Loading...
HomeMy WebLinkAbout05 - CC-5 - Steet Rehab Project, City Project No. 15 - 9/19/2017CITY COUNCIL AGENDA REPORT MEETING DATE: SEPTEMBER 19, 2017 ITEM NUMBER: CC -5 SUBJECT: STREET REHABILITATION PROJECT, CITY PROJECT NO. 15-05 DATE: AUGUST 16, 2017 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by R.J. Noble Company, and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On June 16, 2015, a construction contract in the amount of $1,536,928.00 was awarded to R. J. Noble Company, 15505 E. Lincoln Avenue, Orange, CA 92865. This project consisted of street rehabilitation within the following areas: • Freedom Homes Neighborhood bounded by Victoria Street to the North, 19th Street to the South, Aviemore Terrace to the West, and Placentia Avenue to the East; • Eastside Neighborhood bounded by Santa Isabel Avenue to the North, 21 st Street to the South, Newport Boulevard to the West, and Tustin Avenue to the East; • Bristol East Neighborhood bounded by San Diego Freeway to the North, Baker Street to the South, Bristol Street to the West, and Newport Freeway to the East; • Halecrest Neighborhood bounded by San Diego Freeway to the North, Adams Avenue to the South, Harbor Boulevard to the West, and Fairview Drive to the East; and • Adams Avenue between Fairview Road and Peterson Place. The completed project location maps are included as Attachment 1. The rehabilitation of these streets consisted of the removal and reconstruction of damaged pavement sections, overlaying streets with new asphalt concrete, new painting of pavement markings and legends, replacement of traffic loop detectors, adjustments of utilities, and other incidental work needed to complete the project in accordance with the contract documents. 1 Before Improvements ANALYSIS: Improvements Completed The work required by the contract documents was completed on May 11th, 2017, to the satisfaction of the City Engineer. The final contract cost amounted to $1,504,632.80. A report of the final costs is included herein as Attachment 2. A summary of the costs is as follows: Original Contract Cost: $ 1,536,928.00 Change Order No. 1: 65,000.00 Final Quantity Adjustment ($ 97,295.20) Final Contract Cost: $ 1,504,632.80 The final contract price reflects a 2.1 % decrease to the original contract. Change Order No. 1 was executed to include the rehabilitation of Adams Avenue between Fairview Road and Peterson Place. As of this date, there are no Stop Notices filed against the monies due to R.J. Noble Company. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: This project was funded from appropriated Gas Tax funds and Measure "M" Funds. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: The Street Rehabilitation Project — City Project No. 15-05, has been completed to the satisfaction of the City Engineer. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. 