HomeMy WebLinkAbout06 - CC-6 - West Bay St Improvements- City Project - 6/20/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: JUNE 20, 2017
ITEM NUMBER: CC -6
SUBJECT: WEST BAY STREET IMPROVEMENTS - CITY PROJECT NO. 17-06
DATE: JUNE 8, 2017
FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335
RECOMMENDATION:
1. Adopt plans, specifications, and working details for the West Bay Street Improvements, City
Project No. 17-06, funded by the Community Development Block Grant (CDBG) program.
2. Award a construction contract to Copp Contracting, Inc., 6751 Stanton Ave. Buena Park, CA
90621, in the amount of $179,149.00.
3. Authorize the Mayor and the City Clerk to execute the Public Works Agreement.
BACKGROUND:
The West Bay Street Improvements consists of the removal and reconstruction of damaged
pavement sections; milling and overlaying with new asphalt; utility adjustments; implementation of
traffic control; the replacement of lane markings, stop bars, legends, traffic loops and raised
pavement markers (RPMs) as well as other incidental work needed to complete the project in
accordance with the contract documents.
The limits of work include improvements along West Bay Street from Newport Boulevard to
Harbor Boulevard. A map of the project limits is included as Attachment 1. Copies of the project
plans, specifications and reports are available for review in the Public Services Department and
on the City's webpage at costamesaca.gov.
ANALYSIS:
The City Clerk received and opened seven (7) bids for this project on May 16, 2017. Copp
Contracting Inc. was the apparent low bidder with a bid proposal of $179,149.00. The
Engineer's estimate was $290,900.00; and the average of the seven (7) bids received
amounted to $208,628.17. An analysis of the bids indicates that the apparent low bidder
submitted a proposal that is approximately 61% lower than the Engineer's estimate. The
variance between the low bidder and the Engineer's estimate may be attributed to the highly
competitive conditions prevalent for this type of work at this time. The Bid Abstract is included as
Attachment 2.
The license and references of Copp Contracting Inc. were checked and staff has found them to
be in good standing. Copp Contracting Inc. has successfully completed other City projects,
including the 2013-2014 (CDBG) Wallace Avenue Improvements from 1911 Street to Hamilton
Street, City Project No. 14-03.
ALTERNATIVES CONSIDERED:
The alternative to this Council action would be to reject all the bids. If all the bids are rejected, the
City would need to re -advertise or cancel the project. Staff believes that re -advertising will not
result in lower bids.
FISCAL REVIEW:
Funding for this project has been budgeted from the Community Development Block Grant
(CDBG) funds appropriated in Fiscal Year 2015-2016.
LEGAL REVIEW:
Copp Contracting Inc. has furnished the necessary bonds and insurance, which were approved as
to form by the City Attorney. After the award and subsequent execution of the contract, a "Notice
to Proceed" will be issued.
CONCLUSION:
The City has received bids for the West Bay Street Improvements, City Project No. 17-06. Staff
has evaluated all of the bids and recommends that the City Council adopt the plans,
specifications, and working details for said project; award a contract to the apparent low bidder,
Copp Contracting Inc., in the amount of $179,149.00; and authorize the Mayor and the City Clerk
to execute the Public Works Agreement.
RAJA SETHURAMAN
Public Services Director
ATTACHMENTS:
DISTRIBUTION
1 Location Map
2 Bid Abstract
City Manager
Assistant City Manager
City Attorney
City Clerk
Staff
File
BALTAZAR M EJ IA
City Engineer
North CITY OF COSTA MESA
N.T.S. Public Services/Engineering
ATTACHMENT 1
0
W
J
VICTORIA ST.
:LL PL.
ST.
YORKSHIRE
F.
wl
J
a
�ERNARD sCr-
J J
Q ¢
ALLEY #18
N ¢
N W
Z (7
O
w
Q O
d U
HAMILTON ST.
I FORD RD.
RALCAM PL.
19TH ST.
