HomeMy WebLinkAbout05 - CC-5 - Eastside Neighborhood Parkway Concrete - 6/20/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: JUNE 20, 2017
ITEM NUMBER: CC -5
SUBJECT: 2014-2015 EASTSIDE NEIGHBORHOOD PARKWAY CONCRETE REPAIR PROJECT
(ZONE #3 AND ZONE #12) - CITY PROJECT NO. 15-02
DATE: JUNE 8, 2017
FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335
RECOMMENDATION:
1. Accept the work performed by C.J. Concrete Construction Inc. and authorize the City Clerk to file
the Notice of Completion.
2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful
Performance Bond one (1) year after the filing date; and release the retention monies 35 days after
the Notice of Completion filing date.
BACKGROUND:
On May 5, 2015, a construction contract in the amount of $737,200.00 was awarded to C.J.
Concrete Construction, Inc., 10142 Shoemaker Avenue, Santa Fe Springs, California, 90670, for the
2014-2015 Eastside Neighborhood Parkway Concrete Repair Project, City Project 15-02. The scope
of work consisted of localized reconstruction of sidewalks, curb and gutter, cross gutters, spandrels,
driveway approaches, curb ramps, and other incidental work needed to complete the project in
accordance with the contract documents. The list of parkway improvement locations is included as
Attachment 1.
Before Improvements
After Improvements
1
ANALYSIS:
The work required by the contract documents was completed on April 28, 2017, to the satisfaction of
the City Engineer. The final contract cost, including change orders, amounted to $781,331.00. A report
of the final costs is included herein as Attachment 2.
A summary of the costs is as follows:
Original Contract Cost: $ 737,200.00
Change Order No. 1: $ 50,000.00
Final Quantity Adjustments: ($ 5,869.00)
Final Contract Cost: $ 781,331.00
The final contract price reflects a six percent (6%) increase to the original contract due to Change
Order No. 1, which was issued to utilize the competitive unit prices to reconstruct additional areas, and
address final quantity adjustments.
As of this date, there are no Stop Notices filed against the monies due to C.J. Concrete Construction
Inc.
ALTERNATIVES CONSIDERED:
There were no alternatives considered for this item.
FISCAL REVIEW:
This project was funded with Measure "M2" Fairshare funds and Gas Tax revenues appropriated in
Fiscal Year 2014 - 2015.
LEGAL REVIEW:
There is no legal review required on this item.
CONCLUSION:
The 2014-2015 Eastside Neighborhood Parkway Concrete Repair Project, City Project 15-02 has been
completed to the satisfaction of the City Engineer. It is recommended that the City Council authorize
staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice
of Completion filing date; and release the bonds accordingly.
RAJA SETHURAMAN
Public Services Director
ATTACHMENTS:
DISTRIBUTION
1 - Location Map
2- Cost Summary
City Manager
Assistant City Manager
City Attorney
City Clerk
Staff
File
BALTAZAR M EJ IA
City Engineer
FA
CITY OF COSTA MESA ATTACHMENT #1
t
N.T.S. Public Services/ Engineering
w z
SANTA ISABEL AV. m
} z
GEORGEANNE PEACHTRE
PL. w z o n
V) o
mo LN. o
z Q z
WILSON ST. U CHER T EE aJ
0
w
LN. m NEWPO GLEN
Q CYNTHIA a DAWNVIEW LN. CT yFgT
a
CT. a J C� o
w
>
Qz z o o -NT
add
w
o
23RD ST.
o
m
a o z VIA MART
z
8
m
Q
ALBERT PL w J o
mo
VISTA BAYA VISTA BA
3:
VISTA BAYA
CECIL PL.
z
COLLEEN PL cn
SIERRA
CATHERINE UEANETTE
VIRGINIA PL. PL. PL' MEADOW
U
w
z z
O
22ND ST.
j
SA
CAMELLIA LN. aa
UD,
TULIP LN. za
ROSE LN. a Q o
QV'
,OQO�1y�1
o MERRILL PL COTTAGE
o
>
m
j PL 1
a a z a Q�/ ��
U
m
�
a w LILAC LN. C>���Q`�
PAUL NE PL.
z
z w O
��
H0
21ST ST.
a
O,}
SHERWOOD ST.
m
BUOY ST.
