HomeMy WebLinkAbout04 - CC-4 - 2014-2015 Westside Neighborhood Parkway - 1/17/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: JANUARY 17, 2017
ITEM NUMBER: CC -4
SUBJECT: 2014-2015 WESTSIDE NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT -
CITY PROJECT NO. 15-01
DATE: JANUARY 5, 2017
FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335
RECOMMENDATION:
1. Accept the work performed by Global Power Group, Inc. and authorize the City Clerk to file the
Notice of Completion.
2. Release the Labor and Material Bond seven (7) months after the filing date; release the
Faithful Performance Bond one (1) year after the filing date; and release the retention monies
35 days after the Notice of Completion filing date.
BACKGROUND:
On May 5, 2015, a construction contract in the amount of $759,358.70 was awarded to Global
Power Group, Inc., 10260 Woodside Avenue, Lakeside, CA, 92040 for parkway maintenance in
the Westside Neighborhood (between 19th Street and Victoria Street, and Placentia Avenue to the
Westerly City limits).
The scope of work under this contract consisted of localized reconstruction of damaged curb and
gutter, concrete spandrels, driveway/driveway approaches, and sidewalks.
Before Improvements
After Improvements
1
ANALYSIS:
Over two-thirds of the work contained within the contract documents was completed by Global
Power Group, Inc. as of January 20, 2016 to the satisfaction of the City Engineer.
The work performed by Global Power Group Inc. was significantly deficient in manpower and
equipment, which resulted in a longer period to complete the work. This deficiency resulted in
subsequent corrective work to be performed by Global Power Group, Inc. prior to acceptance.
Based on this, City staff recommends that the balance of uncompleted work be cancelled and
performed under a separate contract by another contractor.
The final contract cost of the completed work amounted to $525,123.15, which reflects a 30.8%
percent decrease to the original contract as a result of the cancellation of the unfinished work
(Change Order No. 1). A report of the final costs is shown herein as Attachment 1, with the
summary of the contract costs as follows:
Original Contract Cost: $759,358.70
Contract Change Order No. 1 (uncompleted work) ($234,235.55)
Final Contract Cost: $525,123.15
A listing of the parkway repair locations completed with this contract is shown in Attachment "2".
As of this date, there are no Stop Notices filed against the monies due to Global Power Group,
Inc.
ALTERNATIVES CONSIDERED:
An alternative would be to allow Global Power Group, Inc. to continue working on this contract.
This alternative is not recommended due to above-mentioned issues.
FISCAL REVIEW:
This project was funded with Capital Improvement and Gas Tax funds.
LEGAL REVIEW:
There is no legal review required for this item.
CONCLUSION:
Approximately 69% of the work for the 2014-2015 Westside Neighborhood Parkway Concrete
Repair Project, City Project No. 15-01 performed by Global Power Group, Inc., has been
completed. It is recommended that the City Council authorize staff to file the Notice of
Completion; release the retention monies 35 days after the Notice of Completion filing date; and
release the bonds accordingly.
1►
RAJA SETHURAMAN
Public Services Director
ATTACHMENTS: 1 - Cost Summary
2- Listing of Locations
DISTRIBUTION: City Manager
Assistant City Manager
City Attorney
City Clerk
Staff
File
BALTAZAR MEJIA
City Engineer
PROJECT COST SUMMARY
PROJECT: 2014-2015 WESTSIDE NEIGHBORHOOD PARKWAY CONCRETE REPAIR (ZONE #1)
CITY PROJECT 15-01
ITEMBID
I
I UNIT
PREVIOUS
QUANTITY
TOTAL QUANTITY
PREVIOUS
AMOUNT
TOTAL
CONTRACT
NO
QUANTITY
DESCRIPTION
PRICE
QUANTITY
THIS ESTIMATE
TO DATE
AMOUNT
THIS EST
TO DATE
PRICE
1
3,500
LF
Remove and Reconstruct curb & Gutter (C6) (with TAC Slot
$35.13
1,316
LF
502
LF
1,818 LF
$46,231.08
$17,635.26
$63,866.34
$122,955.00
Pave)
2
1,200
LF
Remove and Reconstruct Curb & Gutter (C-8) (with TAC Slot
$43.25
111
LF
0
LF
111 LF
$4,800.75
$0.00
$4,800.75
$51,900.00
Pave)
3
1,600
LF
Remove and Reconstruct Curb & Thickened Gutter (10' both
$45.75
1,112
LF
40
LF
1,152 LF
$50,874.00
$1,830.00
$52,704.00
$73,200.00
side of existing tree
4
3,800
LF
Remove and Reconstruct Curb &Gutter (C-6)(with 1' AC Slot
2,738
LF
718
LF
3,456 LF
$96,185.94
$25,223.34
$121,409.28
$133,494.00
Pave)$35.13
5
420
LF
Remove and Reconstruct Curb & Gutter (C-8)(with VAC Slot
$44.16
272
LF
0
LF
72 LF
$12,011.52
$0.00
$12,011.52
$18,547.20
Pave)
6
11,250
SF
Concrete Sidewalk (4" P.C.C./ 4" C.M.B.)
