HomeMy WebLinkAbout04 - CC-4 - Community Development Block Grant Proj - 5/16/2017CITY COUNCIL AGENDA REPORT MEETING DATE: MAY 16, 2017 ITEM NUMBER: CC -4 SUBJECT: COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT: TEWINKLE PARK ADA AND PARKING LOT IMPROVEMENTS, CITY PROJECT NO. 17-01 DATE: MAY 4, 2017 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: Adopt plans, specifications, and working details for the TeWinkle Park ADA and Parking Lot Improvements Project, 970 Arlington Drive, Costa Mesa, CA, 92626, City Project No. 17-01. 2. Award a construction contract to All American Asphalt, 400 E. Sixth Street, Corona, CA 92879, in the amount of $220,272.00. 3. Authorize the Mayor and the City Clerk to execute the Public Works Agreement. BACKGROUND: The Americans with Disabilities Act (ADA) is a federal civil rights law enacted in 1990 to provide persons with disabilities with accommodations and access equal to, or similar to, those available to the general public, including accessible parking lots. Title III of the ADA requires that owners of buildings that are considered to be places of public accommodations remove architectural and communications barriers to allow use of the facilities by persons with disabilities. An ADA survey for TeWinkle Park has been completed and identified a number of deficiencies that included parking lot grades, location of parking spaces, signage, and ramps. Other areas identified for ADA upgrades include concrete walkways along the path of travel to various elements of the park. Attachment 1 describes a typical finding from the ADA survey report prepared by Q3 Engineers, Inc. The scope of work under this project includes resurfacing the parking lot to bring the surface grades to ADA standards; striping of parking stalls; installation of ADA signage; reconstruction of walkways that were identified as non-compliant with ADA standards, and other incidental work needed to complete the project in accordance with the contract documents. Copies of the project plans, specifications and reports are available for review in the Public Services Department and on the City's webpage at costa mesaca.gov. ANALYSIS: The City Clerk received and opened eight (8) bids for this project on April 11, 2017. All American Asphalt was the apparent low bidder with a bid proposal of $220,272.00. The Engineer's estimate was $322,945.00; and the average of the eight (8) bids received amounted to $293,143.54. An analysis of the bids indicates that the apparent low bidder submitted a bid proposal that is 31.79% lower than the Engineer's estimate. The variance between the low bidder and the Engineer's estimate may be attributed to the highly competitive conditions for this type of contracts at this time. The Bid Abstract is included as Attachment 2. The license and references of All American Asphalt were checked and staff has found them to be in good standing. All American Asphalt has successfully completed several projects in the City of Costa Mesa including the Eastside Street Maintenance Project, intersection improvements at Harbor Boulevard and Adams Avenue, 19th Street Rehabilitation from Newport Boulevard to Park Avenue and most recently, the Harbor Boulevard Improvements Project from South Coast Drive to Sunflower Avenue. ALTERNATIVES CONSIDERED: The alternative to this Council action would be to reject all the bids. If all the bids are rejected, the City would need to readvertise or cancel the project. Staff believes that readvertising the project will not result in lower bids. FISCAL REVIEW: Funding for this project has been budgeted in Fiscal Year 2015-2016 from CDBG Grant Funds and Capital Improvements Funds. LEGAL REVIEW: All American Asphalt has furnished the necessary bonds and insurance, which were approved as to form by the City Attorney. After the award and subsequent execution of the contract, a "Notice to Proceed" will be issued. The advertisement and bid opening for the TeWinkle Park Parking Lot Improvements Project, City Project No. 17-01, has been completed. It is recommended that the City Council adopt the plans, specifications, and working details for said project; award the contract to the apparent low bidder, All American Asphalt, in the amount of $220,272.00; and authorize the Mayor and the City Clerk to execute the Public Works Agreement. RAJA SETHURAMAN BALTAZAR MEJIA Public Services Director City Engineer ATTACHMENTS: 1 - Excerpt from the ADA Survey Report Prepared by Q3 Engineers, Inc. 2- Bid Abstract DISTRIBUTION City Manager Assistant City Manager City Attorney City Clerk Staff File 2 W 1) Curb ramp on south end of parking lot on Junipero Drive is not level at bottom transition. The slopes on the flared sides are in excess of 1:10. There are no detectable warnings. There are no grooved borders at top of ramp. (2013 CBC 1113406.5) ATTACHMENT CITY OF COSTA MESA DEPARTMENT OF PUBLIC SERVICES TEWINKLE PARK PARKING LOT IMPROVEMENTS CITY PROJECT NO. 17-01 BID OPENING DATE: APRIL 11, 2017 BID OPENING RESULTS Bidder City Total Base Bid 1. ALL AMERICAN ASPHALT 2. ASTRA BUILDERS, INC. CORONA ANAHEIM $220,272.00 $244,146.79 3. HYM ENGINEERING, INC. BUENA PARK $285,626.00 4. VIDO SAMARZICH, INC. ALTA LOMA $286,081.00 5. HORIZONS CONSTRUCTION CO. ORANGE $287,276.00 6. ROADWAY ENGINEERING AND CONTRACTING, INC. MIRA LOMA $299,926.50 7. EBS GENERAL ENGINEERING, INC. CORONA $326,820.00 8. HARDY & HARPER, INC. SANTA ANA $395,000.00 Average $293,143.54 Engineer's Estimate. $ 322,945.00 14