2 RAJA SETHURAMAN Public Services Director ATTACHMENTS: 1 - Project Location Maps 2- Cost Summary DISTRIBUTION: City Manager Assistant City Manager City Attorney City Clerk Staff File BALTAZAR MEJIA City Engineer 4i��1� CIT OF COSTA ESA ATTACHMENT 1 North / --/ Public Services/ Engineering V.T.S. p�. VICTORIA ST. VALLEY o ao U rPINE J\ J CIR. GLEN oz z m o DGECRES CIR. Q w w w U CIR. GLENEAGLES a ALLEY #2 a a SEA BLUFF DR. OAK ST. 0 0 opt J a LINDEN PL. a a Q J W J 0 TER.a a N o z Q a v~ GROVE PL. a J a a z a z w w Q U z � g � w a z o O w U � 20TH ST. EVERGREEN PL DOGWOOD ST. n a v CEDAR PL. a w _ a � � ARBOR ST. a 19TH ST. 0 z a ALLEY 1 w CnOf w U y U Y U K Q U Y r a a Cif CENTER ST. 4� PARKHILL DR. 2014-2015 STREET REHAB PROJECT #15-05 LOCATION MAP FREEDOM HOMES NEIGHBORHOOD (ZONE #1) - AS BUILT ® 2° COLDMILL AND 2" AC OVERLAY ® 1" AC LEVELING COURSE (SLURRY SEAL UNDER SEPARATE CONTRACT) 4 Page 1 of 4 CITY OF COSTA MESA t N.T.S. Public Services/ Engineering ATTACHMENT 1 a p a w 4TH PL. 0 RIVERIA DR. z m Z a SANTA ISABEL AV. m _ }a PEACH GEORGEANNE 3 PL. o E Aw z o ~ LN. z a WILSON ST. CHER T EE o LN. w NEWPO GLEN a z W w z CYNTHIA CT. NVIEW LN. yrgAA y FR J � w CL m a w a 3 a N1 ly z 7 g L �O Y 23RD ST. g a Z � J o VIA MARINA ALBERT PL. w 3 � VISTA BAYA VISTA BAYA CECIL PL. VISTA BAYA COLLEEN PL. SIERRA VISTA CATHERINE JEANETTE VIRGINIA PL. PL PL. 6 MEADOW w z LN. z a22ND ST. SANTIAGO DR Z J 0� w d 'a a 4� CAMELLIA LN. a � a TULIP LN. ¢ z � WINDW ROSE LN. a z z a m MERRILL PL. COTTAGE N¢ a aN PL. ;LILAC 0. D�-� 1:mz-0 a LN FRANC z `" LINE PL. 3 0 21 ST ST. 2014-2015 STREET REHABILITATION PROJECT #15-05 LOCATION MAP EASTSIDE NEIGHBORHOOD (ZONE #3, 25) - AS BUILT ® 2" COLDMILL AND 2" AC OVERLAY ® 1" AC LEVELING COURSE (SLURRY SEAL UNDER SEPARATE CONTRACT) 5 Page 2 of 4 North CITY OF COSTA MESA ATTACHMENT 1 N.T.S. Public Services/ Engineering SAN DIEGO FREEWAY ALLEY #126 TRAVERSE DR. Q STURGEON DR. PIERPONT DR. C0 z 0 z MAMANISTEE DR. CIR. P� RAND HAV N Q CIR. FAYETTE PAULARINO AV. CIR. Ln V) Q�Q 9L (If BAKER ST. w 9L Fq PJ 2014-2015 SLURRY SEAL PROJECT #15-05 LOCATION MAP BRISTOL EAST NEIGHBORHOOD (ZONE #12) - AS BUILT ® 2° COLDMILL AND 2° AC OVERLAY ® 1° AC LEVELING COURSE (SLURRY SEAL UNDER SEPARATE CONTRACT) 6 Pago 5 of North CITY OF COSTA MESA N.T.S. Public Services/ Engineering PL. GISLER AV, w BAKER ST. SAN DIEGO 405 FREEWAY LONDONDERRY ST. ATTACHMENT 1 r ALLEY #44 ALLEY #45 Y DALE WY. O z z LOGAN AV. U p � K W J K Lai VILLAGE WY. 0 Y W W J W 00 Z d 0 O ADAMS AV. m a x J M) d � z T O W N J a d 2014-2015 STREET REHAB PROJECT #15-05 LOCATION MAP HALECREST NEIGHBORHOOD (ZONE #15) - AS BUILT W/ CHANGE ORDER #1 ® 2" COLDMILL AND 2" AC OVERLAY 7 ® 1" AC LEVELING COURSE (SLURRY SEAL UNDER SEPARATE CONTRACT) Page 4 of 4 ATTACHMENT 2 CITY OF COSTA MESA FINAL Payment to: R. J. NOBLE 15505 E. LINCOLN AVE., ORANGE, CA 92865 PROJECT: 2014-2015 STREET REHABILITATION PROJECT City Project No. 15-05 DATE: 08/15/17 ITEM NO BID QUANTITY DESCRIPTION UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUm AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 1 LS Mobilization $25,000.00 100.00 % 0.00 % 100.00 % $25,000.00 $0.00 $25,000.00 $25,000.00 2 573,700 SF Cold Mill (2" Max Depth; $0.14 442,719.00 SF 0.00 SF 442,719.00 SF $61,980.66 $0.00 $61,980.66 $80,318.00 3 1,600 TON Remval & Reconstruction Asphalt Concrete (6" Max Depth, Including