HomeMy WebLinkAbout03 - CC-3 - Harbor Blvd. Bike Trail City Project No. - 2/21/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: FEBRUARY 21, 2017 ITEM NUMBER: CC -3
SUBJECT: HARBOR BOULEVARD BIKE TRAIL PROJECT - CITY PROJECT NO. 14-14
DATE: FEBRUARY 9, 2017
FROM: PUBLIC SERVICES DEPARTMENT
PRESENTATION BY: RAJA SETH URAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, 714.754.5291
RECOMMENDATION
1. Accept work performed by KASA Construction Inc. and authorize the City Clerk to file the Notice of
Completion.
2. Release the Labor and Materials Bond seven (7) months after the filing date; release the Faithful
Performance Bond one (1) year after the filing date; and release the retention monies 35 days after
the Notice of Completion filing date.
BACKGROUND
On March 15, 2016, the City Council awarded a contract to KASA Construction for $962,356.00. The scope of
work for the Harbor Boulevard Bike Trail Project included the removal of the old asphalt path and the
construction of a 12 ft. wide bicycle trail, the removal of the irrigated turf, and the installation of drought
tolerant California native shrubs and trees; and low level bollard lighting. The scope also includes other work
needed to complete the project in accordance with the contract documents.
BEFORE AFTER
ANALYSIS
The work required by the contract documents was completed on August 25, 2016 to the satisfaction of the
City Engineer. The final contract cost amounted to $1,002,697.09. A report of the final costs is included
herein as Attachment 1.
Original Contract:
Change Order No. 1
Change Order No. 2
Final Quantity Adjustment:
TOTAL COST
$962,356.00
$ 4,434.51
$ 36,756.58
($ 850.00)
$1,002,697.09
During construction of this project, it became necessary to provide additional utility pipes and wiring for the
routing of the trail lighting electrical connections to an approved SCE service.
The final contract price reflects a 4.2 percent (4.2%) increase to the original contract as a result of the
aforementioned change orders and final quantity adjustment.
ALTERNATIVES CONSIDERED
There were no alternatives considered for this item.
FISCAL REVIEW
Funding for this project was provided by FY 2012-2013 and FY 2015-2016 Capital Improvement Funds and
Gas Tax funds.
LEGAL REVIEW
There is no legal review required for this item.
CONCLUSION
The Harbor Boulevard Bike Trail Project, City Project No. 14-14 has been completed. It is recommended
that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies
35 days after the Notice of Completion filing date; and release the bonds accordingly.
RAJA SETHURAMAN
Public Services Director
ATTACHMENT:
DISTRIBUTION
1 — Cost Summary
City Manager
Assistant City Manager
City Attorney
City Clerk
Staff
BALTAZAR M EJ IA
City Engineer
E
CITY OF COSTA MESA
KASA CONSTRUCTION INC.
15148 SIERRA BONITA LANE
CHINO, CA 91710
PROJECT: HARBOR BIKE TRAIL, PROJECT #14.14
DATE:
PAGE:
ITEM
NO
BID QUANTITY
DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTALOUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
1
1
LS
MOBILIZATION
$ 35,000.00
100
%
0
%
100
%
$35,000.00
$0.00
$35,000.00
$35,000.00
2
11,250
SF
