Loading...
HomeMy WebLinkAbout06 - CC-6 - Harbor Blvd Improvements from South Coas - 7/5/2016CITY COUNCIL AGENDA REPORT MEETING DATE: JULY 5, 2016 ITEM NUMBER: CC -6 SUBJECT: HARBOR BOULEVARD IMPROVEMENTS FROM SOUTH COAST DRIVE TO SUNFLOWER AVENUE, CITY PROJECT NO. 14-07 DATE: JUNE 23, 2016 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, TRANSPORTATION SERVICES MANAGER FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5291 RECOMMENDATION: 1. Approve Contract Change Order No. 4 (Attachment 1) in the amount of $19,898.00; 2. Approve Budget Adjustment Authorization No. 17-002 (Attachment 2) in the amount of $19,898.00; 3. Accept the work performed by All American Asphalt and authorize the City Clerk to file the Notice of Completion; 4. Release the Faithful Performance Bond (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: The Harbor Boulevard Improvements Project consisted of adding a fourth northbound travel lane from north of South Coast Drive to Sunflower Avenue. In addition, the project included traffic signal modifications to intersections of Harbor/Sunflower and Harbor/Law Court. The project met the recommended roadway widths/geometries as specified in the Harbor Boulevard Smart Street Study as well as the Orange County Transportation Authority (OCTA) Master Plan of Arterial Highways (MPAH), and implemented required improvements per the City's Circulation Element. On June 17, 2014, the City Council awarded a construction contract to All American Asphalt, P.O. Box 2229, 400 E. Sixth Street, Corona, California 92878, in the amount of $769,769 for the construction of Harbor Boulevard Improvements. Change Orders No. 1 and 2 were approved by the CEO pursuant to Council Policy No. 700-1. Change Order No. 1 in the amount of $3,510.99 was to revise the roadway grades to match existing conditions, and Change Order No. 2 in the amount of $49,850 was to address utility conflicts encountered during construction. On November 3, 2015, the City Council approved Change Order No. 3 in the amount of $80,812.65 for revisions to the work requested by Southern California Edison (SCE) and repair work of a sinkhole on South Coast Drive. ANALYSIS: The overall scope of work for the widening of Harbor Boulevard from South Coast Drive to Sunflower Avenue has been competed to the satisfaction of the City Engineer. Before Improvements After Improvements All American Asphalt has submitted extra work requests and delay stand-by time for the relocation of cable television facilities in the widened area of the roadway. The extra work requests and delay time was addressed in accordance with the Utility Relocation and Utility Delay Sections of the contract specifications. Change Order No. 4 compensates All American Asphalt for these costs in the amount of $19,898.00. City Council Policy No. 700-1 requires all changes for a project be approved by the City Council once the costs exceed 10% of the original contract price. However, additional funding for the unanticipated utility claim is required to finalize this project. Therefore, staff is recommending that the City Council approve Change Order No. 4 in the amount of $19,898.00 and Budget Adjustment Authorization No. 17-002 for $19,898.00. With approval of Change Order No. 4 the cumulative total of the change orders to date will increase the original contract amount to $923,840.64 or 20.02% over the original contract price. A report of the final cost summary is included herein as Attachment No. "3." A summary of the project costs is as follows: Original Contract Cost: $769,769.00 Change Order No. 1: $ 3,510.99 Change Order No. 2: $ 49,850.00 Change Order No. 3: $ 80,812.65 Change Order No. 4: $ 19,898.00 Final Contract Price: $923,840.64 Change Order No. 1, in the amount of $3,510.99 was to revise the roadway grades to match existing