Loading...
HomeMy WebLinkAbout04 - CC-4 - Del Mar Ave Median Improvements, City Pr - 2/7/2017CITY COUNCIL AGENDA REPORT MEETING DATE: FEBRUARY 7, 2017 ITEM NUMBER: CC -4 SUBJECT: DEL MAR AVENUE MEDIAN IMPROVEMENTS (FROM NB NEWPORT BOULEVARD TO 300 FEET EAST), CITY PROJECT NO. 15-12 DATE: JANUARY 26, 2017 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: BALTAZAR MEJIA, CITY ENGINEER FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, 714-754-5335 RECOMMENDATION: 1. Accept work performed by HYM Engineering, Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Materials Bond seven (7) months after the filing date; release the Faithful Performance Bond twelve (12) months after the filing date and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On September 1, 2015, a construction contract in the amount of $299,422.00 was awarded to HYM Engineering, Inc., 6380 Roland Street, Buena Park, CA 90621 for the Improvements at Del Mar Avenue at Newport Blvd. The work under this contract consisted of the removal of the existing paved median and construction of a wider median at Del Mar Avenue and Newport Boulevard, installation of "Eastside Costa Mesa" monument sign and drought tolerant landscaping, reconstruction of westbound right turn median, and construction of decorative crosswalk and access ramps to meet the Americans with Disabilities Act (ADA) standards. _712, E /* Before Improvement After Improvement ANALYSIS: The work required by the contract documents was completed on September 14, 2016 to the satisfaction of the City Engineer. The final contract cost amounted to $290,952.00. A report of the final costs is included herein as Attachment 1. A summary of the costs is as follows: Original Contract Cost: $299,422.00 Final Quantity Adjustment: ($8,470.00) Final Contract Cost: $290,952.00 The final contract price reflects a 2.9 percent (2.9%) decrease to the original contract as a result of the aforementioned final quantity adjustment. As of this date there are no Stop Notices filed against the monies due to HYM Engineering, Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: This project was funded with Capital Improvements and Gas Tax funds. LEGAL REVIEW: There is no legal review required for this item. CONCLUSION: The Del Mar Avenue Median Improvements Project, City Project No. 15-12, has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion, release the remaining retention monies 35 days after the Notice of Completion filing date and release the bonds accordingly. RAJA SETHURAMAN Public Services Director ATTACHMENT DISTRIBUTION 1 — Cost Summary City Manager Assistant City Manager City Attorney City Clerk BALTAZAR MEJIA City Engineer