HomeMy WebLinkAbout04 - CC-4 - Clearbrook Lane Alley (Alley No. 46) - 10/17/2016CITY COUNCIL AGENDA REPORT
MEETING DATE: OCTOBER 17, 2016 ITEM NUMBER: CC -4
SUBJECT: CLEARBROOK LANE ALLEY (ALLEY NO. 46), FLOWER STREET ALLEY (ALLEY NO.
81), BROADWAY ALLEY (ALLEY NO. 89), MAGNOLIA STREET ALLEYS (ALLEY NO.
91, ALLEY NO. 93 AND ALLEY NO. 94), AND 18th STREET ALLEY (ALLEY NO. 96)
IMPROVEMENT PROJECT - CITY PROJECT NO. 15-13
DATE: OCTOBER 6, 2016
FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION
PRESENTATION BY: JAMES G. ROSS, INTERIM PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5291
RECOMMENDATION:
1. City Council accept the work performed by Blackrock Construction Company and authorize
the City Clerk to file the Notice of Completion; and
2. Release the Labor and Material Bond seven (7) months after the filing date; release the
Faithful Performance Bond one (1) year after the filing date; and release the retention monies
35 days after the Notice of Completion filing date.
BACKGROUND:
On November 3, 2015, a construction contract in the amount of $848,500.00 was awarded to
Blackrock Construction Company, 615 N. Berry Street, Suite G, Brea, CA 92821. This project
consisted of rehabilitation of the following alleys (Attachment No. 1):
1. Clearbrook Lane Alley (Alley No. 46) located between Civic Center Park, Clearbrook
Lane, and west of Vanguard Way.
2. Flower Street Alley (Alley No. 81) located between Flower Street, Broadway, Tustin
Avenue, and Irvine Avenue.
3. Broadway Alley (Alley No. 89) located between Broadway, Magnolia Street, Tustin
Avenue, and Irvine Avenue.
4. Magnolia Street Alley (Alley No. 91) located between Magnolia Street, E. 18th Street,
Fullerton Avenue, and Orange Avenue.
5. Magnolia Street Alley (Alley No. 93) located between Magnolia Street, E. 18th Street,
Westminster Avenue, and Santa Ana Avenue.
6. Magnolia Street Alley (Alley No. 94) located between Magnolia Street, E. 18th Street,
Tustin Avenue, and Irvine Avenue.
7. 18th Street Alley (Alley No. 96) located between Abbie Way, E 18th Street, and Irvine
Avenue.
The rehabilitation of these alleys consisted of removal of the existing asphalt concrete alley
sections, the construction of new Portland Cement Concrete (PCC) pavement sections, and other
incidental work needed to complete the project in accordance with the contract documents.
1
Before Improvements
ANALYSIS:
After Improvements
."'IN
The work required by the contract documents was completed on August 16, 2016, to the
satisfaction of the City Engineer. The final contract cost amounted to $874,690.30. A report of the
final costs is included herein as Attachment No. 2.
A summary of the costs is as follows:
Original Contract Cost: $ 848,500.00
Change Order #1: $ 30,000.00
Final Quantity Adjustments: ($ 3,809.70)
Final Contract Cost: $ 874,690.30
Change Order No. 1, for a total amount of $30,000.00, was issued for the re -construction of City
Alley No. 96, located on 18th Street, between 18th Street, Abbie Way, and Irvine Avenue. By
utilizing remaining project funds and Change Order No. 1 in the amount of $30,000.00, the City
was able to eliminate additional mobilization costs and was also able to maintain Blackrock
Construction's competitive bid unit pricing for the rehabilitation of City Alley No. 96.
The final contract cost reflects a three point one percent (3.1%) increase to the original contract
cost as a result of Change Order No. 1 and the final quantity adjustments.
As of this date, there are no Stop Notices filed against the monies due to Blackrock Construction
Company.
ALTERNATIVES CONSIDERED:
There are no alternatives considered for this item.
FISCAL REVIEW:
This project was funded from Gas Tax revenues and Capital Improvement Funds from Fiscal
Year 2014-2015.
LEGAL REVIEW:
There is no legal review required on this item.
1►
CONCLUSION:
Rehabilitation of the Clearbrook Lane Alley (Alley No. 46), Flower Street Alley (Alley No. 81),
Broadway Alley (Alley No. 89), Magnolia Street Alleys (Alley No. 91, Alley No. 93 And Alley No.
