Loading...
HomeMy WebLinkAbout21 - PH-1 - Attachment 3 - 10/20/2015l I ' •. Ort a .r •. ilc...l. • .r 1. low '• •y ..R 1!_.. v •m r AF w A lu. IN i f ■ ■ .. ••/ r r �� t.0 I ■r ■ l I ul I L r � � v W a 00 U o r0 0, O u L T U N U o C_ o_ C 0 0 N L N c s m 0 v ra N L o CL U L N 0 O 0 z O L 0- %0 %0 L L X W a. N Q) tkn lu a v ^u W L- on on C U C O 7 N - C - N Q) pr 4J N O N L a on Ld > O L CL v tj N h X W W Chapter 4. Project Description Section 4.2. Project Description - 43 4.2.2 Site 1 - Segerstrom Town Center (3.3 acres) Project Location Property Owner Authorized Agent 3400 and 3420 Bristol Street South Coast Plaza Partners Paul Freeman/David Wilson C.J. Segerstrom & Sons 3315 Fairview Road Costa Mesa, CA 92626 Office Project — 3420 Bristol Street Existing unbuilt entitlement 336,525 sq.ft. of office Existing uses to be demolished 84,025 sq.ft. of office Proposed development Maximum conversion of 103,355 sq.ft. of unbuilt office entitlement to a maximum of 225 residential high-rise units resulting in 233,170 sq.ft. of office Maximum building height 315 feet above ground level Hotel Project — 3400 Bristol Street Existing unbuilt entitlement 200 -key hotel (220,000 sq.ft.) Existing uses to be demolished 31,500 sq.ft. of theaters (2) Proposed development Addition of 50 residential units in addition to the unbuilt hotel entitlement Maximum building height 315 feet above ground level Existing Setting Segerstrom Town Center (Exhibit 5) is located at the southeast corner of Bristol Street and Sunflower Avenue, immediately east and across Bristol Street from South Coast Plaza. Retail/commercial centers are located north of the site in the City of Santa Ana across Sunflower Avenue. The Park Tower office building and parking structure is located to the east of the site, and office and restaurant uses are located to the south across Town Center. The site is currently developed with a single -story office building, a multi -story office building, and two vacant movie theaters (31,500 square feet). The existing uses on the site would be demolished in order to make room for the entitled and proposed develop- ments. Site 1 photographs are shown on Exhibit 6 and Exhibit 7. EIR No. 1047, the South Coast Plaza Town Center FIR, analyzed an increase in development intensity within the South Coast Plaza Town Center area, and included the development of a 186 -key, 220,000 - square -foot high-rise hotel, and 339,025 square feet of high-rise office uses on this site. These projects were approved by the City of Costa Mesa in February 2001, but have not yet been constructed. In 2003, the hotel was increased to 200 keys, and the office entitlement was decreased to 336,025 square feet. Site 1 is identified as the Segerstrom Town Center sub -area of Area 4, South Coast Plaza Town Center, in the NCMSP. `4D City of Costa Mesa c man�.:&uSo urs North Costa Mesa High -Rise Residential Project Program EIR Chapter 4. Project Description Section 4.2. Project Description — 44 I 2. Proposed Development The proposed project includes two high-rise residential towers with a total of 275 residential units. The first tower, located at 3400 Bristol Street, would include 50 residential units, built atop a previously entitled, but un -built 200 -key hotel. The second tower, located at 3420 Bristol Street, would include 225 residential units, built in addition to 233,170 square feet of previously entitled, but un -built office building space. The existing entitled office space totals 336,525 square feet, however, this would be reduced to 233,170 in order to maintain the existing trip budgets. The two towers would be 315 feet above ground level (AGL), and project construction is not contemplated until after year 2010. The design for this site is conceptual and has not yet been finalized. The developer will be required to submit a Final Master Plan to the Costa Mesa Planning Division, which shall address all design re- quirements as set forth in the City's General Plan and the NCMSP. The development proposals are further described in Table 6 - Project Summary (page 91) and Table 7 - Development Components Summary (page 92). f. u I I I P I I I I q City of Costa Mesa North Costa Mesa ram EIR High -Rise Residential Project Pro CVLBEUSf .AO S&MSOCIATE$ 9 J 9