on the two or other equivalent control measures) in conformance with the Air Corridors. Quality Management Plan for the South Coast Air Basin. . Received OCTA Measure M2 grant for traffic signal synchronization and upgrade of signals along Bristol Street (joint project with Santa Ana and Newport Beach), Harbor Boulevard (joint project with Santa Ana) and Sunflower Avenue Corridors. NOISE ELEMENT GOAL N-1 NOISE HAZARDS AND CONDITIONS: It is the goal of the City of Costa Mesa to protect its citizens and property from injury, damage, or destruction from noise hazards and to work towards improved noise abatement. Objective N -1A: Control noise levels within the City for the protection of residential areas and other sensitive land uses from excessive and unhealthful noise. N -1A.1: Require, as a part of the environmental review process, that Ongoing for all new projects. full consideration be given to the existing and projected noise environment. N -1A.2: The maximum acceptable exterior noise levels for residential Ongoing areas is 65 CNEL. N -1A.3: Give full consideration to the existing and projected noise Ongoing environment when considering alterations to the City's circulation system and Master Plan of Highways. Annual Review of Costa Mesa General Plan (12" Edition) Page 20 General Plan Goal, Objective or Policy Description of City Action N -1A.4: Encourage Caltrans to construct noise attenuation barriers Ongoing along State freeways and highways adjoining residential and other noise sensitive areas. N -1A.5: Ensure that appropriate site design measures are Ongoing. Specific sounds attenuation for interior and exterior spaces is incorporated into residential developments, when required by an incorporated per requirements of the acoustical studies on project basis. acoustical study, to obtain appropriate exterior and interior noise levels. When necessary, require field testing at the time of project completion to demonstrate compliance. N -1A.6: Apply the standards contained in Title 24 of the California Ongoing Code of Regulations as applicable to the construction of all new dwelling units. N -1A.7: Discourage sensitive land uses from locating in the 65 CNEL Ongoing noise contour of the John Wayne Airport. Should it be deemed by the City as appropriate and/or necessary for a sensitive land use to locate in the 65 CNEL noise contour, ensure that appropriate interior noise levels are met and that minimal outdoor activities are allowed. N -1A.8: Support alternative methods for the reduction of noise Ongoing impacts at John Wayne Airport while continuing to maintain safety and existing limitations on aircraft daily departures. COMMUNITY DESIGN ELEMENT GOAL CD -1 VEHICULAR AND PEDESTRIAN CORRIDORS: Strengthen the image of the City as experienced from sidewalks and roadways. Objective CD -1A. Contribute to City beautification by enhancing the visual environment of Costa Mesa's vehicular and pedestrian corridor. CD -1A.1: Implement the City of Costa Mesa Streetscape and Median New and consistent landscape palette was required for all new development Development Standards in all new streetscape corridor and parkway along Harbor Blvd. south of the 405 Freeway. projects. Coordinate with new development adjacent to applicable Multiple City street rehabilitation projects have been completed, including the public rights-of-way to integrate landscape features and design Harbor Boulevard beautification project. elements consistent with the streetscape standards and recommendations. CD -1A.3: Walls and fences should contribute to an attractive street All new residential development projects are subject to a standard condition and sidewalk environment and compliment the style and character of that requires decorative walls along the perimeter of the development. the local district and adjacent buildings. Newly constructed or reconstructed walls and fences adjacent to sidewalks and roadways should not run in a continuous plane, should incorporate architectural treatments, such as masonry or wrought iron, and integrate tiered plantings to soften their appearance. CD -1A.4: Require a consistent landscape character along City streets This condition is required for all new commercial development along Harbor to reinforce the unique qualities of each corridor and district, including Blvd. The city tree palette is implemented with all new projects. Annual Review of Costa Mesa General Plan (12" Edition) Page 21 General Plan Goal, Objective or Policy Description of City Action the development of landscaped medians identified in Exhibit CD -5. Support the implementation of the recommended street tree palette for each City street, as identified in the City of Costa Mesa Streetscape and Median Development Standards. CD -1A.5: Electric and communication lines should be placed All new development is required to underground all utilities to the greatest underground, and electrical substations and telephone facilities