Loading...
HomeMy WebLinkAbout08 - CC-8 - Accept Completion of Project No. 16-23, - 5/16/2017CITY COUNCIL AGENDA REPORT MEETING DATE: MAY 16, 2017 ITEM NUMBER: CC -8 SUBJECT: DOWNTOWN RECREATION CENTER POOL DECK REHABILITATION PROJECT, CITY PROJECT NO. 16-23 DATE: MAY 4, 2017 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by CJ Concrete Construction, Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Materials Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On December 7, 2016, a construction contract in the amount of $78,600.00 was awarded to CJ Concrete Construction, Inc., 10142 Shoemaker Avenue, Santa Fe Springs, CA 90670, to perform the Downtown Recreation Center Pool Deck Rehabilitation project. The map of the project location is included as Attachment 1. This project consisted of the demolition and removal of the deteriorated concrete pool deck; and the construction of a new, reinforced concrete slab with integral colored concrete. The project also repaired a portion of the facility's domestic water service and added a new, dedicated water service line for the pool's Disabled Access chair lift. The new water service point -of - connection was installed flush with the top of the new pool deck concrete, providing staff the ability to service the lift equipment without exposing a hose line across the pool deck surface. �T L Before Improvements After Improvements 1XIMM 1 ANALYSIS: The work required by the contract documents was completed on January 6, 2017, to the satisfaction of the City Engineer. The final contract cost amounted to $82,350.00. A report of the final costs is included herein as Attachment No. 2. A summary of the costs is as follows: Original Contract Cost: Change Order No.1: Final Contract Cost: $ 78,600.00 $ 3,750.00 $ 82,350.00 The final contract price reflects a 4.7% increase of the original contract amount. Change Order No. 1 was issued to address an unforeseen electrical conduit conflict with the proposed improvements. As of this date, there are no Stop Notices filed against the monies due to CJ Concrete Construction, Inc. ALTERNATIVES CONSIDERED: There are no alternatives considered for this item. FISCAL REVIEW: This project was funded from the Capital Improvements Fund appropriated in Fiscal Year 14-15. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: The Downtown Recreation Center (DRC) Pool Deck Rehabilitation Project, City Project No. 16-23, has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. RAJA SETHURAMAN Public Services Director ATTACHMENTS: DISTRIBUTION 1 - Location Map 2- Cost Summary City Manager Assistant City Manager City Attorney City Clerk Staff File BALTAZAR M EJ IA City Engineer FA ATTACHMENT 1 DOWNTOWN RECREATION CENTER N.T.S. POOL REHABILITATION PROJECT VICINITY MAP LOCATION 3 CITY OF COSTA MESA PAYMENT TO: CJ CONCRETE CONSTRUCTION INC. 10142 SHOEMAKER AVE SANTA FE SPRINGS, CA 90670 PROJECT: DRC Pool Deck Rehabilitation Project CITY PROJECT 16-23 DATE: 01/10/17 UNIT PREVIOUS QUANTITY TOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACT ITEM NO BID QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE Remove & Reconstruct 4" PCC Concrete Pool Deck % 100 % $0.00 $78,600.00 $78,600.00 $78,600.00 1 1 LS (Reinforced), Replace w/ 3,250psi Integral Colored Concrete & $78,600.00 0 % 100 Epoxy Coated Rebar $3,750.00 Change Order No. 1 Expose and repair (2) 3/4" electrical conduits cast into 0 % 100 % 100 % $0.00 $3,750.00 $3,750.00 C01 1 LS existing pool deck. $3,750.00 PROJECT TOTAL: $0.00 $82,350.001 $82,350.00 $82,350.00