Payment
Date
Remittance to:
Remittance
Payment
Explanation of payment
Ref.
ID:
Amount
0191413
9/11/15
AKAL Consultants
21519
$13,740.00
Study E76 Preparation Services — What is this for?
Public Services - Bear Street and Bristol Street
pavement rehabilitation project. This project is federally
funded and is administered by Caltrans. As part of grant
requirements the City needed to prepare a lot of forms
including Preliminary Environmental Study (PES) and
submit them to Caltrans in order to obtain authorization
o proceed with construction.
0191457
9/11/15
MJK Construction
22968
$2,292.62
Emergency soil sampling services — What was the
emergency?
Public Services — Corporation Yard fuel island smelled
f gasoline when excavated to repair a damaged
electrical line to the propane fueling system. Test found
no soil contamination in the trench and below limits on
he excavated soil. The soil was disposed and the repair
project moved forward.
0190700
9/22/15
Jays Designated
22328
($710.00)
Vendor deceased and check returned. Don't we still
Operator Services
owe the funds to the estate?
Yes. City waiting to be contacted by estate lawyer.
0191679
9/25/15
Capitol Enterprises
1571
$8,831.44
Standard single door shed — What was this for? Are
they secure?
Recreation — Rocks Program
Four Equipment shelters. This product is an all steel
Ic onstruction and is virtually vandal proof.
ADDITIONAL DOCUMENTS - CC -9
MEDIA, JESSICA
Subject: FW: Question on tonight's Consent Item #9 - Fairview Park North Bluff Trail
Realignment - Change Order No. 3
From: MUNOZ, ERNESTO
Sent: Tuesday, October 06, 2015 10:32 AM
To: GENTS, SANDRA <SANDRA.GFNIS@costa mesaca.gov>
Cc: FOLEY, KATRINA<KATRINA.FOLEY@costamesaca.gov>; MENSINGER, STEPHEN
<STEPHEN.MENSINGER@costamesaca.gov>; MONAHAN, GARY <GARY.MONAHAN@costamesaca.gov>; RIGHEIMER, JIM
<JIM.RIGHEI MER@costa mesaca.gov>; RODELIUS, SHARON <SHARON.RODELIUS@costamesaca.gov>; HATCH, THOMAS
<THOMAS.HATCH @costamesaca,gov>; SHELTON, KELLY<KELLY.SHELTON@costamesaca.gov>; Gary Monahan
<garymonahan@att.net>
Subject: Question on tonight's Consent Item #9 - Fairview Park North Bluff Trail Realignment - Change Order No. 3
Council Member Genis,
You requested clarification regarding wording on Consent Item No. 9 in relation to mention of electrical engineering
services and restoration work in the report.
Electrical Engineering Services
The proposed Contract Change Order No. 3 you are considering tonight does not include electrical services in its
scope. Electrical engineering services are already a part of the design services that Kabbara Engineering is providing.
Restoration Work
Habitat restoration was included in the scope of work for Contract Change Order No. 3 to more efficiently manage
design and construction efforts. By combining the habitat restoration (which is partially funded by an HCF grant) with
this change order, we will be able to complete both projects (the trail and the restoration) at the same time.
Please let us know if additional clarification is needed on this item.
Ernesto Munoz, P. E.
Public Services Director
City of Costa Mesa
714-754-5343
ernesto. munoz@,castamesaca.pov
PROPOSED GENERAL PLAN
LAND ALTERNATIVE
FOR THE YEAR 1 1
GENERAL PLAN
1 P
STE E LW4VE
October 1, 2015
Honorable Stephen M. Mensinger; and,
City Council Members
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92628
ADDITIONAL DOCUMENTS - NB -1
E -Mail Transmittal
City Clerk's Office
Subject: "Emulex Property" at 3333 South Susan Street
Inclusion in General Plan Update
City Council Meeting on October 6, 2015- New Business No. 1
Dear Mayor Mensinger:
Steelwave, LLC recently purchased the "Emulex Corporation Property", located in north
Costa Mesa, abutting the LA Times/Tribune property and across the street from Ikea
and Segerstrom "Home Ranch" property. We have invested in your community to create
a prominent office campus. The property has frontage along South Coast Drive, Susan
Street, Sunflower Avenue, and sides to the LA Times property and railroad spur track.
At 14.25 acres we have three buildings totaling 179,090 sf which are partially occupied
by Emulex Corporation. 3.2 acres of the property are vacant along the South Coast
Drive frontage with previous approval to construct a 65,000 sf fourth building.
The City is currently updating its General Plan which will address various opportunities
for future growth in north Costa Mesa. At your joint study session with the Planning
Commission, you recommended our neighboring property owners have their
development potential increased to assist in attracting new businesses and jobs. As
stated in your October 6t" City Council Staff Report, you are considering increasing the
maximum build -out potential of Home Ranch, diagonally across the street from us, to
1.2m sf or .64 FAR. Additionally, you are considering changing the LA Times site from
industrial to a "Commercial Center" land use designation, and increasing that property
to .64 FAR as well.