I±• PROJECT COST SUMMARY PROJECT: DEL MAR AVENUE MEDIAN IMPROVEMENTS eio warmrr rixu auaxrm ux oExnirtiow uwrt rn¢e ouaxrm ouaxrm esrrare roriu awwrm ro wre aiaurrt asaurrt rws esr ro wre coxrnacr ram 1 1 1 LS BONDING, MOBILIZATION AND INSURANCE $ 5 000.00 100 % 0 % 100 % $5,000.00 $0.00 $5,000.ft $5,000.00 2 1 1 LS TRAFFIC CONTROL $ 15,000.00 100 % 0 % 100 % ' $15,000.00 $0.00 $15,000.001 $15,000.00 3 1,764 1,786 SF SAWCUT AND REMOVE EXISTING AC PAVEMENT AND BASE 1,786 SF 0 SF 1786 SF $14,288.00 $0.00 $14,288.00 $14,288.00 MATERIAL PER DETAIL NO.1 ON SHEET NO.2 $ 8.00 4 1,062 1,020 SF SAWCUT AND REMOVE EXISTING PCC MEDIAN CURB AND 1,020 SF 0 SF 1020 SF $8,160.00 $0.00 $8,160.00 $8,160.00 HARDSCAPE $ 8.00 5 2,764 2,806 SF SCARIFY AND RECOMPACT (90% MIN) OF 12" OF SUBGRADE 2,806 SF 0 SF 2806 SF $4,209.00 $O.DO $4,209.00 $4,209.00 $ 150 CONSTRUCT PCC CURB (TYPE Ci -8) PER SPPWC STD PLAN NO. 6 187 221 LF 120-2. PCC CURB TO BE CONSTRUCTED WITH EPDXY AS 201 LF 20 LF 221 LF $7,035.00 $700.00 $7,735.00 $7,735.00 APPROVED BY THE ENGINEER $ 35.00 7 623 370 SF CONSTRUCT 6" AC PAVEMENT OVER 13" CMB OVER COMPACTED 370 SF 0 SF 370 SF $12,950.00 $0.00 $12,950.00 $12,950.00 NATIVE (95% MIN) $ 35.00 8 1 1 EA ADJUST WATER VALVE LID AND CAN TO FINISHED GRADE $ 500.00 1 EA 0 EA 1 EA $500.00 $0.00 $500.00 $500.00 9 2 0 EA ADJUST MANHOLE OR UTILITY COVER TO FINISHED GRADE$ 600.00 0 0 EA 0 EA $0.00 $0.00 $0.00 $0.00 10 32 O SF CONSTRUCT 6" PCC PAVEMENT OVER 6" CMB $ 50.00 0 SF 0.00 SF 0 SF $0.00 $0.00 $0.00 $0.00 ADJUST EXISTING TRAFFIC SIGNAL PULL BOX TO FINISHED 9 E4 0 EA 9 EA $3,600.00 $0.00 $3,600.00 $3,600.00 11 6 9 EA GRADE $ 400.00 '. CONSTRUCT PCC CURB (TYPE Al -8 PER SPPWC STD PLAN NO. 41 LF 0 LF 41 LF $1,640.00 $0.00 $1,640.00 $1,640.00 12 52 41 LF 120.2) $ 40.00 FURNISH AND INSTALL TRUNCATED DOME PANEL (SIZE PER 13 1 0 EA PLAN) BY ARMOR TILE OR APPROVED EQUAL. TRUNCATED DOME 0 EA 0 EA 0 EA $0.00 $0.00 $0.00 $0.00 PANEL TO BE YELLOW PER SPECIFICATIONS $ 2.50 .00 FURNISH AND INSTALL 2-4" PVC (SCHEDULE 80) SLEEVE WITH 14 60 60 LF NYLON PULL ROPE AT STATION 10+69. SLEEVE SHALL HAVE 24" 60 LF 0 LF 60 LF $3,600.00 $0.00 $3,600.00 $3,600.00 MINIMUM COVER AND EXTEND T BEYOND THE BACK OF CURB $ 60.00 CONSTRUCT 1" WATER METER SERVICE LINE PER IRWD STD 15 1 1 EA DRAWING W-1. FURNISH AND INSTALL STANDARD METER 1" 1 EA 0 EA 1 EA $2,500.00 $0.00 $2,500.00 $2,500.00 ASSEMBLY AND BOX PER IRWD STD DRAWING W-1. $ 2,500.00 16 1,250 1.070 SF CONSTRUCT 6" THICK DECORATIVE PCC CROSSWALK PER DETAIL 1,070 SF 0 SF 1070 SF $21,400.00 $0.00 $21,400.00 $21,400.00 NO.3 ON SHEET NO.2 $ 20.00 SAWCUT AND REMOVE EXISTING PCC SIDEWALKAND 17 400 904 SF RECONSTRUCT 4" PCC SIDEWALK PER CITY OF