Loading...
HomeMy WebLinkAbout04 - CC-4 - Clearbrook Lane Alley (Alley No. 46) - 10/17/2016CITY COUNCIL AGENDA REPORT MEETING DATE: OCTOBER 17, 2016 ITEM NUMBER: CC -4 SUBJECT: CLEARBROOK LANE ALLEY (ALLEY NO. 46), FLOWER STREET ALLEY (ALLEY NO. 81), BROADWAY ALLEY (ALLEY NO. 89), MAGNOLIA STREET ALLEYS (ALLEY NO. 91, ALLEY NO. 93 AND ALLEY NO. 94), AND 18th STREET ALLEY (ALLEY NO. 96) IMPROVEMENT PROJECT - CITY PROJECT NO. 15-13 DATE: OCTOBER 6, 2016 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: JAMES G. ROSS, INTERIM PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5291 RECOMMENDATION: 1. City Council accept the work performed by Blackrock Construction Company and authorize the City Clerk to file the Notice of Completion; and 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On November 3, 2015, a construction contract in the amount of $848,500.00 was awarded to Blackrock Construction Company, 615 N. Berry Street, Suite G, Brea, CA 92821. This project consisted of rehabilitation of the following alleys (Attachment No. 1): 1. Clearbrook Lane Alley (Alley No. 46) located between Civic Center Park, Clearbrook Lane, and west of Vanguard Way. 2. Flower Street Alley (Alley No. 81) located between Flower Street, Broadway, Tustin Avenue, and Irvine Avenue. 3. Broadway Alley (Alley No. 89) located between Broadway, Magnolia Street, Tustin Avenue, and Irvine Avenue. 4. Magnolia Street Alley (Alley No. 91) located between Magnolia Street, E. 18th Street, Fullerton Avenue, and Orange Avenue. 5. Magnolia Street Alley (Alley No. 93) located between Magnolia Street, E. 18th Street, Westminster Avenue, and Santa Ana Avenue. 6. Magnolia Street Alley (Alley No. 94) located between Magnolia Street, E. 18th Street, Tustin Avenue, and Irvine Avenue. 7. 18th Street Alley (Alley No. 96) located between Abbie Way, E 18th Street, and Irvine Avenue. The rehabilitation of these alleys consisted of removal of the existing asphalt concrete alley sections, the construction of new Portland Cement Concrete (PCC) pavement sections, and other incidental work needed to complete the project in accordance with the contract documents. 1 Before Improvements ANALYSIS: After Improvements ."'IN The work required by the contract documents was completed on August 16, 2016, to the satisfaction of the City Engineer. The final contract cost amounted to $874,690.30. A report of the final costs is included herein as Attachment No. 2. A summary of the costs is as follows: Original Contract Cost: $ 848,500.00 Change Order #1: $ 30,000.00 Final Quantity Adjustments: ($ 3,809.70) Final Contract Cost: $ 874,690.30 Change Order No. 1, for a total amount of $30,000.00, was issued for the re -construction of City Alley No. 96, located on 18th Street, between 18th Street, Abbie Way, and Irvine Avenue. By utilizing remaining project funds and Change Order No. 1 in the amount of $30,000.00, the City was able to eliminate additional mobilization costs and was also able to maintain Blackrock Construction's competitive bid unit pricing for the rehabilitation of City Alley No. 96. The final contract cost reflects a three point one percent (3.1%) increase to the original contract cost as a result of Change Order No. 1 and the final quantity adjustments. As of this date, there are no Stop Notices filed against the monies due to Blackrock Construction Company. ALTERNATIVES CONSIDERED: There are no alternatives considered for this item. FISCAL REVIEW: This project was funded from Gas Tax revenues and Capital Improvement Funds from Fiscal Year 2014-2015. LEGAL REVIEW: There is no legal review required on this item. 1► CONCLUSION: Rehabilitation of the Clearbrook Lane Alley (Alley No. 46), Flower Street Alley (Alley No. 81), Broadway Alley (Alley No. 89), Magnolia Street Alleys (Alley No. 91, Alley No. 93 And Alley No. 94), and 18th Street Alley (Alley No. 96) Improvement Project - City Project No. 15-13 has been completed to the satisfaction of the City Engineer. