Loading...
HomeMy WebLinkAbout05 - CC-6 - E 17th St Landscape Enhancement Project - 11/1/2016CITY COUNCIL AGENDA REPORT MEETING DATE: NOVEMBER 1, 2016 ITEM NUMBER: CC -6 SUBJECT: EAST 17TH STREET LANDSCAPE ENHANCEMENT PROJECT, FEDERAL PROJECT NO. RPSTPLE - 5312(091), CITY PROJECT NO. 13-12 DATE: OCTOBER 20, 2016 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: BALTAZAR MEJIA, CITY ENGINEER FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. City Council accept work performed by Horizons Construction Co. International and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Materials Bond seven (7) months after the filing date; release the Faithful Performance Bond six (6) months after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On December 3, 2013, a construction contract in the amount of $776,995.00 was awarded to Horizons Construction Co. International, 432 W. Meats Avenue, Orange, CA 92865. The scope of work for this project included the construction of enhanced landscaping along East 17th Street between Santa Ana Avenue and Irvine Avenue. In addition, the contract required the construction of a right -turn pocket from eastbound 17th Street to southbound Tustin Avenue, and a right -turn pocket from northbound Tustin Avenue to eastbound 17th Street and other engineering improvements. Before Construction After Construction ANALYSIS: The work required by the contract documents was completed on July 22, 2016, to the satisfaction of the City Engineer. The final contract cost amounted to $815,733.84. A report of the final costs is included herein as Attachment 1. A summary of the costs is as follows: Original Contract Cost: $776,995.00 Change Orders Nos. 1-3: $38,738.84 Final Contract Cost: $ 815,733.84 Change Order No. 1 in the amount of $10,200.14 offset the cost of extra work for the inclusion of a water meter to provide service to the landscaped median at the southeast corner of Tustin Avenue and East 17th Street. This change order was approved by the Chief Executive Officer per Council Policy No. 700-1. Change Order No. 2 in the amount of $20,787.20 paid for the replacement of traffic signal conduits and associated wiring from the traffic signal to the controller cabinet at the intersection of East 17th Street and Tustin Avenue. This change order was approved by the Chief Executive Officer per Council Policy No. 700-1. Change Order No. 3 in the amount of $7,751.50 was required to adjust the quantities of various bid items and authorized the contractor to perform additional work to address unforeseen items of work and/or changes at the intersection of East 17th Street and Tustin Avenue. This change order was approved by the Interim Public Services Director per Council Policy No. 700-1. The final cost reflects a five percent (5%) increase to the original contract as a result of the aforementioned change orders. As of this date there are no Stop Notices filed against the monies due to Horizons Construction Co. International. