HomeMy WebLinkAbout26 - CC-11 - Portable Office Complex and Site Constru - 9/20/2016CITY COUNCIL AGENDA REPORT
MEETING DATE: SEPTEMBER 20, 2016 ITEM NUMBER: CC -1 1
SUBJECT: PORTABLE OFFICE COMPLEX AND SITE CONSTRUCTION - CITY PROJECT
NO. 16-15
DATE: SEPTEMBER 8, 2016
FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION
PRESENTATION BY: JAMES G. ROSS, INTERIM PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT
RECOMMENDATION:
BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5291
1. Accept bid withdrawal from Patriot Contracting & Engineering;
2. Reject all bids;
3. Adopt Resolution declaring that the Portable Office Complex and Site Construction Project
No. 16-15 can be performed more economically by employees of the City and authorizing
this project to be done by force account;
4. Authorize staff to negotiate contracts with qualified contractors and equipment vendors
within the existing budgeted amount; and
5. Authorize the Chief Executive Officer and the City Clerk to execute the Public Works
Agreements for this project.
BACKGROUND:
The City intends to reconstruct Fire Station No. 1 due to its age and state of disrepair. The
station, originally built in 1961, is experiencing foundation settlement resulting in structural
damage. The station needs to be re -constructed to meet current building codes and standards,
and to provide efficient multi -gender accommodations. The Public Services Department, in
coordination with the Fire Department, is working with WLC Architects to prepare the
construction documents for a new, state -of -the art Fire Station.
The proposed project will provide temporary living and working quarters for fire crews currently
staffed at Fire Station No. 1 during the construction phase. Other project tasks include, utility
establishment, construction of a fire engine shelter, lockable storage containers, construction of
new concrete driveway, and installation of privacy/safety fencing along the perimeter of the site.
This temporary facility will permit the Fire Department to maintain an effective presence
geographically and provide general services to the residents of Costa Mesa in an efficient
manner.
ANALYSIS:
The scope of the Portable Office Complex and Site Construction project includes the delivery,
assembly, and lease of a 64ft by 48ft modular housing trailer; construction of a Fire Engine
Shelter, delivery of an 8ft by 20ft lockable storage container and two 8ft by 40ft lockable storage
containers, construction of a concrete access driveway, installation of utilities, and construction
of a privacy/safety fence along the perimeter of the site. The anticipated use of the temporary
site is for a duration of approximately 18 months.
The City Clerk received and opened three (3) bids for this project on August 22, 2016. The
apparent low bidder, Patriot Contracting & Engineering, submitted a base bid proposal in the
amount of $422,660. However, on August 23, 2016, the apparent low bidder submitted a
request to withdraw its bid due to an error in calculating the bid. California Public Contract
Code Section 5101 et seq. provides for criteria under which a contractor may request to have
its bid withdrawn. Timely notice of a written mistake by the contractor on the bidding
documents — as opposed to an error in judgement or carelessness in inspecting the site or in
reading the plans and specifications — falls within these criteria. The next bidder, PCN3, Inc.,
submitted a bid proposal in the amount of $599,450.00 which is 39% higher than the Engineer's
estimate and in excess of the funding allocation ($500,000.00) for this work. The Engineer's
estimate for this work was $430,300. The Bid Abstract is included as Attachment 2.
Staff, based on evaluation of the proposals, believes that the work can be performed more
economically by force account.
Work described as "force account" is work done where a public entity acts as its own contractor
and hires out the work of the various artisans involved on a rate per hour or other basis of
measurement. When an entity awards work on a force account basis, it generally means the
contractor is paid his or her actual costs plus a profit. It is an accounting principle that
distinguishes the costs of a public agency employing a labor force to perform work as opposed
to contracting with an outside business to perform the same service, work performed under the
direct supervision of the entity and the use of day labor or contracted labor, or the employees of
the agency, or any combination thereof, or work performed by a public entity's own personnel.
As a public works project, prevailing wages are required to be paid to all workers employed on
the project regardless of how the contract is let.
The Uniform Construction Cost Accounting Act ("UCCAA") provides that the City may, at its
sole discretion, reject all bids submitted for a project. See Public Contracts Code § 22038(a);
Costa Mesa Municipal Code § 2-178; City of Costa Mesa Purchasing Policy § 15-102. Under
these provisions, if after the first invitation of bids all bids are rejected, and after reevaluating its
cost estimates of the project, the City has the option of either of the following:
(1) Abandoning the project or re -advertising for bids; or
(2) By passage of a resolution by a four-fifths vote declaring that the project can be performed
more economically by the employees of the City, may have the project done by force account.
Based on the Engineer's estimate of work, staff believes that if all bids are rejected and, upon
grant of authority, contracts can be negotiated among qualified contractors and equipment
vendors to obtain a more economical price to perform the project. The specific items from the
scope of work and all the terms and conditions of the project would essentially remain the
same. If authorized, the contracts will be negotiated with qualified contractors and vendors, and
executed by the Chief Executive Officer and the City Clerk.
E
ALTERNATIVES CONSIDERED:
The alternative to this Council action would be to reject all of the bids and rebid the project.
Staff believes that re -advertising and rebidding the project will delay the construction of the new
fire station significantly. Canceling the project is not recommended because temporary facilities
are needed to house fire personnel and equipment during reconstruction of Fire Station No. 1.
FISCAL REVIEW:
In Fiscal Year 2015-2016, City Council allocated $500,000 of Capital Facility Funds towards the
relocation of fire personnel and equipment.
LEGAL REVIEW:
The City Attorney's office reviewed and approved the attached Resolution as to form.
(Attachment 1).
CONCLUSION:
The City is in the process of reconstructing Fire Station No. 1 and needs temporary facilities for
fire personnel and equipment during construction. The apparent low bidder for the Portable Office
Complex and Site Construction Project, City Project No. 16-15, has requested that its bid be
withdrawn, and the remaining bids exceed the City's allocation for this work. Staff recommends
that the City Council accept the bid withdrawal from Patriot Contracting & Engineering; reject all
bids submitted; adopt a Resolution declaring that the project can be performed more economically
by force account; direct staff to negotiate contracts with qualified contractors within the budgeted
amount; and authorize the Chief Executive Officer and the City Clerk to execute the necessary
Public Works Agreements.
JAMES G. ROSS
Interim Public Services
Director
ATTACHMENTS:
DISTRIBUTION
1. Resolution
2. Bid Abstract
Chief Executive Officer
Fire Chief
Battalion Chief
City Attorney
City Clerk
Staff
File
BALTAZAR M EJ IA
City Engineer
3