HomeMy WebLinkAbout01 - - Additional Documents - 5/16/2017CC -2 ADDITIONAL DOCUMENTS
WARRANT INFORMATION (05/16/17)
Payment
Date
Remittance to:
Remittance
Payment
Explanation of payment
Ref.
ID:
Amount
0204136
05/05/17
GB Landscape Design -
0000025292
$13,232.00
What is this? Where was it located? This i
Fairview Monument sign
for repair & restoration of damaged irrigation
and landscaping at the City entry monumen
sign at Fairview & Sunflower intersection.
0204202
05/05/17
Six Flags Magic Mountain -
0000009888
$1,150.70
Do we have parents sign waiver form? Do w
Teen Camp Excursion -
cover our costs? Waivers are included &
June 2017
signed by parents/guardians during the
initial Camp Registration process. Severa
excursion facilities do also require that a
separate waiver be signed before attending.
100% of costs are not recovered as da
camps fall under the category of partially
supported activities. Roughly 10%-20% o
costs are not recovered.
0203938
04/28/17
Jones & Mayer -
0000014653
$2,000.10
What was the Animal Control costs relate
81977- Animal Control
to? Jones & Mayer provided counsel on
service dog licensing. A citizen wanted to
license his dog as a service dog, which also
allows for the licensing fees to be waived.
Jones & Mayer assisted in reviewing the
municipal codes reference licensing
requirements, ensuring we met ADA
requirements & set guidelines for the
licensing of service dogs.
0204002
04/28/17
Kevin Christianson - Bicycle
0000025170
$121.06
What was this for? Tuition costs to sen
Patrol 4/11-4/13/17
staff to a POST bicycle patrol class. Th
class is required for all police staff before
they can operate in the field on a bicycle,
while performing their duties. Bicycles are
used to patrol target locations because o
the mobility & more discreet profile the
provide.
0204010
04/28/17
Luis Gomez - Exps 4 post
0000004237
$148.85
What was this for? Same as above
Training - Bike Patrol
CC -4 ADDITIONAL DOCUMENTS
CITY OF COSTA IVIES,,--..
PUBLIC SERVICES
TEWINKLE PARK PARKING LOT
CITY COUNCIL MEETING
MAY 16, 2017
Costa Mesa
TEWINKLE PARK PHOTOS
SCOPE OF WORK
• COLD MILL & OVERLAY - 1.5 "
• REMOVE & RECONSTRUCT SIDEWALK
• CONSTRUCT CONFORMING ADA RAMPS
• RECONSTRUCT ADA ACCESSIBLE
PARKING SPACES
• RESTRI PE PARKING LOT
CC -7 ADDITIONAL DOCUMENTS
CITY OF COSTA MESA
Department of Public Services 1 Administration
INTER OFFICE MEMORANDUM
TO: The Honorable City Council
FROM: Raja Sethuraman, Public Services Director
DATE: May 16, 2617
SUBJECT: FAIRVIEW PARK PARKING LOT IMPROVEMENTS
The scope of work for the above-mentioned project includes the rehabilitation of
the existing parking lot by removing the top 1" of the existing asphalt surface and
placing of variable thickness of new asphalt concrete (up to 2.5") to bring the
surface up to the Americans with Disabilities Act (ADA) standards. The parking
lot will be re -striped.
The City conducted an ADA survey for Fairview Park, and it was determined that
a new sidewalk between the existing picnic shelter and restroom building will
need to be constructed as a result of these improvements. However, with the
passage of Measure AA, this work, which is subject to voters' approval, has been
deferred and removed from this project's scope of work. The existing wheelchair
ramps at the signalized intersection will be upgraded to meet ADA standards by
installing detectable warning devices (truncated domes). In addition, any existing
sidewalk adjacent to the parking lot will be protected in place or, if disturbed
during the parking lot rehabilitation, will be replaced in kind. The project, as
currently bid, does not add or expand any hardscape surfaces.
Please let me know if we can answer any questions relative to this item.
c: Thomas Hatch, City Manager
Tamara Letourneau, Assistant City Manager
Thomas Duarte, City Attorney
Brenda Green, City Clerk
Baltazar Mejia, City Engineer
File
CC -7 ADDITIONAL DOCUMENTS
CITY OF COSTA MESA
PUBLIC SERVICES
PARKING LOTS REHABILITATION
AT VARIOUS LOCATIONS - CIN
PROJECT NO. 17-02
CITY COUNCIL MEETING
MAY 16, 2017
Costa Mesa
d
`2 e�e�(llryry
ri 4 —
w --
• t.
