HomeMy WebLinkAbout06 - CC-6 - Accept Completion of RFP No. 1172 - 5/16/2017CITY COUNCIL AGENDA REPORT MEETING DATE: MAY 16, 2017 ITEM NUMBER: CC -6 SUBJECT: REMOVAL OF A 10,000 -GALLON UNDERGROUND STORAGE TANK LOCATED IN THE COSTA MESA POLICE DEPARTMENT- RFP NO. 1172 DATE: MAY 4, 2017 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by MJK Construction, Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond and the Faithful Performance Bond after the Notice of Completion filing date. BACKGROUND: On September 25, 2014, the City, in compliance with the adopted Uniform Public Construction Cost Accounting Act and associated City of Costa Mesa Purchasing Procedures, awarded a not -to -exceed $60,000 construction contract to MJK Construction, Inc., 4780 Cheyenne Way, Chino, CA 91710, for the removal of a 10,000 -gallon underground storage tank in the Costa Mesa Police Department. The scope of work also included the removal of a fuel dispenser, associated pipes, and other incidental work needed to complete the project in accordance with the contract documents. ANALYSIS: The construction contract was approved for an amount not -to -exceed $60,000.00. The final contract cost amounted to $51,305.01. A report of the final costs is included herein as Attachment 1. A summary of the costs is as follows: Initial Contract Cost: $46,443.33 Change Order No. 1: $1,932.08 Change Order No. 2: $2,929.60 Final Contract Cost: $51,305.01 Change Order No. 1 in the amount of $1,932.08 compensated the contractor for the required bonds and insurance for the project. Change Order No. 2 in the amount of $2,929.60 was issued for additional work items required for the completion of the project and included asphalt seal coating, emergency soil sampling at the work site, and laboratory analysis. On November 14, 2014, the work was completed by the contractor to the satisfaction of the City Engineer and all of the obligations of the bonds have been met by the contractor. The applicable time periods within which claims could be brought against the contractor under the Faithful Performance Bond and the Labor and Material Bond have expired. Therefore, staff recommends that the Faithful Performance Bond and the Labor and Material Bond be released to MJK Construction, Inc. immediately after the Notice of Completion is filed. ALTERNATIVES CONSIDERED: The alternative to this Council action would be to retain the Faithful Performance Bond and the Labor and Material Bond. However, the project was completed to the satisfaction of the City Engineer and the applicable time periods within which claims could be brought against the contractor have expired. FISCAL REVIEW: Funding for this project was derived from the Equipment Replacement Fund. LEGAL REVIEW: There is no legal review required for this item. CONCLUSION: The removal of a 10,000 -gallon underground storage tank, RFP No. 1172 has been completed to the satisfaction of the City Engineer. It is recommended that the City Council authorize staff to file the Notice of Completion and release the bonds immediately after the Notice of Completion filing date. RAJA SETHURAMAN Public Services Director ATTACHMENT DISTRIBUTION 1 — Cost Summary City Manager Assistant City Manager City Attorney City Clerk Staff File BALTAZAR MEJIA City Engineer E CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF 7/2/15 DATE: 05/27/15 2nd & FINAL Payment to: MJK CONSTRUCTION, INC. PAGE: 1 OF 1 4780 CHEYENNE WAY, CHINO, CA 91710 PROJECT: REMOVAL OF 10,000 -GALLON UNDERGROUND STORAGE TANK AT THE COSTA MESA POLICE DEPARTMENT (99 FAIR DRIVE, COSTA MESA) - RFP NO. 1172 ITEM NO BID QUANTITY DESCRIPTION I UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 2 1 1 LS LS MOBILIZATION/DEMOBILIZATION PERMITTING $3,171.25 $1571.63 100.00 100.00 % % 0.00 % 0.00 % 100.00 % 0.00 % $3,171.25 $1,571.63 $0.00 $0.00 $3,171.25 $1,571.63 $3,171.25 $1,571.63 3 1 LS REMOVE 10K UST $34,845.560 100.00 % 0.00 % 100.00 % $34,845.56 $0.00 $34,845.56 $34,845.56 4 200.30 GAL TRANSPORT & DISPOSE TANK CONTENTS OFF-SITE $1.95 200.30 GAL 0.00 GAL 200.30 GAL $390.58 $0.00 $390.58 $390.58 5 1 LS SOIL RELATED WORK $4,675.83 100.00 % 0.00 % 0.00 % $4,675.83 $0.001$4,675.83 $4,675.83 6 1 1 LS REPORT SUBMITTAL $1,788.48 100.00 % 0.00 % 100.00 % $1,788.48 $0.00 $1,788.48 $1,788.48 TOTAL: $46,443.331 $0.00 $46 443.33 $46.443.33 CHANGE ORDERS 1 1 1 LS IPAYMENT AND PERFORMANCE BOMND $1,932.081 0.00 % 100.00 % 100.00 % $0.001 $1,932.08 $1,932.08 $1,932.08 2.1 1 1 LS 124 HOURS LABORATORY ANALYSIS 1 $635.001 0.00 % 100.00 % 100.00 % $0.001$635.001 $635.00 $635.00 2.2 1 1 LS JASPHALT SEAL COATING $2,294.601 0.00 % 100.00 °% 100.00 % $0.00 $2294.601 $2 294.60 $2,294.60 CHANGE ORDERS TOTAL: $0.00 $4,861.68 $4,861.68 $4,861.68 PROJECT TOTAL (PLUS COS): 1 $46,443.331 $4,861.681 $51,305.01 $51,305.01 w