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: Staff captured a Transportation Enhancement Activities (TEA) grant which covered up to $500,000.00 of the project costs with the remaining balance funded through the City's available Air Quality Management District (AQMD) and Traffic Impact Fee funds. LEGAL REVIEW: There is no legal review required for this item. CONCLUSION: The East 17th Street Landscape Enhancement Project, Federal Project No. RPSTPLE- 5312(091), City Project No. 13-12 has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion, release the remaining retention monies 35 days after the Notice of Completion filing date and release the bonds accordingly. K RAJA SETHURAMAN Interim Public Services Director ATTACHMENT: 1 — Cost Summary BALTAZAR MEJIA City Engineer DISTRIBUTION: Chief Executive Officer Assistant Chief Executive Officer City Attorney Transportation Services Division City Clerk Staff File 3 FOR PAYMENT ON THE WARRANT LIST OF Still Payment to: HORIZONS CONSTRUCTION CO. INTL, INC. 432 W Meats Ave, Orange, CA 92866 PROJECT: EAST 17TH STREET LANDSCAPE ENHANCEMENT PROJECT FEDERAL PROJECT NO. RPSTPLE-6312 (091), CITY PROJECT No. 13-12 BASE BID NO. 1: STREETSCAPE /MPOVEMENT EAST 17T14 STRFFT /.CANTA ANC TA IRV/NF AVFNIIFI 10114/2016 CITY OF COSTA MESA ATTACHMENTI DATE: 08/23/16 ITEM NO BID QUANTITY DESCRIPTION UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 1 LS MOBILIZATION (STREETSCAPE) $7,500.00 100.0000 % 0.0000 % 100.0 % $7,500.00 $0.00 $7,500.00 $7,500.00 2 1 LS TRAFFIC CONTROL (STREETSCAPE) $8,500.00 100.0 % 0.0 % 100.0 % $8,500.00 $0.00 $8500.00 $8,600.00 3 NOT USED 4 1 LS CLEARING AND GRUBBING (STREETSCAPE) $9,800.00 100.0 % 0.0 % 100.0 % $9,800.00 $0.00 $9,800.00 $9,800.00 5 320 CY UNCLASSIFIED EXCAVATION (STREETSCAPE) $33.00 320.0 CY 0.0 CY 320.0 CY $10,560.00 $0.00 $10,560.00 $10,560.00 8 1,400 LF CONSTRUCT 8" PCC MEDIAN CURB, TYPE "A" $23.00 1,268.0 LF 0.0 LF 1,268.0 LF $29,164.00 MIX) $29,164.00 $32,200.00 7 4 EA CONSTRUCT 4" PCC OVER 4" CMB CURB RAMP PER CALTRANS STD. $3,200.00 4 EA 0 EA 4 EA $12,800.00 $0.00 $12,800.00 $12,800.00 8 1 1,3001 SF CONSTRUCT 4" PCC OVER 4" CMB SIDEWALK WITH CUSTOM FINISH $7.00 1,300 SF 0 SF 1,300 SF $9,100.00 $0.00 $9,100.00 $9,100.00 9 5 EA ADJUST TO GRADE EXISTING MANHOLE RIM WITH CUSTOM FINISH $350.00 5.0 EA 0.0 EA 5.0 EA $1,750.00 $0.00 $1,750.00 $1,750.00 10 2 EA CONSTRUCT TREE WELL AND COVER CASE 1 $850.00 2.0 EA 0.0 EA 2.0 EA $1,700.00 $0.00 $1,700.00 $1,700.00 11 29 EA CONSTRUCT TREE WELL AND COVER CASE II $550.00 29.0 EA 0.0 EA 29.0 EA $15,950.00 $O.DO $15,950.00 $15,950.00 12 2,ODO SF CONSTRUCT 4" THICK RED BRICK STAMPED CONCRETE OVER 4" $10.00 2,000.0 SF 0.0 SF 2,000.0 SF $20,000.00 $0.00 $20,000.00 $20,000.00 13 580 TONS ASPHALT CONCRETE PAVEMENT (STREETSCAPE) $105.00 180.0 TONS 0.0 TONS 180.0 TONS $18,900.00 $0.00 $18,900.00 $60,900.00 14 225 TONS ASPHALT RUBBER HOT MIX (ARHM) (STREETSCAPE) $85.00 355.0 TONS 0.0 TONS 355.0 TONS $30,175.00 $0.00 $30,175.00 $19,125.00 15 1 LS SIGNING AND STRIPING (STREETSCAPE) $11,500.00 100 % 0 % 100 % $11,500.00 $0.00 $11,500.00 $11,500.00 16 8 EA STREET LIGHTING (EDISON CARPINTERIA TYPE) $180.00 0 EA 0 EA 0 EA $0.00 $0.00 $0.00 $1,280.00 17 8 EA EXISTING STREET LIGHTING MODIFIED TO MATCH EDISON $1,600.00 0.0 EA 0.0 EA 0.0 EA $0.00 $0.00 $0.00 $12,800.00 18 1 LS IRRIGATION $74,000.001 100.0 % 0.0 % 100.0 % $74,000.00 $0.00 $74,000.00 $74,000.00 19 1 LS LANDSCAPING $65,000.00 100.0 % 0.0 % 100.0 % $65,000.00 $O.OD $65,000.00 $65,000.00 20 NOT USED 0.0 0.0 21 3,400 SF CONSTRUCT 9" PCC OVER 4" CMB CROSSWALK WITH CUSTOM $7.00 3,386.0 SF 0.0 SF 3,386.0 SF $23,702.00 $0.00 $23,702.00 $23,800.00 22 1,325 LF INSTALL IRRIGATION SLEEVES $26.00 1,325.0 LF 0.00 LF 1,325.0 LF $34,450.00 $0.00 $34,450.00 $34,450.00 23 1 EA INSTALL BACKFLOW DEVICE $3,500.00 1 EA 0 EA 0 EA $3,500.00 $0.00 $3,500.00 $3,500.00 24 12,500 SF COLD MILL (2" MAXIMUM) (STREETSCAPE) $0.45 12,500 SF 14,000 SF 28,500 SF $5,625.00 $6,300.00 $11,925.00 $5,625.00 25420 LF STREET LIGHTING CONDUIT (2" PVC) $20.00 420.0 LF 0.0 LF 420.0 LF $6,400.00 $0.00-- $8,400.00 $6,400.00 26 NOT USED 0.0 TOTAL FOR BASE BID NO. 1: $402,076.00 $6,300.00 $408,376.00 $450,240.00 m a a n m z CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF 10/1412016 9th Payment to: HORIZONS CONSTRUCTION CO. INTL, INC. 432 W Meats Ave, Orange, CA 92866 PROJECT: EAST 17TH STREET LANDSCAPE ENHANCEMENT PROJECT FEDERAL PROJECT NO. RPSTPLE-6312 (091), CITY PROJECT No. 13-12 BASE BID NO. 2: INTERSECTION IMPROVEMENT PROJECT EASET 17TH STREET INTERSECTION AT TUSTIN AVENUE DATE: 08/23/16 ITEM NO BID QUANTITY DESCRIPTION UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 27 1 LS MOBILIZATION (INTERSECTION IMPROVEMLNT) $9,500.00 1.00 LS 0.00 LS 1.00 LS $9,500.00 $0.00 $9,500.00 $9,500.00 28 1 LS TRAFFIC CONTROL INTERSECTION IMPROVEMENT) $8,500.00 1.00 LS 0.00 LS 1.0 LS $8,500.00 $0.00 $8,500.00 $8,500.00 29 1 LS PROJECT MANAGEMENT INTERSECTION IMPROVEMENT) $30,000.00 0.8 LS 0.00 LS 0.8 LS $24,000.00 $0.00 $24,000.00 $30,000.00 30 1 LS CLEARING AND GRUBBING INTERSECTION IMPROVEMENT) $7,500. 100.0 % 0.00 % 100.0 % $7,500.00 $0.00 $7,500.00 $7,500.00 31 380 CY UNCLASSIFIED EXCAVATION (INTERSECTION IMPROVEMENT) $33.00 380.0 CY 590.0 CY 970.0 CY $12,540.00 $19,470.00 $32,010.00 $12,540.00 32 400 LF CONSTRUCT 8" PCC OVER 8" CMB CURB AND GUTTER, TYPE C-8 $2200 549.5 LF 0.0 LF 549.5 LF $12,089.00 $0.00 $12,089.001 $8,800.00 33 2,400 SF CONSTRUCT 4" PCC OVER 4" CMB SIDEWALK $8.00 2,577.0 SF 0.0 SF 2,577.0 SF $15,482.00 $0.00 $15,462.00 $14,400.00 34 1,700 SF CONSTRUCT 6" PCC OVER 8" CMB DRIVEWAY APPROACH TYPE II COMMERCIAL TYPE $7.00 1,786.5 SF 0.0 SF 1,785.5 SF $12,498.50 $0.00 $12,498.50 $11,900.00 35 300 LF CONSTRUCT OFFSITE PCC CURB CURB HEIGHT VARIES $14.00 318 LF 0.00 LF 318 LF $4,452.00 $0.00 $4452.00 $4,200.00 36 200 LF CONSTRUCT 6" PCC OVER 6" CMB CURB AND GUTTER, TYPE C•6 $19.00 173 LF 0 LF 173 LF $3,287.00 $0.00 $3,287.00 $3,800.00 37 130 SF CONSTRUCT 6" PCC OVER 6" CMB PAVEMENT $20.00 176.0 SF 0.0 SF 176.0 SF $3.520.00 $0.00 $3,520.00 $2.601).00 38 5 EA ADJUST TO GRADE EXISTING WATER METER BOX $400.00 5.0 EA 0.0 EA 5.0 EA $2,000.00 $0.00 $2,000.00 $2,000.00 39 1 3 1 EA RELOCATE EXISTING NEWSPAPER RACKS $300.00 3 EA 0.00 EA 3 EA $900.00 $0.00 $900.00 $900.00 40 1 EA RELOCATE EXISTING BUSINESS SIGN 8 -UNOCAL $500.00 1.0 EA 0.0 EA 1.0 EA $500.00 $0.00 $500.00 $500.00 41 2 EA CONSTRUCT REINFORCED CONCRETE COLLAR $2,500. 2.0 EA 0.0 EA 2.0 EA $5,000.