SHERWOOD
2014-2015 EASTSIDE NEIGHBORHOOD
PARKWAY CONCRETE REPAIR PROJECT #15-02
(ZONE #3, #12) LOCATION MAP
PARKWAY REPAIR LOCATIONS
Page 1 of 3
North
CITY OF COSTA MESA ATTACHMENT #1
N.T.S. Public Services/ Engineering
ORM •.'.::::: '. •. •.::: •.
• SAN DIEGO FREEWAY
SAN DIEGO 405 FREEWAY
OLYMPIC AV. TRAVERSE DR.
TANANA PL {
MACKENZIE PL HUDSON AV.
Qz ^4' STURGEON DR.
SNIFFER PARK 0
#15220 Z
PEACE PL a ALLEGHENY AV.
PIERPONT DR.
X02 � J o
9L LIAP;'� PL PLATTE DR. z MA 01 MANISTEE DR.
F2 w a
2FS - PROSPEC CIR.
_(BMTRAND HAV
o z
PL o z
w o CIR.
3
FAYETTE
> m
PAL) LARINO •V• CIR.
z
d JENNIF R LN. p
w
HELENA CIR. F
� RANDOLPH A'a'.
ESA NORTH) w R l;TA.
#2 (BRISTOL WESn
m a
BAKER ST. BAKER SL z
ADAMS AV.
1
FLAMINGO DR
1 �
GOLDENEYE PL �y
0
c
a
MANDARIN DR.
�P
JJ qL �e ,c, J0 2iF.
ATO
_ ..P�oeR4�eJ J T
S �v
FLS �P ,oG q�ti yN p�P
P �
4P ��tr
STSIDE
2014-2015 EASTSIDE NEIGHBORHOOD
PARKWAY CONCRETE REPAIR PROJECT #15-02
(ZONE #3, #12) LOCATION MAP - ADDITIONAL AREAS
PARKWAY REPAIR LOCATIONS
Page 2 of 3
KORNAT DR.
Ady
LEMNOS IN
BALTRA PL 0
N
2
V
' • 2 :
BALEARIC
.: W : 0
6ALFAf
#
N.
w
CAPELLA CT
o
v
Pf
ADAMS AV.
1
FLAMINGO DR
1 �
GOLDENEYE PL �y
0
c
a
MANDARIN DR.
�P
JJ qL �e ,c, J0 2iF.
ATO
_ ..P�oeR4�eJ J T
S �v
FLS �P ,oG q�ti yN p�P
P �
4P ��tr
STSIDE
2014-2015 EASTSIDE NEIGHBORHOOD
PARKWAY CONCRETE REPAIR PROJECT #15-02
(ZONE #3, #12) LOCATION MAP - ADDITIONAL AREAS
PARKWAY REPAIR LOCATIONS
Page 2 of 3
CITY OF COSTA MESA ATTACHMENT #1
North
Public Services/ Engineering
N.T.S.
VICTORIA ST.
cn > 0
cn Q U
Ln W
z w
O RALCAM PL.
o
m
O U
Q U O
� 0
HAMILTON ST.
JQ-
m
Q
z
~ O�
�Q
E177
P�
m
0
m
m
Q
F (EASTSIDE
NEIGHBORHOOD)
s e
FORD RD. u' � �O
z
l
� ��� J�.
�J
BERNARD ST.
4
C��T �0
Qom' ti
S� l J
19TH ST.
s
2014-2015 EASTSIDE NEIGHBORHOOD
PARKWAY CONCRETE REPAIR PROJECT #15-02
(ZONE #3, #12) LOCATION MAP - ADDITIONAL AREAS
PARKWAY REPAIR LOCATIONS
Pogo 3 of 3
ATTACHMENT #2
CITY OF COSTA MESA
CJ CONSTRUCTION INC.