• `\ yr ,
S i • \ r�
F �
F
MATCH LINE - SEE BELOW RIGHT
ATCH LINE - SEE SHEET NO. 3
-.26
R7155 xBR ° ��--'-RS
V 10 2 81 74.47 J,',/- RS; N -s "77c3
= )83t _ a:.34 / t(11P) °.79.9% ) ," M�df7 76 4Z
°
37
�:° /
... 1 A MBWAIKM P ° ]6.72 F ,)%.
]8.a2 "t / .� 76.63FS SIS 2QF 63 ]6.44
µpYµE
FS
°'fib m BL37 - 768-15
-8J. /s _ ea -80 , F 798 o )2 62
P > ES
j
fS
"/ <. (A°r . 2 OG) , A 10_ 10 - :822
.7802 i ��,305 :SYr3 r Q
F .m'y.w-.oNs) ' / F6 \ 9F'�S � srrA aW/6A5tA.a,W-3.AxY ':�\♦ 3 �.3F0 S �Y9.�9 � �y-}esyGf-r1+ JJ tet' _�•7°% w--s,(a
0c'j4 3pe °
) 9P
PPFS°At (ttPF) S -
(]
5)
-
=7834
4 ° ANC"`
NC
78 .1 5 0.59 9.80
TOTAL
(Al POST (OP)
]8.00
WNWP
TO, 79BUNCHJflB780.69) 0 d2 ]80fi PRIME
19.J8 1
79 31 171, 9.25�TFS �' 79 75
LIN
TABLE fi P 9
FS
AEIXPCOP (79t ) (a - -MY6E17
70(80.2fib
FG SGPE 09.42)
.5)
'.
x \ FS
rs -- ce � � 4 `•,.4. -- - "9 � , - Fs -. ata - (D-B1�9 -
eS.OD ]8.92 FS m _�• �° )853 .� ° . ° I
PANT FS -LP -(n.15) / / 296s CWAN--(i9.56} fs' '�° 6 roiAL
8 IRRIGATION 79.52
L x Oow) i �6(114�{/ ' FS P )MET "]9.36 FS \ ° P LANDSCAPE
A.1 F6 FG x A 5 .6�S0 ! _ `S/ / J1 (]970) P /f0 �'� 7�' ° FSP
.803' dq� / _ / - P W IEFUNE. 7.33) (]9.89) 49 .8 B
--i6 '- CONCRETE PATH FS 1
SEE PROLE BELOW 79 88 - / -B
"RE Old 796% 'G2 % /`CONST OL �/o �10 - .]8 SI 004 2.7�� nB CONST -TE
P BRIDING f ] - -_ A ° .80 91
79 EG / \.3
/ r /(80.4 - �8¢2 {/� 28.68. X79 A6 ° �° TO �)
-J .. / yq�r P PO51 (1)PJ W.W(M'GAYO P cx �`s�'^ r.)9 69 O
79 85
roru� - .76
CONSTRUCTION NOTES: °'° A 28,73
0 PROTECT IN PLACE (DESCRIPTION PER PLAN) / -/ / 6 (� _ •/, o _ "
0 "r 'o o 78.83 79 a5 8 Y2 SAWCUT AND REMOVE AC PAVEMENT TO A DEPTH SHOWN ON THE Y 1; T X359 9 A - TO ) 9]
PLANS AND AC SPEED BUMP.
p'*
OCOLDMILL EXISTING AC PAVEMENT (1" MIN) AND APPLY CRACK Wy / C 5 _ 1 r ) ° -. 79 to \
SEAL TO MILLED SURFACE. �OS'�/ 1 ° Z� v F t9
30 CONSTRUCT VARIABLE THICKNESS (0.08' TO 0.21) AC (TYPE 8 PG / O! . Y _ 11 ° �9 9c .]9.21--'Z-�__/ 3A.2i a „•80.9 ,�y1) ° '80.1536
64-10) OVERIAY PER DETAIL NO, 4 ON SHEET N0. 1. / r / 8026 L C - x P \\
r(8093 t �` ...
