Loading...
HomeMy WebLinkAbout17 - NB-1 - General Plan Screening GPS-16-03 for the - 7/5/2016CITY COUNCIL AGENDA REPORT MEETING DATE: JULY 5, 2016 ITEM NUMBER: IVB -1 SUBJECT: GENERAL PLAN SCREENING GPS -16-03 FOR THE EMULEX PROPERTY AT 3333 SUSAN STREET DATE: JUNE 24, 2016 FROM: PLANNING DIVISION/DEVELOPMENT SERVICES DEPARTMENT PRESENTATION BY: MEL LEE, SENIOR PLANNER FOR FURTHER INFORMATION CONTACT: MEL LEE, AICP, SENIOR PLANNER (714) 754-5611 mel.lee@costamesaca.gov RECOMMENDATION Accept or deny General Plan amendment screening request for processing to amend the land use designation from Industrial Park (IP) to Commercial Center (CC) related to development of the 14.25 acre Emulex property at 3333 Susan Street. REQUEST If the General Plan screening request is accepted for processing, the proposal would require approval of the following entitlements: • General Plan Amendment to change the land use designation of the 14.25 acre Emulex property from Industrial Park (IP) to Commercial Center (CC); • Increase the FAR (Floor Area Ratio) of the 14.25 acre Emulex property from .40 allowed to .45 proposed to allow a mix of commercial uses including a hotel, retail, and restaurant uses, on a vacant 3.2 acre portion of the site; • Amend the North Costa Mesa Specific Plan Area 1, Sub -Area C, with regard to land uses, trip budget, and building square footage allowed for the site; • Rezone to change the zoning of the 14.25 acre Emulex property from PDI (Planned Development Industrial) to PDC (Planned Development Commercial) for the existing and proposed land uses for the site; • Amend the Development Agreement for Home Ranch (DA -00-01) for the proposed project; and • Master Plan Amendment for the hotel, retail, and restaurant uses proposed on the vacant 3.2 acre portion of the site. BACKGROUND Project Site The project site is 14.25 acres in size and is bounded by South Coast Drive (south), Susan Street (east), LA Times building (west) and Sunflower Avenue (north). Settin p The three existing, two-story administrative office buildings for Emulex Corporation are comprised of 172,176 square feet of total floor area, surrounded by surface parking and landscaped areas, and are connected by covered walkways. The proposed development would occur on the undeveloped southern portion of the property, which is approximately 3.2 acres in size. This vacant area of the Emulex site had been previously approved and graded for a future fourth office building that was never constructed. Proposed Project The proposed project consists of a General Plan Amendment to change the land use designation of the 14.25 acre Emulex property from Industrial Park (IP) to Commercial Center (CC) to allow a mix of commercial uses, including a hotel, retail, and restaurant uses on the vacant 3.2 acre portion of the site. The related entitlements that would be required if the screening request is approved are described on the first page of this report. Parking /Access Vehicular access to the site is currently from Susan Street. The proposed development will require the construction of additional drive approaches along Susan Street and South Coast Drive as shown on the conceptual site plan attached to this report (Attachment 6). Based on the uses proposed, it is anticipated that the project will result in an increase in the number of AM peak hour trips (158) and PM peak hour trips (194). A full trip generation analysis has been completed by the applicant's traffic consultant, Stantec, and is attached to this report for reference (Attachment 4). To comply with the parking standards, the proposed project will require a total of 147 parking spaces; compared to the existing 630 parking spaces provided for the existing office use, the proposed project will result in a total of 777 on-site parking spaces for all uses on the property. Other Development Standards A summary of the development standards for the proposed project is included in the following table. A more detailed code comparison will be done when the development plan is submitted for processing. Criteria Requirement Proposed Perimeter Open Space 20 feet 20 feet Floor Area Ratio FAR .40 Maximum .45 Max. Building Height Four Stories Maximum Two Stories (Retail) Four Stories Hotel ANALYSIS General Plan Amendment Screening Criteria City Council Policy 500-2 sets forth the criteria to evaluate General Plan amendment requests. Council takes action on whether or not a proposal should be accepted for processing by using these criteria as guidance. The Policy establishes a procedure for processing privately initiated General Plan amendments (Attachment 2). The policy also acknowledges these criteria are only guidelines and City Council may accept an application which does not meet the criteria if it finds there are overriding reasons to do so. A project summary sheet is attached for the screening request. This summary sheet provides the following information: General Plan Land Use Map and Aerial Photograph Potential Project Description, Land Use and Traffic Evaluation Justification for approval or rejection of application for further processing Additionally, acceptance of a proposal for screening is not a commitment to approve the General Plan amendment. This action represents that Council would like to consider the request for processing, and subsequently explore alternatives prior to making a final decision on amending the General Plan. ALTERNATIVES In addition to providing general feedback on the proposed project, City Council would need to take action on the General Plan amendment screening request. Accept processing of the General Plan Amendment request. This would allow the applicant to proceed with applying to amend the General Plan for the proposed project. 2. Deny General Plan Amendment request from further processing. If the application is denied, the applicant may continue with the uses allowed under the current General Plan and Zoning designations. FISCAL REVIEW Fiscal review is not required for this item. LEGAL REVIEW The City Attorney's office has considered the proposal and determined that a General Plan amendment is necessary in order for the project to proceed as proposed. PUBLIC NOTICE General Plan Screenings do not require public notice; however, if the screening were to be approved, the General Plan Amendment and related entitlements as described on page 1 of this report would be subject to public notice per Title 13, Section 13-29(d), of the Costa Mesa Municipal Code. CONCLUSION Staff believes the proposed development meets the goals and intent of the City's General Plan and regional land use plans in that it provides new development that will be consistent and compatible with surrounding properties and uses. MEL LEE, AICP Senior Planner GARY ARMSTRONG, AICP Economic Development & Development Services Director / Deputy CEO Attachments: 1. Summary Sheet 2. Council Policy 500-2 3. Vicinity Map /Existing General Plan Map/Existing Zoning Map 4. Traffic Study 5. Development Agreement DA -00-01 6. Applicant's Request and Conceptual Plans SWGS Susan Street, LLC 2050 Main Street, Suite 830 Irvine, CA 92614 Donald Lamm Diamond Star Associates, Inc. 4100 MacArthur Boulevard, Suite 330 Newport Beach, CA 92660 V GPS -16-03 — 3333 Susan Street 10 TRAFFIC EVALUATION i,RTE VENOSA=—yf 14wm< RTENOVARA=o S z ATTACHMENT 1 GENERAL PLAN SCREENING REQUEST The project site is 14.25 acres in size and contains three existing, two-story administrative office buildings for Emulex Corporation, 172,176 square feet of total floor area, surrounded by surface parking and landscaped areas, and connected by covered walkways. The request is a General Plan Amendment to change the land use designation of the 14.25 acre Emulex Site from Industrial Park (IP) to Commercial Center (CC). Vehicular access to the site is currently from Susan Street. The proposed development will require the construction of additional drive approaches along Susan Street and South Coast Drive as shown on the conceptual site plan attached to this report (Attachment 6). Based on the uses proposed, it is anticipated that the project will result in an increase in the number of AM peak hour trips (158) and PM peak hour trips (194). A full trip generation analysis has been completed by the applicant's traffic consultant, Stantec, and is attached to this report for reference (Attachment 4). General Plan Land Use Development Description AM Peak PM Peak Hour Total Average Designation Hour Trips Trips Daily Trips Industrial Park (IP) General Plan Buildout (Existing and 207 215 1,726 Existing Future Industrial Park). An increase the FAR (Floor Area Ratio) of the site from .40 allowed to .45 is 365 409 4,008 Commercial Center (CC) proposed to allow a mix of commercial Proposed uses, including a hotel, retail, and restaurant uses on a vacant 3.2 acre portion of the site. N/A 158 194 2,282 Difference Proposed Source: Stantec Traffic Assessment, June 17, 2016 PROJECT COMPLIES WITH GOALS OF THE GENERAL PLAN Staff believes that the proposed project is compliance with the following goals of the City's General Plan: 1. General Plan Land Use Objective LU -1A.1: Provide for the development of a mix and balance of housing oDDortunities. commercial aoods and services. and emplovment opportunities in consideration of the needs of the business and residential segment of the community. The proposed development will contribute to jobs and housing balance within the community. The project will be in close proximity to major commercial and transit corridors and major freeways. 2. The Droiect satisfies the General Plan Acceptance Screenina Criteria since the Dreliminary trio aeneration assessment concluded that the Droiect will not result in a sianificant increase of averaae daily trips and is not expected to significantly impact any roadways in the area. In comparison with existing development and General Plan build out the project will result in an increase in the number of AM peak hour trips (158) and PM peak hour trips (194); however, the increase is not considered significant. CITY OF COSTA MESA, CALIFORNIA COUNCIL POLICY ATTACHMENT POLICY EFFECTIVE SUBJECT NUMBER ®ATE PAGE PROCESSING OF GENERAL PLAN AMENDMENTS 500-2 11/3/86 l of 2 Rev. 8/1/94 Background The General Plan constitutes the official policy of the City Council of the City of Costa Mesa with regard to physical development of the City. The City Council may, at its option, amend the General Plan or any element thereof, On August 2, 1982, the City Council enacted Resolution 82-65 adopting "General Plan Administration and Implementation Policies and Procedures". These procedures provided that regularly scheduled General Plan review hearings would be held at the first Planning Commission meeting in February, June, and October, Since that date, State Law has been amended to allow elements of the General Plan to be amended four, rather than three, times during any calendar year. Due to the increased workload on Staff, Planning Commission and City Council resulting from the review of General Plan Amendment applications, the City Council wishes to review the tvpe and number of such applications prior to acceptance for processing. Purpose It is the purpose of this policy to: Establish dates for Amendments. Establish guidelines providing direction to privately initiated applications. Policy the hearing of General Plan to assist the City Council in Staff with regard to processing Genera'_ Plan Amendment Privately initiated General Plan Amendment applications shall be heard at the first Planning Commission meetings in February, June, and October. A fourth date for the hearing of General Plan Amendment applications may be assigned by the City Council at its discretion for either privately initiated or City initiated General Plan Amendments. The City Council shall review applications for amendments to the General Plan and shall direct Staff to either proceed with processing of the applications or to return all materials to the applicant and refund the application fee. A list of applications, including the name of applicant, location of CITY OF COSTA MESA, CALIFORNIA COUNCI L POLICY POLICY EFFECTIVE SUBJECT NUMBER DATE PACE PROCESSING OF GENERAL PLAN AMENDMENTS 500-2 11/3/86 Rev. 8/1/94 2 of 2 property, and request shall be submitted to the City Council by the Planning Staff in sufficient time to be heard by the City Council at the second Council meeting following the application deadline. The following criteria shall be used as guidelines for the City Council to determine which applications will be accepted for processing. An application should be accepted if: A General Plan Amendment is necessary to resolve inconsistency between General Plan designation and zoning. ® A General Plan Amendment is necessary to provide a uniform land use designation on. a si,,-:g_e parcel cr development site. ® A General Plan Amendment would result in decreased traffic impacts from the property. An application for amendment to the General Plan should not be cr>-sid.ered if: ® The request applies to a single small lot or a small area, especially if the change would make the property inconsistent with surrounding properties. ® The property is located in the Redevelopment Area (requires action by the Redevelopment Agency to amend the redevelopment plan). No General Plan Amendment shall be accepted which would increase the overall, City-wide development cap. However, General Plan Amendments which would result in development exchanges or transfers, may be considered. As these are Simply guidelines, the Council may deviate from them if there are other important reasons for accepting or rejecting a particular application. v �� City of Costa Mesa CITY OF COSTA MESA - [Created: 6/22/2016 10:18:22 AM] [Scale: 565.341 [Page: 8.5 x 11 1 Landscape] I Overview Map 1 f Legend 1 (C) 2442-6 GeDPrIse,net (GeoVec, Inc.) - (866)422-2505 Map Display ATTACHMENT 3 IA LUCA pC CORTE VENOSA— D CORTE NOVAJ 0 ,r 1 -.1. - - - . I . - - __ . - � -- -... s,Fvr r -W, .4- GREENVILLEBANNINGCI4ANN€L +LL `+• LL • � a AL• Y1 Aib4 y A 1 .{{ Address Hydrolo- Points gy Cha nne I - Freeway s Roads Colmxior Street ,41 ,,I Froeiv4f Names ,41 1N3or Ncwpmm Street BLVID Centerlin- gran -y es SECONDA, ROW R0 Li nes (C) 2442-6 GeDPrIse,net (GeoVec, Inc.) - (866)422-2505 Map Display ATTACHMENT 3 IA LUCA pC CORTE VENOSA— D CORTE NOVAJ 0 ,r 1 -.1. - - - . I . - - __ . - � -- -... s,Fvr r -W, .4- GREENVILLEBANNINGCI4ANN€L +LL `+• LL • � a AL• Y1 Aib4 y A 1 .{{ City of Costa Mesa CITY OF COSTA MESA - [Created: 6/22/2016 10:19:33 AM] [Scale: 565.351 [Page: 8.5 x 11 / Landscape] Overview Map Map Display ANA Legend Address Street Points Names I/ Freeway Street Roads Centerlin- es f/ Colbnnr �l' FT^owar ROW f/ Mapr Lines sd' l EiVt1 BLVD ,,! Parcel primary Lines S CONDA. 13 City .1 •� Hydrolo- Boundary gy Channel- s RTE MALTE VIA LUCA KT -R, 1I CO VENO A D NO A ORTE NR g CVARA 8�� (C)2002-6 Geoftse.net(Ge Vec, Inc.) -(666)622-2505 GREENVILLE BANNING CHANNEL m m D ICI'KxY.C6 w.Gc pri NET City of Costa Mesa CITY OF COSTA MESA - [Created: 6/22/2016 10:20:13 AM] [Scale: 565.351 [Page: 8.5 x 11 / Landscape] Overview Map Legend Address Hyd:rolo- Points By Channel- hanneI- I4( ,4( Freeway s Roads !t/ colw w Street Fnxm r Names Map ,, No 13o Street Centerlin- BLVD es P--y SEcoNaA- ROW Ry Lines Map Display ;(c(aonva (C) 2002-6 GeoPnse.net (Ge Vec, Inc.) - (866)622-2505 —. SOUTH COAST CIU, GRLLNl iuL U A N NN:SCliANNLL SANTA ANA UNFLOWER Ay -- 11 — ATTACHMENT 4 SteelWave Project - Traffic Assessment City of Costa Mesa Prepared for: SteelWave LLC Prepared by: Stantec Consulting Services Inc. June 17, 2016 Sign -off Sheet This document entitled SteelWave Project -Traffic Assessment was prepared by Stantec Consulting Services Inc. ("Stantec") for the account of SteelWave LLC (the "Client'), Prepared by (signature) Kendall Elmer (949)923-6000 Reviewed by (signature) Daryl Zerfass PE, PTP (949)923-6058 12_ STEELWAVE PROJECT -TRAFFIC ASSESSMENT Table of Contents 1.0 INTRODUCTION................................................................................................................1 2.0 PROJECT SITE TRIP GENERATION.....................................................................................2 3.0 PROJECT TRIP DISTRIBUTION............................................................................................2 4.0 YEAR 2035 TRAFFIC CONDITIONS...................................................................................5 LIST OF TABLES Table 1 Project Site Land Use and Trip Generation Summary ................................................3 Table 2 Project Trip Distribution Pattern......................................................................................4 Table 3 Long -Range (2035) Intersection LOS Summary ...........................................................6 LIST OF ATTACHMENTS Intersection Capacity Utilization (ICU) Worksheets _13- STEELWAVE PROJECT - TRAFFIC ASSESSMENT Introduction June 2016 1.0 INTRODUCTION These technical notes summarize the results of a traffic assessment for the SteelWave development plan proposed on the former Emulex site in the City of Costa Mesa, California. This assessment is intended to provide an initial analysis of fhe potential traffic impacts of the proposed SteelWave development plan for the purpose of opening negotiations between the project applicant and the City of Costa Mesa to potentially amend the Home Ranch Development Agreement to allow the proposed development plan. Subsequent study may be necessary depending on the outcome of the negotiations. The project site, which is located in the northern portion of the City, is bounded by Sunflower Avenue to the north, Susan Street to the east, South Coast Drive to the south, and the former Los Angeles Times site to the west. The northern portion of the site contains three existing buildings with a total of 172,000 square feet of industrial park use. The southern three -acre portion of the site (i.e., the northwest comer of the Susan Street/South Coast Drive intersection), which is currently vacant, is assumed to be developed with 80,650 square feet of future industrial park use