extent possible. No assessment district has been formed. should be screened to minimize visual impacts from sidewalks, streets, and adjacent properties. Support utility undergrounding through conditions of project approval, preparation of undergrounding plans, and the formation of assessment districts. CD -3.2: Reinforce a sense of arrival into the City by promoting New and consistent landscape palette was required for all new development architecturally significant development and significant landscape along Harbor Blvd. and major corridors. plantings at key nodes. Undertake a visioning process to develop specific design guidelines that articulate the desired character for each key node within Costa Mesa. CD -7A.1: Ensure that new and remodeled structures are designed in Ongoing architectural styles which reflect the City's diversity, yet are compatible in scale and character with existing buildings and the natural surroundings within residential neighborhoods. Develop and adopt design guidelines for residential development. SAFETY ELEMENT GOAL SAF -1 ENVIRONMENTAL AND MANMADE HAZARD PROTECTION: It is the goal of the City of Costa Mesa to protect its citizens and property from injury, damage, or destruction from environmental hazards, including hydrologic, geologic, and climatic episodes, as well as from man-made hazards, including hazardous materials. Objective SAF -1A: Work towards the mitigation or prevention of potential adverse consequences of natural disasters. SAF -1A.1: Consider geologic hazard constraints, impacts, and mitigation when developing land use policies and when making public Ongoing decisions relating to land development. SAF -1A.2: Enforce standards, review criteria, and other methods to ensure that structures on or adjacent to bluffs are set back sufficiently Ongoing. Reviewed in detail for each project with the geotechnical report. to preserve the natural contour and aesthetic value of the bluff line and to provide sufficient access for fire protection. SAF -1A.3: Require geologic surveys of all new development located Ongoing. Reviewed in detail for each project with the geotechnical report. on or adjacent to bluffs. SAF -1A.4: Cooperate with local, State, and Federal flood control agencies to reduce the potential for flood damage in the City of Costa Ongoing per State guidelines Mesa. Annual Review of Costa Mesa General Plan (12" Edition) Page 22 General Plan Goal, Objective or Policy Description of City Action SAF -1A.5: Identify and publicize the extent of geologic and seismic hazards within Costa Mesa and advise affected residents and No additional public information has been provided. Seismic standards are property owners of appropriate protection measures. Offer reviewed with building permit applications. information regarding earthquake standards to reduce or eliminate structural damage. SAF -1A.6: Encourage, through technical assistance or development There have been no development incentives regarding seismic hazards in incentives, private property owners to take adequate steps to protect 2012. their property against seismic hazards. SAF -1A.7: Require all proposed development projects to be designed to minimize both the volume and velocity of surface runoff and permit All grading permits are reviewed in accordance with requirements for on-site no adverse downstream impacts due to increased runoff through the Water Quality Management Plan (WQMP) and State requirements for run off proper design of subsurface drains, appropriate grading, on-site and obtaining a SWPPP permit. retention basins, landscape programs, or other appropriate measures. SAF -1A.8: Publicize the extent of flood hazards within Costa Mesa and advise affected residents and property owners of appropriate With the latest improvements in the flood channels reflected in the 2009 Flood protection measures. Develop an education program, such as the maps, there are no residential properties within flood hazard areas. Flood Awareness Program, and emergency disaster plans for flooding. SAF -1A.9: Encourage County, State, and Federal agencies to complete flood control improvements to the Greenville -Banning Completed. Channel to protect Costa Mesa residents and property located in the 100 -year flood zone from a potential major disaster. Objective SAF -1 B: Participate in the safe, efficient and responsible management of hazardous waste materials. SAF -1 B.1: Participate with the County of Orange in the Ongoing implementation of the Orange County Hazardous Waste Management Plan. SAF -1 B.2: Ensure that appropriate in-depth environmental analyses Ongoing with all related projects. are conducted for any proposed hazardous waste materials treatment, transfer, and/or disposal facility. SAF -1 B.3 Continue to work with the County of Orange to identify and Ongoing inventory all users of hazardous s materials and all hazardous waste generators and prepare clean-up action plans for identified