HomeMy WebLinkAbout08 - CC-8 - Resolution Amending 2017-18 Budget to In - 9/19/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: SEPTEMBER 19, 2017 ITEM NUMBER: CC -8
SUBJECT: RESOLUTION AMENDING THE 2017-18 BUDGET TO INCORPORATE A LIST OF
PROJECTS FUNDED BY SENATE BILL 1: THE ROAD REPAIR AND ACCOUNTABILITY
ACT
DATE: SEPTEMBER 7, 2017
FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER
(714) 754-5335
RECOMMENDATIONS:
1. Adopt Resolution (Attachment 1) amending the Fiscal Year 2017-18 Budget to incorporate
a list of projects proposed to be funded with Road Maintenance and Rehabilitation Account
(RMRA) revenues.
2. Approve Budget Adjustment No. 18-009 (Attachment 2).
3. Amend the Fiscal Year 2017-18 Capital Improvement Budget to include revised B-12 forms
(Attachment 3).
BACKGROUND:
Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017),
was passed by the Legislature and signed into law by the Governor in April 2017 to address the
significant multi -modal transportation funding shortfalls statewide. SB 1 increases several taxes
and fees to raise over $5 billion annually in new transportation revenues. Moreover, SB 1 makes
adjustments for inflation every year so that the purchasing power of the revenues does not
diminish as it has historically.
Beginning in November, portions of SB 1 revenues will be deposited into the RMRA and
subsequently made available to eligible cities and counties, which must comply with RMRA
funding requirements as determined by the California Transportation Commission (CTC).
SB 1 prioritizes this funding towards critical maintenance, rehabilitation, and safety
improvements on state highways, local streets and roads, and bridges and to improve the state's
trade corridors, transit, and active transportation facilities. As codified in the Streets and Highways
Code (SHC), RMRA local streets and roads allocations must be used for projects that include, but
are not limited to, the following:
• Road maintenance and rehabilitation
• Safety projects
• Railroad grade separations
• Traffic control devices
• Complete street components, "including active transportation purposes, pedestrian and
bicycle safety projects, transit facilities, and drainage and storm -water capture projects in
conjunction with any other allowable project.
Since the City of Costa Mesa has an average Pavement Condition Index (PCI) that meets or
exceeds 80, the City may spend its apportioned RMRA funds on a broader range of priorities
related to transportation, such as complete streets components and traffic control devices.
As part of SB 1's various accountability and transparency measures, the City will annually submit
a proposed project list to the CTC and subsequently provide year end updates on the progress of
previously proposed projects.
ANALYSIS:
It is estimated the City will receive approximately $650,000 in Fiscal Year 2017-18 from RMRA
funding. To be eligible to receive this funding, the City must submit a proposed project list to the
CTC by October 16, 2017, along with a resolution documenting the City Council's approval of the
City's amended Capital Improvement Program Budget reflecting the projects with specific RMRA
funding allocations. City staff, in anticipation of this additional $650,000 in RMRA revenue, had
already included the additional gas tax revenues in the adopted FY 2017-18 Budget approved by
City Council on June 20, 2017. This additional gas tax was allocated to 2 (two) new street
improvement projects: Newport Boulevard Frontage Road (northbound) — 15th Street to 17th
Street and 23rd Street from Elden Avenue to Waterman Way (included as part of the Citywide
Street Improvements Project).
In order to meet SB 1's eligibility and reporting requirements, the $650,000 of RMRA funding must
be specifically differentiated from the Highway Users Tax Account (HUTA) funding. Each project
utilizing RMRA funds is required to include the following information: project description, specific
location, proposed schedule for its completion, and the estimated useful life. Consequently, staff
revised the applicable 2017-18 Capital Improvement Program Budget forms (Attachment 3) to
meet all requirements. Since the CTC strongly discouraged proposed RMRA funded projects to
be listed as "citywide", the 23rd Street from Elden Avenue to Waterman Way Street Improvement
Project was removed from the Citywide Street Improvements Project and is now an individual
project.
ALTERNATIVES CONSIDERED:
One alternative is to not adopt the Resolution. However, this alternative is not recommended as it
would result in the City not receiving RMRA funding for future road maintenance and rehabilitation.