I iii--
(CDBG) WEST BAY STREET IMPROVEMENTS PROJECT
PROJECT #17-06
_ PROPOSED IMPROVEMENTS
ATTACHMENT 2
CITY OF COSTA MESA
DEPARTMENT OF PUBLIC SERVICES
CDBG WEST BAY STREET IMPROVEMENTS, CITY PROJECT NO. 17-06
BID OPENING DATE: MAY 16, 2017
COPP CONTRACTING, ALL AMERICAN PALP. INC. DBA EXCEL
RJ NOBLE COMPANY
INC. ASPHALT PAVING COMPANY
BASE BID CITY ESTIMATE BUENA PARK ORANGE CORONA LONG BEACH
BID
UNIT
UNIT UNIT
UNIT
UNIT
NO.
QUANTITY
DESCRIPTION
PRICE TOTAL
PRICE TOTAL PRICE
TOTAL
PRICE
TOTAL PRICE
TOTAL
1
1
LS
Mobilization
$ 10,000.00 $10,000.00
$11,530.00
$11,530.00 $19,000.00
$19,000.00
$14,875.00
$14,875.00 $17,000.00
$17,000.00
2
30,000
SF
Cold Mill 2" Max Depth)
$ 0.60 $18,000.00
$0.32
$9,600.00 $0.40
$12,000.00
$0.40
$12,000.00 $0.30
$9,000.00
3
100
TON
Remove & Reconstruct Asphalt Concrete (6" Max
$ 225.00 $22,500.00
$167.00
$16,700.00 $195.00
$19,500.00
$200.00
$20,000.00 $210.00
$21,000.00
Depth)
$9,600.00
$70.00
$16,800.00
4
150
TON
Type "D" Asphalt Concrete Leveling (Paving
$ 130.00 $19,500.00
$107.00
$16,050.00 $64.00
$10,500.00 $112.00
Machine)
$78,420.00 $64.00
$76,800.00
$65.00
$78,000.00 $65.00
$78,000.00
5
1,200
TON
Type "B" Asphalt Concrete Overlay (Paving
$ 135.00 $162,000.00
$65.35
Machine
$6,090.00 $500.00
$3,850.00 $500.00
$50.00 $13.00
$7,000.00
$5,000.00
$65.00
$490.00
$205.00
$10.00
$6,860.00 $584.00
$2,050.00 $500.00
$50.00 $6.00
$8,176.00
$5,000.00
$30.00
6
14
EA
Adjust Manhole to Grade
$ 550.00 $7,700.00
$435.00
7
10
EA
Adjust Water Valve to Grade
$ 500.00 $5,000.00
$385.00
8
5
EA
Install Reflective Blue Raised Pavement Markers
$ 40.00 $200.00
$10.00
(RBPM)
$650.00
$2,800.00
$5,700.00
$310.00
$335.00
$8,125.00
$620.00 $340.00
$2,680.00 $370.00
$8,125.00 $11,000.00
$680.00
$2,960.00
$11,000.00
9
2
EA
Install (Type E Traffic Signal Loops
$ 450.00 $900.00
$310.00
$620.00 $325.00
$2,800.00 $350.00
$5,600.00 $5,700.00
10
8
EA
Install (Type D Traffic Signal Loops
$ 450.00 $3,600.00
$350.00
11
1
LS
Install Lane Markings, Striping, Pavement
$ 10,000.00 $10,000.00
$5,600.00
Legends, and Raised Pavement Markers
$2,750.00 $275.00
$2,750.00
$260.00
$2,600.00 $280.00
$2,800.00
12
10
EA
Adjust and Reset Existing Survey Monuments and
$ 450.00 $4,500.00
$275.00
Ties
$5,089.00 $5,000.00
$20,000.00 $20,000.00
$5,000.00
$20,000.00
$9,065.00
$20,000.00
$9,065.00 $16,000.00
$20,000.00 $20,000.00
$16,000.00
$20,000.00
13
1
LS
Traffic Control
$ 7,000.00 $7,000.00
$5,089.00
14
1
FA
Additional Work Items
$ 20,000.00 $20,000.00
$20,000.00
BASE BID TOTAL (PAGE 1): $290,900.00
$179,149.00 $185,865.00
$187,425.00 $208,446.00
Page 1 of 2
ATTACHMENT 2
CITY OF COSTA MESA
DEPARTMENT OF PUBLIC SERVICES
CDBG WEST BAY STREET IMPROVEMENTS, CITY PROJECT NO. 17-06
BID OPENING DATE: MAY 16, 2017
MK CONSTRUCTION HAITBRINK ASPHALT HARDY & HARPER, INC. AVERAGE
PAVING, INC.