disposal sites. SAF -1A.4: Code amendment for an update to the City's floodway and Last amendment adopted in 2009. floodplain ordinance consistent with the federal and state requirements. Annual Review of Costa Mesa General Plan (12" Edition) Page 23 General Plan Goal, Objective or Policy Description of City Action HISTORIC/CULTURAL RESOURCES ELEMENT Goal HCR -1 HISTORIC RESOURCE CONSERVATION: It is the goal of the City of Costa Mesa to provide its citizens with a high quality environment through the protection and conservation of historic and cultural resources. Objective HCR -1A Encourage the preservation and protection of the City's natural and man-made historic resources. HCR -1A.1 Require, as part of the environmental review procedure, Ongoing. Required as a standard condition of approval for projects with an evaluation of the significance of paleontological, archaeological, extensive grading. and historical resources and the impact of proposed development on those resources. HCR -1A.2 Require monitoring of grading operations by a qualified Ongoing. Required as a standard condition of approval for projects with paleontologist or archaeologist when the site is reasonably suspected extensive grading. of containing such resources. If, as a result, evidence of resources is found, require the property to be made available for a reasonable period of time for salvage of known paleontological and archaeological resources by qualified experts, organizations, or educational institutions. HCR -1A.3 Require development on land containing known Ongoing. Required as a standard condition of approval for projects with archaeological resources to use reasonable care to locate structures, extensive grading. paving, landscaping, and fill dirt in such a way as to preserve these resources undamaged for future generations when it is the recommendation of a qualified archaeologist that said resources be preserved in situ. HCR -1A.4 Encourage the preservation of significant historic In 2011 a Historic Reserve account was created related to preservation of resources as identified on Table HCR -1 by developing and Home Ranch historic structures and as a requirement of the Development implementing incentives such as building and planning application Agreement. The Historic Reserve Account is intended to be utilized for permit fee waivers, Mills Act contracts, grants and loans, purposes of providing financial support for the costs of maintaining, operating, implementing the State Historic Building Code and other incentives and preserving the Historic Structures and Site. Per requirements of Home Ranch Development Agreement, the developer has as identified in the City's Historic Preservation Ordinance. been hosting open house events at the Home Ranch site on annual basis. HCR -1A.5 Promote the preservation of significant historical resources See above and encourage other public agencies or private organizations to assist in the purchase and/or relocation of sites, buildings, and structures deemed to be of historical significance. HCR -1A.6 Encourage development of an interpretive center for The Fairview Park Master Plan was last updated in November 2008. The paleontological, archaeological, and historical resources at Fairview Master Plan includes an area south of the rail station, east of Placentia Park. The center may contain resources found in the park area as Avenue, which is being retained for a potential museum site. The site could well as resources found throughout the City. house the Costa Mesa Historical Society, including archaeological and historical resources at the Fairview Park site. Staff continues to search for Annual Review of Costa Mesa General Plan (12" Edition) Page 24 General Plan Goal, Objective or Policy Description of City Action funding sources for the implementation of elements of the Fairview Park Master Plan, including the potential museum site. Annual Review of Costa Mesa General Plan (12' Edition) Page 25 Costa Mesa Table Al — Annual Building Activity Report Table A2 — Annual Building Activity Above Moderate -Income Units Single Housing 5+ Units Housing with Mobile Total without Units Financial Unit Housing Development Information Assist. and/or Financial 45 5 Assist. or Deed 50 for Above Moderate Deed Restrictions Restriction 1 2 3 4 5 6 7 8 Affordability by Household Incomes Project Unit Tenure Very -Low Low Moderate Above Total Assist. Deed Category R=Renter Moderate Units Restrict O=Owner ions Attached O 5 5 SFD O 45 45 Subtotal 50 50 (9) Total of Above Moderate from Table A2 > > > (10) Total by income units (Field 5) Table A 50 50 Table A2 — Annual Building Activity Above Moderate -Income Units Single 2-4 5+ Units Second Mobile Total Family Units Unit Homes No. of Units Permitted 45 5 50 for Above Moderate Annual Review of Costa Mesa General Plan (12r" Edition) Costa Table B - Regional Housing Needs Allocation Progress Page 26 Annual Review of Costa Mesa General Plan (12" Edition) Costa Mesa Table B — Regional Housing Needs Allocation Progress Page 27 Enter Calendar Year starting with the first year of the RHNA allocation period. See 2013 2014" 2015 2016 2017 2018 2019 2020 2021 Example. Total Total Units Remaining RHNA to Date RHNA Allocation Year Year Year Year Year Year Year Year Year (all years) by Income Level Income Level by 1 2 3 4 5 6 7 8 9 Income Level Deed Restricted Very Low 1 1 Non -deed restricted Deed Restricted Low 1 1 Non -deed restricted Deed Restricted Moderate 0 0 Non -deed restricted Above Moderate 0 22 50 72 0 Total RHNA by COG. Enter allocation number: 2 72 Total Units ► ► ► 22 50 2 Remaining Need for RHNA Period ► No. No. ► No. *New RHNA cycle began in 2014. Annual Review of Costa Mesa General Plan (12' Edition) Costa Table C - Housing Program Status Page 28 Annual Review of Costa Mesa General Plan (12' Edition) �_ — Costa Mesa City of Costa Mesa Table C1 - Housing Program Status (January 2014 - December 2014) (HCD) Page 29 ProgramHousing DEVELOPMENT REVIEW Ongoing through the Planning Division, in order to protect residential uses from incompatibility. PUBLIC NUISANCE ABATEMENT Ongoing through various divisions and departments. HOUSING REHABILITATION Ongoing assistance through the Housing and Community Development Division for owner -occupied units. Also the Housing and Community Development Division provides assistance with the purchase and rehabilitation of rental units by non-profit organizations to operate as affordable to low and very -low income tenants. None were funded during FY 13-14. During FY 13-14 rehabilitation of 1 owner -occupied unit was completed. MOBILE HOME PARK Ongoing. The City completed 19 mobile home rehabilitation PRESERVATION projects during FY 13-14. The Zoning Code requires Planning Commission approval to convert to another land use. INCENTIVES FOR AFFORDABLE Implementing ordinance in effect, 151 density bonus units HOUSING currently exist in the City as a result of this ordinance. MANUFACTURED HOUSING Standards incorporated into zoning code, offer development review streamlining through staff level processing; adopted May 1998. SECOND UNITS The second -unit provisions in the Zoning Code were amended to ensure consistency with State Law requirements in 2011. ACCESSORY APARTMENTS In 2014, one accessory apartment was approved at 1017 Grove Place. FEDERAL/STATE HOUSING Ongoing 48 single- and multiple -family units constructed over PROGRAMS the last several years through a combination of public/private partnerships. No new units were constructed in the past year. HOUSING ASSISTANCE Ongoing rental assistance voucher program (formerly Section 8) assistance through OCHA, during FY 13-14. SHARED HOUSING No programs are offered by the City, Senior Center, or County. Annual Review of Costa Mesa General Plan (12' Edition) Page 30 ProgramHousing ZONING ORDINANCE REVIEW Ongoing. See Mixed -Use Developments. OPPORTUNITIES FOR FIRST-TIME Small lot common interest development standards have been HOMEBUYERS (FTHB) adopted since 2001 to promote development for first time home buyers.* The City also adopted Small Lot Subdivision Ordinance in 2014 to further promote homeownership and development of fee simple lots. LAND ACQUISITIONS No land acquisitions occurred in 2014. MIXED USE DEVELOPMENTS A Mixed -Use Overlay District has been approved for the Bristol Street corridor area and Westside Costa Mesa. This overlay district, in conjunction with Urban Plan documents, will allow mixed-use development opportunities, and potentially 4,226 additional units by the year 2025. HOUSING SUPPLY IMPACT Ongoing ASSESSMENT REZONE REVIEW None DEVELOPMENT MONITORING Ongoing activity. PROGRAM CDBG FUNDING FOR HOMELESS During FY 13-14, 7 individuals were provided homelessness SHELTER prevention services (i.e., rental assistance to prevent eviction or deposit assistance to move into housing and rapid housing), plus 23 individuals were provided transitional housing assistance and services. ADEQUATE SITES . With the termination of the City's Redevelopment Agency based on Supreme Court opinion relative to AB1X26 and AB1X27 effective February 1, 2012, the future of affordable housing project sites and financing is being determined. • A total of 50 new and replaced housing units were completed construction in 2014. ** SINGLE -ROOM OCCUPANCY AND Ongoing. Policy was adopted in 1991; three projects are FAMILY -ROOM OCCUPANCY completed and occupied for a total of 247 units; including a 91 HOTELS senior units and 11 SRO units. FAIR HOUSING ASSISTANCE The City is a member of a region -wide effort to ensure equal access to housing. Generally, activities have included investigation, resolution and education. During FY 13-14, 357 Costa Mesa households were assisted with fair housing issues. INCENTIVES FOR AFFORDABLE Accessibility is now required through ADA standards. SPECIAL NEEDS HOUSING A 50 percent density increase for construction of very -low