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. JAMES G. ROSS BALTAZAR MEJIA Interim Public Services Director City Engineer ATTACHMENTS: 1 - Location Map 2- Cost Summary DISTRIBUTION: Chief Executive Officer Assistant Chief Executive Officer City Attorney City Clerk Staff File 3 of CITY OF COSTA MESA N.T.S. Public Services/Engineering Attachment #1 DEL MAR AV. 6 m a O Z a 3 0 z MONTE VISTA AV. IE ALLEY #70ALLEY #71 ALLEY #72 w M ALLEY -#74 _... I J �k FLOWER ST. a FLOWER SL a I I r, ALLEY #77 ALLE7' #78 ALLEY #79 ALLEY #80 ALLE'r #81 - a a BROADWAY a J ALLEY #84 ALLEY #85 ALLEY #86 ALLEY #87 ALLEY #88 ALLEY #85 1 MAGNOLIA ST. I I ALLE, #1,1 ALLE r #9" AI.', E" #„ ALLEi#1,4 1 8TH sr. I a a a w cn ALLEY #95 - w a Z r= a o LR a N 0 Q a ROCHESTER ST. ~ w N ST. < � a N w T � a D a ALLEY #99 z 0 ALLEY #98 3 � a ALLEY 101 17TH ST. I 1 � I � > HARPER SCHOOL 1 PARK CABRILLO ST. - 1 a w 0 ALLEY #1_8 1 0 L r REHABILITATION OF ALLEY NOs. 461 81, 891 91, 931 94 and 96 LOCATION MAP CITY PROJECT #15-13 = ALLEY LOCATIONS PAGE 1 of 1 CITY OF COSTA MESA ATTACHMENT NO. 2 - PROJECT COST SUMMARY ATTACHMENT DATE: 09123116 CONTRACTOR: BLACKROCK CONSTRUCTION COMPANY PAGE: I OF 1 615 N. BERRY ST., SUITE G. BREA, CA 92821 PROJECT: REHABILITATION OF ALLEY NO'S 46, 81, 89, 91, 93,94,96 CITY PROJECT 15-13 BID -- WT PREVIOUS QUANTITY I TOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACT ITEM QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE NO 1 1 LS Mobilization $27,000.00 100 ... 100-.--% ....... % ... ........... 0 ........................ % ... 100 ........ ibb .... .............................. % ........................... $27,000.00 $6,725.00 ......... ------ $0.00 ..... - ------------- $0.00 ----- - ... -11 ---- $27,000.00 ........... ------ - ----$6,725.00 $27,000.00 --------------------- -$6,725.00 - 2 1 LS Clearing and Grubbing $6,725.00 - $5.90 3 104,800 SF Sawcut & Remove Existing Alley Section & Construct 6" thick Sawcut 104,413 SIF 10,090 SF 114,503 SIF $616,036.70 $59,531.00 $675,567.70 $618,320.00 P.C.0 with Buckeye Ultra Fiber 500 over Compacted Native 4 70 CY Compacted Fill $50.00 ....................... ... -- ........................ ----.. ............................................... ........... - ------- $0-00 ................ ....................... ............... $0.00 ... ----- .. -- ............ .................................. $0.00 -- ...................... $3,500.00 ............. ............ Sawcut & Remove Existing and Construct A.C. Slot Paving (6" $200.00 20 TON 5 TON 25 TON $4,000.00 $11,000.00 $5,000.00 $10,000.00 5 50 TON IDeep), over Compacted Native ...................... ........................ ...................... ....... ............... ....................... ............ ........ ... ............. ............ Sawcut & Remove Existing and Construct 4" Concrete $8.00 912 SF 175 SF 1,087 SF $7,296.00 $1,400.00 $8,696.00 $3,040.00 6 380 SF ISidewalk over 4" CMB ---------------------- --------- ........ I ---- ...................... ----------- ........... ...... ................ .......................... .... .......... .............. $8.00 Sawcut & Remove Existing and Construct Curb Ramp Per 48 SF 0 SF 48 SF $384.00 $0.00 $384.00 $2,400.00 7 300 SF I SPPWC STD Plan 111-5, Case D, Type 1, modified Sawcut & Remove Existing and Construct 5" PCC $8.50 4,542 SF 190 SIF 4,732 SF $38,607.00 $1,615.00 $40,222.00 $50,150.00 8 5,900 SF Driveway over Compacted Native -------------------- .. ........................ ................ ...... ................. ...... ----------------------- -- ........................ -- ---------------------------- --- a per City of Costa Mesa STD Plan No. CCU rb8'G uover up ! " $25.00 626 LF 0 LF 526 LF $13,150. 00 $0.00 $13,150.00 $13,750.00 9 550 LF 3C102n,`Tryat 6CIVIB --- $22.00 Construct 6" Curb per SPPWC STD Plan 120-2, Type At -6 25 LF 0 LF 25 LIF $550.00 $0.00 $550.00 $550.00 10 25 LF (150) modified Sawcut & Remove Existing and Construct 6" PCC Alley $10.00 2.651 SF 580 SIF 3,231 SF $26,510.00 $5,800.00 $32,310.00 $28,800.00 11 2,880 SF Intersection Per SPPWC Plan 130-2, Over 6" CMB . ....... - ............ 83 EA ........................ 21 EA --------- ......... ............. ....... 104 .. . .... EA ..... .... ................... $8,300.00 .............. ......... - ..................... ........ $2,100-00 ............... ........... - ..... $110,4156.156 .......... I ---- --- ..... ............. - .............. - ......... $-6.,400.0-0 12 EA jAdjust Water Valve/Water Meter/Utility Box to Grade $100.00 64 - 13 13 EA jAdjust Sewer Manhole to Grade $225.00 ......... -------- 10 ._--.----10-- ------- idd% ----- EA ------------- 2 ............ 0 EA % - 12 .................. 100 .... ----------- EA % ... $2,250.00 ........................ $4,940.00 . ................ $450.00 ..................... 11 $0.00 ............... . - . $2,700.00 ............... ---------- $4!94.0..00 ................ $2,925.00 .............. ................ $4.,.940.0.0 .. ....... . - 14 1 $4,940.00 LS ITraffic Control - 15 1 FA Additional Work Items $70,000.00 0 % . .................... ....... b.-iC ....................... 6 ...................... 0� ib .00 ............ ........... $ ( I .00 ....................... $0.00 .......................... $70,000.00 .............................. Alley 46 - 4000psi Concrete, Increase Alley Section from 6" to $0.67 9,780 SF 0 SF 9,780 SIF $6,600.00 $0.00 $6,600.00 $0.00 15.01 9,780 SF Price Difference for Increased PSI & Depth. .... _ 300 ... ....... * ..... ........ LF ------ SF .. ........ .............. 0 ------------- 0 ...... I ----------------- LF --- '* -- SF ...................... 300 LF 25,212"0' ....S'F' --- --------......... - .......... ------ - .............. - ....... $11.L1.00:00- ------------ $9,350:00 .......... .... ....................... ............ $0..00 � --------------50:00 ......................... ____________$1,100-.,00 $9350.00 ..... .......... --- .... ....................... ...... ... .................. $0.0.0. ... __--------_-----------50.00 15.02 300 LF Alley 94 - Redwood Header Board $3.67 15.03 25,320 SF Alley 89 -Increase Alley Section from 6" to 7" $0.37 ChangeOrder No. 1 ............ ......... ........ .......... I ---- ------------- ........ . ------------ ................... - ........... .......................... ..........----530 000 Alley No. 96 - Sawcut & Remove Existing Alley Section & Col 5,084 SF Construct 6" thick P.C.0 with Buckeye Ultra Fiber 500 over $5.90 0 SF 5,084 SF 5,084 SF $0.00 $29,995.60 $29,995.60 Compacted Native; - - ------ - PROJECT TOTAL: , $772,798.701 $101,891.60$878,500.00