2050 Main Street, Suite 830, Irvine CA 92614 1 PH 949-863-0390 1 WEB SteelWaveLLC.com
S T E E LWAVE
Mayor Stephen M. Mensinger
Emulex Property 3333 South Susan Street
October 1, 2015
Page 2.
The Emulex office campus was included in the North Costa Mesa Specific Plan and
Home Ranch Master Plan with an approved building ratio of approximately .40 FAR.
Since we have acquired existing office buildings only 52% occupied, it is our intent to
upscale the site and attract new businesses to make this a premier office campus.
However, to remain competitive with our neighboring properties, we respectfully request
you designate our property for a maximum 0.64 FAR for office uses and 0.54 FAR for
retail/commercial uses, with a Commercial Center land use designation. In so doing, the
Home Ranch property, LA Times abutting our westerly property line, and the Emulex
campus would all have a consistent floor area ratio.
We are excited to immediately market our property and attract new jobs to the community.
With office space in place, we can satisfy an immediate market demand while the General
Plan EIR is being prepared and Council makes its final decision. We understand inclusion in
the "Proposed General Plan Land Use Alternative" is not an approval but merely
authorization for your staff to analyze all property owner requests.
We apologize for the lateness of our request, but please recognize we just acquired the
property this week and could not proceed until we held title to the property. With our local
office in Orange County, and significant expertise in real estate development and property
management, we look forward to making a major contribution to Costa Mesa and supporting
the community's needs.
Sincerely,
Han Jang
Vice President, Acquisitions & Development
Cc: Brenda Green, City Clerk
City of Costa Mesa
2050 Main Street, Suite 830, 1rvine CA 92614 1 PM 949-863-0390 1 WP -13 SteelWaveLLC,com
ADDITIONAL DOCUMENTS - N13-1
1_WHI`1`T1E1(
- 1887 _....................
COLLEGE
October 1, 2015
City Council
City Of Costa Mesa
77 Fair Drive
Costa Mesa Ca 92626
Re: General Plan Update
Whittier Law School
3333 Harbor Blvd.
Dear City Council Members:
I am writing on behalf of the Whittier Law School, which is owned by Whittier College. As you
undertake your city-wide General Plan Update, I would like to request that you include the law
school property in the general plan process.
While we have not fully vetted potential long-term land use alternatives for the site, we feel that
it would be beneficial to Whittier College to include the Law school site as part of the general
plan update process.
Intracorp Companies, which has been active in the City of Costa Mesa in both Level 1 and
Superior edge projects, will be assisting the college. We look forward to meeting with City staff
to discuss the general plan process.
Thank you for your consideration.
Sincerely,
Sharon D. Herzberger
President
Whittier College
OFFICE OFTHE PRESIDENT - 13405 E. PHILADELPHIA STRUT - P.O. BOX 674 • WHITTIER, CA 90608-0574
TEL: (562) 907-4201 • FAX: (562) 907-4242 - PIZESIDENTVWHITTIER.EDU • WWW.WHITTIER.EDU
ADDITIONAL DOCUMENTS - N13-1
i3raSGEFNER,AL SERVICES
VIA HAND DELIVERY & EMAIL
October 6, 2015
The Honorable Stephen Mensinger
Mayor of the City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92626
RE: City of Costa Mesa Regular City Council Meeting, October 6, 2015;
Proposed General Plan Land Use Alternatives for the 2015-2025 General Plan
Update, Fairview Developmental Center
Dear Mayor Mensinger:
In June of this year, the California Legislature approved and the Governor signed into
law Senate Bill 82 [SB82] (Chapter 23, Statutes of 2015) which added section 14670.36
to the Government Code.
This legislation authorizes the Director the Department of General Services, with the
consent of the Director of the Department of Developmental Services, to lease up to 20
acres at the Fairview Developmental Center (FDC) at a price that will permit the
development of affordable housing for people with developmental disabilities
(Shannon's Mountain).This legislation also requires that a minimum of twenty percent
(20%) of the housing units developed shall be available and affordable to individuals
with developmental disabilities served by a regional center pursuant to the Lanterman
Developmental Disabilities Services Act. In addition to meeting the affordability
requirements, the developer of the project will be required to comply with Section 1720
of the Labor Code, for the purpose of prevailing wage requirements.