income senior housing is provided in the Density Bonus Program. COMMON INTEREST In 2014, 602 units of common interest developments were DEVELOPMENTS approved, under construction or completed. CONDOMINIUM CONVERSIONS No apartment conversions were approved in 2014. PRESERVATION OF AT -RISK No new activity. HOUSING Annual Review of Costa Mesa General Plan (12' Edition) Page 31 ProgramHousing DENSITY BONUS COMPLIANCE Annual review conducted to ensure compliance; 222 affordable MONITORING units in compliance with the density bonus program exist in the City. As of 2014, all of the 29 properties participating in the Density Bonus Program are in compliance with the program's requirements in terms of maximum affordable rental rates. A separate report will be provided on the status of the Density Bonus units to the Planning Commission and City Council in April/ May, 2015. Annual Review of Costa Mesa General Plan (12' Edition) Costa Mesa City of Costa Mesa Table C2 - Housing Program Status (January 2014 — December 2014) Page 32 *Master plan screening for 262 additional live/work and residential units was approved in 2014. The development plans are in process. Affordability by Household Incomes Housing Element Programs Very Low- Moderate- Above Total Units Low- Income Income Moderate - Income Income HOUSING REHABILITATION- 1 0 0 0 1 OWNER HOUSING REHABILITATION- 0 0 0 0 0 RENTER MOBILE HOME REHABILITATION 12 7 0 0 19 AFFORDABLE HOUSING 0 0 0 0 0 CONSTRUCTION GRANNY FLATS AND ACCESSORY 0 0 0 1 1 APARTMENTS CONSTRUCTION FIRST-TIME HOMEBUYER 0 0 0 0 0 (this program is no longer available) NEW SINGLE ROOM OCCUPANCY 0 0 0 0 0 HOTEL ROOMS PRESERVE AT -RISK UNITS 0 0 0 0 0 CONDOMINIUM CONVERSIONS N/A 0 APPROVED SOBECA URBAN PLANS MIXED-USE DEVELOPMENTS WESTSIDE 262 262 APPROVED* RESIDENTIAL 0 0 OWNERSHIP REZONE REVIEW 0 *Master plan screening for 262 additional live/work and residential units was approved in 2014. The development plans are in process. Annual Review of Costa Mesa General Plan (12' Edition) Costa Table D — Approved & Completed Residential Units Page 33 Annual Review of Costa Mesa General Plan (12th Edition) Page 34 The following is a list of residential units approved in 2014 and units completed and under construction approved in previous years. APPROVED PROJECTS Number of Units Building Type Address 2 units Detached 320 E. 18th Street 10 units Attached 522 & 526 Bernard Street 2 units Detached 119 Cecil Place 2 units Detached 1944 Church Street 28 units Detached, including 7 live/work 2095 Harbor Boulevard 18 units Detached 650 Hamilton 5 units Detached 2661 Orange Avenue 36 units Attached 30 live/work, 6 residential 2023, 2025, and 2027 Placentia Avenue 14 units Detached 2075 Placentia Avenue 37 units Detached condos 573-591 Victoria Street 3 units Detached 1817 Viola Place 89 units Detached, 40 live/work, 49 residential APPROVED PROJECTS• 1620-1644 Whittier Avenue • Number of Units Building Type Address 13 units Detached live/work 1036 & 1042 W. 18th Street 4 units Detached 743 W. 20th Street 26 units Attached 2013-2029 Anaheim Avenue 55 units Attached live/work 132, 134, 140 Industrial Way & 1527 Newport Blvd. 4 units Detached 2160 and 2172 M ran Drive 6 units Detached 2070 Maple Street 6 units Detached 2183, 2187, and 2191 Miner Street 5 units Detached 1974 Meyer Place (approved in 2012 14 units Attached condominiums 2460 Newport Blvd. (approved in 2007 2 units Detached 2590 Orange Avenue 5 units Detached 2294 Pacific Avenue 2 units Detached 270 Palmer Street 19 units Detached Condominiums 789 & 795 Paularino Avenue 15 units Detached live/work 2026 Placentia Avenue 2 units Detached 389 Rochester Street 8 units Detached 2525 Santa Ana Avenue 49 units Attached live/work 1677 & 1695 Superior Avenue, 643-651 W. 17th St. 11 units Detached 1631-1645 Tustin Avenue 7 units Detached 2157 Tustin Avenue 25 units Detached 372, 378, and 382 Victoria Street 11 units Detached 687 Victoria Street 17 units Detached COMPLETED 1259 Victoria Street UNITS Number of Units Building Type Address 20 units Detached live/work 1036 & 1042 W. 18th Street 2 units Detached 185 E. 19th Street 5 units Detached 791 Center Street & 1856 Placentia Avenue 5 units Attached live/work 132, 134, 140 Industrial Way & 1527 Newport Blvd. 2 units Detached 1970 Maple Avenue 2 units Detached 1509 Orange Avenue 2 units Detached 1578 and 1580 Redlands Place 7 units Detached 2157 Tustin Avenue 5 units Detached 372, 378, and 382 Victoria Street Annual Review of Costa Mesa General Plan (12' Edition) Page 35 TOTAL UNITS APPROVED: 246 UNITS TOTAL UNITS UNDER CONSTRUCTION: 306 UNITS TOTAL UNITS COMPLETED: 50 UNITS (includes common interest and detached single family) Annual Review of Costa Mesa General Plan (12' Edition) Costa Mesa Appendix A 2000 General Plan Goals, Objectives, Policies Page 36 Annual Review of Costa Mesa General Plan (12' Edition) 11 Costa Mesa Appendix B Housing Successor Annual Report Fiscal Year 2013-2014 Page 37