HomeMy WebLinkAbout04 - CC-4 - Halecrest Neighborhood Parkway Concrete - 6/20/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: JUNE 20, 2017
ITEM NUMBER: CC -4
SUBJECT: 2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT -
CITY PROJECT NO. 15-03
DATE: JUNE 8, 2017
FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335
RECOMMENDATION:
1. Accept the work performed by C.J. Concrete Construction Inc. and authorize the City Clerk to file
the Notice of Completion.
2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful
Performance Bond one (1) year after the filing date; and release the retention monies 35 days after
the Notice of Completion filing date.
BACKGROUND:
On May 5, 2015, a construction contract in the amount of $1,118,607.50 was awarded to C.J.
Concrete Construction, Inc., 10142 Shoemaker Avenue, Santa Fe Springs, California, 90670, for the
2014-2015 Halecrest Neighborhood Parkway Concrete Repair Project, City Project 15-03. The
scope of work consisted of localized reconstruction of sidewalks, curb and gutter, cross gutters,
spandrels, curb ramps, driveway approaches, and other incidental work needed to complete the
project in accordance with the contract documents. The list of parkway improvement locations is
included herein as Attachment 1.
l h
-' Ill. i.�l.l ....r.-•� '�
Before Improvements After Improvements
ANALYSIS:
The work required by the contract documents was completed on April
the City Engineer. The final contract cost amounted to $1,170,409.90
included herein as Attachment 2.
A summary of the costs is as follows:
Original Contract Cost: $ 1,118,607.50
Change Order No. 1: $ 55,930.38
Final Quantity Adjustments: ($ 4,127.98)
Final Contract Cost: $ 1,170,409.90
19, 2017, to the satisfaction of
. A report of the final costs is
The final contract price reflects a four and six -tenths percent (4.6%) increase to the original contract
due to Change Order No. 1, which was issued to utilize the competitive unit prices to reconstruct
additional areas, and address final quantity adjustments.
As of this date, there are no Stop Notices filed against the monies due to C.J. Concrete Construction
Inc.
ALTERNATIVES CONSIDERED:
There were no alternatives considered for this item.
FISCAL REVIEW:
This project was funded with Measure "M2" Fairshare funds and Gas Tax revenues appropriated in
Fiscal Year 2014 - 2015.
IXH_1g0WA1=15
There is no legal review required on this item.
CONCLUSION:
The 2014-2015 Halecrest Neighborhood Parkway Concrete Repair Project, City Project 15-03, has
been completed to the satisfaction of the City Engineer. It is recommended that the City Council
authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after
the Notice of Completion filing date; and release the bonds accordingly.
RAJA SETHURAMAN
Public Services Director
ATTACHMENTS:
9]6�1V1301Is] I
1 - Location Map
2- Cost Summary
City Manager
Assistant City Manager
City Attorney
City Clerk
Staff
File
BALTAZAR M EJ IA
City Engineer
FA
North
CITY OF COSTA MESA ATTACHMENT #1
N.T.S. Public Services/ Engineering
2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE
REPAIR PROJECT #15-03 (ZONE #15) LOCATION MAP
PARKWAY REPAIR LOCATIONS
Page 1 of 3
GISLER AV,
SAN DIEGO 405 FREEWAY
GISLER PARK
#15 200
LONPF-
DONDERRY ST.
r
GARLINGFORD
z
z
z
z J
Z
Y z J
J
zo
J
U Z
}
m
KILLYBROOKE
> g Y
o
m
BOISE
Y
z
z
��
STONEFIELD
ST.
BISMARKMC
CORMACK
LN.
°2
BELFAST AV.
DATE
o
z
AUGUSTA
PL.
-�
HAMRO K
C0�
z ?
z
ARNELL
qV
z
PL.
ATLANTA
�
DONEGA
PL.
Q (7�P J PL.
GALWAY Y of
m
o Z
DORSETID
0
cn LN.
�
w
2 o
Z
LN.
OR
Q
U
w
J 1
O
�
CONWAY
U
O
W
o
z
AV.
BAKER ST.
4
i
�
o
�
DALE WY.
Y
z
I
z
LOGAN AV.
a
w
U
PAULARINO
CHANNEL
VILLAGE WY.
o
m
U
Y
W
O
m
W
U
W
z
�
w
m
m
m
15
W
ADAMS AV.
a
<
(HALECREST)
2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE
REPAIR PROJECT #15-03 (ZONE #15) LOCATION MAP
PARKWAY REPAIR LOCATIONS
Page 1 of 3
North
CITY OF COSTA MESA ATTACHMENT #1
N.T.S. Public Services/ Engineering
rEVENs
mUEIENSSTEVENS qAV.w w
NIS
m
o-
SUNFLOWER AV,
o'
z
w
U
Y �
<
a a
W W
OWN CENTER 0 O�
w
•T w � #15130
z �
w
Q
ANTON BLVD.
0
G2
G2 Q:
PNNEL
(PERFORMING ARTS CENM
•'.AIRPORT. •, •, •,.• .
'. STORM •.
