Loading...
HomeMy WebLinkAbout04 - CC-4 - Resolution for Comprehensive Transportat - 11/15/2016CITY COUNCIL AGENDA REPORT MEETING DATE: NOVEMBER 15, 2016 ITEM NUMBER: CC -4 SUBJECT: RESOLUTION FOR COMPREHENSIVE TRANSPORTATION FUNDING PROGRAM APPLICATIONS DATE: NOVEMBER 2, 2016 FROM: PUBLIC SERVICES DEPARTMENT/TRANSPORTATION SERVICES DIVISION PRESENTATION BY: RAJA SETHURAMAN, INTERIM PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: RAJA SETHURAMAN, INTERIM PUBLIC SERVICES DIRECTOR - (714) 754-5343 RECOMMENDATION: Adopt resolution approving the submittal of grant applications for transportation improvement projects under the Orange County Transportation Authority's (OCTA) Comprehensive Transportation Funding Program (CTFP) for Fiscal Years 2017-18 through 2019-20 (Attachment 1). BACKGROUND: In November 1990, Orange County voters approved Measure "M", a 20 -year, half -cent local sales tax to fund transportation improvements countywide. All major transportation improvement projects and programs included in the original Measure "M" have been completed. The City of Costa Mesa has successfully secured approximately $80 million in revenues under the Measure "M" Comprehensive Transportation Funding (CTFP) and Turnback Programs. In November 2006, the Orange County voters passed the Renewed Measure "M" Program (M2), extending the half -cent sales tax for the next 30 years, beginning in the year 2011. Revenues from this extended sales tax are proposed to fund a wide range of improvements in Orange County, including freeway, arterial, and transit systems. In September 2011, the OCTA Board of Directors approved guidelines for the CTFP Program and subsequently authorized the annual "Call for Projects" under the "M2" Program. Since 2011, the City of Costa Mesa has successfully secured approximately $9 million in revenues under the Renewed Measure "M" Program (M2) CTFP. The "2017 Call for Projects" was issued for the Regional Capacity Program (RCP) providing approximately $32 million for roadway improvements across Orange County, and an allocation of $10 million for traffic signal system projects through the Regional Traffic Signal Synchronization Program (RTSSP). ANALYSIS: OCTA has developed several regional competitive programs under the CTFP. With the current "Call for Projects," projects under the RCP and RTSSP are eligible for funding. Cities can compete and receive up to 75 percent funding for various transportation projects in the RCP category, which includes improvements on arterials, intersections, and freeway interchanges. A total of $32 million is available for the above components of the RCP for projects to be implemented in Fiscal Years 2017-18 through 2019-20. A total of $8 million has been allocated Countywide within the RTSSP for this "Call for Projects." The RTSSP funds up to 80 percent of project costs. The projects submitted will need to meet certain minimum requirements to be eligible for Measure "M" grants. While the City has met all these eligibility requirements, OCTA requires approval of the attached resolution prior to any consideration of City applications. The submittal of applications in response to this "2017 Call for Projects" will not be deemed complete and final until an adopted resolution is submitted to OCTA. Proposed projects for which funding applications were submitted are listed in the attached resolution (Attachment 1 — Exhibit A) and are briefly described in Attachment 2. The resolution authorizes the Public Services Director or designee to submit the grant applications and manage the projects that receive grant funding. ALTERNATIVES CONSIDERED: One alternative considered is to not adopt the resolution. This alternative would result in the City's project applications being declined and rendering the City ineligible to compete for available grant funding. FISCAL REVIEW: If staff is successful in capturing grant dollars under these programs, a recommendation will be made to City Council relative to a funding source for any required a local match. Available sources include the Traffic Impact Fee account and Air Quality Management District (AQMD) AB2766 funds. Both of these funding sources are eligible as local match funds under the CTFP guidelines. If the City is successful in capturing CTFP grant funding, the projects are typically implemented within a two-year to three-year period. This would allow for the City to adequately budget any required matching funds. LEGAL REVIEW: The City Attorney has reviewed and approved the resolution as to form. CONCLUSION: The current Countywide "2017 Call for Projects" provides an opportunity for the City to compete for grant funding for implementation of certain transportation projects under the Renewed Measure "M" Program (M2). Staff recommends that the City Council adopt the attached Resolution for OCTA's consideration of project applications under the Comprehensive Transportation Funding Program. RAJA SETHURAMAN Interim Public Services Director ATTACHMENTS: 1 — CTFP Resolution 2 — Proposed Projects DISTRIBUTION: Chief Executive Officer Assistant Chief Executive Officer City Attorney City Clerk 0 ATTACHMENT 1 RESOLUTION NO. 16- A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COSTA MESA, CALIFORNIA, APPROVING THE SUBMITTAL OF REGIONAL CAPACITY PROGRAM (PROJECT O) AND REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION PROGRAM (PROJECT P) IMPROVEMENT PROJECTS TO THE ORANGE COUNTY TRANSPORTATION AUTHORITY FOR FUNDING UNDER THE COMPREHENSIVE TRANSPORTATION PROGRAM THE CITY COUNCIL OF THE CITY OF COSTA MESA HEREBY RESOLVES, DETERMINES AND ORDERS AS FOLLOWS: WHEREAS, the City of Costa Mesa desires to implement the transportation improvements listed in Exhibit A; and WHEREAS, the City of Costa Mesa has been declared by the Orange County Transportation Authority to meet the eligibility requirements to receive Measure M2 "Fair Share" funds; and WHEREAS, the City's Circulation Element is consistent with the County of Orange Master Plan of Arterial Highways; and WHEREAS, the Measure M2 Regional Traffic Signal Synchronization Program targets over 2,000 signalized intersections across Orange County to maintain traffic signal synchronization, improve traffic flow, and reduce congestion across jurisdictions; and WHEREAS, the City of Costa Mesa will enter into a cooperative agreement for the project funding and implementation responsibilities if required by project location; and WHEREAS, the City of Costa Mesa will provide matching funds for each project as required by the Orange County Comprehensive Transportation Funding Programs Guidelines; and WHEREAS, the Orange County Transportation Authority intends to allocate funds for transportation improvement projects within the incorporated cities and the County; and WHEREAS, the City of Costa Mesa will not use Measure M2 funds to supplant Developer Fees or other commitments; and WHEREAS, the City of Costa Mesa will use Arterial Highway Rehabilitation Program funding as a supplement to the existing pavement management program; and WHEREAS, the City of Costa Mesa has a currently adopted Local Signal Synchronization Plan consistent with the Regional Traffic Signal Synchronization Program Master Plan as a key component of local agencies' efforts to synchronizing traffic signals across local agencies' boundaries; and WHEREAS, the City of Costa Mesa desires to implement multi -jurisdictional signal synchronization; and WHEREAS, the City of Costa Mesa must include all projects funded by Net Revenues in the seven-year Capital Improvement Program as part of the Measure M2 Ordinance eligibility requirement; and WHEREAS, the City of Costa Mesa authorizes a formal amendment to the seven- year Capital Improvement Program to add projects approved for funding by the Orange County Transportation Authority Board of Directors. NOW, THEREFORE, BE IT RESOLVED THAT: 1) The City Council of the City of Costa Mesa hereby requests the Orange County Transportation Authority allocate Measure M2 funds in the amounts requested in the City's applications, for the programs listed in Exhibit A, to the City from the Comprehensive Transportation Programs. The City agrees that said funds shall be matched by City funds as required and shall be used as supplemental funding to aid the City in the improvement of the projects described in Exhibit A. 2) The City Council of the City of Costa Mesa, California, does hereby authorize the Costa Mesa Public Services Director, or his or her designee, to file applications for Renewed Measure M (M2) funded Comprehensive Transportation Funding Programs, to sign such applications, and to invoice the Orange County Transportation Authority for payment of allocated funds as appropriate. PASSED AND ADOPTED this 15th day of November, 2016. ATTEST: Stephen M. Mensinger, Mayor APPROVED AS TO FORM: Brenda Green, City Clerk Thomas P. Duarte, City Attorney 2 STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss CITY OF COSTA MESA ) I, BRENDA GREEN, City Clerk of the City of Costa Mesa, DO HEREBY CERTIFY that the above and foregoing is the original of Resolution No. 16- and was duly passed and adopted by the City Council of the City of Costa Mesa at a regular meeting held on the 15th day of November, 2016, by the following roll call vote, to wit: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: IN WITNESS WHEREOF, I have hereby set my hand and affixed the seal of the City of Costa Mesa this day of November, 2016. (SEAL) BRENDA GREEN, CITY CLERK 3 EXHIBIT A PROPOSED PROJECTS FOR CTFP Y REGIONAL CAPACITY PROGRAM (RCP) Hyland Avenue — MacArthur Boulevard (Right-of-way and Construction phases) REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION PROGRAM (RTSSP) Bear Street Signal Coordination Attachment 2 PROPOSED PROJECTS FOR CTFP • REGIONAL CAPACITY PROGRAM (RCP) Hyland Avenue — MacArthur Boulevard: This project widens the northbound direction of the intersection in order to provide two (2) left -turn lanes, one optional through/right-turn lane, and a right -turn lane. The project will require modification of traffic signal operations to provide split phasing for the north - south movements. This project is identified as mitigation for the Garfield Avenue/Gisler Avenue Santa Ana River Crossing and is included in the Memorandum of Understanding (MOU) between OCTA and the Cities of Costa Mesa, Huntington Beach, and Fountain Valley. Funding is requested for the right-of-way and construction phases of the project. Total Project Cost (Right -of -Way and Construction Phases) - $537,932 Grant Amount Requested - $403,449 City Match - $134,483 • REGIONAL TRAFFIC SIGNAL SYNCHRONIZATION PROGRAM (RTSSP) Bear Street Signal Coordination: The proposed project would synchronize all the traffic signals on Bear Street from Sunflower Avenue near the City of Santa Ana to Bristol Street in the City of Cota Mesa. The project scope includes signal timing improvements, fiber optic cable interconnection using existing and new conduits, and Closed -Circuit Television cameras (CCTV's). Controllers and cabinet replacements throughout the project corridor are also included. Total Project Cost - $464,390 (Costa Mesa portion) Grant Amount Requested - $371,512 City Match - $92,878 0