Loading...
HomeMy WebLinkAbout10 - CC-10 - New Sidewalk and Parkway Maintenance Pro - 12/6/2016CITY COUNCIL AGENDA REPORT MEETING DATE: DECEMBER 6, 2016 ITEM NUMBER: CC -10 SUBJECT: NEW SIDEWALK AND PARKWAY MAINTENANCE PROJECT (PHASE 1) - CITY PROJECT NO. 16-07 DATE: NOVEMBER 17, 2016 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, INTERIM PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5291 RECOMMENDATION: Adopt plans, specifications, and working details for the New Sidewalk and Parkway Maintenance Project (Phase 1), City Project No. 16-07. 2. Award a construction contract to C.J. Concrete Construction, Inc., 10142 Shoemaker Avenue, Santa Fe Springs, CA 90670 in the amount of $1,930,725.00. 3. Authorize the Mayor and the City Clerk to execute the Public Works Agreement. BACKGROUND: Concrete improvements located within the City's parkways and streets require ongoing repair and maintenance due to age, maturing trees, soil conditions, water intrusion, and traffic loads. The City's Parkway Concrete Repair Program is funded to repair as many of these damaged areas as possible, eliminating the potential liability associated with aging parkways. The locations identified for repair are prioritized based on pedestrian and handicap traffic and the severity of the damage. In addition, this project includes construction of new parkway improvements to streets with missing sidewalks, and reconstruction of parkway improvements and other concrete elements like cross gutters and spandrels for streets scheduled for rehabilitation this year. A map of parkway improvement locations within the scope of work of this contract is included as Attachment 1 ". The scope of work under this contract consists of localized reconstruction of curb and gutter; cross gutter and spandrels; sidewalks; driveway/driveway approach; and other work needed to complete the project in accordance with the contract documents. ANALYSIS: The City Clerk received and opened nine (9) bids for this project on September 8, 2016. C.J. Concrete Construction, Inc. was the apparent low -bidder with a bid proposal of $1,930,725.00. The Engineer's estimate was $2,296,550.00 and the average of the nine (9) bids received amounted to $2,833,801.33. An analysis of the bids indicates that the apparent low bidder submitted a proposal approximately sixteen percent (16%) lower than the Engineer's estimate. The Bid Abstract is included as Attachment "2". The license and references of C.J. Concrete Construction, Inc., have been checked and staff has found them to be in good standing. C.J. Concrete Construction, Inc. has successfully completed other City projects, including the 2014-2015 Parkway Concrete Repair and New Sidewalk Construction Project, the 2014-2015 Halecrest and Eastside