•SAN DIEGO FREEWAY
C�jR, J I DARRELL ST. j I I I
MODJESKA 00 a
o'
z w
w
C) >
a
> > CAPITAL ST, a
a w a a
� w z
z WILSON
sENATE sT. z g
o w
GOVERNOR ST. 4(0)
VICTORIA ST. (WESTSIDE)
2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE
REPAIR PROJECT #15-03 (ZONE #15) LOCATION MAP - ADDITIONAL AREAS
PARKWAY REPAIR LOCATIONS
Page 2 of 3
CITY OF COSTA MESA ATTACHMENT #1
North
N.T.S. Public Services/ Engineering
VICTORIA ST.
cn > 0
cn Q U
Ln W
z w RALCAM PL.
O o
m
O U
Q U O
� 0
HAMILTON ST.
JQ-
m
Q
z
~ O�
BAY ST.
P�
m
O
C2
m
Q
(EA IDE
NEIGHBORHOOD)
s e
FORD RD. 'f' T �O
l
� ��� \J�.
�J
BERNARD ST.
q
C��T �0
Qom' ti
S� l J
19TH ST.
s
2014-2015 HALECREST NEIGHBORHOOD
PARKWAY CONCRETE REPAIR PROJECT #15-03
(ZONE #15) LOCATION MAP - ADDITIONAL AREAS
PARKWAY REPAIR LOCATIONS
Page 3 of 3
ATTACHMENT #2
CITY OF COSTA MESA
CJ CONSTRUCTION INC.
10142 SHOEMAKER AVENUE SANTA FE SPRINGS. CA 90670
PROJECT: 2014-2015 HALECREST NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT (ZONE #15)
CITY PROJECT 15-03
ITEM
BID
UNIT
PREVIOUS
QUANTITY
TOTAL QUANTITY
PREVIOUS
AMOUNT
TOTAL
CONTRACT
NO
QUANTITY
DESCRIPTION
PRICE
QUANTITY
THIS ESTIMATE
TO DATE
AMOUNT
THIS EST
TO DATE
PRICE
1
3,450
LF
Remove and Reconstruct Curb and Gutter (C-6) (with TAC
$44.00
3,465
LF
0
LF
3,465
LF
$152,460.00
$0.00
$152,460.00
$151,800.00
Slot Pave)
2
300
LF
Remove and Reconstruct Curb and Gutter (C-8) (with TAC
$50.00
455
LF
0
LF
455
LF
$22,750.00
$0.00
$22,750.00
$15,000.00
Slot Pave
3
2,000
LF
Remove and Reconstruct Curb & Thickened Gutter (10' both
$50.00
1,369
LF
0
LF
1,369
LF
$68,450.00
$0.00
$68,450.00
$100,000.00
side of existing tree
4
5,000
LF
Remove and Reconstruct Curb & Gutter (C-6) (with VAC Slot
$40.00
2,931
LF
0
LF
2,931
LF
$117,240.00
$0.00
$117,240.00
$200,000.00
Pave
5
770
LF
Remove and Reconstruct Curb & Gutter (C-8) (with VAC Slot
$43.00
621
LF
0
LF
621
LF
$26,703.00
$0.00
$26,703.00
$33,110.00
Pave
6
39,400
SF
Concrete Sidewalk 4" P.C.C./ 4" C.M.B
$6.00
54,572
SF
0
SF
54,572
SF
$327,432.00
$0.00
$327,432.00
$236,400.00
7
15,400
SF
Concrete Driveway/Driveway Driveway/DrivewayApproach
$7.90
23,400
SF
0
SF
23,400
SF
$184,860.00
$0.00
$184,860.00
$121,660.00
8
25
TON
Miscellaneous AC Pavement
$175.00
44
TON
0
TON
44
TON
$7,700.00
$0.00
$7,700.00
$4,375.00
9
400
SF
Paint Curb Red
$20.00
470
SF
0
SF
470
SF
$9,400.00
$0.00
$9,400.00
$8,000.00
10
15,550
SF
Remove and Reconstruct Concrete Cross Gutter, Spandrel
$12.75
11,534
SF
0
SF
11,534
SF
$147,058.50
$0.00
$147,058.50
$198,262.50
Local Depression and Concrete Pad
11
1
FA
Additional Work Items
$50,000.00
0
%
0
%
0
%
$0.00
$0.00
$0.00
$50,000.00
11.1
5,586
SF
Remove and Reconstruct Sidewalk (Enclave Location)
$7,90
5,586
SF
0
SF
5,586
SF
$44,129.40
$0.00
$44,129.40
6" PCC / 6" CMB
C01
est Bay Street (Newport Boulevard to Harbor Boulevard)
$55,930.38
12.1
530
LF
Remove and Reconstruct Curb & Gutter (C-6) (with VAC Slot
$40.00
LF
530
LF
530
LF
$0.00
$21,200.00
$21,200.00
Pave
12.2
4,109
SF
Concrete Sidewalk 4" P.C.C./ 4" C.M.B
$7.00
SF
4,109
SF
4,109
SF
$0.00
$28,763.00
$28,763.00
12.3
1,4321
F
Concrete Driveway/Driveway Driveway/DrivewayApproach
$8.25
SF
1,432
SF
1,432
SF
$0.00
$11,814.00
$11,814.00
12.4
3
TON
Miscellaneous AC Pavement
$150.00
TON
3
TON
3
TON
$0.00
$450.00
$450.00
PROJECT TOTAL: 1
$1,108,182.901
$62,227.001
$1,170,409.90
$1,174,537.88