HomeMy WebLinkAbout09 - CC-9 - Alleys Rehabilitation Project-City Proj - 7/18/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: JULY 18, 2017
ITEM NUMBER: CC -9
SUBJECT: ALLEYS REHABILITATION PROJECT - CITY PROJECT NO. 16-03
DATE: JULY 6, 2017
FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335
RECOMMENDATION:
1. Adopt plans, specifications, and working details for the Mace Avenue Alley (Alley No. 36), 19'
Street Alley (Alley No. 70), Flower Street Alleys (Alley No. 77, Alley No. 78, and Alley No. 79),
and Broadway Street Alleys (Alley No. 85, Alley No. 86, and Alley No. 88) Improvement
Project - City Project No. 16-03.
2. Award a construction contract to Black Rock Construction Company, 615 N. Berry Street, Unit
G, Brea, CA 92821, in the amount of $899,996.00.
3. Authorize the Mayor and the City Clerk to execute the Public Works Agreement.
4. Approve Contract Change Order No.1 in the amount of $305,000.00, and authorize the City
Manager to execute the Change Order.
BACKGROUND:
The City owns and maintains 129 alleys. On November 20, 2007, a Citywide Alley Improvement
Report was presented to the City Council. At that meeting, the Council approved a City Alley
Improvement Priority List to address the City's alley system beginning with those alleys most in
need of improvements. Over the past ten years, 76 alleys were reconstructed. This project
includes rehabilitation of the following eight additional alleys:
1. Mace Avenue Alley (Alley No. 36) located between Mace Avenue and Ginger Avenue,
from Caraway Drive to Wintergreen Place.
2. 19th Street Alley (Alley No. 70) located between 19th Street and Flower Street, from
Orange Avenue to Westminster Avenue.
3. Flower Street Alley (Alley No. 77) located between Flower Street and Broadway, from
Orange Avenue to Fullerton Avenue.
4. Flower Street Alley (Alley No. 78) located between Flower Street and Broadway, from
Orange Avenue to Westminster Avenue.
5. Flower Street Alley (Alley No. 79) located between Flower Street and Broadway, from
Westminster Avenue to Santa Ana Avenue.
6. Broadway Alley (Alley No. 85) located between Broadway and Magnolia Street, from
Orange Avenue to Westminster Avenue.
7. Broadway Alley (Alley No. 86) located between Broadway and Magnolia Street, from
Westminster Avenue to Santa Ana Avenue.
8. Broadway Alley (Alley No. 88) located between Broadway and Magnolia Street, from
Raymond Avenue to Tustin Avenue.
A Location Map has been included as Attachment 1.
ANALYSIS:
The alley rehabilitation process for the Mace Avenue Alley, 19th Street Alley, Flower Street
Alleys, and Broadway Alleys consists of removal of deteriorated asphalt concrete alley sections
and construction of new Portland Cement Concrete (PCC) pavement sections, adjustment of
water and sewer utilities to grade, and other incidental work needed to transition between new
and existing improvements.
The City Clerk received and opened five (5) bids for this project on May 23, 2017. Black Rock
Construction was the apparent low bidder with a bid proposal of $899,996.00. The Engineer's
estimate was $1,082,530.00; and the average of the five (5) bids received amounted to
$1,116,242.20. The Bid Abstract is included as Attachment 2.
Analysis of the bids indicates the apparent low bidder submitted a bid proposal that is 17%
lower than the Engineer's estimate. The variance between the low bidder and the Engineer's
estimate may be attributed to the competitive conditions prevalent in the roadway construction
industry at this time. Change Order No. 1 in the amount of $305,000.00 is being requested to
utilize the competitive bid unit prices to add Sterling Avenue Alleys (Alley No. 12 and Alley No. 14)
to this contract. Change Order No. 1 is included as Attachment 3.
The license and references of Black Rock Construction Company were checked and staff has
found them to be in good standing. Black Rock Construction Company has successfully
completed other City projects, including the rehabilitation of several alleys.
ALTERNATIVES CONSIDERED:
The alternative to this Council action would be to reject all the bids. If all the bids are rejected, the
City would need to readvertise the project. Staff believes that readvertising the project will not
result in lower bids.
FISCAL REVIEW:
This project is funded from appropriated Gas Tax and Capital Improvement funds from prior
fiscal year allocations and Fiscal Year 2017-2018.
LEGAL REVIEW:
Black Rock Construction has furnished the necessary bonds and insurance, which were approved
as to form by the City Attorney. After the award and subsequent execution of the contract, a
"Notice to Proceed" will be issued.