FISCAL REVIEW:
Prior to City Council's adoption of the 2017-18 Operating and Capital Improvement Program Budget,
staff received projected Gas Tax Fund revenues, which included approximations for both HUTA and
the newly established RMRA. Consequently, portions of this newly established RMRA were allocated
to 2 (two) proposed Capital Improvement Projects within the Gas Tax Fund in the adopted FY 2017-
18 Capital Improvement Program Budget. These street improvement projects included Newport
Boulevard Frontage Road (northbound) — 15th Street to 17th Street and 23rd Street from Elden
Avenue to Waterman Way, which was included as part of the Citywide Street Improvements Project.
Pursuant to the CTC's August 2017 Final Annual Reporting Guidelines for 2017 Local Streets and
Roads Funding, staff recommends amending the Fiscal Year 2017-18 Capital Improvement Program
Budget to identify projects with RMRA funding. The attached Budget Adjustment No. 18-009 reflects
the $650,000 of anticipated RMRA revenue, with specific allocations for the 2 (two) new projects.
Since the 23rd Street from Elden Avenue to Waterman Way Street Improvement Project was
previously included under the Citywide Street Improvements Project, the budget adjustment reflects
a decrease to the Citywide Street Improvements Project Budget.
2
FY 2017-18 Proposed RMRA Funded Projects
Program/Project Name
Gas Tax (RMRA)
Fund
Newport Blvd. Frontage Rd. (N/B) — 15th St. to 17th St.
$350,000.00
23rd Street from Elden Ave. to Waterman Way
$300,000.00
Total RMRA Funding
$650,000.00
LEGAL REVIEW:
The City Attorney has reviewed and approved the Resolution as to form.
CONCLUSION:
It is recommended that the City Council adopt the attached Resolution to amend the Fiscal Year
2017-18 Budget to incorporate a list of projects proposed to be funded with Road Maintenance
and Rehabilitation Account revenues.
RAJA SETHURAMAN
Public Services Director
STEPHEN DUNIVENT
Interim Finance Director
BALTAZAR MEJIA
City Engineer
AMBER HASTON
Management Analyst
ATTACHMENTS: 1. Proposed Resolution and FY 2017-18 List of Projects
2. Budget Adjustment No. 18-009
3. Revised B -12's for FY 2017-18 Capital Improvement Program
Budget
DISTRIBUTION: City Manager
Assistant City Manager
City Attorney
Interim Finance Director
City Clerk
3
ATTACHMENTI
RESOLUTION NO. 17 -
RESOLUTION AMENDING THE 2017-18 BUDGET TO INCORPORATE A LIST OF
PROJECTS FUNDED BY
SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT
WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017
(Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the
Governor in April 2017 in order to address the significant multi -modal transportation funding
shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will ensure
the residents of our City are aware of the projects proposed for funding in our community and
which projects have been completed each fiscal year; and
WHEREAS, the City of Costa Mesa must include a list of all projects proposed to receive
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, in
the City budget, which must include a description and the location of each proposed project, a
proposed schedule for the project's completion, and the estimated useful life of the
improvement; and
WHEREAS, the City of Costa Mesa, will receive an estimated $650,000 in RMRA
funding in Fiscal Year 2017-18 from SB 1; and
WHEREAS, the City used a Pavement Management System to develop the SB 1 project
list to ensure revenues are being used on the most high-priority and cost-effective projects that
also meet the community's priorities for transportation investment; and
WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate local
streets and roads and provide resources for similar projects in the future; and
WHEREAS, the 2016 California Statewide Local Streets and Roads Needs Assessment
found that the City's streets and roads are in an overall good condition, with some streets
identified in poor condition, and this revenue will help us increase the quality of such streets and
assist in bringing our citywide streets and roads into an excellent condition; and
WHEREAS, if the Legislature and Governor failed to act, a few city streets would have
continued to deteriorate, having some negative impacts on our community; and
WHEREAS, cities and counties own and operate more than 81 percent of streets and
roads in California, and from the moment we open our front door to drive to work, bike to school,
or walk to the bus station, people are dependent upon a safe, reliable local transportation
network; and
WHEREAS, modernizing the local street and road system provides well -paying
construction jobs and boosts local economies; and
WHEREAS, the local street and road system is also critical for farm to market needs,
interconnectivity, multimodal needs, and commerce; and
WHEREAS, police, fire, and emergency medical services all need safe reliable roads to
react quickly to emergency calls and a few minutes of delay can be a matter of life and death;
and
WHEREAS, maintaining and preserving the local street and road system in good
condition will reduce drive times and traffic congestion, improve bicycle safety, and make the
pedestrian experience safer and more appealing, which leads to reduce vehicle emissions
helping the State achieve its air quality and greenhouse gas emissions reductions goals; and
WHEREAS, restoring roads before they fail also reduces construction time, which
results in less air pollution from heavy equipment and less water pollution from site run-off; and
WHEREAS, the SB 1 project list and overall investment in our local streets and roads
infrastructure, with a focus on basic maintenance and safety, investing in complete streets
infrastructure, and using cutting-edge technology, materials and practices, will have significant
positive co -benefits statewide.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City
Council of the City of Costa Mesa, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The City of Costa Mesa Capital Improvement Program budget for Fiscal Year 2017-18 is
amended to incorporate the following list of projects planned to be funded with Road
Maintenance and Rehabilitation Account revenues:
FY 2017-18 List of Projects
Project Title: Newport Blvd. Frontage Rd. (N/B) — 15th St. to 17th St.