® CONSTRUCT 021' AC (TYPE B PG 64-10) OVERLAY PER DETAIL / 'o ( q 39 (E NO. 3 ON SHEET NO 1 t - ��
A � )9.Ba r / 0. TW) a
2 \ 0. 6 A
p 3B � r � P r>g
O CONSTRUCT 6" PCC SIDEWALK OVER S" CRUSH MISCELLANEOUS / / 8087]:'_ 3 , ° ] p ) ,8075 '�
BASE (CMB) OVER COMPACTED NAIVE (90% RELATIVE) PER CITY \S 10 062 45 .79 6° 00 '"�0 20 40 WrY 8 8046\
OF COSTA MESA SMD PLAN NOS 412 AND 413, `MOTH PER / / (tN.82) % �0 1 79 68 j- '
TYPICAL SECTION N0. 1 ON SHEET N0. 1 Es 1 �°A f - FS - f4 Vo FS t't
(8193) k 'C SCALE IN FEET N y
OCONTRACTOR SHALL REMOVE AND REPLACE EXISTING / FS r80 B1 P LAND ME 1" = 20' 8060 aC.6a 50) .,\^u25�5P< .
LANDSCAPING IN KIND AND MODIFY EXISTING IRRIGATION SYSTEM 99 ,y fS oe ° 0 10 ?�/ GAMAP-<0C)__\ / y "
AS NECESSARY.FURNo
O APPRISH AND INSTAU OVEO EQUAL MAimTONCATED BE FEDERALYELLOWPERK TILE OR h LAN ta P �� '.69 >a021 N. 1. C.
SPECIFICATIONS DIMENSIONS PER PLAN
O
F
CONSTRUCT AC SPEED BUMP PER DETAIL NO. 2 ON SHEET NO. 1.
P FS 80.27
to 80.60 8064
CONCRETE PATH CENTERLINE PROFILE
SCALE H:1'=10'. V 1"=2'
0
ADJUST MANHOLE TO RNSHED GRADE.
eG 76 S S
CONTRACTOR UC' 8
OREMOVE
AND SALVAGE EXISTING PCC WHEEL STOP. REINSTALL
CITY OF COSTA MESA
DEPARTMENT OF PUBLIC SERVICES / ENGINEERING DIVISION
20.00' VC
NO. DAMI
SALVAGED WHEEL STOP PER LAYOUT DETAIL ON SHEET NO. 4.
EIEVADOW CHECKED BY: SN 12-16
DESCR1PT10N:
RECOMMENDED BY: 12-16
PARKING LOT IMPROVEMENT PLAN
SITE IMPROVEMENTS
FAIRVIEW PARK
2501 PLACENTIA AVENUE
10
CONSTRUCT REDWOOD HEADER OR APPROVED EQUAL PER DETAIL
SIOE'N
�.
DATE OF CONSTRUCTION
e6c. END
NO. 3 ON SHEET NO. I.
LEGEND
V
11
CONSTRUCT PCC CROSS GUTTER (W=6') PER SPPWC STD PLAN
AREA
6
NO. 122-2
® I" CAUEMILL/25" AC OVERLAY
DATE ACCEPTED BY CITY COUNCIL
,2
CONSTRUCT AC (TYPE B PG 64-10) DEEPUFT (DEPTH PER PLAN)
Ill
OVER COMPACTED NATIVE.
1- CO.OMILL/VARABLE THICKNESS AC OVERLAY
6" PCC/8' CMB
_ R Under
-V
AC REMOVAL AND RECONSTRUCTION
$
S •k Akrt
a
E;$E
=.X;- EXISRNG CONTOUR
Calla TOLL FREE
r
-XX- PROPOSED CONTOUR
7
-
POET TOP) ,P 865.5' t 6 SSWH 11
�..... Q xa c 7
y 38
8- a C
MATCH LINE - SEE ABOVE LEFT
AC2121 ALTON PARKWAY. SURE 2W
Ems./ (\I IRVINECA 92606
PHONE (949) 963-0588
76 E N G I N E E R I N G FAX (949) BIsL589
r)OO-227-26DO
or 81
11RG VpRNINc own BEFORE . me
PM El 78.07
CONCRETE PATH CENTERLINE PROFILE
SCALE H:1'=10'. V 1"=2'
PN 79.12
C o n s v I t i n g Civil E n SI I n e e r s a n d
Land Surveyors
PROP FS
CONTRACTOR UC' 8
BENCHMARK DESIGNED BY: JRC 12" 6
BENCH MARK NO.: SEE SHEET NO. 1 DRANK BY: JRC 12-16`Py
R
CITY OF COSTA MESA
DEPARTMENT OF PUBLIC SERVICES / ENGINEERING DIVISION
20.00' VC
NO. DAMI
DESCRIPTION APP.
