Loading...
HomeMy WebLinkAbout12 - OB-2 - Second Reading of Ordinance No.17-13 Est - 9/19/2017CITY COUNCIL AGENDA REPORT MEETING DATE: SEPTEMBER 19, 2017 ITEM NUMBER: OB -2 SUBJECT: SECOND READING OF ORDINANCE NO. 17-13 OF THE CITY COUNCIL OF THE CITY OF COSTA MESA, CALIFORNIA TO ESTABLISH AN EXPEDITED PERMITTING PROCESS FOR ELECTRIC VEHICLE CHARGING STATIONS IN ACCORDANCE WITH AB 1236 DATE: SEPTEMBER 12, 2017 FROM: ECONOMIC & DEVELOPMENT SERVICES DEPARTMENT PRESENTATION BY: ISSAM SHAHROURI, BUILDING OFFICIAL FOR FURTHER INFORMATION CONTACT: ISSAM SHAHROURI (714) 754-5604 ISSAM.SHAHROURI(aD-costamesaca.gov RECOMMENDATION Give second reading to Ordinance No. 17-13, to be read by title only, which sets forth an expedited, streamlined permitting process for electric vehicle charging stations, per the requirements of Assembly Bill 1236 (2015). BACKGROUND On September 5, 2017, the City Council gave first reading to Ordinance No. 17-13, by a 5-0 vote. The City Council did not make any changes to the ordinance as proposed. Staff has no further information on this item. Links to the staff report prepared for the September 5, 2017 City Council hearing as well as the action report of the meeting are provided below: http://www. costamesaca.gov/ftp/council/agend x/2017/2017-09-05/PH-3. pdf ISSAM SHAHROURI, PE, CBO Building Official BARRY CURTIS, AICP Economic and Development Services Director ATTACHMENTS: 1) Ordinance to Establish an Expedited Permitting Process for Electric Vehicle Charging Stations in Accordance with AB 1236 2) Checklist for residential electric vehicle charging stations expedited review ATTACHMENT 1 ORDINANCE NO. 17 - AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF COSTA MESA, CALIFORNIA, AMENDING TITLE 5 OF THE COSTA MESA MUNICIPAL CODE WITH THE ADDITION OF CHAPTER XI, RELATING TO EXPEDITING ELECTRIC VEHICLE CHARGING STATION PERMITS WHEREAS, the State of California and the City of Costa Mesa have consistently promoted and encouraged the use of fuel-efficient electric vehicles; and WHEREAS, the State of California recently adopted Assembly Bill 1236 ("AB 1236"), which requires local agencies to adopt an ordinance that creates an expedited and streamlined permitting process for electric vehicle charging systems; and WHEREAS, creation of an expedited, streamlined permitting process for electric vehicle charging stations would facilitate convenient charging of electric vehicles and help reduce the City's reliance on environmentally damaging fossil fuels; and WHEREAS, it is in the public health, safety and welfare of the residents and businesses of the City to provide an expedited, streamlined permitting process for electric vehicle charging stations to assure the effective deployment of electric vehicle charging stations technology, in accordance with AB 1236. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COSTA MESA DOES HEREBY ORDAIN AS FOLLOWS: SECTION 1. Title 5 (Buildings and Structures) of the Costa Mesa Municipal Code is hereby amended to add a new Chapter XI, to read as follows: Chapter XI. Electric Vehicle Charging Station Permits Sec. 5-144. - Intent and purpose. The intent and purpose of this chapter is to adopt an expedited, streamlined permitting process that complies with Section 65850.7 of the California Government Code to achieve timely and cost-effective installations of electric vehicle charging stations. The provisions of this chapter encourage the use of electric vehicle charging stations by removing unreasonable barriers, minimizing costs to property owners and the City, and expanding the ability of property owners to install electric vehicle charging stations, while allowing the City to protect the public health, safety, and welfare. Sec. 5-145. - Definitions. For the purposes of this chapter, the following definitions shall apply: "A feasible method to satisfactorily mitigate the specific, adverse impact" includes, but is not limited to, any cost-effective method, condition, or mitigation imposed by the City on another similarly situated application in a prior successful application for a permit. "Building Official" means the City Building Official or his or her designee. "Electronic submittal' means the utilization of one or more of the following: 1. Electronic mail or email. 2. The Internet. 3. Facsimile. "Electric vehicle charging station" or "charging station" means any level of electric vehicle supply equipment station that is designed and built in compliance with Article 625 of the California Electrical Code, and delivers electricity from a source outside an electric vehicle into a plug-in electric vehicle. "Specific, adverse impact" means a significant, quantifiable, direct, and unavoidable impact, based on objective, identified, and written public health or safety standards, policies, or conditions as they existed on the date the application was deemed complete. Sec. 5-146 - Expedited permitting process. Consistent with Government Code Section 65850.7, the Building Official shall implement an expedited, streamlined permitting process for electric vehicle charging stations, and adopt a checklist of all requirements with which electric vehicle charging stations shall comply in order to be eligible for expedited review. The expedited, streamlined permitting process and checklist may refer to the recommendations contained in the most current version of the "Plug -In Electric Vehicle Infrastructure Permitting Checklist" of the "Zero - Emission Vehicles in California: Community Readiness Guidebook" as published by the Governor's Office of Planning and Research. The City's adopted checklist and required permitting documentation shall be published on the City's website. Sec. 5-147 - Electric vehicle charging station requirements. (a) An electric vehicle charging station shall meet all applicable health and safety requirements of local, state, and federal laws and