HomeMy WebLinkAbout05 - CC-4 - Attachment 3 - 9/15/2015ATTACHMENT
CITY OF COSTA MESA
PROJECT COST SUMMARY
CONTRACTOR: R.J. NOBLE
15505 E. LINCOLN AVE., ORANGE, CA 92865
PROJECT: 2012-2013 STREET REHABILITATION PROJECT
City Project No. 13-01
REM
NO
BID
QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
1
1
LS
Mobilization
$75,000.00
75.00
%
0.00
%
75.00
%
$56,250.00
$0.00
$56,250.00
$75,000.00
2
2,260,000
SF
Cold Mill 1.5'
$0.07
43,686.00
SF
0.00
SF
43,686.00
SF
$3,058.02
$0.00
$3,058.02
$158,200.00
3
65,000
SF
Cold Mill 3"
$0.24
7,966.00
SF
0.00
SF
7,966.00
SF
$1,911.84
$0.00
$1,911.84
$15,600.00
4
140,000
SF
Cold Mill 4"
$0.32
13,283.00
SF
0.00
SF
13,283.00
SF
$4,250.56
$0.00
$4,250.56
$44,800.00
5
37,250
TON
Asphalt Rubber Hot Mix (ARHM) Surface Course
$73.00
19,489.57
TON
0.00
TON
19,489.57
TON
$1,422,738.61
$0.00
$1,422,738.61
$2,719,250.00
6
5,000
TON
Asphalt Concrete Base Course
$73.00
2,866.93
TON
0.00
TON
2,866.93
TON
$209,285.89
$0.00
$209,285.89
$365,000.00
7
155
EA
Adjust Manhole Frame and Cover to Grade
$335.00
158.00
EA
0.00
EA
158.00
EA
$52,930.00
$0.00
$52,930.00
$51,925.00
8
340
EA
Adjust Water Valve Can and Cover to Grade
$285.00
311.00
EA
0.00
EA
311.00
EA
$88,635.00
$0.00
$88,635.00
$96,900.00
9
1
FA
Project Management
$75,000.00
0.25
FA
0.00
FA
0.25
FA
$18,750.00
$0.00
$18,750.00
$75,000.00
10
1
LS
Traffic Control (including estention on Bristol St.)
$18,500.00
122.16
%
0.00
%
122.16
%
$22,600.00
$0.00
$22,600.00
$18,500.00
11
145
EA
Blue "Fire Hydrant' Raised Pavement Markers
$10.00
102.00
EA
0.00
EA
102.00
EA
$1,020.00
$0.00
$1,020.00
$1,450.00
12
1
LS
Lane Markings, Lane Stripes, Pavement Legends and Raised
Pavement Markers (including extention of striping on Bristol St.)
$49,000.00
113.27
%
0.00
%
113.27
%
$55,500.00
$0.00
$55,500.00
$49,000.00
13
87
EA
I Install Traffic Signal Loops
$190.00
92.00
EA
0.00
EA
92.00
EA
$17,480.00
$0.00
$17,480.00
$16,530.00
TOTAL:
$1,954,409.921
$0.001
$1,954,409.92
$3,687,155.00
ADDITIONAL WORK @ NO NET COST TO CONTRACT
1
LS
Junipero Area - Phase 1
$36,000.00
100.00
%
0.00
%
100.00 %
$36,000.00
$0.00
$36,000.00
1
LS
Junipero Area - Phase II
$307,059.60
100.00
%
0.00
%
100.00 %
$307,059.60
$0.00
$307,059.60
746,108
SF
Header Grind
$0.25
373,082.50
SF
0.00
SF
373,082.50 SF
$93,270.63
$0.00
$93,270.63
ITEM 1
427.88
TON
AC with fiber
$15.00
427.88
TON
0.00
TON
427.88 TON