Excavation) $60.00 359.00 TON 0.00 TON 359.00 TON $21,540.00 $0.00 $21,540.00 $96,000.00 4 4,100 TON Type "D" Asphalt Concrete Leveling (Paving Machine' $69.75 401.00 TON 0.00 TON 401.00 TON $27,969.75 $0.00 $27,969.75 $285,975.00 5 11,800 TON Type "B" Asphalt Concrete Leveling (Paving Machine' $68.00 10,857.00 TON 0.00 TON 10,857.00 TON $738,276.00 $0.00 $738,276.00 $802,400.00 6 240 EA Adjust Manhole Frame and Cover to Grade $295.00 128.00 EA 0.00 EA 128.00 EA $37,760.00 $0.00 $37,760.00 $70,800.00 7 175 EA Adjust Water Valve Can and Cover to Grade $370.00 174.00 EA 0.00 EA 174.00 EA $64,380.00 $0.00 $64,380.00 $64,750.00 8 145 EA Install Reflective Blue Raised Pavement Markers (RBPM) $10.001 60.00 EA 0.001 EA 60.00 EA $600.001 $0.00 $600.00 $1,450.00 9 16 EA Install Type E Loop Detector with 10' Spacing in the Direction of Travel $210.00 0.00 EA 0.00 EA 0.00 EA $0.00 $0.00 $0.00 $3,360.00 10 6 EA Install Type "D" Traffic Signal Loops $235.00 0.00 EA 0.00 EA 0.00 EA $0.00 $0.00 $0.00 $1,410.00 11 1 LS Lane Markings, Lane Stripes, Pavement Legends and Raised Pavement Markers RPM $44,000.00 100.00 % 0.00 % 100.00 % $24,000.00 $0.00 $24,000.00 $24,000.00 12 81 EA Adjust and Reset Existing Survey Monuments and Ties $265.00 36.00 EA 0.00 EA 36.00 EA $9,540.00 $0.00 $9,540.00 $21,465.00 13 1 LS Traffic Control $10,000.00 100.00 % 0.00 % 100.00 % $10,000.00 $0.00 $10,000.00 $10,000.00 14 1 FA Additional Work Items $50,000.00 0.00 FA 0.00 FA 0.00 FA $0.00 $0.00 $0.00 $50,000.00 14.01 1 LS Modify Width of Grind, 4 hr Minimum Trucking - Elden Avenue $22,000.00 100.00 % 0.00 % 100.00 % $22,000.00 $0.00 $22,000.00 14.02 7 EA Install Type E Loop Detector with 10' Spacing in the Direction of Travel - Revised Price Based on Revised Quantities $429.00 7.00 EA 0.00 EA 7.00 EA $3,003.00 $0.00 $3,003.00 $0.00 14.03 3 EA Install Type "D" Traffic Signal Loops - Revised Price Based on Revised Quantities $440.00 3.00 EA 0.00 EA 3.00 EA $1,320.00 $0.00 $1,320.00 $0.00 C01 2" Mill & ARHM Overlay (Adams Avenue from Fairview Rd. to Peterson PI.) $65,000.00 1 LS Mobilization $10,000.00 0.00 % 100.00 % 100.00 % $0.001 $10,000.00 $10,000.00 300,000 SF Cold Mill 2" Max Depth] $0.35 0.00 SF 276,353.00 SF 276,353.00 SF $0.001 $96,723.55 $96,723.55 3,600 TON 2" ARHM Overlay $80.00 0.00 TON 3,404.81 TON 3,404.81 TON $0.001 $272,384.80 $272,384.80 12 EA Adjust Manhole Frame and Cover to Grade $925.00 0.00 EA 11.00 EA 11.00 EA $0.00 $10,175.00 $10,175.00 22 EA Adjust Water Valve Can and Cover to Grade $925.00 0.00 EA 21.00 EA 21.00 EA $0.00 $19,425.00 $19,425.00 6 EA Adjust& Reset Survey Monument $925.00 0.00 EA 3.00 EA 3.00 EA $0.00 $2,775.00 $2,775.00 36 EA Install Type D/Type E Traffic Signal Loos $220.00 0.00 EA 36.00 EA 36.00 EA $0.00 $7,920.00 $7,920.00 1 LS Striping,Lane markings, Legends $30,000.00 0.00 % 100.00 % 100.00 % $0.00 $30,000.00 $30,000.00 1 LS CMS Boards -6 week rental $5,000.00 0.00 % 100.00 % 100.00 % $0.00 $5,000.00 $5,000.00 3,404.81 TON Saturday Trucking $0.84 0.00 TON 3,404.81 TON 3,404.81 TON $0.00 $2,860.04 $2,860.04 PROJECT TOTAL 1 $1,047,369.411$457,263.39 $1,504,632.80 $1,601,928.00