according to the City's General Plan and the Home Ranch Specific Plan. In the proposed Steelwave development plan the existing 172,000 square feet of industrial park use (i.e., the existing buildings) would remain on the site and is assumed in this analysis to be utilized as office space rather than industrial park use, and the three -acre vacant portion of the site would be developed with a 128 room, 82,500 square foot hotel and 15,300 square feet of retail development that would include 13,300 square feet of restaurant space and 2,000 square feet of space for retail products. The traffic assessment summarized here analyzes the potential traffic impacts of changing the land use assumptions on the project site from the General Plan and Specific Plan land use (252,650 square feet of industrial park use) to the proposed office, hotel and retail development plan. The assessment utilizes long-range (2035) Costa Mesa Traffic Model (CMTM) traffic forecasts that were prepared for the General Plan Update that is currently being processed by the City. Year 2035 CMTM traffic forecasts based on the proposed General Plan land uses and a constrained highway network setting (as opposed to buildout of the City's General Plan roadway circulation plan) are applied in this analysis as "no -project" conditions. Traffic forecasts with the proposed development plan were prepared by first deriving a traffic distribution pattern for the project using CMTM select zone analysis procedures. The difference in traffic generation between the current General Plan land uses and the proposed development plan were then added to the no -project traffic forecasts based on the CMTM traffic distribution pattern. The potential impacts of the proposed project were analyzed by comparing no -project and with -project peak hour (AM and PM) levels of service (LOS) at key intersections in the vicinity of the project site. (Note that for the purpose of this analysis, "no -project" conditions represent buildout of the site based on the current General Plan.) 4 Stantec ke c:Wantoo 20730104)0 (sleelwWe costa mew)\repot\rpt_sieeiwaae tratfic_Woff p1606v.aocx 1 -19- STEELWAVE PROJECT -TRAFFIC ASSESSMENT Project Site Trip Generation ILRiLxZi]F] Intersection levels of service are based on intersection capacity utilization (ICU) values using the ICU calculation methodology applied in the General Plan Update traffic study. Level of service "D" (ICU not to exceed 0.90) is the performance standard for City of Costa Mesa intersections. The approach described here for evaluating the potential impacts of the project was developed based on coordination with City of Costa Mesa traffic engineering staff. The following sections summarize the trip generation estimates for the proposed project, the traffic distribution pattern assumed for the project site, and the results of the peak hour intersection impact analysis. 2.0 PROJECT SITE TRIP GENERATION Trip generation estimates for the project site based on the General Plan land uses and the proposed development plan were calculated using trip rates from the Institute of Transportation Engineers (fTE) Trip Generation Manual (9th Edition). ITE trip rates are also applied in the CMTM. During the discussions with City of Costa Mesa traffic engineering staff on the traffic analysis approach, the City recognized that the office/hotel/retail development plan proposed for the project would result in certain trip generation reductions because of trips that would be captured internally within the project site due to the mix of land uses that are proposed. For this analysis, the City has permitted that 10 percent of the trips generated by the proposed development plan would be assumed to be internally captured within the project site (i.e., a 10 percent reduction has been applied to the trip generation estimates for the proposed development plan). Table 1 summarizes the AM and PM peak hour and average daily traffic (ADT) trip generation estimates for the General Plan as well as for the proposed development plan, including the 10 percent trip reduction mentioned previously for internal capture. As the table indicates, compared to the General Plan, the proposed development plan is estimated to generate 158 more AM peak hour trips (124 inbound and 34 outbound), 194 more PM peak hour trips (90 inbound and 104 outbound) and 2,282 more daily trips. As mentioned in the introduction, the traffic distribution pattern for the project was developed based on a select zone assignment for the project site using the year 2035 version of the CMTM, which is the traffic forecasting model applied in the City's General Plan Update. The resulting project trip distribution pattern is summarized in Table 2. This distribution pattern was used to add the difference in traffic generation between the current General Plan land uses and the proposed development plan to year 2035 General Plan traffic forecasts. St nteC kec:\sran�ac 20)'..OIOdlO �sreelwwe carte mezaryepar\rpl sleelwove traffic arae 216061 ].tlocn ISI STEELWAVE PROJECT -TRAFFIC ASSESSMENT Project Trip Distribution June 2016 Table 1 Project Site Land Use and Trip Generation Summary Land Use Units AM Peak Hour PM Peak Hour ADT In I Out I Total I In Out Total GENERAL PLAN LAND USES Existin Industrial Park 172 TSF 115 26 141 31 115 146 1 1,175 Future Industrial Park 80.65 TSF 54 12 66 1 15 54 69 551 Total Trip Generation 169 38 207 1 46 169 215 1,726 PROPOSED DEVELOPMENT PLAN Office(Existing Buildings) 172 TSF 236 33 269 43 213 256 1,897 Hotel 128 Rooms 40 28 02 37 77 1,046 Qualit Restaurant 7.72 TSF 3 3 6 39 19 58 694 High Turnover Restaurant 5.58 TSF 33 27 60 33 22 55 709 Retail 2.00 TSF 1 1 2 4 5 9 107 Trip Generation Summary Total Before Trip Reduction 313 92 1 405 159 296 455 4,453 10% Internal Ca ture Tri Reduction -20 -20 -40 -23 -23 -46 -445 Total After Trip Reduction 293 72 1 365 136 273 409 4,008 DIFFERENCE PROPOSED DEVELOPMENT PLAN VERSUS GENERAL PLAN Net Trip Generation Increase 124 1 34 158 90 1 14 194 2,282 TRIP GENERATION RATES (a Industrial Park b TSF .67 .15 .82 .18 .67 .85 6.83 Office c TSF 1.37 .19 1.56 .25 1.24 1.49 11.03 Hotel d Room 31 22 .53 .31 .29 .60 8.17 Quality Restaurant e TSF .41 .40 .81 5.02 2.47 7.49 89.95 High Turnover Restaurant f TSF 5.95 4.86 10.81 5.91 3.94 9.85 127.15 Retail TSF .73 .45 I.18 2.23 2.41 4.64 53.28 Abbreviations: ADT -average daily trips TSF - thousand square feet (a) Source: Institute of Transportation Engineers (ITE) Trip Generation Manual (9th Edition). (b) ITE Category 130 (Industrial Park) (c) ITE Category 710 (General Office Building) (d) ITE Category 310 (Hotel) (e) ITE Category 931 (Quality Restaurant) (f) ITE Category 932 High -Turnover (Sit -Down) Restaurant) (h) ITE Category 820 (Shopping Center) 4 atanteC kecAslanlec 2073010470Weefwc,e costa mesa)\repW\,Pl-slee m traf�-dratf_27160617.doc STEELWAVE PROJECT—TRAFFIC ASSESSMENT Project Trip Distribution June 2016 Table 2 Project Trip Distribution Pattern Roadway Location Percentage of Project Site Trip Generation Fairview Road north of Sunflower Avenue 4% Fairview Road south of 1-405 Freeway 9% Harbor Boulevard north of Sunflower Avenue 6% Harbor Boulevard south of 1-405 Freeway 12% 1-405 Freeway north of Harbor Boulevard 17% 1-405 Freeway south of Fairview Road 24% South Coast Drive east of Fairview Road 5% Sunflower Avenue west of Harbor Boulevard Sunflower Avenue east of Fairview Road 7% Susan Street north of Sunflower Avenue Total 100% Stanter [e c\stonfec W7W104701steeWove costa mesal\repot\rpt_sfeefwave_tralfia_Oratt M16 17.dacx — 1q— STEELWAVE PROJECT - TRAFFIC ASSESSMENT Year 2035 Traffic Conditions June 2016 4.0 YEAR 2035 TRAFFIC CONDITIONS Table 3 summarizes long-range (2035) ICU values and levels of service for intersections in the vicinity of the project site based on the General Plan and proposed development plan land uses (actual ICU worksheets are attached at the end of these technical notes). As the summary table indicates, each of the intersections analyzed is forecast to operate at an acceptable L05 "D" or better under 2035 conditions that assume the proposed development plan (i.e., the proposed plan does not significantly affect the roadway LOS(. Stantec <e rAslante M7WINYO (sleeWw costa mesal\mpad\' t_steeMave hatfic &olt_20160617.Coc -19- O O O a 0 m U m m Q p m 0 0 0 U U U U p J C d o CL 0 a c� vo N ad'oOmmaUaaampmmmaaU O.= Y 0 C 3 Q U 0 O J m U m m Q p m U p U U m U U p �n y � O 4 O m P C W - 6 y O a G 0 p m m Q U a a a m p m m m 0 0 0 d = J 0 (� O Y d BO O P _ N m h m h n CO N N V 'O a � � C C O O o i m Z N U O a 1 a U C j a 7 c a> E E ,n j w ° U m a w^ a a o m o m O > o Ut O m N O c Q 3£ OUL C3 h h m N N O N a 0 N N m U1 3 N ��Z -- O h m y C vOi O cN O .C^ .0 pedes a2f O cH� 0" -0-2 v�x5 o o' oe�oaa ° ° OV NN°6O C N aapN N- J -5-5NO >> O a a O w > O > O O 2' O K > O > O .`n .. C mo mo a¢ m N 3 m m 3 3 m m 3 0 O o n O d Z `o Q `o a d Z a `o -0 `o -0 a p > 41.0 Z S N O S 2 O O S 0.5 . 5� II C .- N vi C aD P N (m1 [PFJ Q R V N m Q — I 1 u da +, c Ln o C. ATTACHMENTS - PEAK HOUR INTERSECTION CAPACITY UTILIZATION (ICU) WORKSHEETS -20- 1. Harbor a Scenic/Lake Center 2035 Proposed General Plan (Constrained Network) AM ?K HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1700 60 .04* 30 .02 NB". 5100 1020 .21 2370 .48* NBR 0 0 40 70 SBL 1 1700 90 .05 20 .01* SBT 3 5100 2560 .52* 1640 .33 SBR 0 11 110 20 EBL 1 1700 10 .01* 90 .05* EBT _1. 1700 20 .01 50 .03 E3R 1 1700 20 .01 130 .08 WBL 1 1700 20 .01 60 .04 WRT 1 1700 30 .02* 00 .10* WBR 0 0 10 70 Clearance interva_ .05* AS* TOTAL CAPACITY UTILIZATION .64 .69 2. Harbor S Sunflower 2035 Proposed General Plan (Constrained Network) AN PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3400 370 .11* 80 .02 NBT 3 5100 1230 .24 2080 .41- NBR i 1700 240 .14 180 .11 SBL 2 3400 240 .07 160 .05' SBT 3 5100 1720 .34* 1710 .34 SBR 1 1700 90 AS 30 .02 EBS 1. 1700 10 .01 40 ,02' EBI 2 3400 200 .06" 170 .05 EBR 1 1700 40 .02 240 .14 WBL 1.5 120 1.05i* 200 .12 WBT 1.5 5100 140 .05 650 .19* WBR i 1700 SO .05 200 .12 Clearance Interval .05* .05* TOTAL CAPACITY UTILIZATION .61 .72 -21- 2035 Proposed G.P.+SteelWave Project (Const. Network) A;4 PK HOUR IN P3 HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1700 60 .04* 30 .02 NBT 3 5100 1022 .21 2376 .48* NBR 0 0 40 70 SBL 1 1700 90 .05 20 AL' SBP 3 5-_00 2567 52* 1645 .33 SBR 0 0 110 20 EBL1 1700 10 A? 90 .05* "EBT1 1700 20 .01 50 .03 EBR 1 1?00 20 .01 130 .08 WBL i 1700 20 .01 60 .04 W3T 1 1700 30 .02* 100 .10� WBR 0 0 10 70 Clearance interval .05* .05* TOTAL CAPACITY UTILIZATION .64 .69 2035 Proposed G.P.+SteelWave Project (Const. Network) AN PK HOUR PH PK HOUR LANES CAPACITY VOL V/C VOL V/C N3L 2 3400 370 .11" 80 .02 NBT 3 5100 '.230 .24 2080 .41' NBR 1 :700 240 .14 i80 .11 SBL 2 3400 247 .07 165 .05* SBT 3 5100 1720 .34* 1710 .34 SBR 1 1700 90 .05 30 .02 BBL 1 1700 10 .01 40 .02* EBT_ 2 3400 201 .06" 171 .OS EBR _ 1700 40 .02 240 ,14 WBL 1.5 120 .051* 200 .12 W3T 1.5 5100 140 .05 651 .19* WBR 1 1700 82 .05 206 .12 Clearance 'nterval .05* .05* TOTAL CAPACITY UTILIZATION .61 .72 0 3. Susan 6 Sunflower 2035 Proposed General Plan (Constrained Network) AM PK HOUR PH PK POUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1700 80 .05 150 .09 NBT 1 1708 250 .15* 430 .25' NBR 1700 20 .O1 140 .08 SIL 1 1700 170 .10+ 70 .04* SBT 1 1700 70 AS 180 .16 SBR 0 0 20 90 EBL 1 1700 80 .C5* 60 .041 EB". 2 3400 330 .10 580 .17 'BR 1 179" 120 .07 50 .03 WB', _ 1700 30 .02 40 .02 NBT 2 3400 400 .141 700 .26" 43R 0 0 90 200 Clearance Interval .05* .05 - TOTAL CAPACITY UTILIZATION .49 .64 4. Fairview 6 Sunflower 2035 Proposed General Plan (Constrained Network) AH PK HOUR 0P1 P( HOAR LANES CAPACITY VOL V/C VOL V/C NEIL 2 3400 200 .06* 190 .06 NBT 33 5100 116, .23 1750 .34 - NK 1 1700 120 .07 33i0 .18 SBL 2 3400 22C .06 150 .04' SI". 3 5100 1790 .37* 1300 .27 SBR 0 0 100 100 E3-1 2 3400 70 .02 460 .14 EST 2 3400 330 .14* 560 .21' BE 0 0 130 1140 'RBL 2 3500 370 .11* 200 .W WET 2 3400 510 .15 320 .09 WBR 1 1700 140 .08 100 .06 Clearance Interval .05' .05* TOTAL CAPACITY UTILIZATION .73 .70 2035 Proposed G.P.+SteelWave Project (Const. Network) 41 PK HOUR PH ?K HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1700 82 .05 157 .09 2" 1 1700 255 .15* 446 .26' NBA 1 1700 24 .01 152 .09 SBL 1 1700 170 .10* 70 .C4* SBT _ 1700 89 .06 194 .17 SBR 0 0 20 90 EBL 1 1700 80 .OS* 60 .04' EBT 2 3400 330 ,10 580 .17 EBR 1 1700 M .98 56 .03 WBL 1 1700 45 .03 51 .03 WB- 2 3400 400 .14* 700 .26* WBR 0 0 90 200 Clearance Interval .05* .05* TOTAL CAPACITY UTILIZATION .49 .65 2035 Proposed G.P.+SteelWave Project (Const. Network) Au PK HOUR PH P3 HOUR LANES CAPACITY VOL V/C VOL V/C NIL 2 3400 200 .06* 190 .06 NBT 3 5100 1160 .23 1750 .34* NBR 1 1700 120 .07 310 .18 SEL 2 33400 220 .O6 15, .04* SBT 3 5100 1790 .375 1300 .28 SBA 0 0 105 104 EBI 2 3400 71 .02 464 .14 EBT 2 3400 332 .14* 567 .21' EBR 0 0 130 l40 WBL 2 3400 370 .11* 200 .06* WBT 2 3400 519 .15 326 .10 HBA 1 1700 140 .08 100 .06 Clearance Interval .DS* .05` TOTAL CAPACITY UTILIZATION .73 .70 _ 22, 0 17. Hyland 6 South Coast/I-405 NB On Ramp 2035 Proposed General Plan (Constrained Network) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NPT 0 0 0 0 NBR 1 0 0 0 SBL 1 1700 250 .15' 340 .20* SRI 0 2 0 SBA f 50 730 E3L 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 0 0 0 0 WBT 2 3400 220 .06' 1059 .31' WAR 1 1700 260 .15 500 .29 Clea Ence Interval .05• .05* TOTAL CAPACITY UTILIZATION .26 .56 18. Harbor s South Coast 2035 Proposed General Plan (Constrained Network) AM P4 HOUR PM PK HOUR :,ALINES CAPACITY VOL V/C VOL V/C NBL 2 3400 350 .10* 220 .06 i -B- 3.5 8500 2290 .35 2310 .34* NBR 1.5 680 230 SBL 2 3400 150 .04 130 .04- 33T 4 6800 2040 .30* 2190 .32 SBR 1 1700 110 .06 100 .06 EBL 1 1700 10 .01 20 .01* EBT 1 700 150 .09* 50 .03 EBR 2 3400 190 .06 350 ._., WBL 2 3400 80 .02* 530 .16 W8' 2 3400 180 .05 1350 .40* VAR 1 1700 40 .02 350 .21 :ieazancz Teterval .OS' .CS* TOTAL CAPACITY UTILIZATION .56 .84 2035 Proposed G.P.+SteelWave Project (Const. Network) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 0 0 0 0 NBR 0 0 0 0 SBL 1 1700 250 .15* 340 .20* SBT 0 0 0 0 SBR f 50 730 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 431. 0 0 0 0 NBT 2 3400 226 .07* 1068 .3i* WAR 1 1700 260 .15 500 .29 Clearance Interval .05' .05* TOTAL CAPACITY UTILIZATION .27 .56 2035 Proposed G.P.+SteelWave Project (Const. Network) AN PK HOUR PH PK FOUR UAIES CA ACITY VOL V/C VOL V/C NBL 2 3400 350 .10* 220 .06 NBT 3.5 8500 2290 .35 2310 .34' 'IBR 1.5 716 256 SBL 2 3400 150 .04 130 .04* SAT 4 6800 2040 .30* 2190 .32 SBR 1 1700 110 .06 LOS .06 EBL 1 1700 10 .01 20 .01' EBT 1 1700 150 .09* 50 .03 EBR 2 3400 190 .06 350 .10 NBL 2 3430 84 .02* 542 .:6 WBT 2 3400 186 .05 1,368 .40* WAR 1 1700 40 .02 350 .21 Clearance Interval .05* .05' TOTAL CAPACITY UTILIZATION .56 .84 - 23 -- 19. Susan & South Coast 2035 Proposed General Plan (Constrained Network) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3400 240 .07 550 .i6 NBT 2 3400 470 .16* 490 .17* NBR 0 0 70 80 SBL 2 3400 100 .03* 140 .04* SB7 2 3400 10 .11 10 .OL SBR 0 50 .03 330 .19 EHL 2 3400 130 .04* 50 .O1* EBT 2 3400 150 .04 200 .06 EBR 1 1700 620 .36 130 .08 WBL 2 3400 10 .00 30 .01 WBT 2 3400 120 .04* 960 .28' ER 1 1700 30 .02 20 .01 Right Turn Adicstment EBR .14* SBR .13* Clearance Interval .05* .05* TOTAL CAPACITY UTILIZATION .46 .68 20. Fairview & South Coast 2035 Proposed General Plan (Constrained Network) AN PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3400 560 .17* 290 .09* NBT 3 5100 1430 .29 1820 .36 NBR 1 1700 290 .17 470 .28 SBL 2 3400 30 .01 70 .02 SBP 3 5100 1780 .33* 1620 .33° S3R 0 0 180 50 EHL 1 1700 30 .02 240 .14 EBT 1.5 5100 70 f.0211 380 1.211' EBR 1.3- 120 790 WBL 2 3400 240 .07* 360 .L" WBT 2 3400 220 .06 420 .12 ia3R 170050 .03 10C .06 CLeararce interval .05' .05* TOTAL CAPACITY UTILIZATION .69 .79 2035 Proposed G.P.+Steelwave Project (Const. Network) All PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 2 3400 246 .07 555 .16 NBT 2 3400 489 .16* 504 .17' NBR 0 0 70 80 SBL 2 3400 112 .03* 177 .05* SBT 2 3400 10 .01 10 .O1 SBR 0 0 53 .03 340 .20 EBL 2 3400 167 .05* 77 .02' EBT 2 3400 150 .04 200 .06 EBR 1 1700 620 .36 130 .08 ABL 2 3400 10 .00 30 .01 NBT 2 3400 126 .04* 965 .28' WBR 1 1700 44 .03 30 .02 -Right Turn Adjustment EBR .13• SBR .12* Clearance Interval .05* .05* TOTAL CAPACITY UTILIZATION .46 .69 2035 Proposed G.P.+Stealwave Project (Const. Network) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NHL 2 3400 595 .18* 301 .09^ NBT 3 5100 1480 .29 1820 .36 NRR 1 1700 290 .17 470 .29 3BL 2 3400 30 .01 70 .02 SBI 3 5100 1780 .38* 1620 .33* SBR 0 0 180 50 E3L 1 1700 30 .02* 240 .14 EBT 1.5 5100 7i 1.021 384 1.21j• EBR 1.5 131 923 NBL 2 3400 240 .07 360 .11* NBT 2 3400 225 .07* 424 .12 NBR 1 1700 50 .03 100 .06 Clearance Literval .05* .05` TOTAL CAPACITY UTILIZATION .70 .79 -24- 38. Harbor S I-405 NB Ramps 2035 Proposed General Plan (Constrained Network) AM PK HOUR PM rr"K HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 4 6800 2300 .45* 1670 .33 2R 0 0 1170 .69 1270 .75 SBS 0 0 0 0 SBT 4 6800 2300 .34 3070 .45* S3R 0 0 0 0 EBL 0 0 0 0 EBT C 0 0 EBR 0 0 0 WBL 1.5 370 .22* 940 NBT 0 5100 0 0 f.35V* RBR .5 820 .24 980 Right Porn Adjustment Multi ,C9" NBR .04* -eararce -nterval .054 .05' TOTAL CAPACITY UTILIZATION .81 .89 39. Harbor 6 I-405 SB 2035 Proposed General Plan (Constrained Network) AM PR HOUR PN. PK ROUR LAMES CA?ACITY VOL V/C VOL 'V/C NBL 0 0 3 LBT 3 5100 1390 .274 1740 .34 QR f 270 490 S9; 0 0 0 0 SBT 4 6800 1510 .22 2760 .41" SBR f 1190 124C EEL 1.5 830 1.3C;k 220 .L' EBT 5100 0 ;.301 0 -BR 1.5 100 930 .27 NST 0 0 0 C N3R 0 0 0 u R'gh-, Turn Adjusument EBR .14k CLearaace Interval 2035 Proposed G.P.+SteelWave Project (Const. Network) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 0 0 0 0 NBT 4 6800 2336 .46* 1696 .33 NBR 0 0 1170 .69 1270 .75 SBL 0 0 0 0 SBT 4 6800 2304 .34 3002 .45* SBR 0 0 0 0 EBL c 0 0 0 EBT 0 0 0 c EBR 0 0 0 0 WBL 1.5 370 .22* 940 WIT 0 5100 0 0 1.35)* WBR 1.5 820 .24 980 Right Turn Adjustment Multi .08* NSR .044 Clearance Interval .05* .05' TOTAL CAPACITY UTILIZATION .81 ,89 2035 Proposed G.P.