Ir
CONCLUSION:
The advertisement and bid opening for the Mace Avenue Alley (Alley No. 36), 19th Street Alley
(Alley No. 70), Flower Street Alleys (Nos. 77, 78, 79), and Broadway Street Alleys (Nos. 85, 86,
88) Rehabilitation Project - City Project No. 16-03, has been completed. It is recommended that
the City Council adopt the plans, specifications, and working details for said project; award the
contract to the apparent low bidder, Black Rock Construction Company, in the amount of
$899,996.00; authorize the Mayor and the City Clerk to execute the Public Works Agreement;
approve Contract Change Order No.1 in the amount of $305,000.00 towards construction of two
additional alleys, and authorize the City Manager to execute the Change Order.
RAJA SETHURAMAN
Public Services Director
BALTAZAR M EJ IA
City Engineer
ATTACHMENTS: 1 - Location Map
2- Bid Abstract
3- Contract Chanae Order No. 1
DISTRIBUTION: City Manager
Assistant City Manager
City Attorney
City Clerk
Staff
File
3
ATTACHMENTI
rCITY OF COSTA MESA
N.T.S. Public Services/ Engineering
20TH ST.
J
¢
J a ALLEY 106
a
v
ALVA LN.
>
a o �� ESTHER ST.
a
ESTHER ST. ESTHER ST.
> vwi z
J 0 J ALLEY #107 w o
¢ Q J
ESTHER ST. ESTHER ST.
ALLEY 109 >
W
ST. 3 WALNUT ST. ¢ '�
WALNUT PL.
DD --<:
WALNUT PL
ALLEY #110
r
ALLEY #112
a
ALLEY #111
COSTA MESA ST.
I
ALLEY #113 ALLEY #114
19TH ST.
19TH ST.
ALLEY #70 ALLEY #71Pi�q
ALLEY #74
FLOWER ST.
aFLOWER ST.'k
LLEY #76 a ALLEY #77 ALLEY #78 ALLEY #79
ALLEY #80 ALLEY #81
z
BROADWAY ¢
LLE t 83 ALLEY #84 ALLEY #85 ALLEY #86
ALLEY #8ST ALLEY #88 ALLEY #89
o �
MAGNOLIA
ALLEY #91 ALLEY #92 ALLEY #93
ALLEY #94
8TH ST.
�° $o a d
dG ALLEY #96
ALLEY #95�'
¢
�P ABBE WY
j
o ¢ ROCHESTER z
ESTER ST. o ¢
w
~ ST. zUj
N
ROCHESTER ST.
j
¢
j Z
CABRILLO ST.
¢ >
z CABRILLO ST. -
j V)
¢ a
D
ALLEY 98
#
¢ N
ALLEY 99
ALLEY #128
w W
p Q
3
¢ ALLEY 101 17TH ST.
REHABILITATION OF ALLEY NOs.
70, 777 787 797 85, 86, 88 AND 36 LOCATION MAP
CITY PROJECT #16-03
= PROPOSED ALLEY LOCATIONS
PAGE 1 OF 3
North CITY OF COSTA MESA
N.T.S. Public Services/ Engineering
__ 11<
U U
a P CHARLES W.
¢ o J� TEWINKLE
O a G�CALIFORNfA
0 o TEXA CIR (STATES NEICHI
U
GISLER AV.
I AGA AR ST.
a
¢
JQ' N
a
ALLEY #32
a CARAWAY DR.
� N7
> DATE
ST
ATTACHMENT 1
GISLER AV.
��.
z
m
m
0
EHAMRO;K�
0
m
K
O
m w
< U
¢ J
O
U
BAKER ST.
SAN DIE,
RD ST.
h
KILLYBROOKE
REHABILITATION OF ALLEY NOS.
70, 77, 78, 79, 85, 86, 88 AND 36 LOCATION MAP
CITY PROJECT #16-03
= PROPOSED ALLEY LOCATIONS
PAGE 2 OF 3
ATTACHMENT
or
CITY OF COSTA MESA
N.T.S. Public Services/Engineering
REHABILITATION OF ALLEY NOs.
70, 77, 78, 79, 85, 86, 88 AND 36 LOCATION MAP
CITY PROJECT #16-03 (CHANGE ORDER 1)
PROPOSED ALLEY LOCATIONS
PAGE 3 OF 3
L.
g
c�
ca
PINE
3
LIH
PL.
HAMILTON ST.
REA CTR.