conditions. Change Order No. 2, in the amount of $49,850.00 was to address utility conflicts encountered during the widening of the roadway and during the construction of the traffic signal. Change Order No. 3, in the amount of $80,812.65 was for revisions to the street lighting system requested by Southern California Edison (SCE) and to address a sinkhole repair on South Coast Drive. FA Change Order No. 4, in the amount of $19,898.00 is a claim by All American Asphalt to re - grade the subgrade after utility relocations and stand-by time for manpower and equipment while the utilities were being relocated. As of this date, there are no Stop Notices filed against the monies due to All American Asphalt. ALTERNATIVES CONSIDERED: No alternatives are being considered for this item. FISCAL REVIEW: Funding for the Harbor Boulevard widening project is available from the OCTA Measure M2 grant, Air Quality Management District (AQMD) funds and Traffic Impact Fees. The attached Budget Adjustment Authorization appropriates $19,898.00 from Traffic Impact Fee Funds towards the requested contract change order. LEGAL REVIEW: There is no legal review required for this item. CONCLUSION: The overall scope of work for the widening of Harbor Boulevard from South Coast Drive to Sunflower Avenue has been completed. Staff is recommending that the City Council Approve Change Order No 4 in the amount of $19,898.00; approve Budget Adjustment Authorization No. 17-002 in the amount of $19,898.00; authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. JAMES G. ROSS BALTAZAR MEJIA, P.E. Interim Public Services Director City Engineer ATTACHMENTS: 1. Contract Change Order No. 4 for $19,898.00 2. Budqet Adjustment Authorization No. 17-002 for $19,898.00 3. Cost Summary DISTRIBUTION: Chief Executive Officer Assistant Chief Executive Officer City Attorney City Clerk Staff File 3 ATTACHMENT( CITY OF COSTA MESA ENGINEERING DIVISION CONTRACT CHANGE ORDER NO. 004 SUPPL NO. REV. PROJECT: Harbor Boulevard Improvements from South Coast Drive to Sunflower Avenue SHEET 1 OF 1 SHEET FEDERAL NO.(S) CITY SPECIFICATION NO. 14-07 To ALL AMERICAN ASPHALT Contractor You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. NOTE: This change order is not effective until approved in accordance with Council Policy No. 700-1 Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price, agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. Change Requested by: CITY The last percentage shown is the net accumulated increase or decrease from the original quantity in the Bid Proposal. UTILITY DELAYS AND EXTRA WORK FOR UTILITY REPAIRS: All American Asphalt has submitted extra work requests for delay costs and re -grading work relating to the relocation of cable television facilities on the eastside of Harbor Boulevard in the area being widened for the new northbound lane on Harbor Boulevard from South Coast Drive to Sunflower Avenue. A brief summary of the work is as follows: 1. Re -survey and re -stake the sidewalk grade that was trenched through by the cable television contractor. 2. Re -grade the sidewalk subgrade from Law Court to Sunflower along Harbor Boulevard after the conduit for cable television was relocated out of the way of the new improvements. 3. Stand-by time for on-site equipment while the cable television's contractor was mobilizing to perform the utility relocation. The costs for this change order are based on time and materials reports, and include all mark-ups allowed by the contract documents. Description Amount % Original Contract Amount: ........................................................... $769,769.00 Previously Approved Change Orders: ............................................. $134,173.64 17.43% Amount this Change Order: ......................................................... $19,898.00 2.58% Revised