COSTA MESA STD 854 SF 50 SF 904 SF $10,248.00 $600.00 $10,848.00 $10,848.00 PLAN NOS. 412 AND 413 $ 12.00 FURNISH AND INSTALL TOPSOIL MATERIAL PER LANDSCAPE 0 CY 0 CY 0 CY $0.00 $0.00 $0.00 $0.00 18 230 0 CY SPECIFICATIONS 0.00 SAWCUT AND REMOVE EXISTING PCC CURB RAMP AND 19 2 2 EA SIDEWALK AS NECESSARY AND RECONSTRUCT PCC CURB RAMP 2 EA 0 EA 2 EA $6,000.00 $0.00 $6,000.00 $6,000.00 (CASE PER PLAN) PER CITY OF COSTA MESA STD PLAN NO. 416 $ 3000.00 TYPE D TRAFFIC SIGNAL LOOP PER CALTRANS STD PLAN 0 EA 0 EA 0 EA $0.00 $0.00 $0.00 $0.00 20 2 0 NO. NO. ES -5B 1,000.00 1,940 1,070 SF SAWCUT AND REMOVE EXISTING AC PAVEMENT AND 1,070 SF 0 SF 1070 SF $6.420.00 $O.DO $6,420.00 $6,420.00 21 RECOMPACT EXISTING BASE TO 95% MIN. 6.00 CONSTRUCT TYPE A PCC CURB (H=20") PER CITY OF COSTA ME JAT 34 LF 0 LF 34 LF $1,700.00 $0.00 $1,700.00 $1,700.00 22 42 34 LF STD PLAN NO- 311 CONSTRUCT 6" THICKCRUSHED MISCELLANEOUS BASE (CMB) 0CY0 CY 0 CY $0.00 $0.00 $0.00 $0.00 23 1 0 CY 95% RELATIVE COMPACTION 500.00 24 1,010 0 SF VARIABLE COLD MILL EXISTING AC $ 1.60 0 SF 0 SF 0 SF $0.00 $0.00 $0.00 $0.00 13 0 TN CONSTRUCT 2" AC OVERLAY FLUSH WITH ADJACENT PAVEMENT 0 TN 0 TN 0 TN $O.DO $0.00 $0.00 $0.00 25 $ 60000 26 1 1 LS PROJECT MANAGEMENT $ 10,000.00 100.00 % 0.00 % 100.00 % $10,000.00 $0.00 $10,000.00 $10000.00 27 1 1 LS CONSTRUCT MONUMENT SIGN $ 18,000.00 100.00 % 0 % 100 % $18,000.00 $0.00 $18,000.00 $18,000.00 28 1,080 970 SF COBBLE STONE MULCH $ 11.00 970 SF 0 SF 970 SF $10,670.00 $0.00 $10,670.00 $10,670.00 29 27 27 EA LANDSCAPE BOULDERS $ 600.00 27 EA 0 EA 27 EA $16200.00 $0.001 $16,200.00 $16,200.00 30 2,835 2,865 SF SOIL PREPARATION AND FINE GRADING $ 1.00 2,865 SF 0 SF 2865 SF $2,865.00 so.00j $2,865.00 $2,865.00 31 2,835 2,835 SF WEEDABATEMENT $ 0.20 2,835 SF 0 SF 2835 SF $567.00 $0.001 $567.00 $567.00 32 1 1 LS IRRIGATION SYSTEM $ 40 000.00 100 % 0 % 100 % $40,000.00 $0.001 $40,000.00 $40,000.00 33 1 1 LS LANDSCAPING $ 15000.00 100 % 0 % 100 % $15,000.00 $0.001 $15,000.00 $15,000.00 34 1 1LS ELECTRICAL AND LIGHTING $ 28,000.00 100 % 0 % $28,000.00 $0.00 $28,000.00 $28,000.00 35 1 1 LS PROVIDE NINETY (90) DAY LANDSCAPE MAINTENANCE PHASE $ q 000.00 100 % 0 % 100 % $4,000.001 $0.00 $4,000.00 $4,000.00 EXTRA WORK 1 1 LS INSTALLATION THREE OF 4" PVC SLEEVE UNDER THE $9,000,00 100 % 0 % 100 % $9,000.00 $0.00 $9,000.00 $9,000.00 CROSSWALK PAD 2 1 LS TRENCH 2' AND INSTALL 4" CONDUIT WORK FOR NEW $5,000.00 100 % 0 % 100 % $5,000.00 $0.00 $5,000.00 $5,000.00 ELECTRICAL LINE TO MEDIAN SLEEVE 3 1 LS ADDITIONAL WORK AT AGREED PRICE -TRENCHING AND $610000 0 % 100 % 100 % $0.00 $6,100.00 $6,100.00 $6,100.00 RESTORATION PROJECT TOTAL: $283,552.00 $7,400.00 290 952.00 $290 952.00