+SteelWave Project (Const. Network) AM PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL 'V/C N8L 0 0 0 0 NBT 3 5100 1405 .28* 1751 .34 NBR f 270 490 SBL 0 0 0 0 SBT 4 6800 15;4 .22 2172 .41' S3R f 1190 1240 EBL 1.5 851 (.301* 235 .14* EBT 0 5130 0 1,301 0 EBR 1.5 760 930 .27 WBL 0 0 0 0 WBT 0 0 0 0 NOR 0 0 0 0 Right Turn. Adjustment EBR .134 Clearance Interval .05* .05' TOTAL CAPACITY UTILIZATION .62 .73 TOTAL CAPACITY UTILIZATION .63 .73 12 - 25- 40. Fairview 6 I-405 NB Ramps 2035 Proposed General Plan (Constrained Network) AM PK HOUR IN PK HOUR LANES CAPACI'_Y VOL V/C VOL V/C NK 1 1700 270 .16* 320 .19* NBT 3 5100 1160 .23 1580 .31 HER 0 0 0 0 SK 0 0 0 0 33T 6 10200 1870 .i8* 2500 .25* 33R _ 1700 300 .18 260 .15 E3L 0 0 0 C EBT 0 0 0 0 EBR 0 0 0 0 WBL 2 3400 520 .15* 900 .26' WET 0 0 0 0 48R 2 3400 7270 .37 980 .29 Rght Turn Adjustment AER .14' C_earaace Interval .05' .05* TOTAL CAPACITY UTILIZATION .68 .75 41. Fairview 6 I-405 SB Ramps 2035 Proposed General Plan (Constrained Network) AM PK HOUR P4 PK HOUR LANES CAPACITY VOL V/C VOL V/C NB-- 0 0 0 0 NET 3.5 8500 1150 .21* '400 1.211* RBF. ..5 1180 .35 510 .19j SBL 3 5100 1150 .23* '1490 .29* 33" 3 5100 1210 .24 1900 .37 S3R 0 0 0 EBL 2 3400 310 .09* 510 .15* EBT 0 0 0 0 EBR 2 3900 370 .11 440 .13 WIL 0 0 0 NIT 0 0 0 WIR 0 0 0 Right 'Pura Adjustment PH .05* Clearaice irtarva: .05* .05* TOTAL CAPACITY UTILIZATION .65 .70 2035 Proposed G.P.+SteelWave Project (Const. Network) AM 2K HOUR. PM PK HOUR LANES CAPACITY VOL V/6 VOL V/C NIL 1 1700 270 .16* 320 .19* NET 3 5100 1170 .23 1587 .31 NBR 0 0 0 0 SBL 0 0 0 0 SET 6 10200 1881 .18* 2533 .25* SBR 1 170u 300 .18 260 ._5 EBL 0 0 0 0 EBT 0 0 0 0 EBR 0 0 0 0 WBL 2 3400 520 .15* 900 .26* WET 0 0 0 0 NBR 2 3400 1255 .37 984 .29 Right Turn Adjustment WBR .14' Clearance Interval .05* .05* TOTAL CAPACITY UTILIZATION .68 .75 2035 Proposed G.P.+SteelWave Project (Const. Network) AN PK HOUR PM PK HOU3 LANES CA.PACIT-Y VOL VIC VOL V/C NBL 0 0 0 0 NBT 3.5 8500 1160 .23* 1407 (.211* NBR 1.5 1180 .35 510 (.191 SBL 3 5100 1158 .23* 1515 .30* SET 3 5100 1213 .24 1908 .31 HER 0 0 0 0 E81 2 3400 310 .09* 510 .15' E3TT 0 0 0 0 EM 2 3400 370 .11 44"s .13 WWI. 0 0 0 0 WET 0 0 0 0 WBR 0 0 0 0 Right Turn Adjustment HER. .05* C_earance Interval .05* .05+ TOTAL CAPACITY UTILIZATION .65 .71 -2(Q�- 13 44. Harbor S Gisler 2035 Proposed General Plan (Constrained Network) A'M PK HOUR PM PK HOUR LANES CAPACITY VOL V/C VOL V/C N3L 1 1100 110 .06* 150 .09' NBT 5 8500 2320 .27 2470 .29 HHB 0 0 10 30 SEL 1 1-100 100 .06 200 .12 SBT 4 5800 2320 .34* 3470 .51' SBR 1 1700 160 .09 460 .27 3BL 3 5100 540 .il 500 .10* WBT 1 1700 60 .11' 30 .08 26R 0 0 130 110 NBL _ 1700 30 .02* 60 .04 WBT 1700 20 .01 50 .03" W3R 11700 160 .09 i30 .08 Clearance hterval .O5* .05* TOTAL CAPACITY UTILIZATION .58 .78 56. Harbor 6 Baker 2035 Proposed General Plan (Constrained Network) AM ?K FOUR PY. PK 3063 LASES CAPACITY VOL V/C VOL V/C NBL 2 3400 50 .01 120 .04* NB', 4 6800 2070 .3O* 2120 .31 NBR 1 1700 210 .16 210 .12 SB:, 2 3400 190 .06* 300 .09 33T 4 6000 1380 .28 2500 .41' SBP. 1 '700 170 .10 420 .25 EBL 2 3400 270 .08' 293 .OB* EBT 2 3400 230 ,07 230 .07 E?3 d P00 60 .04 70 .04 WBL 2 3400 180 .05 590 . P, WBT 2 3400 190 .06* 710 .21* HER 1 11,00 120 .07 230 .14 C,earance Interval TOTAL CAPACITY UTILIZATION .55 .79 2-' 2035 Proposed G.P.+SteelWave Project (Const. Network) AM PK HOUR PH PK HOUR LANES CAPACITY VOL V/C VOL V/C NBL 1 1700 110 .06' 150 .09' NBT 5 8500 2335 .28 2401 .30 NBR 0 0 10 30 SBL 1 1700 100 .06 200 .12 SBT 4 6900 2324 .34' 3402 .51` SBR 1 '700 160 .09 460 .27 EBL 3 5100 540 .11 500 .10* EBT 1 1700 60 .11* 30 .OB EBR 0 0 130 110 WBL 1 1700 30 .02* 60 .04 WBI 1 1700 20 .01 50 .03* WBR 1 1700 160 .09 130 .08 Clearance Isserval .OS* .05* TOTAL CAPACITY UTILIZATION .58 .78 2035 Proposed G.P.+StealWave Project (Const. Network) PM PK HOUR PM PK HOUR LAVES CAPACITY VOL V/C VOL V/C NBL 2 3400 50 .01 120 .04* NBT 4 6000 2091 ,31* 2128 .31 NBR 1 1100 270 .16 210 .12 SBL 2 3400 190 .06* 3300 .09 SBT 4 6600 1883 .28 2809 .41' SBR _ 1700 170 .10 421 ,25 EBL 2 3400 271 .08* 281 ,08* EBT 2 3400 230 .07 230 .07 EBR d 1700 60 .04 70 .04 WBL 2 3400 180 .05 590 .17 WBT 2 3400 190 .06' 710 .21* OR 1 1700 120 .07 230 ._4 Clearance Interval .05* .05' TOTAL CAPACITY UTILIZATION .56 .79 14 58. Fairview t Baker 2035 Proposed General Plan (Constrained Network) AM PK HOUR PN PH HOUR LANES CAPACITY VOL V/C VOL V/C NK 2 3400 130 .04 230 .07 NK 3 5100 1650 .32* 1450 .28* NBR 1 1700 790 .46 520 .31 SK 2 3400 280 .08' 300 .09' PUT - 6800 1150 .17 1730 .25 SBR 1 1700 190 .11 430 .25 E31 2 3400 330 .10 260 .08' EB" 2 3400 520 .15" 620 .10 EBR 1 1700 130 .08 160 .09 WBL 2 3400 390 .11` 540 .16 WBT 5100 320 .06 1600 .31' WBR 1 1700 90 .05 130 .08 Rignt T,.rn Adjustment NBR .W Clearance Incerval .05* .05* 2035 Proposed G.P.iSteelWave Project (Const. Network) AN PK HOUR PM PK HOUR LAMS CAPACITY VOL V/C VOL V/C N81, 2 3400 130 .04 230 .07 NBT 3 5100 1657 .32' 1455 .29* NBR 1 1100 790 .46 520 .31 SBL 2 3400 280 .OB' 300 .09° SBT 4 6800 1152 .17 1736 .26 SBR 1 1700 140 .11 430 .25 EBL 2 3400 330 .10 260 .08" EBT 2 3400 520 .15' 620 .18 EBR 1 1700 130 .08 160 .09 WK 2 3100 390 .11* 540 .16 WBT 3 5100 320 .06 1600 .31' WBR 1 1700 90 .05 DO .08 Hight Turn Adjustment N3H .06* Clearance Interval .05* .05* TOTAL CAPACITY UTILIZATION .77 .81 TOTAL CAPACITY UTILIZATION 77 .82 Mq It',ECORDING REQUESTED BY AND WI -MN RECORDED RETU N TO: CITY OF COSTA MESA 77 Fair Drive Costa Mesa, CA 92626 Attn- CITY Clerk ATTACHMENT 5 N Returns. Guulliy ui 01"Mge Darlene Bioom, Interim Clerk Recorder 1111111111111111111111111111111111111111111111111MIN 0 FEE 20020229863 02:45pm 031201x2 114 1i Al2 46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 (Space Above This Linc For Rccordcr's Use) ,his Development A-greement for Horne RaM-11 Development Property is recorded at the request artd I'or flit Benefit of the CITY of Costa Mesa and is cxenrpt horn the payment of a recording fee pursuant l to Govemment Code § 6103 CIT)' OF COSTA A4ESA By; T L CnZ< Datcd:_m rfla.. a szZ a a` DEVELOPMENT AGREEMENT FOR HOME RANCH by and between CITY OF COSTA MESA and C. J. SEGERSTROM & SONS, SEGERSTROM PROPERTIES LLC, AND HENRY T SEGERSTROM PROPERTIES LLC DA -00-01 Ordinance No. 01-29 _ 2q - INC1, 446N 12 , TABLE OF CONTENTS 1 n 10 DEFiN1TI0NS ANTD EXHIBITS..... ..................... . .....`........... rl C I111LfVilj.................................. ..................... , ...................4 Exhibits.................................................................................. ..........,......._.........C� .. 6 I.I 1.2 Me - Z 2 n AGREEMENT AND ASSURANCES ........... I ...... I ... ...... . 30__� Assurances on the Part of OWNER ...................... 2.1 Agreement and Assurances on the Part of CITY..... .............. ............ ........ ................2.2.1 ?-? Agreement and ... ......................................,...7 General CITY's Consideration and Approval of Requested Chanrges in the Project ..... S 2.2.2 2.2.3 Timing of Development.................................................... .......... ........ 2.2 4 Reservations and Dedication of Lands For Public Purposes .................. ..... 5 Development Exactions..................................................... . 9 2.2.6 Allocation of FAR and Trip Bud ct and Density •••••.. -• ••- 22,7 l-uture Environmental Revie% ............................:......._.._._................ 9 2.2.8 Other C_rovertlmenlal Permits. ..................................... 2.2.9 City Review of Applications for Future Developmcnt. Approvals .............. 4 ............. ?.2.10 Traffic Impact Fee ................. .......: l0 itl 2.3 Reservations of Authority ............. ,..............-_--- 10 2.3.1 Processing Fees .............. ..........__ --------................................. 10 2.3.2 Consistent Future City Regulations ............................................... 2.3.3 Overriding State and Federal Laws and Regulations ......................:. ......... 10 2.3.4 Public Health and Safety .... ....................................... .............................. 1 I 2.3.5 Updated Uniform Codes.............................. .................. ......:...:.:.............. i I 2.3.6 Public Works Improvern:mt Standards ....................... .......... ...................... I 1 2.3.7 Assessment District and/or Community Facilities District ........................ i l 2.3.8 Regulations In Conflict ................. ............. ........................... .,.....:...._....... 12 2-3.9 Public Welfare................................................................................... . 12 2.3.10 Signs................................................................. 2.4 Judicial Decisions....................................................... , ...... 12 3.0 GENTERAL PROVISIONS -. .......... 1Z 3-1 Effective Date of Agreement ........ _................. '- 2 Duration of Agreement ............ ... •- . ---- ....... .... .... ...... ..... 12 3.3 Binding Effect of Agreement ................. .............. .......,..................._ ...._... 13 3 4 Ownership of Property ..............................................................:._ ....:.......... ._ 13 3.5 Periodic Review ................................................................................................. .. 13 3.6 Defaults and Remedies......................................._................................. ..... ._..... 13 3.6.1 Notice and Opportunity to Cure ................... , ............... •...•._............13 3.6.2 Default Remedies .............................. ...._.................-...........__._............... 14 3.6.3 No Cross -Defaults.......... ........................ .... .............:...... 14 3.6.4 Force Majeure .................................................................... 14 3.7 Cooperation in the Event of Legal Challenge ............... •-.... l a R?vloligagee . Rights...................................................................... .... ....... ...... ..... l s 30__� Bxhibit"A�` Legal Description of the Property Exhibit "S�^ Sbowing Property and Its Location Exbibit^C` Existing Development Approvals Exbibii'73~ Existing Land Use Regulations I-zhib'lt^E" Future Development Approvals Exhibit "F" Community Benefits Exhibit "G" FAR and Trip Budget -31— -- !.'--4 V-12 ~31~-- ^,:--4^,/2 3-0.1 Encumbrancesoothe Pnopeitty.............. ___ ............ ... '_............. ^..... ...... 15 ' 3.8,2' Mortgagee Prmteobon-----_-______________._',,_� _ \� 18-3k�or1gaQmc7�oEK�bliguiud---------------' - .... ~.. ' 15 3.8.4 Notice ofDuF0olth3 MRight of Mortgagee toCare-.. ,,-. -' 16 3.9 ��pdmum..-.-------' -------.-------~-.~~..._-`,_-_. �6 �.g�l Y���|--- -� _. _ .. __ _� _ _ , ,~,.� _.,_ Notices Include— _ 10 . 19,2 Foro�ofyJohc�------~-.--.---.-- --. '-_ . . . |b 3.9.3 Changes In Noticed Parties ... ',.-' -..' -'-..- 17 3.1D S ---------------^ -'~~- ' � .. -^-'~^� ' \7 3.11 TinmmmfEssence ----------'' -----�- ' '-_,~.......................... \7 3�l� ' Successors and -.----.__-�-- -' ' -_-__�,.~____ _� |7 3.13 ���------.----.-~.�~--_-_____________~_.__.� Effect on Title is 3 14 Parties ioInterest ------'---------~_.--_-.-____~,__,_� iO 3 15 Fiarther Actions and Instruments ................. .................... ......... ....................... is 3 16 Estoppel Certificates ................................................. ....................................... -. -[8 .1 17 Recordation ---'----'-'_...._^-.~~.,~.~.^,,~,-,_,,~~^,,_,.__ 18 3.18 Section Headings ............................ ~-~-~'.............. ............ ^`~.~............ )� '.. � \� ~ .^ Rules ofConstruction /^ww�o�.....^,..^.,.,,.,___---.'.� 320 Mutual Covcoemnto--.-. -.----..-~ ....... ........ 3.21 Releases ............... ......... ..... .................. ... .... .'.......... ^ ..'- ' 19 ] ZZ Applicable Law -...................... .......... ... ....... ........................ '' '. --' - |q 333 Project as a Private Undcrtak-Ing ...................... ....... - --. 19 324 Approvals, Reasonableness. ..... --.............. -....... ..... - ' ' |o 3,25 Amendments and Waivers ............. ...... .-.,.............................. ... -- 20 3.216 Authority to Execu1c'... ..................................................... .'............. .... ...... .... ZO 327 Entire Agreement ----........................................................... --_---... 20 328 Litigation Expenses ............................... ''. -. 1 2| Bxhibit"A�` Legal Description of the Property Exhibit "S�^ Sbowing Property and Its Location Exbibit^C` Existing Development Approvals Exbibii'73~ Existing Land Use Regulations I-zhib'lt^E" Future Development Approvals Exhibit "F" Community Benefits Exhibit "G" FAR and Trip Budget -31— -- !.'--4 V-12 ~31~-- ^,:--4^,/2 DEVtL0pA4ENT AGREEMENT 1=OR HOME RANCH ed INS This Development Agreement for Home Ranch (t��een is e LlT YtU)'rt:U51 AtNIESA, -n " , 200 i u and tet uay o r. � Y general la« cit "CITY') and C. J. SEGERSTROM & SANS, a California general a y ' partnership, SEGERSTRaM PROI'ERTRT] !r5 L iES �C, a�lGalikforn 10 }�i mired tliability1 c Smpany. HENRY T. SEGERSTK0M PRDpE DWNER." CITY and 0 P�I�k. $ ,are Individually referred to collectively referred to herein as " Iler•ein as a ``Pavy'• and COliectively referred to k)erein as RECITALS is the fee c�•vner of that Cellan property (the ,properly"} on which the A. QWNE Rmore Ranch Project is to be located, which PrOPe attached hereto.hle�1ie oit�vER sss�lay�in the shown in the map set Earth on Exhibit B ba future, desire to de, clop the Propes-ty. Accordingly, i \VNIE'R has t,e emitted(tot b CITY developed et�trn this Ageernent to provide assurances that the Proper(; ill be- {? Land UW ;JccoI dance rA,ith and subject to the provisiorts set f ilh rC� ain and i Clhe l T ,Fu ueD"Existing elo r. int Regulatiosts", CiTY'S "Existing De�+elc�prient Approvals", set forth 1}crein. AFpro��als" to be obtained by deVeloPer, 311 as more particularly Q. Pursuant to California Government Code Section 65965, tale iCrcY adO for rile Resolution No. 58-53, on MY 19. 1858, C5CaI7llSllmg proved tl ment Agreetnertt Procedures and approval cif develc)pment agreements ("CiTY's pe•'ele�p Requirements"), 01r►TfER }yas applied to CITY pursuant to California Government Code Secltons 65964-65869.5 (tile "Development Agreement Statute"), and pursuant to said Reso lution for approval of the AgrtremAnt set forth herein. C. CITY has determined that development of the Home Ranch Project in the future pr 0,,-T significant benefits to the rc mm ni y(i) development hpublic j of the pectta wiilgener to wc1fas-e for the following reasons. amo significant tax revenues that can be utilized to provide police, fire and other essential import, I community; (ii} development will put the Property to productive use public services to the t consistent with the objectives of the CITY's General M ties arres dent$ of the CITY and .rill pra•�,de a long LV -M source of ernplo}t pp of these CITY has stir -rounding region. In const -a of O«+ rER�s[onpro, 'de a ssuf rices oto OkVN'' ER detcrttiined that it is appropriate to enter into this Agreement that rite Project will be permitted to be developed in accordance with and subject to the previsions set forth heiein and in C1TY's Existing Land Use Reguiatiarts, C1TY's Existsrzg fDcvelopnient Approvals, and the Future. Development Approvals to be obtained by 0\VNER.:r1I tis more particularly set forth herein. D, This Agree ent will prornote and elcoutage t13e development of the Project by pt-0%'iding the OWNER witb a greater degree of ccrtzinty of the ❑%�NER's ability to Mrd ecc�;,omically co nipltte tiro jeve)()pment ef'foit, and the P, aZ, e�:peuitit:a�•1 tt:;t tine .. '.I .-Z J ;. 1-2 to consideration to be received by the reTYfi icntpursuant considerationAgreement support tithericlo enaniseand ti -ie OXVNER hereunder constitute _uf aereenicnts of the CITY and the OWNER. E On September 24, 2001, the Planning Commission of CITY held a public hearing pnriyMt !n t}�� iy'1t� C-1-rd 31 this A vYe?rf?7an- ? nri rj-Com "� j nn vl eti`i i.n'� "Vk'.4iv.'.. tion for .''~.. r"" * r? tl. .., ❑f CITY that this A&reement be apPra�'ed. On November 19, 2001, the City Council of CITY also held a public hearing on O*NER's application for approval of this Agreement. F. In connection with its approval of the Project, final Environmental Impact Report No. 1045 ("FE R") was prepared by the CITE' and Cenened theadverse en CityCouncil talon irrt%actsof 19, 2001. The FEIR is a Program LAIR that analyzed pot a full buildout of the Project. G- In accordance with the ants, and at pli ableent e law, on ement tDece December 3,$'20 1 the City AgrGc[nent Procedures and Requtresr; F Council of CITY adopted its Ordinance No. 01-29 approving this AgTeerrtent. COVENANTS: Based upon the foregoing Reeitalss�desaho�et�eoe eipteandto this sufftcieAgreement fwhc3hthis are reference and for good arsd valuable can ackrnow-ledged by both Parties, CITY and OIA--N'ER agree as folloWs: 1.0 DEFINITIONS AND EXHIBITS. 1.1 Def�ons. The following terms when used in this Agreement shall have the meanings set forth below: (a) The term "Agreement" shall mean this Development Agreement, including the exhibits hereto, for the Home Ranch Project by and between the City of Costa 10csa and O\k,NER, as ti same may be a -'Wended from time to t;me. (b) The term "Building Permit" shall mean a permit issued by CITY for the construction of a building within the Project but shall specifically exclude permits for grading, Gurcharging, or the instal Iatiott of subsurface utilities or related facilities. (c) The term "CITY" shall mean the City of Costa Mesa, a municipal corporation ing under the laws of the State of California. organized and exist (d) The term "CITY'S Development Agreement Procedures and Requirements" means the CITY Resolution No. 88-53 adapted on July 19, 1988 titled "A RESOLUTION OF IflNG THE CITY COUNCIL OFEQTHME PROCEDURES AND RNOTS4R CO SIDER4T OTA MESA,aN OLF DEVELOPMENT AGREEME;~ITS." -�33 - utnan_tn02 3 ; I'M AND PROCEDURES REQUIREMENTS FOR CONSIDERATION OF DEVELOPMF-NT AGRELN4T-NTS." commencing (e) The term "Development Agreement Statute" the 1Cao�n'°'�G�v ��ent Code with Lection 65864} of Chapter 4 of Division 1 of Title 7 0 „mean the improvement (f} The terms "Development," `•development,*' eV= nvp �� tstruc� t�s,� improvements and facilities of the Property for the purposes of comple g the Home Ranch Pro)ect including, but not limited to: grading; the constructionthe o comprising infrast infrastructure and public facilities related to the Project whether deir developmenithof buildings e and Property; the construction, demolition, reconstruction a structures; and the installation of lands caping. ermits and The term "Development Approvals" means all land use and building p troval or issuance by CITY in connection Frith development of the entitlemeo nts subject to app liome Ranch project, including, but not limited to' r . • Parcel maps andlor lot line adjustments-. 