Contract Amount: ........................................................... $923,840.64 20.02% TOTAL COST TO CONTRACT: ❑ DECREASE ® INCREASE: $19,898.00 By reason of this order the time of completion will be adjusted as follows: Add 14 days Prepared by: Thomas Banks Date: 06/15/16 Submitted by: Approval Recommended: Date: Approved: Date: We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. JAccepted, Date By Title Contractor If tha C:nntrector did not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. BUDGET ADJUSTMENT AUTHORIZATION Unit Department CITY Public Services Type of Transaction ❑ Revenue Estimate ❑ Estimate Increase ❑ Estimate Decrease ® Source ❑ From Existing Budget Appropriations ❑ From Donations, Fees, or Grants F U ro riated Fund Balance Division Transportation Services ® Expenditure Appropriation ❑ Intra -Departmental Transfer ❑ Inter -Departmental Transfer ❑ Project -TO -Project Transfer ® Appropriation Increase ❑ Appropriation Decrease Reason for Request: Serial Number 17-002 ATTACHMENT 2 To increase project appropriation by $19,898 for the Harbor Blvd. Improvement Project 14-07 change order, as approved by the City Council at the July 5, 2016 meeting. ® rom nape p Name Fund Or anization Program Project/Grant Increase Decrease Unit Account 214 19300 30210 - - $19,898 CITY 340295 Undesignated Fund Balance CITY 500000 CIP- Harbor Widening 214 19300 30210 300142 $19,898 Recommendation: ® Approval ❑ Disapproval Department Authorization: Reasons For Disapproval: Director of Finance Date Director Date 71Department CEO Action: El Approved El Disapproved Not Required Budget Verification: The above information has been reviewed, is complete and accurate, and the appropriations Date and/or unappropriated funds are sufficient to support the request. CEO City Council Action: ® Yes ❑ No ® Approved ❑ Disapproved ❑ Not Required Date Budget Analyst Date CITY OF COSTA MESA ATTACHMENT 3 PAYMENT TO: ALL AMERICAN ASPHALT KID, BOX 2229, CORONA CA 92878 PROJECT: HARBOR BOULEVARD IMPROVEMENTS, CITY PROJECT NO. 14-07 CITY PROJECT NO. 14-07 DATE: 06/16/16 PAGE: 1 OF 1 ITEM NO &D WANTDY DESCRIPTgN UNIT PRICE PREVKKIS GUANTRY WANTITY THISESTIMATE TOTAL WANTDY TO DATE PREVKKIS AMOUNT AMWNT =EST TOTAL TODATE CONTRACT PRICE 1 1 LS MOBILIZATION $ 37,012.00 75 % 25 o 100 % 1 $27,759.00 $9,253.00' $37,012.001 $37,012.00 2 1 LS TRAFFIC CONTROL $ 73,833.00 1 75 % 1 25 % 100 % 1 $55,374.75 $18.458.251 $73,833.001 $73,833.00 3 (F) 1,510 LF SAWCUT AND JOIN EXISTING STRUCTURAL SECTIONS & IMPROVEMENTS $ 3.00 0 LF 1,510 LF 1510 LF $0.00 $4,530.00 $4,530.00 $4,530.00 4 (F) 750 SF SAWCUT AND REMOVE EXISTING PCC CROSS GUTTER AND SPANDRAL $ 3.00 480 SF 868 SF 1348 SF $1,440.00, $2,604.00 $4,044.00 $2,250.00 5 F 435 SF SAWCUT AND REMOVE EXISTING PCC DRIVEWAY APPROACH $ 3.00 1 320 SF 812 SF 1132 SF I $960.00, $2,436.00 $3,396.00 $1,305.00 6 F 1,445 LF SAWCUT AND REMOVE PCC CURB AND GUTTER $ 12.00 204 LF 1,241 LF 1 1445 LF 1 $2,448.001 $14,892.001 $17340001 $17,340.00 7 F 64 LF SAWCUT AND REMOVE PCC CURB $ 12.00 64 LF 30 LF 94 LF $768.00 $360.001 $1.128.00" $768.00 8 F 7,710 SF SAWCUT AND REMOVE PCC SIDEWALK $ 1.60 0 SF 7,710 SF 7710 SF $0.00 $12 336.00 $12,336.001 $12,336.00 9 8 EA EXISTING STREET LIGHT POLE AND PULL BOX TO BE RELOCATED $ 1,600.00 29 $0.00 EA 0 EA 0.00 $0.001 $0.001 $12 800.00 10 1,728 TN CONSTRUCT 17" AC TYPE PG -64-10 DEEPLIFT $ 100.00 0 TN 0.00 TN 0 TN $0.001 0.00 $0.00 $172,800.00 11 500 SF CONSTRUCT 6" PCC OVER 6"CMB OVER COMPACTED (95%MIN) NATIVE $ 15.00 684 SF 7 SF 691 SF $10,260.00 $105.00 $10,365.00 $7,500.00 12 750 SF CONSTRUCT PCC CROSS GUTTER AND SPANDRAL $ 19.00 771 SF 1 0 SF I 771 SF 1 $14,649.001 $0.001 $14,649.001 $14,250.00 13 435 SF CONSTRUCT PCC ALLEY APPROACH $ 19.00 352 SF 1 0 SF 1 352 SF $6,688.001 $0.00 $6,688.00 $8,265.00 14 1,295 LF CONSTRUCT 8" CURB AND