$6,418.20
$0.00
$6,418.20
1
LS
T&M 12/18 Grind & Dig Out Brentwood
$20,171.79
100.00
%
0.00
%
100.00 %
$20,171.79
$0.00
$20,171.79
1
LS
T&M 12/18 Pave Brentwood
$12,172.98
100.00
%
0.00
%
100.00 %
$12,172.98
$0.00
$12,172.98
1
LS
T&M 12/21 Pave Brentwood Cul -De -Sac
$6,684.46
100.00
%
0.00
%
100.00 %
$6,684.46
$0.00
$6,684.46
1
LS
Overnight Lane Closure for Masters Circle
$2,000.00
100.00
%
0.00
%
100.00 %
$2,000.00
$0.00
$2,000.00
Total (Change Order No. 1)
1 $483,777.661
$0.001
$483,777.66
50,000
SF
Remove Excess Pulverized material - Brentwood Street
$0.71
50,000.00
SF
0.00
SF
50,000.00 SF
$35,500.00
$0.00
$35,500.00
ITEM 2
50,000
SF
Pulvirize &Blend (includes Potholing)
$0.34
50,000.00
SF
0.00
SF
50,000.00 SF
$17,000.00
$0.00
$17,000.00
50,000
SF
I Cement Treat 6% at 10"
$0.981
50,000.00
SF
0.001
SF
1 50,000.00 SF
$49,000.00
$0.00
$49,000.00
900
1 TON 3" AC Paving (Conv. AC)
1 $73.001
947.521 TON
1 0.001 TON
1 947.52 TON
$69,168.96
$0.00
$69,168.96
Total (Change Order No. 2)
$170,668.96
$0.00
$170,668.96
512,712
SF
Cold Mill 2" - Bristol Street
$0.30
512,711.50
SF
0.00
SF
512,711.50
SF
$153,813.45
$0.00
$153,813.45
45
EA
Adjust IRWD Watervalves to Grade
$550.00
30.00
EA
0.00
EA
30.00
EA
$16,500.00
$0.00
$16,500.00
ITEM 3
52
EA
Traffic Loops (Redhill Avenue)
$195.00
52.00
EA
0.00
EA
52.00
EA
$10,140.00
$0.00
$10,140.00
7
EA
Blue "Fire Hydrant' Raised Pavement Markers (Redhill Avenue)
$10.00
16.00
EA
0.00
EA
16.00
EA
$160.00
$0.00
$160.00
Total (Change Order No. 3)
$180,613.45
$0.001
$180,613.45
1
LS
Mobilization - Fairview Road
$15,000.00
100.00
%
0.00
%
100.00
%
$15,000.00
$0.00
$15,000.00
1
LS
Traffic Control
$25,000.00
100.00
%
0.00
%
100.00
%
$25,000.00
$0.00
$25,000.00
230,000
SF
2.5 Full Width Grind AC w/ Petromat
$0.34
227,277.00
SF
0.00
SF
227,277.00
SF
$77,274.18
$0.00
$77,274.18
ITEM 4
3,151
TON
2.5 ARHM Overlay
$81.75
3,152.96
TON
0.00
TON
3,152.96
TON
$257,754.48
$0.00
$257,754.48
-
1
LS
Striping
$22,000.00
100.00
%
0.00
%
100.00
%
$22,000.00
$0.00
$22,000.00
39
EA
Loops
$250.00
81.00
EA
0.00
EA
81.00
EA
$20,250.00
$0.00
$20,250.00
560
EA
Double Adjust Manholes
$560.00
3.00
EA
0.00
EA
3.00
EA
$1,680.00
$0.00
$1,680.00
540
EA
Double Adjust Watervalves
$540.00
9.00
EA
0.001
EA
9.00
EA
$4,860.00
$0.00
$4,860.00
Total (Change Order No. 4)
$423,818.66
$0.00
$423,818.66
Page 1 of 2
ATTACHMENT
CITY OF COSTA MESA
PROJECT COST SUMMARY