41 Conditional use permits, final development permits and variances; Zoning changes; Preliminary and/or Final Master Nan approvais or amendments; Tentative and Final Subdivision Maps; • Grading and building permits; and Occupancy permits. in on t of (h} The term "Development Exaction" meanelopmentuAppronal for ht dedication y of with or pursuant to any Land Use Regulation or Development QvMcn, of fees in land, he construction of public improvemcnIs or publ�ctsaaf�development ie�. or the on the ersvironmentdor to lessen, offset, mitigate or cornpGnsate for tl. e imp other public interests. {i) The term "Effect'sve Date" meanro�ts fl dotns al the e Californthe ia Electiionsgthis Code Agreement becomes effective. Subject to the p relating to 1-eferendurn petitions, said ordinance will become effective 12.01 a.m. on the thi�t)' first {315`} day -following -its adoption by the -_. -CITY Council.-- ------------- ----� U) The term "Existing Development Approvals" means Excme istirr Ranch Develv�Qiec` Development Approvals approved or issued prior to the Effective g Approvals include the Development Approvals listed on Exhibit "C" and incorporated herein'by reference. (){} 7lte term "Existing Land Use Regulations' means all Land Use Regdations IF cl'fcct on the Effective Date of this Agreement. The Existing Land Use Regulations are listed on Exhibit "D" and incorporated herein by reference. (1) The term "FAR'' or "Floor Area Ratio" means the gross floor area of all buildings w itl'+i;i u p� uJcu divided by the project for wea. Gross r`toor area is the total building area of all floors within the walls of all structures except elevator and other vertical sliafts (including stairwells) and elevator equipment areas. Parking structures are not considered building area fou w pttrposcs of calculating Floor Area Ratio- Project lot area is the total area of a project excluding required dedications or reservations for public improvements, including, but not limited to, streets, parks, schools, and flood control channels_ (m) The term "Future Development Approvals" means all Development Approvals required or requested subsequent to the Effective Date in connection with the development of the Property in accordance with the Existing Land Use Regulations, some of which are listed in Exhibit "E" attached hereto and incorporated herein by this reference, including any amendments or modifications thereto. (r.) The term "Home Ranch Project" or "Project" means the development of the Propcsty pursuant to the Existing Land Use Regulations, the Existing Development Appro\,als. the Future Development Approvals, and the terms of this Agreement. The Project includes Retail, Industrial, Residential and Office uses. The Retail Portion includes a large, single -use, retail facility, on approximately 17.2 acres or the Property and the coves- ing and irrmprovemefit of the Greenville -Banning Cha.anei and the Gisler Cltannel. The Industrial Portion includes a number of industrial buildings and related uses on approximately 14.5 acres. The Residenlial Portion includes single family detached and town homes and related uses on approximately 16 ncres. The Office Portion includes a number of office buildings and related uses on approximately 45.4 acres of the Property. (o) The term "Industrial Portion" means that portion of the Project, consisting of industrial park buildings and related uses, all on approximately 14.5 acres, located west of Susan Street between South Coast Drive and Sunflower Avenue, whose cumulative gross floor area, excluding any parking structures, will be approximately, but not exceed, 253,648 square feet and whose combined FAR will not exceed 0.40. (p) The term. "Land Use Regulations" means all ordinances, resolutions, codes, rules, regulations and official policies of CITY governing land use development and building construction, including, without limitation: the pernvtted use of land; the density or intensity of use; subdivision requirements; the maximum height and size of proposed buildings: Development Exactions; regulations regarding the rate, time or sequence of development. parking requirements and the design, improvement and construction standards and specifications applicable to the development of the Property. (q) Tile term "Mortgagee' means a mortgagee of a mortgage, a beneficiary under a deed of trust or any other secured lender, and their successors and assigns. - 35 - .if. II,l4Aw.2 t The term "Office Portion" means that Forton f the 'cProjector nsilsngeofas nurrlbe { of office buildings ranging in size up to a n1axi ancillm uses and parking structures, all on approximately d s'exclusivwes,elocated souih of the Reta'iloPot�on, Y Coast Drive between Harbor Boulevard and Falrvicw , (excludingng will be .•'hose cumulative gross floor area for quare feetngs and vhose combined FAR Will not excccd approximately, but rcpt exceed, 791,D5D square 4.44 when applied to all buildings (excluding parking structures) comprising the Office portion of the Project. from Soils, (s) The term "U1A'NER' shall colett }ges California general partnership, properties LLC, a California, limited liability nia limited liability company, and company, and Henry T. Segerstrom ?"operties LLC, a Califor their successors and assigns as rwferred to to Section 3.12 of this f�greement. (t) The term "Party" shall refer singularly to CITY or ONVNIER and collectively Sa CITY and OWNER. u The LZ "program EIR" means an Environmental Impact 'Report prepale.d;on a {)laa.ge project consistent serias es of actions thata [Te lc 1 a Cal. Codizcd e Kegs. §15000 et, seq.) for the California section 15168 of the Guidelines Environmental Quality Act. {v) The term "Properly" means the real property generally bounded by Sunflower A.°enue to the north, the San l7iego Freeway (1-405) to the south, Fairview Road to the cast, and Harbor Boulevard to the West, within the City of Costa Mesa, Orange County, California as more particularly described on Exhibit "A" and depicted on Exhibit "B" to this Agreement. (w) The term "Resern.-ations of Authority" shall have the meaning ascribed in Secti:)rr ?.1 of this Agreement. nsisting of (x) The term "Residential Portion" means that d related us onortion of the oapprooximat ly 16 approximately, bu; not exceeding, 192 residential homes a acres located east of Susan Street and south of Sunnower Avenue. The homes will be a combination of single family detached and to -am homes. (y) The term "Retail Portion" means that portion of the Project which consists of a two-story IKEA home furnishings store approximately, but no more than, 308,044 square feet in size and related parking facilities all on a 17.2 acre portion of the Property plus the covered Greenville -Banning and Gisler Channels located at the southeast comer of Harbor Boulevard and South Coast Drive. A Final Master Plan approval for this phase is included within the Existing Development Approvals. (z) The term "Sales and Use Tax means the allocation to CITY, from the State of California, of the taxes imposed by the State for (i) the privilege of sellirng tangible personal property at retail in this state and (ii) the use, storage Or other consumption in this state of tangible personal property purchased 6.4m any retailer. alp _ aulu,-'-Ovi2 (aa) The term "Subse-quent Land Use Regulations" means any Land Use Regulations adopted and effective after the Effective Date of this Agreement. (bb) The term "Trip Budget" means the maximum number of AM and PIAT peak hour trips allocated to a project site. The Trip Budget is derived by multiplying the project area by the ailn�a>nto:vwC Area P�:.:c ,; �c,� t? e AIA pea:: ia::r trap ge:re�dtic�n rates for rite applicable land use classification. 1.2 ExII tilts - The following documents are attached to, and by this reference made a part of, this Agreement: Exhibit "A" - Legal Description of the Property Exhibit "B" - Map showing Property and its location Exhibit "C" - Existing Development approvals Exhibit "D" - Existing Land Use Regulations Exhibit "E" - Future Development Approvals Exhibit "F" - Community Benefits Exhibit "G" — FAR and Trip Budget 2.0 AGREEMENT AND ASSURANCES. 2.1 Aurct'rncnt and assurances nn the Part of OWNER. From and after the Effective Date, OWNER, in accordance with its sound business judgment, agrees to work to`.,ard development of the Home Ranch Project in accordance with the Existing Land Use Regulations, the Existing Development Approvals, and the Future Development Approvals to be obtained pursuant hereto. Not by way of limitation of the Foregoing, OWNER shall comply with all conditions ia;iposed by CITY on the Existing Development Approvals and all valid conditions consistent with this Agreement that CITY may impose on the Future Development Approvals. OW' ITER represents that it intends to pursue development of the Home Ranch Project in accordance with this Agreement with reasonable diligence as it deems appropriate in Its sound ith its business goals. In this regard, it is understoud that business judgment and consistent w OW.NrER's development of ilte Property and each element thereof depends upon a number of factors including, but not necessarily limited to development and finalization of site plans and building programs, market demand and supply, the availability of Financing, intere-st rates, and vtht:r conditions outside of OWNE-R's control. Accordingly, nothing in this Agreement shall be construed as requiring OWNER to develop the Property, or the Project, or any phase of the _3-7_ ;n u.�;ca�•i z d failure to dCti'elop the Property or the Project shall not be deemed a default by project, an any ()WNER of its obligations set forth to this Agreement. In addition to the foregoing, and as consideration for entering into this Agreeme�u, ti',NER shall },royide the community benefits �vliil}i$ teerensent, tae�of'ticetPortion1 in ttoflthe- ied C other provision of b Exhibit"IF". Notwithstanding any p Project shall be limited to office and office -re a d uses. Retail de clopme t in the Office Portion o t �e Proiect shall be limited to retail uses ancillary �.� Aoreernent and Assurances ors the Part of CITY. e, and the CITY hereby agrees that commencing on the Effective ll have thhetvested right to carry out and entire remaining term of this Agreement, Q1'ifNER shall ihE complete the Project (including the Residential, fthis Industrial. Office and thetExistingtioLandf Use P Project) in accordance Nvtth the express provisions o g have been Regulations, the Existing Development Approvtent�arrntt donce tbyhe stheeDc el pmentbAgreemelnt Future Development Approvals, to the full a p Stature. Nothrng in this Agreement Home'Ra ch ProjecER t. t. Inith any furthera rights, such agreemer l a d 1 relating to any project other than the Ho assurance, and pursuant to the at and jsotitile��es theset arth In fol]ov��ing,Development Agreement Statute, CITY Further hereby agrees to and 2.2.1 General. um The uses permitted hereunder, the density and intensity bu buildings, and ail other ma toot sizes and building setbacks, the maximum height and s affecting land use and development of thUse Ree Pr culaaorrsll et e Exisas set oing Developmrth in the ent Approvals of this Agreement and the Existing Land g and, once the same have been obtained, mentFuture shallebe rent FPewedspursuantddtoltohe Vy' ONER's applications for Future Develop provisions of the CITY's Existing Land ew Regulations shallli the be those exception the thepliimehof notice and appeal, reconsideration and r provisions any appeal, request for reconsideration or review, or required notice. 2.2.2 C1 -1-1''s Consideration and A )roval of R nested Changes in the Pr_oiect. ges that the OWNER may in the future desire to change or modify the CITY acksroled pi-ccise location, configuration, size and height of the proposed buildings and develop a mix of proposed uses after the Effective Date of this Agreement based upon more precise planning, changes in market demand, changes in development occurring in the vicinity, and similar factors In such event, CITY shall cooperate with OWNER to expeditiously inview and taste final action ges in accordance with CITY"s Existing Land Use Regulations. OWNER on such requested chan reserves the right to reduce the densities and intensities of uses and the heights and sizes of buildings below the maximums permitted by this Agreement. In no event, however, shall 0WNER have the right hereunder to increase density, intensity or uses in the Project without fully complying nyith procedures in the land Lsse regulations in effect ar sucit tinge the 'U — � W reqUeSUapplication to increase the density, intensity or uses is processed with the CITY. No change to the Project which is consistent With the Existing Land Use Regulations shall require an amendment of this Agreement rand, in the event any change in the Project proposed by OWNER is approved by the CITY, the references in this Agreement to the Project or applicable portion thcreof shall be deemed to refer to the Proiect as so ch7ngert 2.2.3 D—M_hI of Ueveln rrtent. The Parties acknowledge that the most eff cient and economic development cf the Project depends upon numerous factors such as market orientation and demand, interest rates, competition, and similar factors. Accordingly, except m expressly provided in this Agreement, the timing, sequencing, and phasing of development shall be as determined by OWNER in its sole subjective business judgment and discretion unless it is a condition to a discretionary decision for a Future Development Approval or a project change to which the OWNER consents Not by way of limitation of the foregoi ng, the Panics acknowledge and agree that no moratorium, initiative, ordinance, resolution, or other land use regulation or limitation which is adopted after the Effective Date of this Agreement and which directly or indirectly relates to the conditioning, rate, timing, or sequencing of development of the Project, shall apply to or govern the development of the Project during the term hereof, whether any such regulation or limitation affects or applies to parcel or subdivision maps (whether tentative, vesting tentative, or final), building permits, occupancy permits, or any other licenses, permits, or entitlements to use issued or ,granted by CITY. 2.2.4 Reser 211ons and Dedication of LandS For Public Purnoces. In recognition of the significant contributions and dedications by OWNER, OWNER shall not be required to dedicate, convey, or transfer any interest in land or to construct or install public improvements or facilities in conjunction with the Project, except (i) as expressly provided for in the Existing Development Approvals, (ii) as expressly set forth in the provisions of this Agreement, or (iii) as authorized by Existing Land Use Regulations in conjunction with the processing of Future Development Approvals. The provisions of this Section 2.2.4 a:e not intended to preclude the CITY's ability to require additional dedications and exactions such as curb cuts, tiara pockets, interior streets, and signalization of intersections reasonably necessitated by the impacts of the development of the Project or the Property, in connection with Future Development Approvals as presently authorized by the Existing Land Use Regulations. 2.2.5 Development ExactiONS.. Except as othenvise expressly set forth in this Agreement and Exhibit "C", CITY shall not impose Development Exactions in conjunction with OWNER's development of the: Property or the Project, excepting only those Development Exactions which are authorized by the Existing Land Use Regulations-, provided, however, that the foregoing limitation on Development Exactions does not apply to (i) generally applicable processing, plan check, building permit, and inspection fees for the Project (it being understood that, as to such fees; OvNrNER shall pay the same rets that would be applicable in the absence of this Agreement) or (ii) any Development Exaction that is imposed, levied. collected, or required by any public agency, utility, distric'., ;,r joint powers authority" oilier than CITY, including but not limited to the San Joaquin Hills -39- A Transportation Corridor Agency, Ncvv'port-h3csa Unified School District, Costa i+tcsa Sanitary District, and Mesa Consolidated Water District. 2.2.6 Allacatinn of FAIL and Tri Bl d"t and Density. at tile The Project is considered to be a project ros codder eCiTYI zoning' code Seship or ioncontrol, i 3 G8 andel 3 f the init ial plan submittal and approv a1. Thus, 69, the applicable FAR and Trip Budget shall be determined on the Project as a ,vhole, rather than on a parcel by parcel basis. However, as set forth in Exhibit "G", the Existing Development pecify a separate FAR and Trip Budget for the Retail Portion of the Project, 3 Approvals sOffice adget for the Offind Industrial Portions of the Project, and a combined Fpec and Trip Bu separate Trip Budget for the Residential Portion of flee 1'roje ct. To the extent there is any conflict between Sections 13-68 and 13-69 and Exhibit "G", the FARs and Trip Budgets identified in Exhibit "G" shall govern. The MYTI ER may allocate the FAR and Trip Budget disproportionately between different parcels within any one of these Portions of the Project, provided that the overall FAR or Trip Budget within a respective Portion of the Projcct does not elceed its applicable maximurn. Z.2.7 Ftttvre Enyironrnentnl RevJMY- The potential environmental impacts of the project were analyzed in the Program E1R_ Future Development Approvals will be rev�iyvv�ed in light of the Program EIR to detei7nine if an;r additional environmental documentation will be required. The cietc-�:natian ■gilt be r}adc consistcnt vvith the applicable provisions of CEQA and the State CEQA Guidelines. 