10142 SHOEMAKER AVENUE SANTA FE SPRINGS, CA 90670
PROJECT: 2014-2015 EASTSIDE NEIGHBORHOOD PARKWAY CONCRETE REPAIR (ZONES #3, #12)
CITY PROJECT 15-02
ITEM
BID
UNIT
PREVIOUS
QUANTITY
TOTAL QUANTITY
PREVIOUS
AMOUNT
TOTAL
CONTRACT
NO
QUANTITY
DESCRIPTION
PRICE
QUANTITY
THIS ESTIMATE
TO DATE
AMOUNT
THIS EST
TO DATE
PRICE
1
1,600
LF
Remove and Reconstruct Curb and Gutter (C-6) (with TAC
$47.00
1,892
LF
0
LF
1,892
LF
$88,924.00
$0.00
$88,924.00
$75,200.00
Slot Pave)
2
320
LF
Remove and Reconstruct Curb & Thickened Gutter (10' both
$50.00
1,135
LF
0
LF
1,135
LF
$56,750.00
$0.00
$56,750.00
$16,000.00
side of existing tree
3
4,350
LF
Remove and Reconstruct Curb & Gutter (C-6) (with VAC Slot
$41.00
4,497
LF
0
LF
4,497
LF
$184,377.00
$0.00
$184,377.00
$178,350.00
Pave
4
500
LF
Remove and Reconstruct Curb & Gutter (C-8) (with VAC Slot
$42.00
508
LF
0
LF
508
LF
$21,336.00
$0.00
$21,336.00
$21,000.00
Pave
5
24,600
SF
Concrete Sidewalk 4" P.C.C./ 4" C.M.B
$6.00
33,495
SF
0
SF
33,495
SF
$200,967.00
$0.00
$200,967.00
$147,600.00
6
7,850
SF
Concrete Driveway/Driveway Driveway/DrivewayApproach
$8.00
9,684
SF
0
SF
9,684
SF
$77,472.00
$0.00
$77,472.00
$62,800.00
7
50
TON Miscellaneous AC Pavement
$175.00
34
TON
0
TON
34
TON
$5,950.00
$0.00
$5,950.00
$8,750.00
8
220
LF
Paint Curb (Red)
$15.00
646
LF
0
LF
646
LF
$9,690.00
$0.00
$9,690.00
$3,300.00
9
13,400
SF
Remove and Reconstruct Concrete Cross Gutter, Spandrel
$13.00
7,054
SF
0
SF
7,054
SF
$91,702.00
$0.00
$91,702.00
$174,200.00
I Local Depression and Concrete Pad
10
1
FA
jAdditional Work Items
$50,000.00
0
FA
0
FA
0
FA
$0.00
$0.00
$0.00
$50,000.00
C01
West Bay Street (Newport Boulevard to Harbor Boulevard)
$50,000.00
11.1
131
LF
Remove and Reconstruct Curb & Gutter (C-8) (6" CMB with a
$55.00
LF
131
LF
131
LF
$0.00
$7,205.00
$7,205.00
2' AC Slot Pave
11.2
1,535
SF
Concrete Sidewalk 4" P.C.C./4" C.M.B
$7.00
SF
1,535
SF
1,535
SF
$0.00
$10,745.00
$10,745.00
11.3
344
SF
Concrete Driveway/Driveway Driveway/DrivewayApproach
$8.25
SF
344
SF
344
SF
$0.00
$2,838.00
$2,838.00
11.4
2
EA
Truncated Domes
$325.00
EA
2
EA
2
EA
$0.00
$650.00
$650.00
11.5
184
LF
Paint Curb
$15.00
LF
217
LF
217
LF
$0.00
$3,255.00
$3,255.00
11.6
1,770
SF
4" Stamped Concrete (Adams Avenue Median)
$11.00
SF
1,770
SF
1,770
SF
$0.00
$19,470.00
$19,470.00
PROJECT TOTAL:
$737,168.001
$44,163.00
$781,331.00
$787,200.00