HomeMy WebLinkAbout06 - CC-6 - E 19th St Safe Route to School Project - 1/17/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: JANUARY 17, 2017 ITEM NUMBER: CC -6
SUBJECT: EAST 19TH STREET SAFE ROUTE TO SCHOOL (SRTS) PROJECT FROM CHURCH
STREET TO IRVINE AVENUE, FEDERAL PROJECT NO. SRTSL-5312 (089), CITY
PROJECT NO. 16-17
DATE: JANUARY 5, 2017
FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER,
(714) 754-5335
RECOMMENDATION:
1. Adopt plans, specifications, and working details for hardscape and landscape improvements on
East 19TH Street Safe Route to School (SRTS) Project from Church Street to Irvine Avenue,
Federal Project No. SRTSL-5312 (089), City Project No. 16-17.
2. Approve Budget Adjustment No. 17-007 (Attachment 1) in the amount of $510,138.00.
3. Waive minor irregularities in the bid submitted by the apparent low bidder, EBS General
Engineering, Inc., and award a construction contract to EBS General Engineering, Inc., 1320
East 6th Street, Suite 100, Corona, California 92879 in the amount of $1,164,580.00 (base bid
plus additive bid item AD -1).
4. Authorize the Mayor and the City Clerk to execute the Public Works Agreement.
BACKGROUND:
In June of 2012, staff successfully secured federal funds in the amount of $770,900 under the
Safe Route to School (SRTS) Program towards the design and construction of the East 19th
Street Traffic Calming Project. The project, as designed, improves pedestrian safety, implements
traffic calming measures, and enhances the overall aesthetics within the project limits. More
specifically, this project will implement the above-mentioned improvements at eight (8) locations
along East 19th Street where it intersects with Fullerton Avenue, Orange Avenue, Westminster
Avenue, Santa Ana Avenue, Raymond Avenue, Tustin Avenue, the alley east of Tustin Avenue,
and Irvine Avenue. The project will also add an entry monument sign on a new median that will
be constructed on East 19th Street west of Fullerton Avenue.
The traffic calming will be achieved by installing curb extensions (also called bulb -outs) to narrow
the roadway at the mentioned intersections and, therefore, shorten pedestrian crossing distance,
provide additional pedestrian space and visibility, and create tighter turn radii. The project also
includes installation of visually enhanced crosswalks and streetscaping at the medians and bulb -
out locations to enhance the overall aesthetics of the surrounding areas.
ANALYSIS:
The City Clerk received and opened six (6) bids for this project on December 15, 2016. EBS
General Engineering, Inc. was the apparent low bidder with a bid proposal of $1,164,580.00
(base bid plus additive bid item AD -1) and is recommended for award.
The proposal submitted by the apparent low bidder had a few minor irregularities that included
omitting the total amount for the base bid and the total amount for the base bid and additive bid
item in written words on Proposal Page P-2. However, the proposal included all the required unit
prices which is the basis for determining the total bid. These irregularities have been reviewed
by staff and found them to be minor as they do not change the individual unit prices bid,
quantity, quality, delivery, performance obligations, and did not provide an unfair advantage
over the other bidders. As such, staff recommends that City Council waive these minor
irregularities in the bid documents and award the contract to EBS General Engineering, Inc.
The apparent low bidder's base bid amounted to $1,145,720 and the Engineer's estimate for the
base bid was $1,185,950.00. The average of the six (6) bids received for this project amounted
to $1,481,192.83. An analysis of the bids indicates that the apparent low bidder submitted a
base bid proposal that is 3.4 percent (3.4%) lower than the Engineer's estimate. The Bid
Abstract is included as Attachment "2".
In addition to the base bid, the bidders were required to bid on an additive bid item, which was to
be considered by the City subject to funding availability. Additive bid item No. AD -1 is for
Americans with Disabilities Act (ADA) improvements at the intersection of West 19th Street and
Park Avenue and the installation of crosswalk striping at Placentia Avenue, Pomona Avenue, Park
Avenue and Harbor Boulevard. The incorporation of the additive bid item will result in a net
increase to the contract of $18,000.00. Considering the low bid received for this work, and the
overall project cost being below the Engineer's estimate, staff recommends the inclusion of this
additive item of work.
The license and references of EBS General Engineering, Inc. were checked and staff has found
them to be in good standing.
ALTERNATIVES CONSIDERED:
The alternative to this Council action would be to reject all the bids. If all the bids were rejected,
the City would need to re -advertise the project utilizing general funds or cancel the project. Staff
believes that re -advertising the project will not result in lower bids. This alternative also results in
loss of federal grant funding due to the additional time needed for rebidding process.