Neighborhood Parkway Concrete Repair and New Sidewalk Construction Project, and the rehabilitation project for Tustin Avenue (from 15th Street to 17th Street). ALTERNATIVES CONSIDERED: The alternative to this Council action would be to reject all the bids. Staff believes that re - advertising and rebidding the project will not result in lower bids. FISCAL REVIEW: Funding for this project has been budgeted with the use of Gas Tax funds. LEGAL REVIEW: The City Attorney's Office has reviewed the Public Works Agreement and approved it as to form. C.J. Concrete Construction, Inc. will furnish the necessary bonds and insurance, which will be reviewed by the City Attorney's office prior to issuance of a "Notice to Proceed". CONCLUSION: The City has received bids for the 2015-2016 New Sidewalk and Parkway Maintenance Project (Phase 1), City Project No. 16-07. Staff has evaluated all the bids and recommends that the City Council adopt the plans, specifications, and working details for said project; award a contract to the apparent low bidder C.J. Concrete Construction, Inc. in the amount of $1,930,725.00; and authorize the Mayor and the City Clerk to execute the Public Works Agreement. RAJA SETHURAMAN Interim Public Services Director ATTACHMENTS: DISTRIBUTION "1" Parkway Locations "2" Bid Abstract Chief Executive Officer City Attorney City Clerk Staff File BALTAZAR M EJ IA City Engineer 1► North CITY OF COSTA MESA N.T.S. Public Services/Engineering OAKPOMONA LJ u LJ LINDEN PL a OZ z O U GROVE PL. z g o 3 U 20TH I 20TH ST. EVERGREEN HE DOGWOOD ST. a o z W Q ? a J CEDAR PL r fD o �a ARBOR tt ST 19TH I.r11wat"i101OLIN wI a j PLUMER ,.;T 'a �.FVTEr ST CENTER ST. O (((��� COSTA SCOTT PL. f ( PARK oa JAMES ST. a 2 RK Q� PARK DR. 3 ARKEJ1 DR. a NEWTON WY. TERMINAL WY. 7 ST. R ST. 2015-2016 NEW SIDEWALK AND PARKWAY MAINTENANCE PROJECT #16-07 =PROPOSED PARKWAY REPAIR LOCATIONS ®PROPOSED NEW SIDEWALK LOCATIONS —ZONE LIMITS Page 1 of 7 HAMILTON KNOWELL :PL J J CBMST. d RFA CF $ E BAY ST, COVE ST. YORKSHIRE ST. SEAL ST. m a ROSS ST. o SURF S� I o BEACH ST. w z a IIL BERNARD _T. T a j PLUMER ,.;T 'a �.FVTEr ST CENTER ST. O (((��� COSTA SCOTT PL. f ( PARK oa JAMES ST. a 2 RK Q� PARK DR. 3 ARKEJ1 DR. a NEWTON WY. TERMINAL WY. 7 ST. R ST. 2015-2016 NEW SIDEWALK AND PARKWAY MAINTENANCE PROJECT #16-07 =PROPOSED PARKWAY REPAIR LOCATIONS ®PROPOSED NEW SIDEWALK LOCATIONS —ZONE LIMITS Page 1 of 7 North CITY OF COSTA MESA N.T.S. Public Services/Engineering SOUTH COAST IOWA NTNG cc^ qP qG. SOVR/ EN CKY O SIE P2 r o a a PL. o q a a v ? o o z z HIO z o w i a a o a PL. 3 a -z Q r •� ILLINOIS ST. m w ST. NEW EXIC N�ly o� Y J $ < J CHA NM.EW. JERSEY ST. ST.z I, _ F p d o �_ �CALIFORNIA TEX CIR S GISLER HARBOR REST CEMETERY 1 MADAG AR ST. HARBOR REST CEMETERY 0 