® x'15070
I
IQll�r�ll{jll(IIIIIjll711,1111
®
KNOWELL PL.
RE
a
POMONA
a
_
w
STERLING AV.
BAY ST.
a
J
U
U
�
Q
N
~
Q Q
d
U)
J
(WESTSIDE)
w
COVE ST.
YORKSHIRE
o0 o
v
ST.
T,
0 H ST.
SEAL ST.
ROSS ST.
a
oSURF ST.
�
a
�
�
�
a ¢
a
z
a
a
w
J j
J
BEACH
¢
wER
a a NARD ST.
a
J <
ST.
a N
J
1'1
Q Q
QNa
Wlal W
a
g
o
3
J
Q
ALLEY #124
3
a
ALLEY #18
19TH ST. r=
LEY 1
SR. CENTER
#15030
PLUMER ST.
PLUMER ST.
CENTER ST.
ALLEY #6 J^
J �
6
FIRw151AQ.a (I3
LIBRARY (D,L)
j
4
REHABILITATION OF ALLEY NOs.
70, 77, 78, 79, 85, 86, 88 AND 36 LOCATION MAP
CITY PROJECT #16-03 (CHANGE ORDER 1)
PROPOSED ALLEY LOCATIONS
PAGE 3 OF 3
ATTACHMENT
CITY OF COSTA MESA
DEPARTMENT OF PUBLIC SERVICES
REHABILITATION OF ALLEY NOS. 36, 70, 77, 78, 79, 85, 86, and 88
CITY PROJECT NO. 16-03
BID OPENING DATE: MAY 23, 2017
BID OPENING RESULTS
Bidder
City
Total Base Bid
BREA
SANTA CLARITA
$899,996.00
1. Black Rock Construction
2. Kalban, Inc.
$999,307.00
3. Sully -Miller Contracting Co.
4. Beador Construction Co., Inc.
5. EBS General Engineering, Inc.
BREA
$1,173,000.00
$1,239,700.00
CORONA
CORONA
$1,269,208.00
Average
$1,116,242.20
� �
Engineer's Estimate: $ 1,082,530.00
ATTACHMENT 3
CITY OF COSTA MESA
PUBLIC SERVICES DEPARTMENT
CONTRACT CHANGE ORDER NO. 001 SUPPL NO. REV.
PROJECT REHABILITATION OF ALLEY NOs: 36, 70, 77, 78, 79, 85 86 and 88 SHEET 1 OF 1
FEDERAL NO.(S) CITY SPECIFICATION NO. 16-03
To Black Rock Construction Co. Contractor
You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not
included in the plans and specifications on this contract.
NOTE: This change order is not effective until approved in accordance with Council Policy No. 700-1
Description of work to be done, estimate of quantities, and prices to be paid. Segregate between additional work at contract price,
agreed price and force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually
used and no allowance will be made for idle time.
Change Requested by: CITY
The last percentage shown is the net accumulated increase or decrease from the original quantity in the Bid Proposal.
EXTRA WORK AT CONTRACT PRICES
Remove existing asphalt concrete alley sections and construct a new, 6 -inch section of 4,000psi Portland cement concrete with
Buckeye Ultra Fiber 500 over compacted native soil. Change Order funds will be utilized to improve Sterling Avenue Alleys:
Alley No. 12, located between Pomona Avenue and Wallace Avenue, from Sterling Avenue to W 20th Street, and Alley No. 14,
located between Pomona Avenue and Wallace Avenue, from West 201h Street to West 19th Street. Contractor to be paid at
Contract unit prices, which include all mark-ups allowed by Contract:
ESTIMATE OF INCREASE IN CONTRACT ITEMS AT CONTRACT PRICES
Description
Amount
%
Original Contract Amount: .........................................................
. $899,996.00
Previously Approved Change Orders: .............................................
$0.00
0.00%
Amount this Change Order: .........................................................
$305,000.00
33.89%
Revised Contract Amount: ...........................................................
$1,204,996.00
33.89%
TOTAL COST: ❑ DECREASE ® INCREASE: $305,000.00
By reason of this order the time of completion will be adjusted as follows: TBD
Prepared by: Ian Bronswick Date: 6/21
Submitted by:
Approval Recommended:
Approved:
Date:
Date:
Date:
We, the undersigned contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is
approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services
necessary for the work above specified, and will accept as full payment therefor the prices shown above.
, Date Contractor
Title
If the Contractor did not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding
with the ordered work and filing a written protest within the time therein specified.