Project Location: Newport Blvd. Frontage Rd. (N/B) — 15th St. to 17th St.
Estimated Useful Project Life: 10 years
Proposed Schedule for FY 2017-18
Completion:
Project Description: This project will provide major rehabilitation to City streets
which are in immediate need for improvement. The project
is implemented in accordance with the Pavement
Management System to meet the City Council Goal to
reach and maintain an average Citywide Pavement
Condition Index (PCI) of 85 by 2017. These RMRA funds
will be used towards rehabilitation of Newport Boulevard
Frontage Road (northbound) from 15th Street to 17th
Street.
Project Title: 23rd Street from Elden Ave. to Waterman Wy.
Project Location: 23rd Street from Elden Ave. to Waterman Wy.
Estimated Useful Project Life: 10 years
Proposed Schedule for FY 2017-18
Completion:
Project Description: This project will provide major rehabilitation to City streets
which are in immediate need for improvement. The project
is implemented in accordance with the Pavement
Management System to meet the City Council Goal to
reach and maintain an average Citywide Pavement
Condition Index (PCI) of 85 by 2017. These RMRA funds
will be used towards rehabilitation of 23rd Street, from Elden
Avenue to Waterman Way.
3. The budget for Fiscal Year 2017-18 is amended to identify RMRA funding for the above -listed
projects.
PASSED AND ADOPTED this 19th day of September 2017.
Mayor of the City of Costa Mesa
ATTEST:
Deputy City Clerk of the City of Costa Mesa
STATE OF CALIFORNIA
COUNTY OF ORANGE
I, BRENDA GREEN, City Clerk of the City of Costa Mesa, DO HEREBY CERTIFY that
the above and foregoing is the original of Resolution No. 17- —and was duly passed
and adopted by the City Council of the City of Costa Mesa at a regular meeting held on
the 19th day of September, 2017, by the following roll call vote, to wit:
AYES: COUNCILMEMBERS:
NOES: COU NCI LM EMBERS:
ABSENT: COUNCILMEMBERS:
BRENDA GREEN, CITY CLERK
APPROVED AS TO FORM:
THOMAS P. DUARTE, CITY ATTORNEY
ATTACHMENT
BUDGET ADJUSTMENT AUTHORIZATION
Unit
CITY
Department
Public Services
Division
Engineering
Serial Number
18-009
Type of Transaction
Pro ram
Reason for Request:
® Revenue Estimate
® Expenditure Appropriation
Decrease
❑ Estimate Increase
❑ Intra -Departmental Transfer
To administratively record reduction in FY 2017-18 Gas Tax
® Estimate Decrease
❑ Inter -Departmental Transfer
revenue estimate ($10,884).
® Source
❑ Project -To -Project Transfer
❑ Appropriation Increase
CITY
❑ From Existing Budget Appropriations
Fund Balance — Undesignated
201
E From Donations, Fees, or Grants
® Appropriation Decrease
❑ From Unappropriated Fund Balance
-
($660,884)
Unit
Account
Name
Fund
Organization
Pro ram
Pro ect/Grant
Increase
Decrease
CITY
430239
Gasoline Tax - RMRA
201
13200
50540
($660,884)
CITY
340295
Fund Balance — Undesignated
201
90000
50240
-
($660,884)
CITY
430239
Gasoline Tax - RMRA
201
19200
71200
$650,000
CITY
340295
Fund Balance — Undesignated
201
90000
50240
-
$650,000
CITY
500000
CIP — Street Maintenance Citywide
201
19200
30112
400015
-
($1,605,916)
CITY
340295
Fund Balance — Undesignated
201
90000
50240
-
$1,605,916
CITY
340295
Fund Balance — Undesignated
201
90000
50240
-
($1,595,032)
CITY
500000
CIP — Street Maintenance Citywide
201
19200
30112
400015
$1,595,032
Department Authorization:
_
Department Director Date
Recommendation: E Approval ❑
Reasons for Disapproval:
Director of Finance
Disapproval
Date
City Manager Action:
❑ Approved ❑ Disapproved ®
City Manager
Not Required
Date
Budget Verification:
The above information has been reviewed, is complete and accurate, and
and/or unappropriated funds are sufficient to support the request.