$11.53
3,205
SF
2,337
SF
42 SF
[9,6355.50
$36,953.65
$26,945.61
$63,899.26
$129,712.50
7
9,900
SF
Concrete Driveway/DrivewayApproach
$8.00 18,854.50
SF
781.00
SF
SF
$70836.00
$6,248.00
$77 084.00
$79 200.00
8
25
TON Miscellaneous AC Pavement
$496.00
16
TON
0.50 TON50
TON
$7,936.00
$248.00
$8,184.00
$12,400.00
9
100
LF
Paint Curb (Red)
$6.50
0
LF
0
LF
0 LF
$0.00
$0.001
$0.001
$650.00
10
9,700
SF
Remove and Reconstruct Concrete Cross Gutter, Spandrel,
$9.00
0
SF
0.00
SF
0 SF
$0.00
0.00
$0.00
$87,300.00
Local Depression and Concrete Pad
11
11
FA
lAdditional Work Items
$50,000.00
0
FA
0
FA
0 FA
$0.00
$0.00
$0.00
$50,000.00
PROJECT TOTAL:
$325,828.941
$78,130.21
$403,959.15
$759,358.70
Change Orders'
1A
9,700
SF
Remove and Reconstruct Concrete Cross Gutter, Spandrel,
$ 12.00
7,523
SF
2,574
SF
10097 SF
$90,276.00
$30,888.00
$121,164.00'
e ression and Concrete Pad
Local Dep
TOTAL CHANGE ORDERS: 1
6.00
$30,888.00j
$121,164.001
TOTAL BASE BID PLUS CHANGE ORDERS):
$416,104,941
$109,018.21 1
$525,123.15 1
$759,358.70
ATTACHMENT
2014-2015 PARKWAY CONCRETE REPAIR PROJECT #15-01 (ZONE #1)
PARKWAY CONCRETE REPAIR LOCATIONS
LIST OF STREETS WITHIN PROJECT
(ALPHABETICAL LISTING)
ZONE LOCATION
FROM
TO
1
1
W. 20th St
W. 20th St
Monrovia Ave.
Monrovia Ave.
Cul-de-sac
Federal Ave.
1
Arbor St.
W'ly Cul-de-sac
Continental Ave.
1
1
1
Cedar PI.
Continental Ave
Continental Ave.
Republic Ave.
Oak St
Arbor St.
Monrovia Ave.
Victoria St
Oak St.
1
Dogwood St.
Republic Ave.
Monrovia Ave.
1
Evergreen PI.
Cul-de-sac
Monrovia Ave.
1
Federal Ave
20th St
Oak St
1
Federal Ave.
Pine PI
Victoria St Frontage Rd.
1
Grove PI.
Cul-de-sac
Republic Ave.
1
Linden PI
Cul-de-sac
Republic Ave
1
Monrovia Ave.
19th St.
20th St.
1
Monrovia Ave.
20th St
Victoria St Frontage Road
1
National Ave.
Monrovia Ave.
Oak St.
1
Oak St.
State St.
Continental Ave.
1
Pine PI
Federal Ave.
Cul-de-sac
1
President PI
Cul-de-sac
Victoria St Frontage Road
1
President PI.
Cul-de-sac
Oak St.
1
Republic Ave.
Cul-de-sac
Oak St.
1
Republic Ave.
Union Ave
Victoria St Frontage Road
1
Republic Ave.
Dogwood St.
Arbor St.
1
State Ave.
Grove PI.
Oak St.
1
Victoria St Frontage Road
East End
West End
1
Whittier Ave
Arbor St.
Cul-de-sac
01/04/2017