GUTTER TYPE C-8 $ 32.00 1,172 LF 1 -139 LF 1033 LF $37,504.001 -$4,448.001 $33,056.00 $41,440.00 15 3 EA ADJUST MANHOLE TO FINISHED GRADE. $ 630.00 1 0 EA I 3 EA 3 EA $0.00' $1,890.001 $1,890.001 $1,890.00 16 2 EA RELOCATE WATER METER AND PULL BOX $ 250.00 1 0 EA 1 2 EA 2 EA $0.001 $500.001 $500.001 $500.00 17 1 EA ADJUST WATER VALVE LID AND CAN TO FINISHED GRADE. $ 350.00 0 EA 1 5 EA 5 EAI $0.00, $1,7,5g.00''$1,7511.00 $350.00 18 6 EA ADJUST UTILITY VAULT LID TO FINISHED GRADE. $ 618.00 0 EA 0 EA 0 EA $0.00 0.001 $0.00' $3,708.00 19 1 EA INTERCEPT AND EXTEND EXISTING FIRE HYDRANT LATERAL AND RELOCATE $ 8,137.00 1 EA 0 EA 1' 1 EAI $8,137.00 $0.00 $8,137.00 $8,137.00 20 40 LF CONSTRUCT 6" CURB TYPE A H=18" $ 32.00 48 LF 0 LF ! 48 LFI $1,536.001 $0.001 $1,536.001 $1 280.00 21 7,710 SF CONSTRUCT 4" THICK PCC SIDEWALK $ 6.00 5,718 SF 632 SF 1 6350 SF $34,308.00' $3,792.00' $38,100.001 $46,260.00 22 1 EA RELOCATE BEHIND CURB, ADJUST TO FINISH GRADE (ITEM INDICATED). 4' CLEAR REQUIRED AROUND VERTICAL OBSTRUCTIONS, NO PORTION OF AIR VENTS ALLOWED WITHIN T OF EXCEPTFS AT RISER. 1 $ 5,665.00 0 EA 1 EA 1 EAI $0.00' $5,665.00' $5,665.00 $5,665.00 23 4 EA CONSTRUCT CURB RAMP $ 2,200.00 5 EA 0 EA 5 EA 1 $11,009 $0.001 $11.000.001 $8,800.00 24 1 LS GRADE TO MATCH EXISTING $ 9,750.00 0 % 0 % 0 % $0.00 $0.00 $0.00. $9,750.00 25 1 LS REMOVE EXISTING TREE AND/OR VEGEATION $ 8,500.00 0 % 100 % 100 % $0.00 $8 500.001 $8,500.00'. $8,500.00 26 1 LS SIGNING AND STRIPING IMPROVEMENTS $ 8,500.00 0 % 100 % 100 % $0.00 8 500.00 $8,500.00 $8 500.00 27 1 LS TRAFFIC SIGNAL MODIFICATIONS AT HARBOR BOULEVARD AND LAW COURT $ 184,000.00 100 % 1 % 99.130435 % 1 $184,000.00, $1,600.001 $182,400.00 $184,000.00 28 1LS TRAFFIC SIGNAL MODIFICATIONS AT HARBOR/SUNFLOWER $ 51,000.00 1 100 % -3 % 96.862745 % $51,000.001 -$1,692-22 $49,400.00 $51,000.00 29 1 FA PROJECT MANAGEMENT $ 25,000.00 1 1 FA -1 FA 1 0 FA $25,000.00 -$25 000.00 $0.00 $25 000.00 TOTAL: 5472.831.75 562.923.25 5535.755.00 $769.769.00 CHANGE ORDERS 1 LS REVISED WORK FOR ELECTRICAL STREET LIGHT $41,812.85 100.00 % 0 % 100.00 % $41,812.85 $0.00 $41,812.85 $3,510.99 1 LS Upgrade Type 29 Mast Arm $1,793.82 0.00 LS 0 LS 0.00 LS $0.00 $0.00 $0.00 $49,850.00 1 LS AAA extra work - Cable $19,388.82 0.00 LS 100 LS 100.00 LS $0.00 $19,388.82 $19,388.82 $80,812.65 1 LS Additional survey to restake Curb and gutter $1,111.00 0.00 LS 0 LS 0.00 LS $0.00 $0.00 $0.00 $19,898.00 1 LS AAA extra work - for utilities at Sunflower $6,376.58 0.00 LS 100 LS 100.00 LS $0.00 $6,376.58 $6,376.5 1 LS MSL extra work - for utilities at Law Court $15,590.09 0.00 LS 100 LS 100.00 LS $0.00 $15,590.09 $15,590.09 1 LS Irrigation $25,569.38 0.00 LS 100 LS 100.00 LS $0.00 $25.569.38 $25.569.38, 1 LS Handwaterinq by Kato $4.439.16 0.00 LS 100 LS 100.00 LS $0.00 $4,439.16 $4 439.16 1 LS Traffic Control for irrigation $26,880.00 0.00 LS 55.80 LS 55.80 LS $0.00 $15,000.00 $15,000.00 1 LS Install Retaining Curb $1,960.00 0.00 LS 100 LS 100.00 LS $0.00 $1,960.00 $1,960.0 1 LS Extra work by Kato $4,439.16 0.00 LS 100 LS 100.00 LS $0.00 $4,439.16 $4,439.16 1 LS AAA extra work - for utilities at Law Court $1,960.02 0.00 LS 100 LS 100.00 LS $0.00 $1,960.02 $1,960.02 1 LS AAA extra work - for utilities at Law Court $11,374.05 0.00 LS 100 LS 100.00 LS $0.00 $11,374.05 $11,374.05 420 CY EXCAVATION FOR ROADWAY, WIDENING UNDER CONCRETE, AND SLOPE $90.00 1,035.00 CY 36 CY 1,071.00 CY $93,150.00 $3,240.00 $96,390.00 600 TN 2" ARHM INCL. LEVELING COURSE $101.00 0.00 TN 369 TN 368.82 TN $0.00 $37,250.82 $37 250.82 700 TN 10" AC WITH FORTIFIBER $101.00 20.17 TN 978 TN 997.71 TN $2,037.17 $98,731.54 $100,768.71 18,600 SF COLD PLANE $0.31 0.00 SF 18 600.00 SF 18 600.00 SF $0.00 $5,766.00 $5 766.00 TOTAL: $137.000.0 251 085.62 388 085.64 154 071.64 PROJECT TOTAL: $609,831.77 314 008.87 $923 840.64 923 840.64