FISCAL REVIEW:
The Public Services Department has secured Federal grant funding for construction of this project
under the Safe Route to School (SRTS) Program in the amount of $770,900.00 which was
recognized in Fiscal Year 2013-2014. In order to complete the full scope for the project, including
a 10% contingency for unforeseen conditions, an additional amount of $510,138.00 from
unencumbered Measure M Local Fair Share funding will be required. The attached Budget
Adjustment 17-007 provides for this appropriation.
LEGAL REVIEW:
EBS General Engineering, Inc. will furnish the necessary bonds and insurance, which will be
approved as to form by the City Attorney's office. After the award and subsequent execution of the
contract, a "Notice to Proceed" will be issued.
2
CONCLUSION:
The City has received bids for the East 19th Street Safe Route to School (SRTS) Project from
Church Street to Irvine Avenue, Federal Project No. SRTSL-5312 (089), City Project No. 16-17.
Staff has evaluated all of the bids and recommends that the City Council adopt the plans,
specifications, and working details for said project; approve Budget Adjustment No. 17-007 in
the amount of $510,138.00; waive minor irregularities from the bid proposal; award the contract
to the apparent low bidder, EBS General Engineering, Inc. in the amount of $1,164,580.00 (base
bid plus additive bid item No. AD -1); and authorize the Mayor and the City Clerk to execute the
Public Works Agreement
RAJA SETHURAMAN
Public Services Director
BALTAZAR MEJIA
City Engineer
ATTACHMENTS: "1" Budget Adjustment No. 17-007 for $510,138.00
"2" Bid Abstract
DISTRIBUTION: City Manager
Assistant City Manager
City Attorney
City Clerk
3
BUDGET ADJUSTMENT AUTHORIZATION
Unit
CITY
Department
Public Services
Division
Transportation
Serial Number
17-007
Type of Transaction
Program
Reason for Request:
❑ Revenue Estimate
® Expenditure Appropriation
CITY
El Estimate Increase
El Intra -Departmental Transfer
To transfer $510,138 from Street Maintenance Citywide
19200
30112
project to East 191St. Safe Routes to School project as
❑ Estimate Decrease
❑ Inter -Departmental Transfer
approved by the City Council at the January 17, 2017
® Source
® Project -To -Project Transfer
meeting.
Z From Existing Budget Appropriations
❑ Appropriation Increase
30210
❑ From Donations, Fees, or Grants
❑ Appropriation Decrease
-
❑ From Unappropriated Fund Balance
Unit
Account
Name
Fund
Organization
Program
Pro ect/Grant
Increase
Decrease
CITY
500000
CIP — Street Maintenance Citywide
416
19200
30112
400015
-
$510,138
CITY
500000
CIP — East 19°i St. Safe Routes to School
416
19200
30210
370036
$510,138
-
Department Authorization:
Department Director Date
Recommendation: Z Approval ❑
Reasons for Disapproval:
Director of Finance
Disapproval
Date
CEO Action:
Z Approved ❑ Disapproved ❑
CEO
Not Required
Date
Budget Verification:
The above information has been reviewed, is complete and accurate, and the appropriations
and/or unappropriated funds are sufficient to support the request.
Z Yes ❑ No
Budget Analyst Date
City Council Action:
Z Approved ❑ Disapproved ❑
Not Required
Date
a
a
n
2
rn
Z
ATTACHMENT 2
CITY OF COSTA MESA
DEPARTMENT OF PUBLIC SERVICES
EAST 19TH STREET SAFE ROUTE TO SCHOOL PROJECT
FROM CHURCH STREET TO IRVINE AVENUE
CITY PROJECT 16-17
BID OPENING DATE: DECEMBER 15,2016
BID OPENING RESULTS
Bidder
City
Total Base Bid
Total Base Bid
+ Additive Bid
1. EBS General Engineering
$1,145,720.00
$1,164,580.00
CORONA
2. Roadway Engineering
MIRA LOMA
$1,311,400.00
$1,333,600.00
3.Excel Paving Company
LONG BEACH
$1,318,880.00
$1,378,880.00
4.GMC Engineering
TUSTIN
$1,447,447.00
$1,500,470.00
$1,478,947.00
5. Nobest, Inc.
$1,545,490.00
$2,181,640.001
GARDEN GROVE
CORONA
$2,163,240.00
6. Hillcrest Contracting, Inc.
Average $1,481,192.83 $1,513,856.17
Engineer's Estimate: $ 1,185,950.00 $ 1,203,950.00