HomeMy WebLinkAbout04 - CC-4 - Halecrest Neighborhood Parkway Concrete - 6/20/2017CITY COUNCIL AGENDA REPORT MEETING DATE: JUNE 20, 2017 ITEM NUMBER: CC -4 SUBJECT: 2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT - CITY PROJECT NO. 15-03 DATE: JUNE 8, 2017 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by C.J. Concrete Construction Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On May 5, 2015, a construction contract in the amount of $1,118,607.50 was awarded to C.J. Concrete Construction, Inc., 10142 Shoemaker Avenue, Santa Fe Springs, California, 90670, for the 2014-2015 Halecrest Neighborhood Parkway Concrete Repair Project, City Project 15-03. The scope of work consisted of localized reconstruction of sidewalks, curb and gutter, cross gutters, spandrels, curb ramps, driveway approaches, and other incidental work needed to complete the project in accordance with the contract documents. The list of parkway improvement locations is included herein as Attachment 1. l h -' Ill. i.�l.l ....r.-•� '� Before Improvements After Improvements ANALYSIS: The work required by the contract documents was completed on April the City Engineer. The final contract cost amounted to $1,170,409.90 included herein as Attachment 2. A summary of the costs is as follows: Original Contract Cost: $ 1,118,607.50 Change Order No. 1: $ 55,930.38 Final Quantity Adjustments: ($ 4,127.98) Final Contract Cost: $ 1,170,409.90 19, 2017, to the satisfaction of . A report of the final costs is The final contract price reflects a four and six -tenths percent (4.6%) increase to the original contract due to Change Order No. 1, which was issued to utilize the competitive unit prices to reconstruct additional areas, and address final quantity adjustments. As of this date, there are no Stop Notices filed against the monies due to C.J. Concrete Construction Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: This project was funded with Measure "M2" Fairshare funds and Gas Tax revenues appropriated in Fiscal Year 2014 - 2015. IXH_1g0WA1=15 There is no legal review required on this item. CONCLUSION: The 2014-2015 Halecrest Neighborhood Parkway Concrete Repair Project, City Project 15-03, has been completed to the satisfaction of the City Engineer. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. RAJA SETHURAMAN Public Services Director ATTACHMENTS: 9]6�1V1301Is] I 1 - Location Map 2- Cost Summary City Manager Assistant City Manager City Attorney City Clerk Staff File BALTAZAR M EJ IA City Engineer FA North CITY OF COSTA MESA ATTACHMENT #1 N.T.S. Public Services/ Engineering 2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT #15-03 (ZONE #15) LOCATION MAP PARKWAY REPAIR LOCATIONS Page 1 of 3 GISLER AV, SAN DIEGO 405 FREEWAY GISLER PARK #15 200 LONPF- DONDERRY ST. r GARLINGFORD z z z z J Z Y z J J zo J U Z } m KILLYBROOKE > g Y o m BOISE Y z z �� STONEFIELD ST. BISMARKMC CORMACK LN. °2 BELFAST AV. DATE o z AUGUSTA PL. -� HAMRO K C0� z ? z ARNELL qV z PL. ATLANTA � DONEGA PL. Q (7�P J PL. GALWAY Y of m o Z DORSETID 0 cn LN. � w 2 o Z LN. OR Q U w J 1 O � CONWAY U O W o z AV. BAKER ST. 4 i � o � DALE WY. Y z I z LOGAN AV. a w U PAULARINO CHANNEL VILLAGE WY. o m U Y W O m W U W z � w m m m 15 W ADAMS AV. a < (HALECREST) 2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT #15-03 (ZONE #15) LOCATION MAP PARKWAY REPAIR LOCATIONS Page 1 of 3 North CITY OF COSTA MESA ATTACHMENT #1 N.T.S. Public Services/ Engineering rEVENs mUEIENSSTEVENS qAV.w w NIS m o- SUNFLOWER AV, o' z w U Y � < a a W W OWN CENTER 0 O� w •T w � #15130 z � w Q ANTON BLVD. 0 G2 G2 Q: PNNEL (PERFORMING ARTS CENM •'.AIRPORT. •, •, •,.