94), and 18th Street Alley (Alley No. 96) Improvement Project - City Project No. 15-13 has been
completed to the satisfaction of the City Engineer. It is recommended that the City Council
authorize staff to file the Notice of Completion; release the remaining retention monies 35 days
after the Notice of Completion filing date; and release the bonds accordingly.
JAMES G. ROSS BALTAZAR MEJIA
Interim Public Services Director City Engineer
ATTACHMENTS: 1 - Location Map
2- Cost Summary
DISTRIBUTION: Chief Executive Officer
Assistant Chief Executive Officer
City Attorney
City Clerk
Staff
File
3
of
CITY OF COSTA MESA
N.T.S. Public Services/Engineering
Attachment #1
DEL MAR AV.
6
m
a
O Z
a
3 0
z
MONTE VISTA AV.
IE
ALLEY #70ALLEY #71 ALLEY #72 w M ALLEY -#74 _... I
J �k
FLOWER ST. a FLOWER SL a
I
I
r, ALLEY #77 ALLE7' #78 ALLEY #79 ALLEY #80 ALLE'r #81
- a
a BROADWAY a
J
ALLEY #84 ALLEY #85 ALLEY #86 ALLEY #87 ALLEY #88 ALLEY #85 1
MAGNOLIA ST.
I
I
ALLE, #1,1 ALLE r #9" AI.', E" #„ ALLEi#1,4
1
8TH sr.
I
a a a
w cn ALLEY #95 -
w a Z
r=
a o LR a N
0 Q a ROCHESTER ST. ~
w
N ST. <
� a
N
w
T �
a
D a ALLEY #99 z
0
ALLEY #98
3
� a ALLEY 101 17TH ST.
I
1 �
I �
>
HARPER
SCHOOL 1
PARK CABRILLO ST. - 1 a
w
0
ALLEY #1_8 1 0
L
r
REHABILITATION OF ALLEY NOs.
461 81, 891 91, 931 94 and 96 LOCATION MAP
CITY PROJECT #15-13
= ALLEY LOCATIONS PAGE 1 of 1
CITY OF COSTA MESA
ATTACHMENT NO. 2 - PROJECT COST SUMMARY
ATTACHMENT
DATE: 09123116
CONTRACTOR: BLACKROCK CONSTRUCTION COMPANY PAGE: I OF 1
615 N. BERRY ST., SUITE G. BREA, CA 92821
PROJECT: REHABILITATION OF ALLEY NO'S 46, 81, 89, 91, 93,94,96
CITY PROJECT 15-13
BID
-- WT
PREVIOUS
QUANTITY
I
TOTAL QUANTITY
PREVIOUS
AMOUNT
TOTAL
CONTRACT
ITEM
QUANTITY
DESCRIPTION
PRICE
QUANTITY
THIS ESTIMATE
TO DATE
AMOUNT
THIS EST
TO DATE
PRICE
NO
1
1
LS
Mobilization
$27,000.00
100 ...
100-.--%
.......
%
...
........... 0
........................
% ...
100
........ ibb ....
..............................
% ...........................
$27,000.00
$6,725.00
......... ------
$0.00
..... - -------------
$0.00
----- - ... -11 ----
$27,000.00
........... ------ -
----$6,725.00
$27,000.00
---------------------
-$6,725.00
- 2 1 LS Clearing and Grubbing $6,725.00
-
$5.90
3
104,800
SF
Sawcut & Remove Existing Alley Section & Construct 6" thick
Sawcut
104,413
SIF
10,090
SF
114,503
SIF
$616,036.70
$59,531.00
$675,567.70
$618,320.00
P.C.0 with Buckeye Ultra Fiber 500 over Compacted Native
4
70
CY
Compacted Fill
$50.00
.......................
... --
........................
----..
...............................................
...........
-
------- $0-00
................
.......................
............... $0.00
... -----
.. -- ............ ..................................
$0.00
-- ......................
$3,500.00
............. ............
Sawcut & Remove Existing and Construct A.C. Slot Paving (6"
$200.00
20 TON
5
TON
25 TON
$4,000.00
$11,000.00
$5,000.00
$10,000.00
5
50
TON
IDeep), over Compacted Native
......................
........................
......................
....... ...............
.......................
............ ........
... ............. ............