regulations. (b) An electric vehicle charging station shall meet all applicable safety and performance standards established by the California Electrical Code, the Society of Automotive Engineers, the National Electrical Manufacturers Association, and accredited testing laboratories, including, but not limited to, Underwriters Laboratories, and, where applicable, rules of the Public Utilities Commission regarding safety and reliability. Sec. 5-148 - Permit application processing. (a) Prior to submitting an application for processing, the applicant shall verify that the installation of an electric vehicle charging station will not have a specific, adverse impact to public health and safety and building occupants. Verification by the applicant includes, but is not limited to: electrical system capacity and loads; electrical system wiring, bonding, and protection; building infrastructure affected by charging station equipment and associated conduits; areas of charging station equipment and vehicle parking. (b) A permit application that satisfies the information requirements in the City's adopted checklist shall be deemed complete and be promptly processed. Upon confirmation from the Building Official that the permit application and supporting documents meet the requirements of the City's adopted checklist, and is consistent with all applicable laws and health and safety standards, the Building Official shall, consistent with Government Code Section 65850.7, administratively approve the application and issue all necessary permits. Such approval does not authorize an applicant to energize or utilize the electric vehicle charging station until approval is granted by the City. If the Building Official determines that the permit application is incomplete, he or she shall issue a written correction notice to the applicant, detailing the deficiencies in the application and any additional information required to be eligible for expedited permit issuance. (c) The Building Official shall not condition the approval for any electric vehicle charging station permit on the approval of such system by an association, as that term is defined by Civil Code Section 4080. (d) Consistent with Government Code Section 65850.7, the Building Official shall allow for electronic submittal of permit applications and associated supporting documentation. In accepting such permit applications, the Building Official shall also accept electronic signatures on all forms, applications, and other documentation in lieu of a wet signature by any applicant. Sec. 5-149 - Technical review. (a) It is the intent of this chapter to encourage the installation of electric vehicle charging stations by removing obstacles to permitting for electric vehicle charging stations so long as the action does not supersede the Building Official's authority to address higher priority life -safety situations. (b) If the Building Official makes a finding, based on substantial evidence, that the electric vehicle charging station could have a specific, adverse impact upon the public health or safety, the City may require the applicant to apply for a use permit. The Building Official shall not deny an application for a use permit to install an electric vehicle charging station unless he or she makes written findings based on substantial evidence in the record that: (1) the proposed installation would have a specific, adverse impact upon the public health or safety; and (2) there is no feasible method to satisfactorily mitigate or avoid the specific, adverse impact. Such findings shall include the basis for the rejection of the potential feasible alternatives of preventing the adverse impact. (c) The Building Official's decision on an application to install an electric vehicle charging station, to require a use permit as set forth herein, or to deny a use permit as set forth herein may be appealed to the Planning Commission. Sec. 5-150 - Appeals. The decisions of the Building Official set forth in this chapter may be appealed to the Planning Commission. Sec. 5-151 - Fees. The fees for permits issued under this chapter shall be as established by City Council resolution. SECTION 2. Compliance with CEQA. Adoption of this Ordinance is exempt from the California Environmental Quality Act ("CEQA") under CEQA Guidelines section 15061(b)(3) because it can be seen with certainty that there is no possibility that the Ordinance may have a significant effect on the environment. SECTION 3. Severability. If any section, subsection, sentence, clause, phrase or portion of this Ordinance is for any reason held to be invalid or unconstitutional by the decision of any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this Ordinance. The City Council of the City of Costa Mesa hereby declares that it would have adopted this Ordinance and each section, subsection, sentence, clause, phrase, or portion thereof, irrespective of the fact that any one or more sections, subsections, sentences, clauses, phrases or portions be declared invalid or unconstitutional. SECTION 4. Inconsistencies. Any provision of the Costa Mesa Municipal Code or appendices thereto inconsistent with the provisions of the Ordinance, to the extent of such inconsistencies and no further, are repealed or modified to that extent necessary to effect the provisions of this Ordinance. SECTION 5. Effective Date. This Ordinance shall take effect thirty (30) days after its final passage. SECTION 6. Certification. The City Clerk shall certify to the passage and adoption of this Ordinance and shall cause the same to be published or posted in the manner required by law. PASSED AND ADOPTED this day of ATTEST: Brenda Green, City Clerk STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss CITY OF COSTA MESA ) 12017. Katrina Foley, Mayor APPROVED AS TO FORM: Thomas Duarte, City Attorney I, BRENDA GREEN, City Clerk of the City of Costa Mesa, do