CLEARING AND GRUBBING
$ 1.50
11,250
SF
0
SF
11250
SF
$16,875.00
$0.00
$16,875.00
$16,875.00
3
1
LS
DUST CONTROL
$ 500.00
100
%
0
%
100
%
$500.00
$0.00
$500.00
$500.00
4
13,200
SF
REMOVE CONCRETE FLATWORK & SUB BASE
$ 3.00
13,200
SF
0
SF
13200
SF
$39,600.00
$0.00
$39,600.00
$39,600.00
5
1,200
SF
REMOVE CONCRETE FLATWORK
$ 2.50
1,200
SF
0
SF
1200
SF
$3,000.00
$0.00
$3,000.00
$3,000.00
6
11
EA
REMOVE TREES
$ 180.00
11
EA
0
EA
11
EA
$1,980.00
$0.00
$1,980.00
$1,980.00
7
18,700
SF
REMOVE AC PAVEMENT BIKE TRAIL
$ 0.50
18,700
SF
0
SF
18700
SF
$9,350.00
$0.00
$9,350.00
$9,350.00
8
1
LS
EARTHWORK &GRADING
$ 38,000.00
100
%
0
%
100
%
$38,000.00
$0.00
$38,000.00
$38,000.00
9
22,500
SF
CONCRETE FLATWORK BIKE TRAIL
$ 6.00
22,608
SF
0
SF
22608
SF
$135,648.00
$0.00
$135,648.00
$135,648.00
10
1,100
SF
CONCRETE FLATWORK PER CITY STANDARD
$ 5.00
1,100
SF
0
SF
1100
SF
$5,500.00
$0.00
$5,500.00
$5,500.00
11
1
LS
ITURFSTONE PAVER SYSTEM
$ 3,500.00
100
%
0
%
100
%
$3,500.00
$0.00
$3,500.00
$3,500.00
12
345
CY
IMPORT CLASS A TOPSOIL
$ 45.00
345
CY
0
CY
345
CY
$15,525.00
$0.00
$15,525.00
$15,525.00
13
6,100
SF
FILTER FABRIC
$ 0.50
6,100
SF
0
SF
6100
SF
$3,252.00
$0.00
$3,252.00
$3,252.00
14
21
TON
DECOMPOSED GRANITE BACKFILL
$ 600.00
21
TON
0
TON
21
TON
$12,600.00
$0.00
$12,600.00
$12,600.00
15
6,100
SF
COBBLESTONE MULCH
$ 10.00
6,100
SF
0
SF
6100
SF
$61,000.00
$0.00
$61,000.00
$61,000.00
16
155
EA
LANDSCAPE BOULDERS
$ 200.00
155
EA
0
EA
0
EA
$31,000.00
$0.00
$31,000.00
$31,000.00
17
23,300
SF
WEED ABATEMENT
$ 0.20
23,300
SF
0
SF
23300
SF
$4,660.00
$0.00
$4,660.00
$4,660.00
18
3,650
LF
ROOT BARRIER
$ 6.00
3,650
LF
0
LF
3650
LF
$21,900.00
$0.00
$21,900.00
$21,900.00
19
17
EA
QUEEN PALM TREE
$ 850.00
16
EA
0
EA
16
EA
$13,600.00
$0.00
$13,600.00
$13,600.00
20
31
EA
24" BOX TREE 20 BTH
$ 300.00
31
EA
0
EA
31
EA
$9,300.00
$0.00
$9,300.00
$9,300.00
21
64
EA
15 GAL SHRUB
$ 60.00
64
EA
0
EA
64
EA
$3,840.00
$0.00
$3,840.00
$3,840.00
22
53
EA
5 GAL SHRUB
$ 20.00
53
EA
0
EA
53
EA
$1,060.00
$0.00
$1,060.001
$1,060.00
23
142
EA
2 GAL SHRUB
$ 16.00
142
EA
0
EA
0
EA
$2,272.00
$0.00
$2,272.00
$2,272.00
24
1,937
EA
1 GAL SHRUB
$ 7.00
1,937
EA
0
EA
0
EA
$13,559.00
$0.00
$13,559.00
$13,559.00
25
1
LS
IRRIGATION SYSTEM 23,300 SF
$ 105,000.00
100
%
0
%
100
%
$105,000.00
$0.00
$105,000.00
$105,000.00
26
15,300
SF
WOOD MULCH 3" DEPTH
$ 0.45
15,300
SF
0
SF
15300
SF
$6,885.00
$0.00
$6,885.00
$6,885.00
27
9,500
SF
TURF REPAIR WITH SOD
$ 0.75
9,500
SF
0
SF
9500
SF
$7,125.00
$0.00
$7,125.00
$7,125.00
28
23,300
SF
90 DAY MAINTENANCE PERIOD
$ 0.25
7,689
SF
0
SF
7689
SF
$5,825.00
$0.00
$5,825.00
$5,825.00
29
1
LS
ELECTRICAL & LIGHTING
$ 329,000.00
100
%
0
%
100
%
$329,000.00
$0.00
$329,000.00
$329,000.00
30
1
LS
BORING UNDER PAVEMENT
$ 6,000.00
100
%
0
%
100
%
$6,000.00
$0.00
$6,000.00
$6,000.00
31
1
LS
FORCE ACCOUNT WORK
$ 20,000.00
100
%
0
%
100
%
$20,000.00
$0.00
$20,000.00
$20,000.00
CO #1
LS
SCE PLAN ELECTRICAL WORK
$4,434.51
$0.00
$4,434.51
$4,434.51
CO #2
LS
ELECTRICAL &LIGHTING
$36,756.58
$0.00
$36,756.58
$36,756.58
Qt Ad'.
1
EA
QUEEN PALM TREE
$ 850.00
-$850.00
$0.00
-$850.00
-$850.00
$1,002,697.09
$0.00
$1,002,697.09
$1,002,697.09