Sawcut & Remove Existing and Construct 4" Concrete
$8.00
912
SF
175
SF
1,087
SF
$7,296.00
$1,400.00
$8,696.00
$3,040.00
6
380
SF
ISidewalk over 4" CMB
----------------------
--------- ........
I ----
......................
----------- ...........
...... ................
..........................
.... .......... ..............
$8.00
Sawcut & Remove Existing and Construct Curb Ramp Per
48
SF
0
SF
48
SF
$384.00
$0.00
$384.00
$2,400.00
7
300
SF
I SPPWC STD Plan 111-5, Case D, Type 1, modified
Sawcut & Remove Existing and Construct 5" PCC
$8.50
4,542
SF
190
SIF
4,732
SF
$38,607.00
$1,615.00
$40,222.00
$50,150.00
8
5,900
SF
Driveway over Compacted Native
--------------------
..
........................
................
......
................. ......
-----------------------
-- ........................
--
----------------------------
---
a per City of Costa Mesa STD Plan No.
CCU rb8'G uover
up ! "
$25.00
626
LF
0
LF
526
LF
$13,150. 00
$0.00
$13,150.00
$13,750.00
9
550
LF
3C102n,`Tryat 6CIVIB
---
$22.00
Construct 6" Curb per SPPWC STD Plan 120-2, Type At -6
25
LF
0
LF
25
LIF
$550.00
$0.00
$550.00
$550.00
10
25
LF
(150) modified
Sawcut & Remove Existing and Construct 6" PCC Alley
$10.00
2.651
SF
580
SIF
3,231
SF
$26,510.00
$5,800.00
$32,310.00
$28,800.00
11
2,880
SF
Intersection Per SPPWC Plan 130-2, Over 6" CMB
.
....... - ............
83
EA
........................
21
EA
---------
......... .............
....... 104
.. . ....
EA
.....
.... ...................
$8,300.00
.............. .........
- .....................
........ $2,100-00
...............
........... - .....
$110,4156.156
.......... I ---- --- .....
............. - .............. -
......... $-6.,400.0-0
12 EA jAdjust Water Valve/Water Meter/Utility Box to Grade $100.00
64
- 13
13
EA
jAdjust Sewer Manhole to Grade
$225.00
......... --------
10
._--.----10--
------- idd%
-----
EA
-------------
2
............
0
EA
% -
12
..................
100 ....
-----------
EA
% ...
$2,250.00
........................
$4,940.00 .
................
$450.00
..................... 11
$0.00
............... . - .
$2,700.00
...............
---------- $4!94.0..00
................ $2,925.00
..............
................ $4.,.940.0.0
.. ....... .
- 14 1 $4,940.00
LS ITraffic Control
-
15
1
FA
Additional Work Items
$70,000.00
0 %
. ....................
....... b.-iC
.......................
6
......................
0�
ib .00
............ ...........
$ ( I .00
.......................
$0.00
..........................
$70,000.00
..............................
Alley 46 - 4000psi Concrete, Increase Alley Section from 6" to
$0.67
9,780
SF
0
SF
9,780
SIF
$6,600.00
$0.00
$6,600.00
$0.00
15.01
9,780
SF
Price Difference for Increased PSI & Depth.
.... _
300 ...
....... * .....
........
LF
------
SF ..
........ ..............
0
-------------
0
...... I -----------------
LF
--- '* --
SF
......................
300 LF
25,212"0' ....S'F' ---
--------.........
- .......... ------ -
.............. - .......
$11.L1.00:00-
------------
$9,350:00
.......... ....
.......................
............ $0..00
� --------------50:00
.........................
____________$1,100-.,00
$9350.00
..... .......... --- ....
....................... ......
... .................. $0.0.0.
...
__--------_-----------50.00
15.02 300 LF Alley 94 - Redwood Header Board $3.67
15.03 25,320 SF Alley 89 -Increase Alley Section from 6" to 7" $0.37
ChangeOrder No. 1
............ .........
........ ..........
I ----
-------------
........
. ------------ ...................
- ...........
..........................
..........----530 000
Alley No. 96 - Sawcut & Remove Existing Alley Section &
Col
5,084
SF
Construct 6" thick P.C.0 with Buckeye Ultra Fiber 500 over
$5.90
0
SF
5,084
SF
5,084
SF
$0.00
$29,995.60
$29,995.60
Compacted Native;
-
- ------ -
PROJECT TOTAL:
, $772,798.701
$101,891.60$878,500.00