BASE BID CITY ESTIMATE ORANGE CORONA SANTA ANA
BID
UNIT
UNIT
UNIT
UNIT
UNIT
NO.
QUANTITY
DESCRIPTION PRICE TOTAL
PRICE
TOTAL PRICE
TOTAL
PRICE
TOTAL PRICE
TOTAL
1
1
LS
Mobilization $ 10,000.00 $10,000.00
$20,000.00
$20,000.00 $14,000.00
$14,000.00
$11,000.00
$11,000.00 $15,343.57
$15,067.50
2
30,000
SF
Cold Mill 2" Max Depth) $ 0.60 $18,000.00
$0.36
$10,800.00 $0.36
$10,800.00
$0.39
$11,700.00 $0.36
$11,150.00
3
100
TON
Remove & Reconstruct Asphalt Concrete (6" Max $ 225.00 $22,500.00
$125.00
$12,500.00 $210.00
$21,000.00
$240.00
$24,000.00 $192.43
$18,950.00
Depth)
$22,500.00
$160.00
$24,000.00 $109.29
$16,325.00
4
150
TON
Type "D" Asphalt Concrete Leveling (Paving $ 130.00 $19,500.00
$102.00
$15,300.00 $150.00
Machine)
$73.00
$87,600.00 $70.84
$85,008.00
$76.00
$91,200.00 $68.46
$82,838.00
5
1,200
TON
Type "B" Asphalt Concrete Overlay (Paving $ 135.00 $162,000.00
Machine
$360.00
$250.00
$6.00
$5,040.00 $1,400.00
$2,500.00 $750.00
$30.00 $6.00
$19,600.00
$7,500.00
$30.00
$500.00
$500.00
$30.00
$7,000.00 $609.86
$5,000.00 $441.43
$8,598.33
$4,316.67
$62.50
6
14
EA
Adjust Manhole to Grade $ 550.00 $7,700.00
7
10
EA
Adjust Water Valve to Grade $ 500.00 $5,000.00
8
5
EA
Install Reflective Blue Raised Pavement Markers
$ 40.00 $200.00
$150.00 $11.57
(RBPM)
$330.00
$385.00
$660.00 $345.00
$3,080.00 $405.00
$7,800.00 $8,200.00
_ $690.00
$3,240.00
$8,200.00
$500.00
$400.00
$13,750.00
$1,000.00 $351.43
$3,200.00 $370.71
$13,750.00 $8,596.43
$706.67
$2,966.67
$8,195.83
9
2
EA
Install (Type E Traffic Signal Loops $ 450.00 $900.00
10
8
EA
Install (Type D Traffic Signal Loops $ 450.00 $3,600.00
11
1
LS
Install Lane Markings, Striping, Pavement $ 10,000.00 $10,000.00
$7,800.00
Legends, and Raised Pavement Markers
$3,000.00 $550.00
$5,500.00
$400.00
$4,000.00 $334.29
$3,433.33
12
10
EA
Adjust and Reset Existing Survey Monuments and $ 450.00 $4,500.00
$300.00
Ties
$25,952.00 $12,000.001
$20,000.00 $20,000.00
$12,000.00
$20,000.00
$39,000.00
$20,000.00
$39,000.00 $16,015.14
$20,000.00 $20,000.00
$16,017.67
$20,000.00
13
1
LS
Traffic Control $ 7,000.00 $7,000.00
$25,952.00
$20,000.00
14
1
FA
Additional Work Items $ 20,000.00 $20,000.00
BASE BID TOTAL (PAGE 2): $290,900.00
$214,262.00 $230,068.00
$255,000.001 $208,628.17
Page 2 of 2