()0 $0.00 $5,000.00 $5,000.00 42 2 EA CONSTRUCT PARKWAY DRAIN NO. 1 INLET TYPE II $4,600.00 2.0 EA 0.0 EA 2.0 EA $9,200.00 $0.00 $9,200.00 $9,200.00 43 2 EA REMOVE EXISTING CATCH BASIN $600.00 2.0 EA 0.0 EA 2.0 EA $1,200.00 $0.00 $1,200.00 $1,200.00 44 20 LF SUPPLY AND INSTALL 18" RCP $220.00 20.0 LF 0.0 LF 20.0 LF $4,400.00 $0.00 $4,400.00 $4,400.00 45 2 EA CONSTRUCT INLET TYPE II INCLUDING LOCAL DEPRESSION, W=14' $4,600.00 2.0 EA 0.0 EA 2.0 EA $9,200.00 $0.00 $9,200.00 $9,200.00 48 225 TONS ASPHALT CONCRETE PAVEMENT (INTERSECTION IMPROVEMENT) $110.00 225 TONS 0 TONS 225 TONS $24,750.00 $0.00 $24,750.00 $24,750.00 47 50 TONS ASPHALT RUBBER HOT MIX (ARHM) (INTERSECTION IMPROVEMENT) $108.00 50 TONS 0.00 TONS 50 TONS $5,400.00 $0.00 $5,400.00 $5,400.00 48 1 LS TRAFFIC SIGNAL MODIFICATION $111,875.00 100.0 % 0.0 % 100.0 % $111,875.00 $0.00 $111,875.00 $111,875.00 49 1 LS SIGNING AND STRIPING (INTERSECTION IMPROVEMENT) $6,800.00 100.0 % 0.0 % 100.0 % $6,800.00 $0.00 $6,800.00 $6,800.00 50 1 EA ADJUST TO GRADE EXISTING BACKFLOW PREVENTER $1,200.00 1.0 EA 0.00 EA 1.0 EA $1,200.00 $0.00 $1200.00 $1 200.00 51 2 EA ADJUST TO GRADE EXISTING WATER VALVE $800.00 2.0 EA 0.0 EA 2.0 EA $1,200.00 $0.00 $1.200.W $1 200.00 52 1 EA ADJUST TO GRADE EXISTING FIRE HYDRANT $900.00 1.0 EA 0.00 EA 1.0 EA $900.00 $0.00 $900.00 $900.00 53 2 EA ADJUST TO GRADE EXISTING SCE PULL BOX $1,600.00 2.0 EA 0.00 EA 2.0 EA $3,200.00 $0.00 $3,200.00 $3,200.00 54 24 LF CONSTRUCT METAL HAND RAIL TYPE "A" PER SPPWC $60.00 0.0 LF 0.0 LF 0.0 LF $0.00 $0.00 $0.00 $1,440.00 55 3 EA RELOCATE EXISTING PARKING LOT LIGHT $4,200.00 3.0 EA 0.00 EA 3.0 EA $12,600.00 $0.00 $12,600.00 $12,600.00 56 1,250 SF CONSTRUCT 9" PCC OVER 12" CAB $9.00 1 133.5 SF 0.0 SF 1 133.5 SF 10 201.50 0.00 10 201.50 11 250.00 TOTAL FOR BASE BID NO. 2: $323,875.00 $19,470.00 $343,346.00 $326,766.00 TOTAL FOR BASE BID NO.1 plus NO, 2--1 $726,961.00 $26,770.00 $761,721.00 $776,996.00 CHANGE ORDERS C01 1.00 LS Install Water Meter Connection $10,200.14 100.00 % 0.00 % 100.00 % $10,200.14 $0.00 $10,200.14 $10,200.14 CO2.1 1.00 LS Storage Charges by Pole Manufacturer $2,049.88 100.00 % 0.00 % 100.00 % $2,049.68 $0.00 $2,049.88 $2,049.88 CO2.2 1.00 LS Re laced Traffic Signal Conduits $18,737.32 100.00 % 0.00 % 100.00 % $18,737.32 $0.00 $18,737.32 $18,737.32 CO3.1 1.00 LS Delete Decorative Scrolls $4,800.00 100.00 % -100.00 % 0.00 % $4 800.00 -$4,800.00 $0.00 $0.00 CO3.2 1.00 LS Remove Existing Palm Trees $1 784.50 100.00 % 0.00 % 100.00 % $1,784.50 $0.00 $1,784.50 $1,784.50 CO3.3 1.00 LS Remove and Repair Curb due to Design $1,928.22 0.00 % 100.00 % 100.00 % $0.00 $1,928.22 $1,928.22 $1,928.22 CO3.4 1.00 LS Additional Irrigation and Seeding $3,339.79 0.00 % 100.00 % 100.00 % $0.00 $3,339.79 $3,339.79 $3,339.79 CO3.5 1.00 LS Sawcut and Removal Island and Asphalt $16,345.00 0.00 % 100.00 % 100.00 % $0.00 $16,345.00 $16,345.00 $16,345.00 CO3.6 1 1.00 1 LS Addit onal Mobilization on Cold Planer $10 522.99 0.00 % 100.00 % 100.00 % $0.00 $10 522.99 $10,522.99 $10 522.99 CO3.7 1.00 LS Credit for Vee wells $895.00 0.00 % 100.00 % 0.00 % $0.00 $895.00 -$895.00 $895.00 CO3.8 1.00 LS I Quantity Adjustment for the Variouse Bid Items 1 -$25,274.001 0.00 % 1 100.00 % 1 0.00 % $0.00 -$25,274.00 $25 274.00 $25 274.00 CHANGE ORDERS TOTAL: $37,571.84 $26,441.00 S64,012.84 $38,738.84 PROJECT TOTAL (BASE BID NO. 1 PLUS NO. 2 PLUS COs): $763,522.84 $52,211.00 $816,733.941 $816,733.84 J