® Yes ❑ No
Budget Analyst
the appropriations
Date
City Council Action:
E Approved ❑ Disapproved ❑
Not Required
Date
BUDGET TRANSFER AUTHORIZATION
Unit
CITY
Department
Public Services
Program
Engineering
Serial Number
18-126
Z Source
LXJ Expenditure Appropriation
Reason for Request:
Z From Existing Budget Appropriations
Z Project -To -Project Transfer
Reallocation of appropriations for FY 2017-18 CIP projects
500000
❑ Appropriation Increase
impacted by S61 RMRA funding requirements.
19200
❑ Appropriation Decrease
400015
Unit
Account
Name
Fund
Organization
Program
Project/Grant
Increase
Decrease
CITY
500000
CIP — Street Maintenance Citywide
201
19200
30112
400015
-
($500,000)
CITY
500000
CIP — 23rd Street — Elden to Waterman
201
19200
71200
300165
$300,000
CITY
500000
CIP — 23rd Street — Elden to Waterman
201
19200
30112
300165
$200,000
CITY
500000
CIP — Newport Blvd Frontage
201
19200
30112
400015
-
($350,000)
CITY
500000
CIP — Newport Blvd Frontage
201
19200
71200
300164
$350,000
Department Authorization:
Department Director Date
Recommendation: Z Approval ❑ Disapproval
Reasons for Disapproval:
Director of Finance
Date
City Manager Action (only if an exception item):
® Approved ❑ Disapproved ❑ Not Required
City Manager
Date
Budget Verification:
The above information has been reviewed, is complete and accurate, and the appropriations
and/or unappropriated funds are sufficient to support the request.
Z Yes ❑ No
Budget Analyst Date
ATTACHMENT
CITY OF COSTA MESA, CALIFORP
CAPITAL IMPROVEMENT PROJECT
FISCAL YEAR 2017-2018
DEPARTMENT
DIVISION
PROGRAM
Public Services
Engineering
Street Improvements - 30112
PROJECT TITLE
PROJECT MANAGER
ITEM
Citywide Street Improvements
Bart Mejia, x-5291
8
Account Fund Org Program Project
PROJECT ACCOUNT STRING: 500000 201 19200 30112 400015
500000 416 19200 30112 400015
Existing Project
500000 207 19200 30112 400015
Priority Classification:
❑ Class I Required by action of the City Council or legislation of another governmental agency.
Class II Eliminates a hazard to public health or safety. Replaces an obsolete facility or maintains or better utilizes an existing
facility. Benefits the City's economic base. Results in reduced operating costs or better service.
❑ Class III Prevents a substantial reduction in an existing standard of City service due to population growth. Eliminates potential
hazard to health or safety, or eliminates nuisance conditions.
❑ Class IV Provides a new facility or asset or improves an existing standard of service. Provides programs to increase public
convenience or comfort or projects having primary social, cultural, historic or aesthetic value.
FY 17-18
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
Description of Expenditures
Architect Fees
-
-
-
-
-
Construction
3,430,916
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
6.000,000
Engineering Fees
-
-
-
-
-
-
-
Equipment
Inspection
Land Acquisition
-
-
Other Costs (please identify)
-
-
$ 3,430,916
$ 6,000,000
$ 6,000,000
$ 6,000,000
$ 6,000,000
$ 6,000,000
$ 6,000,000
Total
Description of Resources
Gas Tax
1,105,916
-
-
-
-
-
-
Measure "M2" fund 416
1,800,000
-
-
-
-
Capital Imrovement Fund
525,000
$ 3,430,916 Is
is
-
$ -Is
- Is
-is
Total
Project Justification I Operating Impact: $
This program will provide major rehabilitation to City streets which are in immediate need for improvement. The program is
implemented in accordance with the Pavement Management System to meet the City Council Goal to reach and maintain an
average Citywide Pavement Condition Index (PCI) of 85 by 2017.