q�q} PJ �qMq� �qT. pP PL. - Cq RO pp�gJ p5 Q 0Pp F CORIANDER DR. P 24 J w 5 CARAWAY DR. o m E o 01; O,FP a Y N o� $ cPPRI Po A WINTERGREEN PL NUTMEG CIR. CORSICA PL. 2 y ST. - o 22 E� ••••• RD. Sl pP� MYRTLEWOOD ST 1� F' oe MFS o Ups �, p Sj' � SANDALWOOD F WHITE OAK A ••'•`'• LANAI DR. ST. KORNAT DR. SUVA CIR. > PL. a o PRIMROSE ST. a OPNU Z a LEMNOS DR. SUMBA PQg' OPN," PL o Y R a CIR. eA 9P pL U Ell j_i MINORCA CT$2 BALEARIC o C�' OAR PAROS ST'PO t M - _ a CIR. 1jeC< p� ESA VERDE PARK \NORCP PONDEROSA S zy M tt m CAPELLA CT L Z RHODES DR. Ci d nELM q � ifN tt S. CAPELLA CT. BOA VISTA N a - DR. R CIR. F,1 �2 o a tt 0 0 CALVERT AV. ESTANDIA PITCAIRN PARK DR. W AV. ADAMS FLAMINGO � DR. 0 3 0 2015-2016 NEW SIDEWALK AND PARKWAY MAINTENANCE PROJECT #16-07 =PROPOSED PARKWAY REPAIR LOCATIONS ®PROPOSED NEW SIDEWALK LOCATIONS —ZONE LIMITS Page 2 of 7 North CITY OF COSTA MESA Public Services/Engineering N.T.S. ' ON PARSONS _. {::ya ESTANCIA -. r+ JOANN TRABUCO ;'• CIR.FE;DARRIELL r ODJ KA o p a a o DARRELL CI o WILSON ?r • hQ }r.' a <a • � •y a m CAPITAL ST. a CAPITA � �• a z w }; -P� PJ. SENATE ST VALSON w 3 SENATE teA g f, w W CONGRESS _ CONGRESS IT CONGR ST. QPG�F }. AMERICAN GOVERNOR '.,T GOVERN � VICTORIA ST. c�'( ci VALLEY PLUM VISTA o > m N < ¢ a CIR. GLEN PL w i Q IDGEC ES CIR. VICTORN PINE a z VIGTO IA 3 PARK a SEA L OR. PL LENEAGLES a � OAK ST o L � SOP LINDEN PL J _ z a POMONA z R TER. F p o GROVE PL. < a o 3 20TH �.' 4 ST. EVERGREEN P PSP Rgtic/S � P{Q°e- W `rT P� O OPQO O�� LOgy 0� PJ. 3` �Gq Lq 20TH NLT OPeO 3` �, co 2 G�' �S 4J O P 1fHSq ST AqY �'�. Q OQ,. P � O P 9POgO�gy 9TH p- FSTHP ST < O(q�0 ST PJ O 'eTH HiQ- ? ST ST QP C �G QOG q. ST S < PJ STHF? Q T O `TT 2015-2016 NEW SIDEWALK AND PARKWAY MAINTENANCE PROJECT #16-07 ®PROPOSED NEW SIDEWALK LOCATIONS =PROPOSED PARKWAY REPAIR LOCATIONS —ZONE LIMITS Page 3 of 7 North CITY OF COSTA MESA N.T.S. Public Services/Engineering MACARTHUR BLVD. oj SCENICLAKE CENTER �E DR. 0 SUNFLOWER AV. SqN 00 30 ALASKA AV, NEW INA,,, )r-, 2015-2016 NEW SIDEWALK AND PARKWAY MAINTENANCE PROJECT #16-07 =PROPOSED PARKWAY REPAIR LOCATIONS =PROPOSED NEW SIDEWALK LOCATIONS —ZONE LIMITS Page North N.T.S. CITY OF COSTA MESA Public Services/ Engineering SUNFLOWER AV. I 9 Ic WAKEHAM w C) 9�a a F9 DAMASCUS CIR. cn wti JQ Op SECRETARIAT CIR. J BEGONIA AV.Li W a FCARIATON w az AV. ' L (n JASMINE POPPY CIR. WAKEHAM PRK U � N Ln $15300 U Q D CROCUS 11 o w N Fh Y Z Q (n 73PJ LIA AV. REDDING AV. w VISALIA DR. o w 00 Psj OR' Qw CDSOv N w TULARE DR. z (SOUTH COAST PLAZA) a (SOUTH COAST METRO) DIEGO 405 FREEWAY v o WN A� SANTA ROSA AV. W\Mg�EQON DOSE SP U LLEJO CIF C) SAN PABIL 0 CIF o g U ELLE DR. w 0 a a SANT CRUZ CIR w DEBRA DR. SALINAS AV. Q SALINAS AV. Q Z \ w o W TURLOCK DR. 9 Ic WAKEHAM w C) 9�a a F9 