Loading...
HomeMy WebLinkAbout04 - CC-4 - 2014-2015 Westside Neighborhood Parkway - 1/17/2017CITY COUNCIL AGENDA REPORT MEETING DATE: JANUARY 17, 2017 ITEM NUMBER: CC -4 SUBJECT: 2014-2015 WESTSIDE NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT - CITY PROJECT NO. 15-01 DATE: JANUARY 5, 2017 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by Global Power Group, Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On May 5, 2015, a construction contract in the amount of $759,358.70 was awarded to Global Power Group, Inc., 10260 Woodside Avenue, Lakeside, CA, 92040 for parkway maintenance in the Westside Neighborhood (between 19th Street and Victoria Street, and Placentia Avenue to the Westerly City limits). The scope of work under this contract consisted of localized reconstruction of damaged curb and gutter, concrete spandrels, driveway/driveway approaches, and sidewalks. Before Improvements After Improvements 1 ANALYSIS: Over two-thirds of the work contained within the contract documents was completed by Global Power Group, Inc. as of January 20, 2016 to the satisfaction of the City Engineer. The work performed by Global Power Group Inc. was significantly deficient in manpower and equipment, which resulted in a longer period to complete the work. This deficiency resulted in subsequent corrective work to be performed by Global Power Group, Inc. prior to acceptance. Based on this, City staff recommends that the balance of uncompleted work be cancelled and performed under a separate contract by another contractor. The final contract cost of the completed work amounted to $525,123.15, which reflects a 30.8% percent decrease to the original contract as a result of the cancellation of the unfinished work (Change Order No. 1). A report of the final costs is shown herein as Attachment 1, with the summary of the contract costs as follows: Original Contract Cost: $759,358.70 Contract Change Order No. 1 (uncompleted work) ($234,235.55) Final Contract Cost: $525,123.15 A listing of the parkway repair locations completed with this contract is shown in Attachment "2". As of this date, there are no Stop Notices filed against the monies due to Global Power Group, Inc. ALTERNATIVES CONSIDERED: An alternative would be to allow Global Power Group, Inc. to continue working on this contract. This alternative is not recommended due to above-mentioned issues. FISCAL REVIEW: This project was funded with Capital Improvement and Gas Tax funds. LEGAL REVIEW: There is no legal review required for this item. CONCLUSION: Approximately 69% of the work for the 2014-2015 Westside Neighborhood Parkway Concrete Repair Project, City Project No. 15-01 performed by Global Power Group, Inc., has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion; release the retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. 1► RAJA SETHURAMAN Public Services Director ATTACHMENTS: 1 - Cost Summary 2- Listing of Locations DISTRIBUTION: City Manager Assistant City Manager City Attorney City Clerk Staff File BALTAZAR MEJIA City Engineer PROJECT COST SUMMARY PROJECT: 2014-2015 WESTSIDE NEIGHBORHOOD PARKWAY CONCRETE REPAIR (ZONE #1) CITY PROJECT 15-01 ITEMBID I I UNIT PREVIOUS QUANTITY TOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACT NO QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE 1 3,500 LF Remove and Reconstruct curb & Gutter (C6) (with TAC Slot $35.13 1,316 LF 502 LF 1,818 LF $46,231.08 $17,635.26 $63,866.34 $122,955.00 Pave) 2 1,200 LF Remove and Reconstruct Curb & Gutter (C-8) (with TAC Slot $43.25 111 LF 0 LF 111 LF $4,800.75 $0.00 $4,800.75 $51,900.00 Pave) 3 1,600 LF Remove and Reconstruct Curb & Thickened Gutter (10' both $45.75 1,112 LF 40 LF 1,152 LF $50,874.00 $1,830.00 $52,704.00 $73,200.00 side of existing tree 4 3,800 LF Remove and Reconstruct Curb &Gutter (C-6)(with 1' AC Slot 2,738 LF 718 LF 3,456 LF $96,185.94 $25,223.34 $121,409.28 $133,494.00 Pave)$35.13 5 420 LF Remove and Reconstruct Curb & Gutter (C-8)(with VAC Slot $44.16 272 LF 0 LF 72 LF $12,011.52 $0.00 $12,011.52 $18,547.20 Pave) 6 11,250 SF Concrete Sidewalk (4" P.C.C./ 4" C.M.B.) $11.53 3,205 SF 2,337 SF 42 SF [9,6355.50 $36,953.65 $26,945.61 $63,899.26 $129,712.50 7 9,900 SF Concrete Driveway/DrivewayApproach $8.00 18,854.50 SF 781.00 SF SF $70836.00 $6,248.00 $77 084.00 $79 200.00 8 25 TON Miscellaneous AC Pavement $496.00 16 TON 0.50 TON50 TON $7,936.00 $248.00 $8,184.00 $12,400.00 9 100 LF Paint Curb (Red) $6.50 0 LF 0 LF 0 LF $0.00 $0.001 $0.001 $650.00 10 9,700 SF Remove and Reconstruct Concrete Cross Gutter, Spandrel, $9.00 0 SF 0.00 SF 0 SF $0.00 0.00 $0.00 $87,300.00 Local Depression and Concrete Pad 11 11 FA lAdditional Work Items $50,000.00 0 FA 0 FA 0 FA $0.00 $0.00 $0.00 $50,000.00 PROJECT TOTAL: $325,828.941 $78,130.21 $403,959.15 $759,358.70 Change Orders' 1A 9,700 SF Remove and Reconstruct Concrete Cross Gutter, Spandrel, $ 12.00 7,523 SF 2,574 SF 10097 SF $90,276.00 $30,888.00 $121,164.00' e ression and Concrete Pad Local Dep TOTAL CHANGE ORDERS: 1 6.00 $30,888.00j $121,164.001 TOTAL BASE BID PLUS CHANGE ORDERS): $416,104,941 $109,018.21 1 $525,123.15 1 $759,358.70 ATTACHMENT 2014-2015 PARKWAY CONCRETE REPAIR PROJECT #15-01 (ZONE #1) PARKWAY CONCRETE REPAIR LOCATIONS LIST OF STREETS WITHIN PROJECT (ALPHABETICAL LISTING) ZONE LOCATION FROM TO 1 1 W. 20th St W. 20th St Monrovia Ave. Monrovia Ave. Cul-de-sac Federal Ave. 1 Arbor St. W'ly Cul-de-sac Continental Ave. 1 1 1 Cedar PI. Continental Ave Continental Ave. Republic Ave. Oak St Arbor St. Monrovia Ave. Victoria St Oak St. 1 Dogwood St. Republic Ave. Monrovia Ave. 1 Evergreen PI. Cul-de-sac Monrovia Ave. 1 Federal Ave 20th St Oak St 1 Federal Ave. Pine PI Victoria St Frontage Rd. 1 Grove PI. Cul-de-sac Republic Ave. 1 Linden PI Cul-de-sac Republic Ave 1 Monrovia Ave. 19th St. 20th St. 1 Monrovia Ave. 20th St Victoria St Frontage Road 1 National Ave. Monrovia Ave. Oak St. 1 Oak St. State St. Continental Ave. 1 Pine PI Federal Ave. Cul-de-sac 1 President PI Cul-de-sac Victoria St Frontage Road 1 President PI. Cul-de-sac Oak St. 1 Republic Ave. Cul-de-sac Oak St. 1 Republic Ave. Union Ave Victoria St Frontage Road 1 Republic Ave. Dogwood St. Arbor St. 1 State Ave. Grove PI. Oak St. 1 Victoria St Frontage Road East End West End 1 Whittier Ave Arbor St. Cul-de-sac 01/04/2017