2.2.8 ❑Ater GcNti'ern1tzenta€ Persnit5. Provided that OWNER pays the actual cast of such caoperation, as reasonably estimated by CITY, after CITY has approved the development of any portion of the Project, CITY shall cooperate with OWNER in its efforts to obtain such additional permits and approvals as may be required by any other governmental or quasi -governmental agencies having jurisdiction over such portion of the Project which perrnits and approvals arc consistcnt with CITY's approval(s) and which are consistent with this Agreement. CITY does not warrant or represent that any other governmental or quasi -governmental permits or approvals will be granted. 2.2.9 City Review of Applications for Future Dcvelo meat A rovaLs. CITY acknowle:•'?es and represents that the Future Development Approvals listed in Exhibit "E" are a non -exhaustive Iist of discretionary CITY development and building approvals that 01�TfER may request or be required to obtain in order to cornplete the development of tate Project. All subsequent consideration by CITY of 0MIN-ER's applications for Future Development Approvals for the Project shall be subject to the tears and conditions set forth in this Agreement. To the extent permitted by the Development Agreement Statute, ill no event shall CITY disapprove, condition, or delay the processing of any applications for any Future Deveirpmenl Approval for reasons inconsistent w -h tha Existing Land Use Regulations, the E,\isti', Development Approvals, or the express provisions of this Agreement. if 6T`f is unable <<} —10 4il 1;!744011? timely process any of O"ER's applications for Future Development Approvals, upon OWNER's request CITY shall consider engaging qualified outside consultants reasanabl}r acceptable to OWNER to aid in such processing, provided that OWNER shall be required to advance all charges to be incurred by CITY for such outside consultants. In this regard, OWNER, in timely manner, will provide CITY with all documents, applications: pians s,"d information necessary 1br CITY to carry out its obligations hereunder and will cause OVvNIIR's planners, engineers, and all other consultants to submit in a timely manner all required materials and documents therefor. After the date that CITY approves an application for a Future Development Approval, OWNER shall have the vested right to develop pursuant to said Future Development Approval, the Existing Development Approvals and the Existing Land Use Regulations to the same ext;;nt that OVVINER has the vested right to develop pursuant to the Existing Development Approvals. 2.2. 10 Traffic Imnact Fee. OWNER shall pay Citywide Traffic lrnpact Fees of $3,887,910 (which allows up to 19,938 average daily trips (ADT) at $195 per rrip end) for General Plan level improvements. These fees shall be paid upon issuance of a Building Permit for the first building constructed on the project site following execution of this Agreement CITY and O1'YNER agree that, at the time future discretionary master plan permits arc submitted for the construction of improvements within the Project, CITY shall pei-form additional traffic studies, as required by CEQA, to determ'sne if there will be tra` is impacts not anticipated in the FE1 R. If such studies demonstrate new significant traffic impacts they shall be mitigated in a manner consistent with CEQA. Z.3 Reservations p Authority. Notwithstanding anything to the contrary set forth in this Agreement, the following la%,S, ordinances, regulations, resolutions, guidelines, and official politics adopted or approved after the Effective Date of this Agreement shall apply to and govern development of the Project (collectively, the "Reservations of Authority"): 2.3.1 PraccssinQ Fees. Generally applicable processing fees which include the CITY's actual cost, as may be reasonably estimated by CITY, of processing applications for Development Approvals. 2.3.2 Consistent Future City Re,-Tulations. City ordinances, resolutions, regulations, and official policies governing development and building which are in furtherance of and not in conflict with this Agreement, the Existing Developrrmcnt Approvals, and the Existing Land Use Regulations shall apply to the Property and the Project. t 2.3.3 Qverridino State and Federal Laivs and Regulations. - -911- A(] 1 IJ -4 All% 12 ved r the State and federal ia`'+'c and regulations which are adopted d of funk iiia his Agree hent Onall Bate of this Agreement which ove detOW1NE v ill vested rtedC1TY land use ordinances, res oluticns. apply to the Property and the Project,(0g ether ulations, and official policies "�hich aie adapted ar approved oaft � such Effective ga5tate and _ to enable CITY to p y Agr4ement and -which arc necessary Federal laws and regulations, provided, however, Stthaate, Staten, f de al, lore local laws, regulation , challenge or contest the validity of any such r lied to the Property and the ordinances. resolutions, or official policies, on tltea• ,ace or aPP elation alldlor any valid Project; and (b) to the event that any such State or federal lav or reg t nts CITY ordinance, resolution, regulation, or °fr1cpolicy this Aga en ursuan s ht provisions pofthis or precludes compliance with one or more provisions such Agreement shall he modified or suspended as may be necessary al to policy and thishAgreernent over-riding l State, federal or local law, regulation, resolution, o p remain in full force and effect to the extent h2lt it rformance of this not e rt wLh such r rnaining proti tsionlaw, ofhis regulation, resolution or official policy and that pe would not be inconsistent with the intent and purposes of this Agreement. OWNER Agreement w° Ar CITY shall ld the right to challenge, by appropriate judicial proceedings any such nes}' law or regulation preventing compliance tuit}1 the terms of this Agreelncnt or the modification or suspension of this Agreement. In the event effacsuch challenge is successful, this Agreement shall remain Linmodified and in full force 2.3.4 i'nhli� 1[eaftlt and Safrt�. cial cs Future CITY ordinances,re solutions, the grlopert}' r�rations � . the f immedr,t;e rcommun ty,aor reasonalJly necessary to protect thepersons hoth, from conditions dangerous to their health and/or safety. z,3,g [,] rioted Uniform Codes. Provisions of the building standards set forth in the California Building Standards Code in effect in the City at the time of the issuance of the Building Permit for a building or structure shall apply to the Property and the Project, including any valid local modifscaticns to the State standards in effect at such time, including without limitation the applicable provisions of the Unifomi Building Code, Uniform Plumbing Cade, Uniform N4echanical Code, National Electrical Code, and Uniform Fire Code. Z.3.G Public :Marks Im .rn•ement Standards. To the extent Ok'NER is constructing or installing public �voiks or facilities, the V standards in effect for such public works or facilities at the time of CITY's issuance of a permit, license, or other authorization for construction or installation of same. 2.3. '7 ;lssessment District and/or Corrtrntznity l.'aciiitics District. The provisions of any benefit assessment district, community facilities district, business improvement district, or similar financing district that is validly formed pursuant to applicable Ja„ and made applicable to the Property and ,s.inil;Jly-sit�a.ted prnl)ei�y; provided, howetier, _ O�'VNCR does not hereby consent to the formation of any such district or to the imposition of any benefit assessment, special tax, fee, or charge against OWNER or the Property with respect thereto, and OWNER expressly reserves all of its legal rights with respect to the formation of any such district and the imposition of any assessment, special tax, fee, or charge against OWNER or the Property, including without limitation such rights to object and protest that would exist in the absence of this Agreement_ 2.3.8 Regulations In Conflict. Any regulations set forth in this Section 2.3 vv-hich are in conflict with the Project provided OWNER has given written consent to the application of such regulations to development of the Property. 2.3.9 Public Welfare. Ordinances and regulations applicable on a City-wide basis establishing residential occupancy standards, energy conservation standards and living (minimum) wage standards. 2.3.10 Signs. Amendments of and/or modifications to the CITY's sign ordinance. 2.4 Judicial Decisions. Notwithstanding any other provisions of this Agreement, should a final decision of a court acting within its area of jurisdiction determine that any project approval issued by the CITY was improperly issued, the CITY shall be entitled to impose such additional conditions and mitigation measures which the CITY, in the reasonable exercise of its discretion, determines are appropriate to insure proper issuance of the challenged project approval and shall otherwise be authorized to comply with any lawful order issued by the court. Except as otherwise provided by law, CITY shall use reasonable efforts to insure that such new conditions or compliance requirements are consistent with the terms of this Agreement. if OWNER, in its sole discretion, determines that any of the proposed new conditions er compliance requirements are unacceptable it may elect to withdraw the challenged project application. 3.0 GENERAL PROVISIONS. 3.1 Effective Date of Agreement. Subject to the applicable provisions of the California Elections Code relating to referendum petitions, this Agreement shall be effective on the Effective Date. 3.2 Duration of Agreement. This Agreement shall be operative commencing on the Effective Date and continue thereafter until the date that is fifteen (15) years after the Effective Date, unless othenvise extended by the Parties, subject to earlier termination upon the completion, performance, and discharge of all obligations hereunder. In this regard, at the request of OWNER, the term of this f;greeircnt shall expire as to any separate legal parcel comprising uh'e Property on the later of the 4:S 10744QPr 2 ficate occummc-y Of r 1 io�� in dates: [i] the dzte on ��'1?iCh CITY issues its Etna Flo ements of for the de elopmlent p ilzspectiotz permitting occupancy of the completed buil tttg authorized by this Agreement Or (ii) such later date or dates on which the initial tenants Or occupants of the completed building impro-'erncnts cornmence occupancy of the premiseS. Upon p -�rccl, each termination of this Agreement as to the Property as a nbole or any separate legal pZ Party agrees to cooperate with, the other in cxeci t mg ma tr alize said terminationum"111 ill ble for -ria as may and (ii) remove be reasonably requested by the other Party tQ (] egal parcel on z title re�("I- this r7, this ?.greement as a matter affectirr -Ig re utablethe rtitle��nsurerOr ch IOWNER shall pay CITY's c:0n=ttmcnt or policy issued by Y p of such documents, reasonable casts for preparation and review including altarney fees incurred by CITY in such review and preparation. 3.3 B ffect ndina Eof Aareernent- evelopmnt of the on The Property is hereby trade subject carr ed out n accthis Agreement. ordance with the terms ,oftthis the Property is hereby authorized and shall be Agreement. 3.4 91,ners11i 2 of 1Pr'02crty. OWNER represents and covenants that it is the fee ovener of the Property. 3.5 Periodic Re—view. The periodic review described in Resolution No. 88-53 is applicable to this Agreeement. conduct of e a rlod'c review of In no event shall CITY 95 failure 1O modification of O1,�t+N�1�'serrghts here der orcons itute performance result in a ,wi minatton o brcach by the CITY of this Agreement. 3.6 Dtfaulis :rnd RDnedies. 3.6.1 I�Iotiee and D drtttnity to Ctrre. Before this Agreement may be terminated or action may be taken to obtain judicial relief, rhe Party seeking relief ("Nondefaulting party") shall comply with the notice and cure provisions of thiscetio� n 3 6-1_- The Nondefaulting Party in its discretion may elect to declare a default under this Agreement in accordance with the procedures hereinafter set forth for any failure or breach of the other Party (the "Defaulting Party") to perform any mated al duty or obligation of the Defaulting Party in accordance with the telTnsDofauirtin l'g ee sent. foHthwlhe nattuhe Noir-Defau}ting Party must provide written notice tat !; of the breach or failure. The Defaulting Party shall be deemed in "default" of its ohli_ ions set forth in this Agreement if said breach or failurc can be cured, after the aulting date of s chy has failed to take such actions and cure such default within ten (10) y nzonetal y de (for efaults) or within thirty (30) days after the date of such noticc (for non-rr:onetary defaults]. I% i7owevcr, a non-mon default cannot be cured within such thirty (10) day ] months, as long as the 1"]efat period, but can be curd within twenty -foul' (2,4Party does e�tC}z of the iollo'�'1T1g-+) notifics the Non -Defaulting Patty in writing with ith s a explanation as to he reasons the asserted default is not curable within the thirty (30) day period, 41)10744t1.12 (ii) notifies the bion -Defaulting Party in writing of the Defaulting Party's reasonable, proposed course of action, acceptable to the Non -Defaulting Party, to cure the default; (iii) promptly commences to cure the default within the thirty (30) day period; (iv) makes periodic reports every three (3) months to the Non -Defaulting Party as to the progress of the program of cure; and ,. , rti.i.ct;l;„� .tl„ P_ -p suc, cu.e to •:ur, psuruc�; then in such event the i}cfaulting Party steal not be deemed in breach of this Agreement. 3.6.2 Dela ilt Rctnedics. Subject to the foregoing, in the event of an uncured default, the Non -Defaulting Pany, at its option, may institute legal action to cure, correct, or remedy such default, to enjoin any threatened or attempted violation, to enforce the tet -ms of this Agreement by specific performance, or other equitable remedies. In no event shall monetary damages of any kind be available as a remedy for breach CITYthesertiAgreement. atifailable addition, rernedies the underevent theof an De Development material default by O Agreement Statute and CITY's Development Agreement Procedures and Requirements to amend or terminate this Agreement; provided, however, that OWNER does not hereby consent to any unilateral aniendrnents to this Agreement that increase or materially alter OWNER's obligations hereunder or that are not limited in purpose and effect to measures needed to cure or remedy the pmocular default in question_ The remedies set Forth in this Section 3.G. shall be the cxclus i� e rarnedies of the Parties hereto with respect to this Agreement. 3.6.3 Ilio Cress-Deftit1Its. in the event that this Agreement is assigned by OWNER in connection with the sale. lease, sublease, or other transfer, of a portion of the Property, to any entity in which the OWNER has no interest, and a default subsequently -occurs with respect to any pal -I of the PrUpei-ty so sold, leased, subleased, or otherwise transferred, such default shall not be considered a default as to any nontransferred remaining Property and the CITY shall not be entitled to any remedies with respect to the non -defaulted portion of the Property or the owner of said Property or to enforce or terminate this Agreement with respect thereto. Notwithstanding the foregoing, the CITY shall be entitled to all equitable and non -monetary legal remedies with respect to all portions of the Property and OWNER of said Property to enforce or terminate this Agreement with respect to any default which existed prior to the sale, lease, sublease or transfer by OWNER, 3.6.4 nonce MR' re. Neither party shall be deemed to be in default where failure or delay in performance of any of its obligations under this Agreement is caused by floods, earthquakes, other Acts of God, fires, wars, :gots or similar hostilities, or other cause, without fault and beyond the reasonable control of such Party. If arty such events shall occur, the time for performance by either party of any of its obligations hereunder shall be extended by the parties for the period of time that such events prevented such performance. 3.7 Cno enation in ttte Event of Leval Challenge. In the event of any le -gal -action instituted by a third paj,y, including without limitatiolt any ocher governmental entity or official, challenging the validity of this Agreement or any meat Approval granted pursuant to this Agreement, the parties agree to cnr+perate fiil}y Des-elop pP rovided, ha�vever, that Q"ER shall, at its sole with each other in defending, such action, P agents and expense, defend, indemnify and hold harmless the CITY, its Officers, c:mployecs, ag agents, consultants from any claim, action, or proceeding ransackt� the CITY, its officers,challenge empiaYeus and/or consultants. which actron seeks approval by the City Council, Planning Comzrrissivn. limitations r other blow,tt OWNER shng all pay or pP or CITY staff action concerning the Project. Subject to t ze the CITY'S reasonably incurred defense costs, including aaoela rney e7,rees,enses,�and shall repert l imbu se witness costs, and all other reasonably incurred litigation r result of such defense. the CITY for court costs which the CITY rnay be required to pay as a issue against the CITY fees t4 a OWN>R shall further pay any adverse financial award which y challenging such Project including but not limited to any award of attorney pasty a roval. If the approval of the Project results in a referendum, Ot hail fUrth reasonable attorneyeT burse PP the CITY for all its casts and expenses, and including_ related to such referendum and any Psion r femme ttoherein, Ho wever,Tas to attorney fees og y,t f select its counsel of choice tri any action ref CITY retains legal c:ounscl scparatefr❑m tthat +torn s Pay' bl�shall se ° suchch counsel. Any such responsible for the first 1350,000 in s e,.'sonabf ' y attorney fees in excess of $350,DQ0 shall be the full responsibility of CITY. Notwithstanding any other provision of this Agreement, this Section 3.7 shall become effective and binding upon execution ofthis Agreement by both Parties. 