DAMASCUS CIR. cn wti JQ Op SECRETARIAT CIR. J BEGONIA AV.Li W a FCARIATON w az AV. ' L (n JASMINE POPPY CIR. WAKEHAM PRK U � N Ln $15300 U Q D CROCUS 11 o w N Fh Y Z Q (n 73PJ LIA AV. REDDING AV. w VISALIA DR. o w 00 Psj OR' Qw CDSOv N w TULARE DR. z (SOUTH COAST PLAZA) a (SOUTH COAST METRO) DIEGO 405 FREEWAY 2015-2016 PARKWAY REHAB PROJECT (ZONE #14, #15 AND #27) LOCATION MAP PROPOSED PARKWAY IMPROVEMENTS PAGE 5 OF 7 v o o Z AV. BAKER SL 4� m ALLEY #44 r ALLEY #45 w 0 DALE WY. Y U w � z > a LOGAN AV. � Q > U � O W Z J O W n a PAULARINO CHANNEL � a w J Q VILLAGE WY. w W CLa D C� U FF Z N J-) w O Z Q ALLEY #29 w m o' w w Z a ADAMS AV. � J W Q > EL C 00 N a } W J U d m Of Ld0 ST. i15 Z O Z O � ST. J (HALECREST) 2015-2016 PARKWAY REHAB PROJECT (ZONE #14, #15 AND #27) LOCATION MAP PROPOSED PARKWAY IMPROVEMENTS PAGE 5 OF 7 tCITY OF COSTA MESA N.T.S. Public Services/ Engineering w z SANTA ISABEL AV. m a r GEORGEANNE 3 w PEAR EH I MIN* P L. w z 0 vn r N o LN. o a WILSON ST. z U< CHERF( EE g a w LN. NEWPtj Q � y z z CYNTHIA a DAWNVIEW LN. FqT r o z yF� w w N CT. a co a Q p w 3 Z Q0 J ' NT w cc J Q z = icy Z m p J �O' U Q LdY Q 23RD ST. 0 JN aJ Q o o VIA MARINA o z_ Q ALBERT PL. J o w p � VISTA BAYA VISTA BAYA 3. w VISTA BAYA LU CECIL PL 5 COLLEEN PL. SIERRA VISTA CATHERINE JEANETTE VIRGINIA PL. PL_ PL' MEADOW U W Li z z 0 0 22ND ST. F--1 n I I SANTIAGO D 2015-2016 PARKWAY REHAB PROJECT (ZONE #25) LOCATION MAP PROPOSED PARKWAY IMPROVEMENTS PAGE 6 OF 7 1 t CITY OF COSTA MESA Public Services/ Engineering N.T.S. U� w MESA DR. d LISA LN. o w z � z SANTOo > w w m SANTO TOMAS ST. TOMAS ST. J U FAIRWAY PL. > � Q CUTTER LA CANADA w z ALLEY 117 m WY. Y. C) w LILLIAN PLa z MIRA LOMA a z z a QUIET BAY LN. DEL MAR AV. UNIV RSITY a w o SEAWIND SUSANNAH v~ J DR. J PL z 7E ~ GRA ADA m > a � w Q WY. o m a w � w z w o J� 0 MONTE VISTA AV. w � > � z U BRENTWOOD o i w ,w V� HILL PL. ST. 0 o a o w 24TH PL 3 w RIVERIA DR. c z w m w � SANTA ISABEL AV. Z m a 2015-2016 PARKWAY REHAB PROJECT (ZONE #26) LOCATION MAP PROPOSED PARKWAY IMPROVEMENTS PAGE 7 OF 7 ATTACHMENT 2 CITY OF COSTA MESA DEPARTMENT OF PUBLIC SERVICES 2015-2016 NEW SIDEWALK AND PARKWAY MAINTENANCE PROJECT CITY PROJECT NO. 16-07 BID OPENING RESULTS: SEPTEMBER 8, 2016 Bidder City Total Base Bid 1. C J Concrete Construction, INC Santa Fe Springs $1,930,725.00 2. EBS General Engineering, INC Corona $2,488,450.00 3. California Landscape and Design, INC Upland $2,598,700.00 4. Vido Samarzich, INC Atla Loma $2,778,600.00 5. All American Asphalt Corona $3,037,037.00 6. Hardy Harper, INC Santa Ana $3,096,000.00 7. Nobest, INC Garden Grove $3,119,975.00 8. Sully- Miller Contracting Co. Brea $3,194,125.00 9. Griffith Company Santa Fe Springs $3,260,600.00 Average $2,833,801.33 Engineer's Estimate $2,296,550.00