HomeMy WebLinkAbout04 - CC-4 - Improvement at Three Bus Stops, Project - 7/5/2016CITY COUNCIL AGENDA REPORT MEETING DATE: JULY 5, 2016 ITEM NUMBER: CC -4 SUBJECT: IMPROVEMENTS AT THREE BUS STOPS, PROJECT NO. 15-11 DATE: JUNE 23, 2016 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: BALTAZAR MEJIA, CITY ENGINEER FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, 714-754-5335 RECOMMENDATION: 1. Accept work performed by Unique Performance Construction, Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Materials Bond seven (7) months after the filing date; release the Faithful Performance Bond six (6) months after the filing date and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On June 29, 2015, a construction contract in the amount of $79,820.00 was awarded to Unique Performance Construction, Inc., 1321 N. Jefferson Street, Anaheim, CA 92807 for the Improvements at Three Bus Stops Project. The work performed consisted of improving three of the City's bus stops located at Harbor Boulevard/Victoria Street (Bus Stop # 1195), Harbor Boulevard/Wilson Street (Bus Stop # 1220) and Wilson Street/Harbor Boulevard (Bus Stop # 1371) by installing new bus shelters, bus benches and associated amenities. Also, the existing sidewalk was removed and replaced with a new decorative sidewalk. Before Improvement �� y • 4I �1 ll 11 1 After Improvement ANALYSIS: The work required by the contract documents was completed on June 15, 2016 to the satisfaction of the City Engineer. The final contract cost amounted to $81,400.36. A report of the final costs is included herein as Attachment 1. A summary of the costs is as follows: Original Contract Cost: $79,820.00 Change Order No. 1: $3,620.36 Final Quantity Adjustment: ($2,020.00) Final Contract Cost: $81,420.36 During construction, it was determined that certain aspects of the proposed engineering design were not feasible. As a result, Change Order No. 1 in the amount of $3,620.36 offset the cost of extra work necessary during the course of the project, including the fabrication and installation of modified brackets for the bus shelter on Harbor Boulevard and Victoria Street. The final contract price reflects a two percent (2%) increase to the original contract as a result of the aforementioned change order and final quantity adjustment. As of this date there are no Stop Notices filed against the monies due to Unique Performance Construction, Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: Staff captured a Measure M2 grant for this work which will cover 100% percent of the project cost. LEGAL REVIEW: There is no legal review required for this item. CONCLUSION: The Improvements at Three Bus Stops Project, City Project No. 15-11 has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion, release the remaining retention monies 35 days after the Notice of Completion filing date and release the bonds accordingly. E JAMES G. ROSS Interim Public Services Director ATTACHMENT: 1 — Cost Summa BALTAZAR MEJIA City Engineer DISTRIBUTION: Chief Executive Officer Assistant Chief Executive Officer City Attorney City Clerk Transportation Services Manager Staff File 3 ATTACHMENT 1 CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF 5/13/16 DATE: 05/10/2016 2nd Payment to: UNIQUE PERFORMANCE CONSTRUCTION, INC. 1321 N. JEFFERSON STREET, ANAHEIM, CA 92807 PROJECT: IMPROVEMENTS AT THREE BUS STOPS CITY PROJECT NO. 15-11 PAGE: ITEM BID UNIT PREVIOUS QUANTITY TOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACT NO QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE 1 1 LS MOBILIZATION 6,000.00 100.00 % 0.00 % 100.00 % $6,000.00 $0.00 $6,000.00 $6,000.00 2 1 LS TRAFFIC CONTROL 2,800.00 100.00 % 0.00 % 100.00 % $2,800.00 $0.00 $2,800.00 $2,800.00 3 1400 SF DECORATIVE PCC SIDEWALK 17.00 1,280.00 SF 0.00 SF 1,280.00 SF $21,760.00 $0.00 $21,760.00 $23,800.00 4 2 EA FURNISH AND INSTALL ADVERTISING BUS 16,500.00 2.00 EA 0.00 EA 2.00 EA $33,000.00 $0.00 $33,000.00 $33,000.00 SHELTER 5 6 EA FURNISH AND INSTALL BUS BENCH 720.00 6.00 EA 0.00 EA 6.00 EA _ $4,320.00 $0.00 $4 320.00 $4,320.00 6 6 EA FURNISH AND INSTALL TRASH RECEPTACLE 1,650:90901 6.00 EA 0.00 EA 6.00 EA $9 900.00 $0.00 $9 900.00 $9900.00 PROJECT TOTAL: 77 780.00 0.00 77 780.00 79 820.00 CHANGE ORDERS FABRICATE AND INSTALL MODIFIED MOUNTING 1 1 LS BRACKETS FOR BUS SHELTER INSTALLATION ON HARBOR BOULEVARD $3,620.36 0 % 100 % 100 % $0.00 $3,620.36 I $3,620.36 $3,620.36 CHANGE ORDERS TOTAL: 1 $0.001 $3,620.361 $3,620.361 $32620.361 PROJECT TOTAL: 1 $77,780.001 3 620.36 $81,400.361 83 440.36