3.8 141nrtpadee I1112hts. 3.8.1 EnDl1}r]i7rt+nceS (i rt ilio j'rn ertY. The Partics hereto agree that this Agreement shall not prev;,nt or limit Ou'NER, in any y of anY manner, at pWN�R's sole and absolute discretion, from rencumbering art a e rldeed of tru t,t sale and portion thereof or any improvements thcrcan with anY wigthgres respect to the construction, leaseback, or other form of secured financing ("Mortgage) p development, use, or operation of the Project. 3.8.2 TvIort-n"ce Protection. To the extent legally permissible, this Agreement shall be superior and senior to any lien placed upon the Property, or any portion thereof, including the lien of any MCIlgage Notwithstanding the foreg°iiig, no breach of deiin Agreement andall fordvalue� Any acquistlion diminish, or impair the lien of any Mortgage m l; or acceptance of title or any right or interest in or with respect to the Property or any portion tliereof by the holder of a Mortgage (a "Mortgagee"), pursuant to foreclosure, trustee's sale, deed in lieu of foreclosure, lease termination or otfienysse, shall be subject to all of the te►ms and conditions of this Agreement and any such Mortgagee who takes title to the Properly or any Portion thereof shall be entitled to the Benefits arising under this Agreement, provided Mortgagee complies ,vith Section 3.8.3 below. 3.8.3 Mortiluec: Nat Obligated. Notwithstanding the provisions of this Section 3.8, Mortgagee will not have any ns of obligation or duly pursuant to the te�S set forth eherleundeerrent tor,eor t:orform tlguarantee le o such O\VNER or other affirmative coven performance, except that the Mortgagee who acquires Or accepts title or a portion thereof as aL.tiii► .7.J.V..'l. a+iaij j'i$'r `, i, i� i,�lll lV uC- a op Llje r1U�Cl:T. without n.s rry complying WLth the terms of this Agreement and executing and delivering to CITY, in a form and with terms reasonably acceptable to CITY, an assumption agreement of OWNER's obligations hereunder. 3.8.4 Notice of Default to Nlorta-svyce- Ri-lit of Mort -a soce to Cue. l�,ach Mortgagee shall, upon written request to CITY, be entitled to receive written notice From CITY of the results of the periodic review conducted pursuant to Section 3.5, and of any default by O\vNER of its obligations set forth in this Agreement. CITY shall, within tett (10) days of sending the notice of default to OWNER, provide a copy of such notice to each Njo--gagee who has submitted a written request to CITY fora copy of such notice. 3.9 !iot1 ces_ 3.91 —N ti ces Us clx1d e. As used in this Agreement, "notice" includes, but is not limited to, the communication of notice, request, demand, approval, statement, report, acceptance, consent, waiver, appointment or other communication required or permitted hereunder. 3.9.2 corm of Notice. All notices shall be in writing and shall be considered given either: (i) when delivered in person to the recipient named below; or (ii) on the date of delivery or refusal shown on the return receipt, after deposit in the United States mail in a sealed envelope as either registered or certified mail with return receipt requested, and postage and postal charges prepaid, and addressed t° the recipient named below; {iii) on the date of delivery or refusal, when delivered ts by Fcderal Express or other cotmnercial express deli very se fv$ facsimile wledge me nof of receipt; (iv) an the date of deilvery when delivered by providing delivery and receipt; or (v) on the date of delivery shown in the records of the telegraph company after transmission by telegraph to the recipient named below. Such notices or communications shall be given to the Parties at their addresses set forth below: If to CITY: City of Costa Mesa 77 Fair Drive post office Box 1200 Costa Mesa, CA 92628-1200 Attn: City Manager NVith Copy to: City of Costa Mesa 77 Fair Drive Post Office'sox INC Costa Mesa, CA 912628-1200 Attn: City t" forrtcy if to C)NVNER: C. 1. Segerstrom & Sons 3315 Fairview Road Costa Mesa, CA 92626 Attn-. Paul Freeman and Barney Page With a copy to' Pillsbury Wintluop LLP 650 Town Center Drive 7th Floor Costa Mesa, CA 92626 Attn: William R. Devine, Esq. 3.9.3 Clt:tnoss In Noticed Parties_ Either party may, by notice given at any tirne, require subsequent notices to Lie givet7 to another person or entity, -,whether a parry or all ofriccr or repYe54ntativ a of a Party. or to a dir"crcr<t adds cgs, cr bath- Ntntices given before actual receipt of not ice of change shall not be invalidated by the change. 3.10 Sever-thiIitY- if any term, provision, covenant, or condition set forth in this Agreement is held by the Final judgment of a court of competent jurisdiction to be invalid, void, or unenforccable, the remaining prollli�ions, covenants, and conditions shall contins�v in full force and effect to the extent that the l7asic intent of the Paries as expressed herein can be accomplished. In addition, in such event the Parties shall cooperate in good faith in an effort to amend or modify this Agreement in a manner such that the pus -pose of the invalidated or voided provision, ccv---nant, and condition can be accomplished to the maximum extent legally permissible-, provided, however, that in no event shall either Party be required to agree to an amendment or modification of this Agreement that materially adversely impacts its rights or materially increases its obligations or risks as set forth herein. 3.11 Time of Essence. Time is of the essence in the performance of each provision of this Agreement as to which there is a time element. 3.I2 5ticcesSnrq ,Ind Assi`ns- The provisions of this Agreement shall be binding upon and shall inure to the benefit of the Parties and their respective successors and assigns. To the extent of OWNER's tang its successors' and assigns') interest in the Property, the cotenants of OWNER set forth irs this Agreement shall be covenants running with the land and enforceable to the full extent permitted by applicable law. Nothing set foMlt in this Agrcement shall p-11.i.1zt OWNER from selling, leasing, subleasing, or otherwise transfett•ing all or any portion of the Property together with a transfer or Aft 111, Af 1.li assignment of alI of the rights and obligations of this Agreement as they apply to such portion of the Property, and G1TY's approval or saconsent e nlease5 subleashall note orequired other transfer, the in ion seiler�rlessor, th Upon the effective date of any sublessor, or other transferor automatically shall be released from any executory obligations to CITY }i�rP�tnrirr u jt}h rrcrect to Tt�r nnr!rnn Cf the proNg-y ScIdA, 11caSCd, SubiGased, ul r however, that unless CITY releases the seller, lessor, sublessor, or other transferred, provided, transferor in «+citing, it shall remain responsible to CITY for performance of any obligations as to Which it was in default as of the effective date of the transfer. 3.13 r f cert on Title. OWNER and CITY agree that if this Agreement terminates as to any portion of the Ps-opetty, it shall not thereafter continue as an obligation that applies to such portion of the Property. 3.14 Parties in Interest. This Agreement and all of its terms, conditions, and provisions are entered into only for the benefit of the Parties executing this Agreement (and their respective successors and assigns in interest), and not for the benefit of any other individual or entity. No other persons shall have any right of action based upon any provision of this Agreement. 3.15 Further �.cti ns and lntitrumcnts. Each party shall cooperate with and provide reasonable assistance to the other Pasty to the extent necessary to implement this Agreement. Upon the request of either P-mly at any time, the other Pasty shall promptly execute, with acknowledgment or affidavit if reasonably required, and file or record such required instruments and writings and take any actions as may be s-easonably necessary to iniplerrnent this Agreement or to evidence or consummate the transactions contemplated by this Agreement, OWNER shall pay CITY's reasonable costs for preparation and review of such documents including attorney fes incurred Ley CITY in review and preparation. 3.16 stns a a eI Certificates. Either Party hereunder may, at any time, but in no event exceeding six (6) times during any calendar year, deliver written ncatice to the other Pasty requesting such Party to cenify in of the cert Party, (t) this Agreement is in full force and writing that, to the best knowledge effect and a binding obligation of the Pasties, (ii) this Agreement has not been aniended or modified, or if so amended, identifying the amendments, and (iii) the requesting Party is not in default in the performance of its obligations set forth in this Agreement or, if in default, to describe therein the nature and amount of any such defaults. A Party receiving a request hereunder shall execute and return such certificate within a reasonable time following tate receipt t hCreo f. OWNER shall pay CITE 's reasonable costs, including attorney fees, incurred in complying with this Section. Recorda ion. SM 3.18 Section Headings. All section headings and subheadings are inserted for convenience only and shall not effect any construction or interpretation of this Agreement. 3.19 Rules of C0nstructii0t3. As used herein, the singular of any word includes the plural and the masculine gender includes the feminine. 3.20 Mutual Co''enan ts. titute i-lie cpVenani5 contained herein are mutual covenants covenantiono be to the concurrent or subsequent performance by party Uenchted thereby of perrorrned hereunder by such benefited part V. 3.21 Releases- I CITY hereby covenants and agrees that upon cantgl ftOW of the CITYt shall execute a d this Agreement, or any portion thereof, at the reqte reluest of gations deliver to the Orange County Recorder the dn roof of rther under [his ftgreeme:,t, for the portion ornpletedePrajec� O Rs ER (hall pay !1C1TY s attorney fees, incurred in complying write this Section_ reasonable costs, including 3.22 Applicable Law. This Agreement and any dispute arising hereunder shall be govemcd and interpreted in accordance with the 4av�s of the State of California. This Agreement shall be construed as a �i�hale according to its fair language and common rnearuing to achieve the objectives and purposes of the parties hereto, .and the ruI a of construction to the effect that ambiguities are to be resolved against the drafting party shall not be employed in interpreting this Agreement, all parties having been represented by counsel in the rtegoJation and preparation hereof. 3.23 Pro ect as a Private Undertaken - IL is understood and agreed by and between the parties hereto that the development of the Project is a private development, that neither party is acting as the agent of the other in any respect hereunder, and that eachparty is an independent. contracting entity with respect to the lcr-ms, covenants and conditions contained in this Agreement. No partnership, joint venture or other association ofany kind is formed by this Agreement. The only relationship between CITY and tJ%'WHR is that of a government entity regulating the development of private property and the ON NER of such property. I,- 3.24 A ra.'ais Reasonabtencsc. ecrr�ent specifically authorizes a Party to withhold its approval or Except when this Agr when either CI'T'Y or OWNER shall require the consent in its sole and absolute discretion, consent of the other Party in fulff,illing any covenant, provision, yr Conditian� set forth such approval or consent srial� l not be unreasonably wietd, conditioned, or �elayeo by approval � r neretn, PP the Party from whom such approval or consent is sought_ 3.25 Atnendrnertts and W3i�'ers. No modification or amendment of this Agreement or any of the provisions hereof shad be � u ase unless Set Earth in a writing signed by iy authorized s all be effect � e $entatives unless in effective fory P rP Waiver of any provision of this Agreement of bath Parties. Ido against wham enforcement of writing and signed by a duly authorized representative of the Party g is sought- ht. No ny occurrence or event shall waiver of any right or remedy in respect aQr subsequent occ��rrence ar be deemed a waiver of an a waiver y right or remedy in respect to any other event_ 3.z6 Authori to Execute. The ers❑ns hority executing this Agreement warrant and represent he Parties forat they have the whichTh py have l0 CxeCutE ih75 AgreemEerfarma.nCerepresent ❑f thehobl dations helreu�der. y at the they are signing to the p 3.27 Enter r�eeme°t. anding This Agreement (including the Exhibits hereto) constitutes theass ons andtagreem agreements agreement of the Parties and Supersedes allprevious he object negotiations, Iter hereof. No parol evidence between the Parties with respect to all or p Bement. shall be permitted to contradict or vary the terms of this Agr —6) 3.28 Liti ration Fx enscs. In any judicial proceeding or arbitrations between the Parties (collectively, "Acn tion") i ut of the toms and provisions of this Agreement, the jr,ly way connected with or arising o prevailing Party in such Action shallbe be rdti recoverable pursuant to Code of Cor ts actual and ivil Procedure cxpenses (whwtl}er or tzat the Same Would �1033.5 or 1717 in the absence of this Agreement}, including but not limited to expert witness fccs, sttorney fess, and costs of investigation and preparaljosl prior to the eornmerrcement of the accrue upon commencement of the Action. The right to recover such costs and cxperiscs shall Action, regardless of whether the Action is prosecuted to a final judgment or decision. IN WITNESS WHEREOF, each of the Parties has executed this Agreement on the date first ahova written. CITY OF COSTA MESA B y1- -- MAYOR OF COSTA MESA ATTEST: CITY CLE , CITY OF COSTA HIES. APPROVE AS TO FORJI`4: "► CFFY ATTORNEY, CITY OF COSTA MESA C. J. SEGERSTROM & SONS, a California general partnership By: HTS Mana ernes Co y, inc., a Cal' omi orpor ion Man ger By: By: Henry T. Segerstrom Management, LLC, a California limited liability company, Manager [3y:._ Its: - 5 Z- ?Numr,r,<,> s SEGERSTROM PROPERTIES LLC, a California lintitcd liability conA }any By: Henry T. Segerstrom Propenies, LLC, a California limited liability company, Manager A By: By: Ruth Ann Mon artylropertics LLC, a California limited liability company, Manager By� Its: HENRY T. SEGERSTROM PROPERTIES LLC, a California limited liability campany By: Henry T. Segerstrom Managcment, LLC, a California limited liability comPany, Manage By: Its: �3- CALIFORNIA ALL-PURPOSE ACKNOWLEDGEMENT State of California County of Orange On February 19, 2002 before me, Nolene Sherman, Notary Public, personally appeared Henry T. Segerstrom, personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed e instrument. 7NESS my hand and official seal NOLENE SHERN" ComrnWon N 123565 r Nalary Public - CQrltaTn o 1r Orange County , OCS Z2. Z= s c s hr41r Comm.Expres 1 State of California County of Orange On February 19, 2002 before me, Nolene Sherman, Notary Public, personally appeared Henry T. Segerstrom, personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. WITNESS my hand and official seal TiOLENE SHERhAAN 215660 � @fgR aflorr isntyl C122-2= i State of California County of Orange On February 19, 2002 before me, Nalene Sherman, Notary Public, personally appeared Henry T. Segerstrom, personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. NOLENE SHERMAN i Com-' ion 9 12,5664 Z _r; Nolary Pubr1C - California ; r Omnge CounSy [ MyC- mm. bg'n~s O -:s 22 7.M r WITNESS my hand and official seal Suite of California) SS County of Orange) On February 22.2002, before nye. Karen G. wlioley, NoiarSy Public, personally appeared Sandra S. tobe the-r I'Vh VC S �';;;mom iN yyVJYi 1 Vvu iv iiia. w i tll jlll l 1 1f 1 )i�anit�ltl nPrcnnally kn�twn sn rrs� and acknowledged iD me that she executed the same in her authorized capacity, an thatby her or the entity upon behalf of which the person acted, executed signature on theinstrument the person the instrument. WITNESS my hand and official KAREN G. WHOLEY Commission # i 182543 Notay Public - Coritarnia orange County W Comm. Goes MW 4.j2= OPTIONAL CAPACITY CLAIMED BY SIGNERS Partners: ❑ General ❑Limited ❑Managing Signers are representing HTS Management Co., Inc., a California corporation, Manager DESCRIPTION OF ATTACHED DOCUMENT Title or type of document Number of pages (excluding loose certificates) Date of document Signers) other than named abo%,e 15's- STATE OF CALIFOR�NTIry 5s. COUNTY OF 1 On � f'�[Cx 2� �G'C► ?� _, before me, �_: �c1 IIf-7 - b-�. `� personally appeared ��tjl-h'l �+ I.