EIEVADOW CHECKED BY: SN 12-16
DESCR1PT10N:
RECOMMENDED BY: 12-16
PARKING LOT IMPROVEMENT PLAN
SITE IMPROVEMENTS
FAIRVIEW PARK
2501 PLACENTIA AVENUE
IONIC
r.
Zt1. YC
SIOE'N
�.
DATE OF CONSTRUCTION
e6c. END
12 V.
ta
AREA
DATE ACCEPTED BY CITY COUNCIL
BASIS CP BEARING SEE SHEET NO. 1
BALTAZAR MEJIA. CITY ENGNEER R.C.E.
Ill
$
E;$E
�
r
Er
LL
-8 8e
-.-.
o
a FG
0
400
POET TOP) ,P 865.5' t 6 SSWH 11
�..... Q xa c 7
y 38
8- a C
MATCH LINE - SEE ABOVE LEFT
AC2121 ALTON PARKWAY. SURE 2W
Ems./ (\I IRVINECA 92606
PHONE (949) 963-0588
76 E N G I N E E R I N G FAX (949) BIsL589
r)OO-227-26DO
or 81
11RG VpRNINc own BEFORE . me
--- REOW000 HEADER OR EQUAL
- CA GRADE BREAK UNE
CONCRETE PATH CENTERLINE PROFILE
SCALE H:1'=10'. V 1"=2'
C o n s v I t i n g Civil E n SI I n e e r s a n d
Land Surveyors
REVISIONS
CONTRACTOR UC' 8
BENCHMARK DESIGNED BY: JRC 12" 6
BENCH MARK NO.: SEE SHEET NO. 1 DRANK BY: JRC 12-16`Py
�FE65,
Ne' °t
No M. m rF,
P. °N 18 .�
CIVtx'
V�`[k qA1
P.E. SEAL
CITY OF COSTA MESA
DEPARTMENT OF PUBLIC SERVICES / ENGINEERING DIVISION
SHEET
2 OF 5
NO. DAMI
DESCRIPTION APP.
EIEVADOW CHECKED BY: SN 12-16
DESCR1PT10N:
RECOMMENDED BY: 12-16
PARKING LOT IMPROVEMENT PLAN
SITE IMPROVEMENTS
FAIRVIEW PARK
2501 PLACENTIA AVENUE
DATE OF CONSTRUCTION
e6c. END
PLAN
NUMBER
-
APPROVED BY:
DATE ACCEPTED BY CITY COUNCIL
BASIS CP BEARING SEE SHEET NO. 1
BALTAZAR MEJIA. CITY ENGNEER R.C.E.
Ill
CITY HALL PARKING LOT
IMPROVEMENTS
SCOPE INCLUDES - COLD MILL & OVERLAY 2" ASPHALT, ADA RAMP
IMPROVEMENTS AND MINOR SIDEWALK IMPROVEMENTS
FIRE STATION NO.2 PAVEMENT
IMPROVEMENTS
SCOPE INCLUDES - COLD MILL 3" & OVERLAY WITH 3" ASPHALT, ADA
PARKING STALL WITH ADA RAMP TO BLDG & CONSTRUCT WHEEL STOPS
AND RENEW ALL PAVEMENT STRIPING
FIRE STATION NO.4 PAVEMENT
IMPROVEMENTS
SCOPE INCLUDES - REMOVE EXISTING 7" STRUCTURAL SECTION (3"AC OVER
4"AB), COMPACT SUBBASE AND REPLACE WITH SAME SECTION, RELOCATE
FIRE HYDRANT, REPLACE TRAFFIC DETECTOR LOOPS FOR GATE, RESTRIPE
PARKING LOT & REMOVE/HAULAWAY SITE TRAINING AIDS
� � r
!.Y
Y _. Mie' _ ' •� f Y
y± -4
r
<
y