• . '. STORM •. •SAN DIEGO FREEWAY C�jR, J I DARRELL ST. j I I I MODJESKA 00 a o' z w w C) > a > > CAPITAL ST, a a w a a � w z z WILSON sENATE sT. z g o w GOVERNOR ST. 4(0) VICTORIA ST. (WESTSIDE) 2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT #15-03 (ZONE #15) LOCATION MAP - ADDITIONAL AREAS PARKWAY REPAIR LOCATIONS Page 2 of 3 CITY OF COSTA MESA ATTACHMENT #1 North N.T.S. Public Services/ Engineering VICTORIA ST. cn > 0 cn Q U Ln W z w RALCAM PL. O o m O U Q U O � 0 HAMILTON ST. JQ- m Q z ~ O� BAY ST. P� m O C2 m Q (EA IDE NEIGHBORHOOD) s e FORD RD. 'f' T �O l � ��� \J�. �J BERNARD ST. q C��T �0 Qom' ti S� l J 19TH ST. s 2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT #15-03 (ZONE #15) LOCATION MAP - ADDITIONAL AREAS PARKWAY REPAIR LOCATIONS Page 3 of 3 ATTACHMENT #2 CITY OF COSTA MESA CJ CONSTRUCTION INC. 10142 SHOEMAKER AVENUE SANTA FE SPRINGS. CA 90670 PROJECT: 2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT (ZONE #15) CITY PROJECT 15-03 ITEM BID UNIT PREVIOUS QUANTITY TOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACT NO QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE 1 3,450 LF Remove and Reconstruct Curb and Gutter (C-6) (with TAC $44.00 3,465 LF 0 LF 3,465 LF $152,460.00 $0.00 $152,460.00 $151,800.00 Slot Pave) 2 300 LF Remove and Reconstruct Curb and Gutter (C-8) (with TAC $50.00 455 LF 0 LF 455 LF $22,750.00 $0.00 $22,750.00 $15,000.00 Slot Pave 3 2,000 LF Remove and Reconstruct Curb & Thickened Gutter (10' both $50.00 1,369 LF 0 LF 1,369 LF $68,450.00 $0.00 $68,450.00 $100,000.00 side of existing tree 4 5,000 LF Remove and Reconstruct Curb & Gutter (C-6) (with VAC Slot $40.00 2,931 LF 0 LF 2,931 LF $117,240.00 $0.00 $117,240.00 $200,000.00 Pave 5 770 LF Remove and Reconstruct Curb & Gutter (C-8) (with VAC Slot $43.00 621 LF 0 LF 621 LF $26,703.00 $0.00 $26,703.00 $33,110.00 Pave 6 39,400 SF Concrete Sidewalk 4" P.C.C./ 4" C.M.B $6.00 54,572 SF 0 SF 54,572 SF $327,432.00 $0.00 $327,432.00 $236,400.00 7 15,400 SF Concrete Driveway/Driveway Driveway/DrivewayApproach $7.90 23,400 SF 0 SF 23,400 SF $184,860.00 $0.00 $184,860.00 $121,660.00 8 25 TON Miscellaneous AC Pavement $175.00 44 TON 0 TON 44 TON $7,700.00 $0.00 $7,700.00 $4,375.00 9 400 SF Paint Curb Red $20.00 470 SF 0 SF 470 SF $9,400.00 $0.00 $9,400.00 $8,000.00 10 15,550 SF Remove and Reconstruct Concrete Cross Gutter, Spandrel $12.75 11,534 SF 0 SF 11,534 SF $147,058.50 $0.00 $147,058.50 $198,262.50 Local Depression and Concrete Pad 11 1 FA Additional Work Items $50,000.00 0 % 0 % 0 % $0.00 $0.00 $0.00 $50,000.00 11.1 5,586 SF Remove and Reconstruct Sidewalk (Enclave Location) $7,90 5,586 SF 0 SF 5,586 SF $44,129.40 $0.00 $44,129.40 6" PCC / 6" CMB C01 est Bay Street (Newport Boulevard to Harbor Boulevard) $55,930.38 12.1 530 LF Remove and Reconstruct Curb & Gutter (C-6) (with VAC Slot $40.00 LF 530 LF 530 LF $0.00 $21,200.00 $21,200.00 Pave 12.2 4,109 SF Concrete Sidewalk 4" P.C.C./ 4" C.M.B $7.00 SF 4,109 SF 4,109 SF $0.00 $28,763.00 $28,763.00 12.3 1,4321 F Concrete Driveway/Driveway Driveway/DrivewayApproach $8.25 SF 1,432 SF 1,432 SF $0.00 $11,814.00 $11,814.00 12.4 3 TON Miscellaneous AC Pavement $150.00 TON 3 TON 3 TON $0.00 $450.00 $450.00 PROJECT TOTAL: 1 $1,108,182.901 $62,227.001 $1,170,409.90 $1,174,537.88