�i i personally known Co me ( F nee to be the persons) -whose nameks•Xigi e subscribed to the within instrument and ackno•v ledged to rrIe ChuC hqe they" executed the same in his erlthok authorized capacityjics), and that by hi ler/their signature( -q -)–on the instrument the persorW or the entity upon behalf of which the persap(s) acted, executed the instrument. Witness my hand and official seal. E.ArtiE LI:N ON commission it I I5p06N 7 Notary PuViiC - Ca!itcmla x• x pronne County ,►.y Ccr:m. 5- irm :ul 23.3702 ? STATE OF CALIFORNIA COUNTY OF On nersonally appeared Notary Public SS. , before me, personally knomm to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose narne(s) islare subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by hislherltheir signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrurnent. Witness my hand and official seal. Notary Public (SEAL] -Sl0 A F1 M-14400 12 STATE OF CALIFORNIA COUNTY OF 5S. On `7CC1tJ �- ,before me,C personally appeared personally known to me [ to be the persons) whose name(s) is/are subscribed to the within instrument and acknowledged to me ilial lw4Wthey executed the same in him9=ltheir authorized capacity(ies), and that by hisEk Lheir signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness my band and o s 'a seal. ftMHE r �t ,. czaarki� MC�M8q*M"td 4 fs�Z0 STATE OF CALIFORNIA } COUNTY OF ) On _ ss. before nye, Personally appeared Personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose narnc(s) is/are subscribed to the within instrument and acknowledged to me that helshekbey executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument. Witness rnv hand and official seal. Notary Public (SEAL] -sq- 4nlu7arivlz EXHIBIT"A" PARCEL A I Map 94-120 in the City of Costa Mesa, CoUntyof Parcels 1 and 3, as shown on Parce pages 7 through 10 of Parcel Maps, in the office of the ❑ ran ge, filed in Book 284, County Recorder of said County. PARCEL 13 Parcel 1, as shown on Parcel Maps of parcelin the Mapstyn theof a of the County sta Mesa, County RerCarder filed to Book 194, Pages 13 and 1 of said County, z. PARCEL C Parcel 1 i liar ce�,ai;� parcel of land situated =,n the City of Costa Mcsa. County of Orange, State of California, ?arc Part;els 3 and 4 of Parcel Map No. 79-381. as shown on a map thereof riled in Book 139, Pages 71 through 24 of Parcel 1�Iaps, in the office of the CatIrty Recorder ofsaid Orange County, together With that portion of Parcel 2 of said Parcel Nirip No. 79-381 lying westerly of the following described line: COMNIENCINC at the norihEvest Garner of said Parcel 4; then cc along the northerly line of said parcel map North 89125'40" 'East 1370.17 feet to the beginning of a tangent curve, concave northerly and having, a radius of 1384.00 feet; thence along said curve and northerly line easterly 8 9.7 9 feet through a central angle of 03°43'02" to a paint on a non - tangent curve concave westprl Rh $$ �8 ��,a West said point alsofeet, be�ngd[he TRUE said curve from said point bears No POINT OF BEGINNING; thence leaving said northerly line along said curve southerly 87.13 feet through a central angle of 04123'48"; thence tangent from said curve South 0601512" West 119.69 feet to the beginning of a tangent curve concave easterly and having a radios of 1161-09 feet; thence along said curve southerly 154.54 feet through a centra! angle of 0703T33"; thence along a radial line of said curve North 88°37'39" *2ast 7.83 feet; thence South 00°53'48" East 198.66 feet to the beginning of a tangent curVe concave northeasterly and having a radius of 5 13.4 5 feet; thence along said curve southerly 439.17 feet through a central angle of 49 100'24", thence along a radial line of said cunrw North 40'05'49" East 12..79 feet to a point on a non -tangent curve concave northeasterly and having a radius of 504.66 feet, said curve being concentric with said cur��e hereinabove described as having a radius of 5 t 3.45 feet; thence along said concentric curve southeasterly 117.49 feel through a central angle of 13°26'45" to the southerly line of said Parcel 2. _. 58 201?F39ity 1 EXCEPTING THEREFROM that portion described as follows: COMMENCING at the northwest corner of said Parcel 4; thence along the northerly line of said parcel map North 99°25'40" East 1169.02 feet to the TRUE POINT OF ,.� ............ ..�..a,) iifc� ivul RF -GINNING; thence cont.11-6110" �lo�^ cn,rl .,..tet,., -l.. i._- 201.15 feet to the beginning of a tangent curve concave northerly and having a radius of 1384.00 feet; thence along said curve and northerly line easterly 89.79 feet through a central angle of 03043'02" to a point on a non -tangent curve concave westerly and having a radius of 1135.50 feet, a radial line of said curve from said point bears North 8800836" West; thence leaving said northerly line along said curve southerly 87.13 feet through a central angle of 04°23'48"; thence tangent from said curve South 06'1512" West 119.68 feet to the beginning of a tangent curve concave easterly and having a radius of 1161.09 feet; thence along said curve southerly 125.26 feet through a central angle of 06'l 0'52"; thence non -tangent from said curve South 88°3329" West 249.74 feet; thence North 79°?4'20" West 10.08 feet; thence North 00°53'48" West 329.52 feet to the TRUE POINT OF BEGINNING; ALSO EXCEPTING THEREFROM Parcels 101839-1 and 101839-2 as described in that certain Grant Deed to the State of California, recorded October 27, 2000, as instrument No. 20000582392 of Official Records, in the Office of the County Recorder of said Orange County. And ALSO EXCEPTING THEREFROM Parcels 101837-1 and 101837-3 as described in that certain Grant Deed to the State of California recorded October 27, 2000 as Instrument No. 20000582393 of Official Records, in the Office of the County Recorder of said Orange County. CONTAINING: 17.246 Acres, snore or less. Pareel 2 That certain parcel of -land situated in the City of Costa Mesa, County of Orange, State of Califomia, being those portions of Parcels 2 and 3 of Parcel Map No. 79-381 as shown on a map thereof filed in Book 139, Pages 21 through 24 of Parcel Maps, in the Office of the County Recorder of said Orange County described as follows: COMMENCING at the northwest corner of Parcel 4 of said Parcel Map No. 79-381; thence along the northerly line of said parcel map North 89025'40" East 1169.02 feet to the TRUE POINT OF BEGINNING; thence continuing along said northerly line North 89°25'40" East 201.15 feet to the beginning of a tangent curve concave northerly and haling a radius of 1384.00 feet; thence along said curve and northerly line easterly 89.79 feet through a central angle of 03°43'02" to a point on a non -tangent curve concave westerly and having a radius of 1135.50 feet, a radial line of said curve from said point bears North 88108'36" West; thence leaving said northerly line along said curve southerly 87.13 feet through a central angle of 04°23'48"; thence tangent from said curve South 06°15'12" 'Nest 119.68 feet to the beginning of a tangent curve concave -10126380VI - sa- having a radius of 1161.09 feet; thence along said curve southerly 125.26 feet through a -tangent from said curve South 88°33'2x3" West central angle of 45°10'52"; thence non 249.74 feet; thence North 79024'20" West 10.08 feet; thence North 00°53'48" West .12o, S2 feet to the TRUE POINT OF BEGINNING; CONTAINING: 2.074 Acres, more or less. Parcel 3 That certain parcel of land situated in the City of Costa Mesa, County of Orange, State of California, being that portion of Parcel 2 of Parcel Map No. 79-381 as shown on a map thereof filed in Sook 139, Pages 21 through 24 of Parcel Maps, in the Office of the County Recorder of said Orange COun€y, Bring easterly of the following described cine: C{7MNlENCING at the northwest corner of said Parcel 4; thence along the northerly line of said parcel map North 89°25'40" East 1370.17 feet to the beginning of a tangent cun.,e, concave: northerly and having a radius of 1384.00 f fl; thence along o point on as nand northerly line easterly 89.79 feet through a central angle tangent curve concave westerly and having a radius of 1135.50 feet, a radial line of said curve from said paint bears North 88°08'36" West, said point also being the TRUE POINT DF BEGINNING; thence leaving said northerly line along said curve southerty 87.13 feet througls a central angle of 04'23'48"; thence tangent from said curve South O6° l 5'12 "W£st 119.68 feet to the beginning of a tangent curve concave easterly and having a radius of 1151:09 feet; theme along said curve southerly 154.54 feet through a ccnlral ankle of 07137'33"; thence along a radial line of said curve North 98'3 T39" past 7.83 feet; thence South 00°53'48" East 195.66 Feet to the beginning of a tangent carve concave northeasterly and having a radius of 513.45 feet; thence along said curve southerly 439.17 feet through a central angle of 49100'24"; thence along a radial line of said curve North 40°05'48" East 12.79 feet to a point on a non -tangent curve concave northeasterly and having a radius of 500.66 feet, said curve being concentric with said curve hereinabove described as having a radius of 513.45 feet; thence along said concentric curve southeasterly 117.49 feet through a central angle of 13026'45" to the southerly line of said Parcel 2. EXCEPTING THEREFROM Parcels 101837-1,101837-2 and 101837-3 as described in that certain Grant Deed to the State of Califomia recorded October 27, 2000 as Instrument Na. 20000582393 of Official Records, in the Office of the County Recorder of said Orange County. CONTAINING: 31.214 Acres, more or less. SUBJECT TO all Covenants, Rights, Rights -of -Way and Easements of Record. (44 4CII761S O,I EXHIBIT "B" DEPICTION OF THE PROPERTY PARCEL A i li �J h y 4 a� 4�4 r �i S,,nraT'}f �•���, Q?A/f j PARCEL B 6 ;:w11 w r—sovlH Go�S, D>Rlrf ...,,...._ i . �iC�YiJa.+R7 tr.t31L• Lsi M.11►1�1' �.�. ; ! irr1.1.. M I . �K.•wH / w• 11 P/RCC: t .�....r.t MIM. _(aI— so;zcar,SVt Exhibi! B-] SOUTH -COAST DRIVE ~NaWV1 tE ems- AMING PARCEL C r SOUTH COAST DRIVE I"13 � w � I� SAN DIEGO FI?EEnAY (ROUTE 405) a012(dGSv1 �EXj]lblt $-2 EXfI BIT "C" LIST OF EXISTING DEVELOPMENT AP PRdYALS Mitigation I`'Ionitoring Program for Final Program EIR No. 1048 by City of Costa Mesa. ?. General Pian Amendment GP -00-05. 3. North Costa Mesa Specific Plan Amendment SP -00-02. 4. Rezone R-00-02. 5 Master Plan PA -99-02 and Minor Conditional Use Permit ZA-01-36. 6. Development Agreement DA -00-01. Sf11f1?6df1v12 ExxrB1T "D" EXISTING LkND USE REGULATIONS I . CITY of Costa Mesa General Plan 2 North Costa Mesa Specific Plan. 3. Title 13 of the Costa Mesa Municipal Code (Planning, Zoning and Development Codcs). 4. All other ordinances, resolutions, regulations, and official policies governing land use development and building construction. l of the CITY ta 5 Resolution Na. 88-53, A Rei011 of the CITY s and Requirements foriConside anon of Development Agreements. California Establishing Procedure Agreements. THE APPLICABLE VERSIONS OF THESE DoCUMB.NTS ARE THOSE FN EFFECT ON THE EFFCCTNE DATE OP'f1-1.15 �EARE OCOPIES FILE � 1� CITYISTING PLANMNG D USE R.EGULATIDNS LISTED ABOVEDEPARTMENT MW nuiu7asm. I? EXP1rBIT "E" LIST OF FUTURE DEVELOPMENT APPROVALS 1 _ Planned sign program approval!amendment and sign permits. 2. Preliminary and/or Final Master Plan approvals. 3 5 Subdivision and/or Pa"cel maPs, or lot line adjustments necessary development of the Project. Possible conditional use permits and/or variances that may be sought. to facilitale Building, grading, occupancy and demolition permits and all other ancillary permits required by other uniform codes. 4111417 A 411 V 12 —IPS - 4 111417 IPS - EXHMIT F COIt'il,WNITY BENEFITS PROVIDED BY OWNER A. Circtriation Im rovernents Improvements Required in Accordance with the General Pian owNER shall pay Citywide Traffic Impact Fees of $3,887,910 (which allows up to 19.938 average daily trips (ADT) at $195 per trip end) for General Plant level improvements. These fees shall be paid upon issuance of a Building Permit for the first building constructed on the project site following execution of this Agreement. Improvements Required by Project Beyond the General Plan Additionally, in accordance with and in addition to f=inal Environmental Impact Report F#1048 ( E!R), OWNER shall pay the following amounts for tliw construction of the improver, ents identified in the table below. The total ❑VVNER obtigatiorr� except the cost for the easibound right -turn lane at 14arbor-South Coast', shall be paid upon issuance of a Building Permit for the first building constructed on the project site following, execution of this Agreement. This total amount due at first Building Permit, which includes both construction and construction management, is $4,578,400. Payment of the designated arrrsounts in the requa cd time period shall fulfill all OWNER obligations for construction of the Identified improvements. Thee are in addition to the traffic impact fees and transportation corridor fees applicable to the project. It is anticipated that the eastbound right -turf lane at Harbor -South Coast will soon be incorporated into the Citywide Traffic Impact Fee Program for General Plan level improvements and be subject to traffic impact fees. If this traffic improvement is not included in the program within the next 36 months, O WL-fER shall pay $350,000 to the City for the cost of such construction and an additional $35,000 for construction management. Such payment will be due the later of (i) 36 months after recordation of this Agreement or (ii) issuanc!e-uf a -Buil -ding PC: -Mit far tite first building constructed an the }project site following execution of this Agreement_ _/_('0— antu?aaP.•t2 Intersection Improvement Harbor — Adams Rcstripe SB thru to thru + ri ht Harbor — Sunflower Reconfigure and _ Restri a EB and WB Harbor -- South Coast Add NB thru lane Add EB rip ,lit -tum lane oaches See footnote 1 Fairview — I-405 NB Ramps Restrine NB offramp Fairview —1-405 SB Ramps Add SB left -tum lane & widen onram Bristol — Baker Add EB left -turn lane & NB thru lane Total Site access Improvements Total OWNER's Share Construction Construction of Construction Management rest uas► Cast 04Q $10,000 $10 $525,000 $262,500 $26,250 51,419,000 $1,419,000 $141,900 $350,000 $350,000 S35,000 $10.000 $10,000 $4 $2,200 000 S2,200,000 $220,000 $525,000 $262,500 $26,250 $5,039,000 _$4,5142000 $449 400 OWNER shall provide dual left -turn lanes and associated signal modifications at the South Coast Drive —Susan Street intersection in Fau-vitewnRoad and Susan Sns, and shall treet. Susan access into Home Ranch from South Coast Drive Susan Street Offramp Provided that all necessary local, State and Federal approvals for the Susan Street Offramp project are obtained, OWNER tinshall dedicate ityland for standardsnof as Susad fund ll cost of n Street exit amploff the ney� inspection and construction, pursuant northbound 1-405/Harbor Boulevard offramp collector/distributor road. Future Unanticipated Right -01 -Way Needs If, during the term of Lhis Agreement, the City determines that additional right-of-way within the Project boundaries is needed for the construction of street improvements that are- not now anticipated by the FEIR or the City General Plan in effect on the Effective Date, OWNER agrees that, if it is still owned by OWNER at the time such need is established, OWNER shall transfer such right-of-way to CITY, OVA-IER agrees that the fair market value of any such right-of-way, shall be the lesser of (1) the fair market value on the Effective Date, adjusted by the Consumer Price Index for all Urban Consumers for the Los Angeles Metropolitan Area, Base Year 1982- 84=100 but not exceeding 4% annually or (2) the fair market value at the time of conveyance. For purposes of this provision the Project is bounded by Fairview, Sunflower, Harbor= and the 405 h-eeway and extend: t -o the -centerline of each. Q, QuItttral Res a rres a n M744002 OXkNF_R, shall preserve the Seg erstrom home, guesthouse, garage, and barn on a parcel of land, which shall be set aside in perpetuity for historic resource preset-vauon. OWNER shall dedicate to �l} a nonprofit foundation ncreas do+o any a by of °`n' c� 5 titation City of Costa Mesa, or (3) another governmentagency «ath U \V N ER, a min imurn 1.5 acre parcel of land t o allow tor: Preservation of the buildings as stated above (including possible relocation of the barn within the site) • Public assembly areas • Parking • Passive public recreation Since this historic area is adjacent to OW1`4ER's business offices, City agrees that all management and use of the historic arca shall be performed in a manner that does not disrupt the erations of OWNER. City also agrees,- that all development rights of day to day business oproperty OWNER, including square footage Rart h trip budget, site scsih ^r the 7f South Coast ❑ridve a df east trans ferred to the remainder of the rlo P of the proposed Susan Street. If the barn is relocated, OWNER shall pay the east of such relocation. As determined by City in cor`5ll14 �`o��tedt[ �yNn iRtytht oFOtopertY may be WNER or ded cat d,�at no cost, t,Sta Vnanaged by a private foundation the City of Costa Mesa or other- designated government agency . The historic site shall be open for public use and access for special events and docent -led tours, within five years of the date of recordation of this Agreement, or at the time development immediately adjacent to the historic site occurs, whichever comes first. A plan for public use and access shall be approved by the City if the property is owned by a nonprofit entity. Within the five-year period following recordation of this Agreement, an endowment of 5250,000 shall be established by OWNER for the purpose of forming a nonprofit foundation whose responsibility %vi11 be to manage the Historic site. The board of directors of the foundation shall consist of five (5) members, three (3) appointed by the City and two (2) appointed by the Segerstrorn family. The endowment shall be used to cover such expenses as the cost of maintenance and operation, historic presel-vatioa and listing of the property on the State Registry This endowment shall constitute the full extent of owNER's monetary obligation for the long, term preservation of the Historic site. O\VNIER shall fully fund the cost to create a preservation plan to maintain the Historic site, and .;uch plan shall be completed within five years of recordation of this Agreement. (Approximate value - S 10,000) Until such time as the endowment is made and the managing entity formed, OWNER shall maintain the site and its improvements (the home, guest house, garage, arra barn) in good condition and fund all maintenance -costs. - 4010744DvI2 — �� OWNER or homebuilder shall pay the full amount of park dedication in -lieu fees associated with residential development. Dedication of the 1.5 acres of land for cultural resources shall not be used as a credit against applicable in -lieu fees or parkland dedication requirements. The City acknowledges on-going discussions between the OiVNER and the Mesa Consolidated •,, ;tier