It has come to the state's attention that the city is updating their general pian and
considering new land use designations for the FDC that would include a maximum of
500 dwelling units at a density of 15 dwelling units per acre (or a maximum of 25
dwelling units per acre with a density bonus). The state intends to proceed with the
Shannon's Mountain project with the city as the lead agency for purposes of CEQA,
building permits and inspections. However, at this time it is important to maintain
maximum flexibility on the density for the Shannon's Mountain project since the project's
financial feasibility will require a unit density greater than the proposed designation of 15
units per acre in order to meet the affordability goals. The state requests that the City
include the 20 acres specified in SB 82 in the general plan update allowing a maximum
of up to 40 units per acre, which density would be consistent with staff's initial
recommendation (City Council/Planning Commission Joint Study Session on September
8, 2015) and with staff's recommendation to include the Residential Incentive Overlay
into the general plan update allowing 40 dwelling units per acre for properties along
Real Estate Services Division/Asset Management Branch I State of California 1 Government Operations Agency
707 3rd Street, 5th Floor [ West Sacramento, CA 95605 1 t 916.376.7800 1 916.376.6219
Mayor Mensinger -2- October 6, 2015
Harbor Boulevard (October 8, City Council 2015 Agenda). Additionally, the FDC is
located within a designated High Quality Transit Area which usually has a minimum of
20 dwelling units per acre; therefore higher densities should be supportable.
Moreover, the state respectfully requests that the city not take any action regarding new
land use designations for the balance of the FDC property that may conflict with state
law or in any way impede the state's use of the property. At the present time, no
decision has been made regarding the closure of the FDC. Even if FDC closes, portions
of the property will continue serving the needs of the developmentally disabled
community, e.g. Harbor Village and Shannon's Mountain and/or other housing programs
or specialized services. Additionally, in the event FDC closes at some future date and
portions are determined to be excess to the Department of Developmental Services'
(DDS) needs, the first priority would be to determine whether or not the property could
be repurposed for state use.
The state looks forward to working together with the city on Shannon's Mountain to
provide housing for the developmentally disabled that will minimize density impacts on
the area while improving the likelihood of financial feasibility. Please contact me at
Robert. McKinnon(a)dgs.ca.pov or (916) 376-1814 if I can provide additional information.
Sincerely,
Robert W. McKinnon
Assistant Branch Chief, Asset Management Branch
Department of General Services
cc: City Clerk, City of Costa Mesa
Mayor Pro Tem Jim Righeimer, City of Costa Mesa
Council Member Katrina Foley, City of Costa Mesa
Council Member Sandra Genis, City of Costa Mesa
Council Member Gary Monahan, City of Costa Mesa
Claire Flynn, AICP, Asst. Development Services Director, City of Costa Mesa
Fariba Shahmirzadi, Assistant Deputy Director, Administrative Operations,
Department of Developmental Services
Marie W. Maddy, Chief, Facilities Planning and Support Section, Department of
Development Services
• PROPOSED
• •
5 Ell Mill Wall I vlogm
ADDITIONAL DOCUMENTS - N13-3
MEGA, JESSICA
Subject: FW: Opposition to Development at 440 Fair Drive
Attachments: Letter To City Council Oct 5 2015.pdf
Dear Brenda,
We are unable to attend the city council meeting on October 6. We would like the attached letter
entered in to public comment as to our opposition to the proposal for 440 Fair Drive. Can you please
confirm that the attached letter will be forwarded to the correct person(s)?
If you have any questions, please do not hesitate to contact me.
Sincerely,
Kelli Weber
October 5, 2015
RE: the project at 440 Fair Drive.
To whom it may concern,
As longtime residents of College Park, we would like to firmly express out disapproval with the proposed
project at 440 Fair Drive. The proposed development does not fit with the current neighborhood. We
told the developer as much as did our neighbors, and it appears he substantially ignored the resident's
concerns. The current property at 440 Fair has little impact the neighborhood. We are not opposed to a
new use for that property, just not the current proposal as of October 5, 2015.
Following are the reasons why we are opposed to the project:
• We already have a massive high density development in College Park.
• There are already parking problems in College Park in the area surrounding 440 Fair due to
Mediterranean Village not providing enough parking, this project will only make the parking
issues worse.
• There will be a significant increase in traffic on Bucknell and Princeton from this project. Drivers
exiting the development will not be able to turn on to Fair from Carnegie during peak traffic
times.
• The development entrance/exit will focus all vehicle headlights on the properties across the
street when exiting the development.
• A rooftop deck on the 3 story units "effectively" creates a fourth story.
• The homes will look into the backyards of the existing homes.
• There are only 4 guest parking spots for the 28 units. (The original plan had 0 spots).
• There is no green space in the property.
Please consider these issues and reject this terrible project.
Sincerely,
Kelli & Todd Weber
2513 Lehigh Place
ADDITIONAL DOCUMENTS - N13-3
MEDIA, JESSICA
Subject: FW: 440 Fair Drive Agenda Item
-----Original Message -----
From: Brian Burnett [mailto:
Sent: Tuesday, October 06, 2015 1:23 PM
To: CITY COUNCIL<CITYCOUNCIL@ci.costa-mesa.ca.us>
Subject: 440 Fair Drive Agenda Item
Dear Costa Mesa City Council,
Please leave the zoning the way it is on the 440 Fair Drive building.