CONTRACTOR: R.J. NOBLE
15505 E. LINCOLN AVE., ORANGE, CA 92865
PROJECT: 2012.2013 STREET REHABILITATION PROJECT
City Project No. 13.01
ITEM BID
No QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
1
LS Mobilization - Baker Street
$15,000.00
0.00
%
100.00 %
100.00
%
$0.00
$15,000.00
$15,000.00
1
LS Traffic Control
$25,000.00
0.00
%
100.00 %
100.00
%
$0.00
$25,000.00
$25,000.00
225,000
SF 2" Grind
$0.19
0.00
SF
210,797.00 SF
210,797.00
SF
$0.00
$40,051.43
$40,051.43
2,700
TON 2" ARHM Overlay
$81.75
0.00
TON
2,664.73 TON
2,664.73
TON
$0.00
$217,841.68
$217,841.68
1
LS Striping, Markings, and Legends
$17,500.00
0.00
%
100.00 %
100.00
%
$0.00
$17,500.00
$17,500.00
ITEM 5 10
EA Loops Type D
$265.00
0.00
EA
10.00 EA
10.00
EA
$0.00
$2,650.00
$2,650.00
19
EA Loops Type E
$250.00
0.00
EA
19.00 EA
19.00
EA
$0.00
$4,750.00
$4,750.00
29
EA Double Adjust Manholes
$560.00
0.00
EA
27.00 EA
27.00
EA
$0.00
$15,120.00
$15,120.00
22
EA Double Adjust Watervalves
$540.00
0.00
EA
25.00 EA
25.00
EA
$0.00
$13,500.00
$13,500.00
3
EA Adjust Vaults
$1,200.00
0.00
EA
0.00 EA
0.00
EA
$0.00
$0.00
$0.00
2
EA Adjust Monument
$540.00
0.00
EA
2.00 EA
2.00
EA
$0.00
$1,080.00
$1,080.00
1
LS Install Video Detection (Baker St. & Bristol St.)
$9,435.40
0.00
LS
100.00 %
100.00
%
$0.00
$9,435.40
$9,435.40
Total (Change Order No. 5)
$0.00
$361,928.51
$361,928.51
1
LS Mobilization - Redlands Place
$5,500.00
0.00
%
100.00 %
100.00 %
$0.00
$5,500.00
$5,500.00
1
LS Traffic Control
$3,500.00
0.00
%
100.00 %
100.00 %
$0.00
$3,500.00
$3,500.00
10,000
SF 2" Grind
$0.84
0.00
SF
9,270.00 SF
9,270.00 SF
$0.00
$7,786.80
$7,786.80
120
TON 2" AC Overlay
$120.00
0.00
TON
120.54 TON
120.54 TON
$0.00
$14,464.80
$14,464.80
ITEM 6
1
EA Adjust Manholes
$1,400.00
0.00
EA
0.00 EA
0.00 EA
$0.00
$0.00
$0.00
1
EA Adjust Watervalves
$1,400.00
0.00
EA
1.00 EA
1.00 EA
$0.00
$1,400.00
$1,400.00
4,500
LF Paint Red Curb
$0.79
0.00
LF
4,025.00 LF
4,025.00 LF
$0.00
$3,179.75
$3,179.75
2
EA Install Thermo Keep Clear w/ 12" Bar
$434.31
0.00
EA
2.00 EA
2.00 EA
$0.00
$868.62
$868.62
2
EA Replace Existing sign w/ 24x36 R10-6
$739.85
0.00
EA
2.00 EA
2.00 EA
$0.00
$1,479.70
$1,479.70
1
LS Striping
$495.00
0.00
LS
100.00 %
100.00 %
$0.001
$495.001
$495.00
Total (Change Order No. 6)
$0.001
$38,674.671
$38,674.67
PROJECT TOTAL (PLUS COs): 1
$3,213,288.651
$400,603.18
$3,613,891.83
$3,687,155.00
Page 2 of 2