GENERAL PLAN CONSISTENCY GOAL: POLICY: OBJECTIVE:
File: FY17-18 CIP- Citywide Street Improvements (002) 1 09/11/2017 3:23 PM
CITY OF COSTA MESA, CALIFORNIA
CAPITAL IMPROVEMENT PROJECT
FISCAL YEAR 2017-2018
DEPARTMENT
DIVISION
PROGRAM
Public Services
Engineering
RMRA - 71200
PROJECT TITLE
PROJECT MANAGER
ITEM
Newport Blvd Frontage Rd (N/B) - 15th St to 17th St
Bart Mejia, x-5291
12
Account Fund Org Program Project
PROJECT ACCOUNT STRING: 500000 201 19200 71200 300164
New Project 1W
Priority Classification:
❑ Class I Required by action of the City Council or legislation of another governmental agency.
OClass II Eliminates a hazard to public health or safety. Replaces an obsolete facility or maintains or better utilizes an existing
facility. Benefits the City's economic base. Results in reduced operating costs or better service.
E] Class III Prevents a substantial reduction in an existing standard of City service due to population growth. Eliminates potential
hazard to health or safety, or eliminates nuisance conditions.
❑Class IV Provides a new facility or asset or improves an existing standard of service. Provides programs to increase public
convenience or comfort or projects having primary social, cultural, historic or aesthetic value.
FY 17-18
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
Description of Expenditures
Architect Fees
-
Construction
350,000
Engineering Fees
-
Equipment
Inspection
Land Acquisition
Other Costs (please identify)
$ 350,000
$
$
$
$
$
$
Total
Description of Resources
Gas Tax (RMRA) Fund
350,000
Total
$ 350,000
$
$
$
$
$
$
Project Justification Operating Impact: $
This program will provide major rehabilitation to City streets which are in immediate need for improvement. The program is
implemented in accordance with the Pavement Management System to meet the City Council Goal to reach and maintain an
average Citywide Pavement Condition Index (PCI) of 85 by 2017.
These funds will be used towards rehabilitation of Newport Boulevard Frontage Road (northbound) from 15th Street to 17th street.
Estimated Useful Project Life: 10 years
GENERAL PLAN CONSISTENCY GOAL: POLICY: OBJECTIVE:
File: FY17-18 CIP- Newport Blvd Frontage Rd - Northbound 1 09/08/2017 3:44 PM
CITY OF COSTA MESA, CALIFORNIA
CAPITAL IMPROVEMENT PROJECT
FISCAL YEAR 2017-2018
DEPARTMENT
DIVISION
PROGRAM
Public Services
Engineering
RMRA - 71200
PROJECT TITLE
PROJECT MANAGER
ITEM
23rd Street from Elden Ave. to Waterman Wy
Bart Mejia, x-5291
12a
Account Fund Org Program Project
PROJECT ACCOUNT STRING: 500000 201 19200 71200 300165
500000 201 19200 30112 300165
New Project
Priority Classification:
❑ Class I Required by action of the City Council or legislation of another governmental agency.
0 Class II Eliminates a hazard to public health or safety. Replaces an obsolete facility or maintains or better utilizes an existing
facility. Benefits the City's economic base. Results in reduced operating costs or better service.
❑ Class III Prevents a substantial reduction in an existing standard of City service due to population growth. Eliminates potential
hazard to health or safety, or eliminates nuisance conditions.
❑ Class IV Provides a new facility or asset or improves an existing standard of service. Provides programs to increase public
convenience or comfort or projects having primary social, cultural, historic or aesthetic value.
FY 17-18
FY 18-19
FY 19-20
FY 20-21
FY 21-22
FY 22-23
FY 23-24
Description of Expenditures
Architect Fees
-
Construction
450,000
Engineering Fees
50,000
Equipment
-
Inspection
Land Acquisition
Other Costs (please identify)
-
$ 500,000
$
$
$
$
$
$
Total
Description of Resources
Gas Tax (RMRA) Fund
300,000
Gas Tax (HUTA) Fund
200,000
Total
Is 500,000
is
$
$
$
$
$
Project Justification I Operating Impact: $
This program will provide major rehabilitation to City streets which are in immediate need for improvement. The program is
implemented in accordance with the Pavement Management System to meet the City Council Goal to reach and maintain an average
Citywide Pavement Condition Index (PCI) of 85 by 2017.
These funds will be used towards rehabilitation of 23rd Street from Elden Avenue to Waterman Way.
Estimated Useful Project Life: 10 years
GENERAL PLAN CONSISTENCY GOAL: POLICY: OBJECTIVE:
File: FY17-18 CIP- 23rd St Elden to Waterman 1 09/08/2017 3:43 PM