District (ivlVinU) regarding the possible placement of an underground reservoir within the area adjacent to the Historic site as identified herein. In the event any portion of the area adjacent to the Historic site is conveyed by unforced sale to MCNkD for such reservoir, OWNER or N4C%V. D shall, prior to such conveyance, obtain approval from the City for all aspects of the design and construction of such facilities. In addition, as conditions of any such unforced sale. OWNER and MCWD shall provide that (i) the reservoir be placed below grade unless tlhe City agrees otherwise and (ii) the surface area overlying the underground reservoir be dedicated to tlhe CITY for use by the CITY for recreational and similar purposes. City agrees, that all development rights of OWNER, including square footage and trip budget, for property t:•ansferred to MCWD, shall be transferred to the remainder of the Home Ranch project site south of South Coast Drive and east of the proposed Susan Street. if the conveyance to MCWD is not completed or in escrow within eight (8) years of the Effective Date, OWNER shall dedicate an additional 1.5 acres adjacent to the Historic site, to the entity which then owns and operates the Historic site, for the purpose of expanding the Historic site area and creating more public open space. This entity will be (1) a nonprofit foundation unrelated to any entity of OWNER, (2) the City of Costa Mesa, or (3) another government agency as determined by City in consultation with OWNER. CITY agrees, that all development rights of OWNER, including square footage and trip budget, for the property dedicated, shall be transferred to the remainder of the Home Ranch project site south of South Coast Drive and cast of the proposed Susan Street. C. Contribution to Edntational Advancement for Costa Mesa Students OWNER commits to fund expanded educational opportunities and facilities for Costa Mesa and Estancia High Schools and TeWinkle Middle School. OWNER contributions to expanded education opportunities shall be used for programs or capital facilities to exclusively benefit Costa Mesa students. Funding identified in the following shall not be used to supplant existing educational funding provided by the Newport Mesa Unified School District (NMUSD) nor capital construction/renovation as authorized by local voters in approval of Measure A. Funding shall be in addition to, rather than in -lieu of, statutory school OWNER fees. Concurrently with the issuance of the first Building Permit for the Project, OWNER shall conti7bute a total of $2,000,000 for educational advancement opportutikies and facilities. The contribution shall initially be paid to the CITY and held by the CITY in a separate account earmarked for these purposes_ Fifty percent (50%) of such funds shall go toward Estancia/TeWinkle school prograrns/facilities and fifty percent (50%) toward Costa Mesa high school programs/facilities. Within one year of the recordation of this Agreement, the City of Costa Mesa, in cooperation with OWNER and the schools, shall identify an existing Foundation or Foundations or establish a new Foundation or Foundations to }}'hick ►=pis %:ducational contribution will be commiucd. The City of Costa Mesa shall enter into such agreements as may be necessary with the identified 40l(17440V12 Foundation or Foundations to ensure that the proceeds identified above Will 'oc used to the exclusive benefit of Costa Mesa students. D. ContriAthlctic Facilities Concurrently •vith issuance of the first Building Permit for the Project, 0`<'JNER shall contribute a total of $250,000 to the Costa Mesa Community Athletic Foundation for purposes of helping the Foundation fund a new aquatic complex at Costa P9esa High School and a ne%v stadium complex at Estancia High School. E. Contribution To Restor:�tion of Huscroft House Within ninety days (90) of the issuance of the first Building Permit for the Project, ONVNER shall contribute a total of $200,000 to CITY to help fund the transport of the Huscroft house to a permanent location and provide for its restoration. F. Residential Cord anent QWNER shall construct only owner occupied attached or detached housing within the residential portion of the project, and shall comply with existing zoning on the 16 -acre residential portion of the project at an average density of I2 units per gross acre. On that portion of the residential site which .%-ill be detached, si- fGrnily homes, the rninimuni lot size shall be consistent with City standards adopted by the Costa Mesa City Council on lune 18, 2001, and effective July 18, 2001, for small lot single family homes. However, town home style housing may be 3 stories, not exceeding 50 feet in height. G. Fre Station Development of Home Ranch incrementally increases the demand for City fire suppression and emergency medical services in the northwest area of the community. To meet the increased demand, a fire suppression impact fee of $0.285 per square foot of gross building floor area shall be paid prior to the issuance of Building Permits for each building. However, since the need for a fire station may occur prior to collection of any substantial portion of the fees, or build -out of Home Ranch, OWNER shall be responsible for the following: • Land — Within 3 years of execution of this Agreement, City shall complete a fire suppression study and determine whether a new fire station is needed in the Home Ranch area. If it is determined that such a facility is needed, OWNER shall dedicate, at no cost to the City, a maximum 30,000 square foot parcel of undeveloped land owned by OWNER, acceptable to CITY, either within Home Ranch or the nearby vicinity, for a future fire station. City agrees that all development rights, including square footage and trip budget, for any property conveyed for afire facility, shall be transferred to the remainder of the Home Ranch project area south of South Coast Drive and east of the proposed Susan Street. if it is determined that such a facility is not needed or no determination is made within the 3 year period, OWNER's obligation to dedicate land for t �' `1; ility ss%all terminate and OWNER may proceed to dn,elop all of its property according to its zoning. In addition, if a determination of need is made but construction of the facility is not commenced within 5 years of 4111�:stpv[2 — lO after ation, the property dedicated shall be conveyedaccts ding to zan ng, Any such determtn proceed to develop such property which syn MR maY dicatian and conveyance shall be the sole rinds specified above. lity of }��maY costs of such de subject to the time pe P The City, at its sole discretion, and sub) ILI des eiinine when dedication is necessary 1Owritten notice to110� 4j MR of the need for City shall provide six months advance dedication- stXnctian - tes a minimum fl-ve The City's Fire Departmentdedt toaccommodatefuture' • Building COn will be nee thousand squame foot fire station building e ui ment and personnel- Since the architectural $500,0x4 of the cost of Suppression q P R shall be respans cost is unknown at this time, ❑� a ens shall be building construction and site improvement, less �i credit For all file, impact fees poi ' Home Ranch up to �e date of fire statinn cons or to the date CITY�:�sues constructivF} in a ments would made to CITY no later than icn (lroe sssfor the fire facility. Thest p Y documents initiating the bidding p Etre irn act, lees fair the balance or P satisfy any remaining obligation tO shall make this payment without regard to development in Home Ranch. O wired for the fire whether the above -referenced dedication of land is ultimately req station. Sales and Use Tax GuARrar+tee 1 g months a€tez issuance of the Certiretailer}ithin the Prfor occt, fand Commencing eighteen ( ) or such comp=bje Cornm nci ry retail building (i.e. IEA ears, OW i�TER or their designeelassignee, shall non-ancontinuing annually thereafter for up to five () Y �,hich money Will be used as deemed pay the City The amounts identified in the table belay, ho-'vever, shall receive credit %r annual the Costa Mesa City Council. pWNTR, appropriate by all businesses located within Home Ranch. Said credit Home Ranch businesses sales and use tax revenues generated by use2 months} for which tomple;e State Board all be based as the City's share ❑£ safes auadrters (Ixes generated by sales and shall receding q during the last four, immediately p Sales and Use Tax Guarantee year the signee of Bquaiization records arc available. If in any do not meet the amounts identified in tequalto•til difference. At sucheeltime as use tax revenues Guarantee payrnent) to the City eel shall make a payment ( ents from OWNER or the total amount of sales and use tax revenu 00 even f achieved in less than 5 years, Bement terminate and no fl�rther Guarantee Payments designeelassignee, received by the City, rear$5X0, the obligations under T this is s ct'On ,000). of the shall be required. ------------ Szaks and Z Ise Tax Yearly Amount Guarantee Year } Guaranteed 1 $750,000 2 $750,000 3 $1,000,000 4 $1,250,000 �$ $1,250,000 Total $5,000,000 ._—I Z -- AAIna?auiuj] Cumulative Amount Guaranteed at Year End $750,000 $1,500,000 $2,500,000 $3,750,000 $5,000,000 $5,000,000 a *. ! EXETA1T G PROJECT FAR AND TRWBUDGET industrial Residential TOTAL: 0.40 12 du/acre l 102 l 130 1 Trip Budget for office and industrial is a combined budget. --1-5- A 0 1 n74404L-1 2 -13- A01n7dd04L•l2 1738 1 2130 ATTACHMENT 6 June 1, 2016 Mayor Steven Mensinger; and, Members of the City Council CITY OF COSTA MESA 77 Fair Drive Costa Mesa, CA 92628-1200 Subject: General Plan Amendment Screening Request STEELW"E- Former Emulex Site 3333 Susan Street, Costa Mesa Honorable Mayor and Council Members: Steelwave, LLC, and its partners, purchased the former Emulex Corporate headquarters property in October 2015. Currently developed with three two story office buildings, and a fourth approved but not yet built. Emulex Corporation sold its property upon being acquired by another business and has vacated two of three buildings. As such, Steelwave proposes to remodel this campus of three office buildings and attract new jobs and businesses. As the new property owner, Steelwave is excited about this opportunity to enhance the property by replacing the fourth "future office building" with a hotel and dining/retail building on the remaining 3.2 acres fronting South Coast Drive. As currently approved, we can immediately proceed and build a fourth office building, however, we believe the surrounding area will have an abundance of office space but lack commercial services for employees and business visitors. This proposal will address that need. Attached is our "concept" plan depicting a four story hotel consisting of approximately 128-130 rooms, with a dining/retail building serving our office campus and neighboring properties. In particular, we wish to provide a full service dining restaurant, cafe, quick serve restaurant for outdoor dining, and specialty retail in freestanding theme structures. Our vision is similar to the "SOCO" center dining experience or that of "The Camp". The total office, hotel, and commercial floor area is slightly greater than that allowed in the current General Plan, which necessitates the need for a General Plan Amendment from .40 FAR to .45 FAR on the overall site. Additionally, implementing amendments would be needed to the applicable specific plan, zoning, and development agreement, as follows: 2050 Main Street, Suite 830, Irvine CA 92614 1 PH 949-863-0390 1 WEB SteelWaveLLC.com —%Q General Plan Amendment Screening Steelwave- Former Emulex Site 3333 Susan Street, Costa Mesa Page. 2 REQUESTS • General Plan Amendment — to increase the "floor -to -area" ratio on 14.25 acres (620,730 s.f.) of property from 0.40 FAR to 0.45 FAR, moderate traffic generation, thereby allowing limited commercial services such as a hotel/restaurants/retail uses on the remaining 3.2 acre vacant parcel that is currently approved for construction of a fourth office building. • Amend North Costa Mesa Specific Plan- revisions to "trip budget, building height, and building square footage" assigned to this property. • Zone chane from PDI- Planned Development Industrial to PDC- Planned Development_ _Commercial - 14.25 acres site- Allows new proposed uses and general office uses. • Amend Home Ranch DA # 00-01/ Ord. 01-29- only the "Industrial Portion" 14.25 acres (former Emulex site) in the development agreement. Development Project as a subsequent application: • Master Development Plan- future design submittal for the hotel and dining/retail uses on the 3.25 acres vacant site. PUBLIC BENEFITS Replacement of future office space with a hotel, restaurants, and specialty retail would generate new "transient occupancy tax" and "sales tax" along with providing local services to employers and employees in the immediate area. The ability to walk to lunch from office buildings, or stay in a hotel adjacent to businesses north of the freeway, would be a great benefit to the area. Overall, we view this proposal, versus our current approved plan, as a "win" for the community, businesses, and employees in the area. 2050 Main Street, Suite 830, Irvine CA 92614 ; PH 949-863-0390 1 WEB SteelWavel_t-C.COm — 1�5— �j TE E L W A V While we recognize you are in the process of adopting a comprehensive General Plan update, our request is an insignificant amendment to create a better plan that represents good planning for the area. Therefore, we respectfully request your support to authorize staff to process our General Plan Amendment application. Sincerely, Seth Hiromura Managing Director Acquisitions and Development Attachments: Concept site plan Traffic Study 2050 Main 5treet, Suite a30, Irvine CA 92614 1 Ph 949-863-0390 1 WEB SteelWaveLLC.com ana3nv a�rinoiirarls !1 l i I I 1 I 1 1 1 f U I!1 9 w U iLLLL- LL O C9 Z N X W i7= 14 �.;�` STEELWAVE Costa Mesa Design District Design Package 3333 SOUTH SUSAN COSTA MESA, CALIFORNIA IRV15-0133-00 CONCEPTUAL DESIGN 02.12.2016 WARE NIALCOML architecture I planning I interiors graphics I civil engineering OPP Ell A Ak d 40 JL NMI Ow its) IL 1111EA PAI!x IX A .AlIME01tAll vu,yN STREET r STEELWAVE scheme: 8E Revised Overall Site Plan w/ Hotel j 3333 SOUTH SUSAN STREET COSTA MESA, CA n LU I Z LU Q UJ 0 J IL Z I C0 PROJECT DATA: SITE AREA: 14.25 AC (620,730 SF) TOTAL BUILDING AREA: 281,879 GFA Existing Office: 180,0000 SF 4 -story Hotel: 62,524 SF Retail: 19,355 SF F.A.R. 0.45 PARKING REQUIRED: 884 STALLS Existing Office: 180,0000 SF 93.5/1000 = 630 Stalls 4 -Story Hotel: 128 Keys @ 1/Key = 128 Stalls Retail: Office: 8,254 SF @ 4/1000 = 33 Stalls Coffee Shop: 3,499 SF @ 10/1000 = 35 Stalls Kitchen: 2,141 SF @ 5/1000 = 11 Stalls Restaurant: 3,861 @ 10/1000 = 39 Stalls— Mlnl - Retail: 1,600 SF @ 5/1000 = 8 Stalls" "Assumed square footage is nighttime use. TOTAL PARKING PROVIDED: 777 STALLS Existing Office: 630 Stalls @ 3.5/1000 Hotel : 128 Stalls (Assume 71 shared Hotel Stalls) Retail: 126 Stalls (47 Are assumed nighttime use) WARE MALCOMB 02112120 16 SHEET 3 W 1r ^ V O U I O U) RESTAURANT 3,541 SF — COFFEE SHOP 3,499 SF — OUTDOOR EATING 4,200 SF — 71 iC; 1 17 7T ru 9 in" [3:1 3 ri 1 0 o Tj o LIE �nnor� t,7 r HOTEL DROP OFF I L L] F -1L rz, L I � . F- C c L . C C ❑ ❑ L C ' r � _ 1 TAKEOUTPODS 320 SF SHARED KITCHEN 2,000 SF EXTERIOR DESIGN 5T E E LWAV 8z— SERVICE CAFE PATIO p Enlarged Floor Plan w/ Hotel 3333 SOUTH SUSAN STREET WARE COMB VuV9il, 01134 D0) SHEET COSTA MESA, CA {��e.ria?�r�(�)�tc 4 I —, T— Lj--r—I , —1 EID m 'I HOTEL 82,524 5F o L 4 -STORY HOTEL Hl ' 128 11EY5 Lij D u G rpR i.°n tJ Eli C p Enlarged Floor Plan w/ Hotel 3333 SOUTH SUSAN STREET WARE COMB VuV9il, 01134 D0) SHEET COSTA MESA, CA {��e.ria?�r�(�)�tc 4 SECOND FLOOR DECK— area: ECK—area: 1495 SQ. FT. SECOND FLOOR OFFICE---, area: 7755 SQ. FT. 125'-0" 5 T E E LWA V E y EXTERIOR DESIGN -93- LEVEL 1 - FLOOR PLAN A SCAM, Level 1 Floor Plan 3333 SOUTH SUSAN STREET COSTA MESA, CA WARE NIALCOMB 02.12 zo °6 SHEET 7 MEN EMIMIN ME NEI MEN, MEN a 0 o I 0 0 0 s I O 00 C:) I 1 N 00 NORTH ELEVATION scat ,na•_,•..� H� 111111111111 111111111111 gill m11g'1111 mill lllm 11mg 1l1111am "m mill 1111 IIIR loll mile mill 1111/111 mill 1111 1/1/1111 glllggglmill - 1111 mole mill loll loll mill llllllllllll llllllllllll lllllmll 1111 mill lmll 11II loll mill mill mill mlml.l111 llllllllllll mallRlll loll 11111111 mill 111111111111 gill mill .1111 111111111118 111111111111 - MM MMM_ 5TE E LWAVE EXTERIOR DESIGN 40'y -- SOUTH ELEVATION North and South Elevations 3333 SOUTH SUSAN STREET COSTA MESA, CA WARE MALCOMB 02.112. 120 06 SHEET AAAA IIINj 111111111111 ■1 1111111111111 111111111111 .1ANNN 11111111il EAST ELEVATION 0 I 0 0 I - 0 0 I n 0 r� 0 o � I � 0 WEST ELEVATION 0 SmLipe . EXTERIOR DESIGN East and West Elevations STE E LWAVE 3333 SOUTH SUSAN STREET IRV15-0133-00 SHEET — �� COSTA MESA, CA Wt1RE MALCOMB 02.12.2016 9 Southeast View of Shipping Container Mall Entry EXTERIOR DESIGN S T E E LWAV E (0, 4 I Rendered Perspective View 3333 SOUTH SUSAN STREET IV] 5-0133-00 SHEET R COSTA MESA, CA WARE MALCOMB 02.12.2016 IO i Northeast View of Shipping Container Mali EXTERIOR DESIGN _ Rendered Perspective View STE E LW A V E 3333 SOUTHCOSTA MESA, CA NV RE M LCOMB 02.112. 120 16 S 11 T T i n -r i Northeast View of Shipping Container Mali EXTERIOR DESIGN _ Rendered Perspective View STE E LW A V E 3333 SOUTHCOSTA MESA, CA NV RE M LCOMB 02.112. 120 16 S 11 T Southeast View of Shipping Container Mall EXTERIOR DESIGN Rendered Perspective View S T E E LWAV E 3333 SOUTH SUSAN STREET IRV15-0133-00 SHEET COSTA MESA, CA WARE MALCOMB 02.12.2016 12 Southeast View of Shipping Container Mall S T E E LWAV E r, EXTERIOR DESIGN • Rendered Perspective View 3333 SOUTH SUSAN STREET COSTA MESA, CA SHEET WARE ALCOMB 02.12 20 M 13 Northwest View of Office and Restaurant Entry /,x STE E LWAVE EXTERIOR DESIGN qp- Rendered Perspective View - - - 3333 SOUTH SUSAN STREET IRV15-0133-00 SHEET COSTA MESA. CA WARE MALCOMB 02.12.2016 14 Southeast View of Hotel Beyond •�,`'� ST E E LWAVE EXTERIOR DESIGN Rendered Perspective of Hotel 3333 SOUTH SUSAN STREET n COSTA MESA, CA WARE MALCOMB 02.12 2006 SHEET