hereby certify that the foregoing ordinance was duly passed and adopted by the City Council of the City of Costa Mesa at a regular meeting held on the day of 2017, by the following roll call vote, to wit: AYES: COUNCIL MEMBERS: NOES: COUNCIL MEMBERS: ABSENT: COUNCIL MEMBERS: IN WITNESS WHEREOF, I have hereby set my hand and affixed the seal of the City of Costa Mesa this day of , 2017. BRENDA GREEN, CITY CLERK (SEAL) ATTACHMENT 2 DEVELOPMENT SERVICES – BUILDING DIVISION 41 = lkil_VKC9J[1410MI RESIDENTIAL ELECTRIC VEHICLE CHARGING STATIONS EXPEDITED REVIEW EFFECTIVE: 09/30/2017 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC, CMC, CEC, CALGreen, CEC, and PAMC The information provided in this document is general and intended as a guide only. Each project is unique and additional requirements may be enforced as deemed appropriate. PURPOSE The purpose of this guideline is to assist permit applicants in streamlining the permitting, installation and inspection process for Residential EV Chargers. TYPES OF ELECTRIC VEHICLE (EV) CHARGERS Be aware that there are different types of Electric Vehicle (EV) Chargers. There are 2 basic types of EV chargers for home use (Level 1 and Level 2). LEVEL 1 Level 1 Chargers are smaller units that plug directly into a standard 120 volt receptacle outlet. These types of chargers typically require a longer period of time to recharge the vehicle. As long as the receptacle outlet being used to plug-in the Level 1 Charger exists, there is no requirement to secure a permit from the Building and Safety Division. On the other hand, if you will be installing a new 120 volt receptacle outlet for the charger, you will need to obtain a permit—but you will not need to provide any plans or electrical load calculations as would be required for the more powerful Level 2 type charging systems. LEVEL 2 A Level 2 EV charging system requires a 240 volt electrical circuit and charges the vehicle battery much faster than a Level 1 charger. Level 2 charger installations typically require an electrical permit and inspections of the installation. In order to obtain the permit you will need to provide some basic information to show that your existing electrical service can handle the added load. Installing a Level 2 EV charging system requires changes to building's electrical wiring. Before installing the EV charging equipment and the associated wiring, talk to your EV manufacturer about the electrical requirements for the charger unit to be installed at your home. Be sure to use a licensed Electrical contractor whose state contractor's license and insurance are current. The contractor should follow the installation instructions of the EV charger manufacturer and the requirements of California Electrical Code. SU BMITTALREQUIREMENTS This Residential EV Charger Permit Guideline has been developed to streamline the permit, installation and inspection process. In most cases, you or your contractor merely need to fill-in the blanks on this document, attach the manufacturer's installation instructions and charger specifications and submit it to the Building Department at the Development Center for an over-the-counter review and permit issuance. If all of the information is provided and the proposal complies with the applicable codes, the review and approval process can usually be performed over-the-counter or within a day or two depending upon workloads and staffing levels at the time of submittal. Once the permit is issued, the installation may begin. When the installation is complete, an inspection of the work must be scheduled with the Building Inspector. Inspections are typically performed on the work day following your request for inspection. Keep in mind that someone will need to be present during the inspection so that the Building Inspector can access the location of the electrical meter and EV charger (typically in the garage) and perform torque requirements. CALIFORNIA ELECTRICAL CODE GENERAL REQUIREMENTS All Electrical Vehicle Charging Systems shall comply with the applicable sections of the California Electrical Code, including Article 625. EQUIPMENT HEIGHT The coupling means of the Electric Vehicle Supply Equipment shall be stored at a height of not less than 18 inches above the floor level for indoor locations and not less than 24 inches above the grade level for outdoor locations. (CEC 625.50) LISTED EQUIPMENT All Electric Vehicle Supply Equipment shall be listed by a nationally recognized testing laboratory. You can find a list in the US Department of Labor's website. (CEC 110.3(8)) FASTENED IN PLACE Specify if the Level 2 Electric Vehicle Supply Equipment will be permanently connected and fastened in place in accordance with the manufacturer's installation instructions. PROTECTION FROM PHYSICAL DAMAGE Electrical Vehicle Supply Equipment shall be protected against vehicle impact damage when located in the path of a vehicle. In order to avoid the installation of a substantial pipe bollard as an equipment guard, locate the Electrical Vehicle Supply Equipment on a garage side wall, out of vehicular path (see sample drawing below). (CEC 110.27(B)) IF MORE THAN 60 AMPS When EV charging equipment is rated at more than 60 amps, the disconnect means shall be provided and installed in a readily accessible location and shall be capable of being locked on the open position. (CEC 625.42) SITE PLAN Provide two copies of the job -specific site plan showing: o The location of the building and street name o All EVSE receptacle location(s), electric service, disconnects, and existing or proposed electric meter location o Information as required in the tables in the following page (see Other Helpful Information) KDN 4� AMP FIA72D L��1 ELEC7RI- VEHKLE CHARGER SECLREE IN PLACE — *EW W CCNGLII7 WITH.4r18 00UDJUOR2 PER ;ALFORNAElfOTFtl AL G CEDE NEW 4D AMP CJRCLIjT- G RSR FE MLEM IN THE EY3-Tr WS ELeMRC » E7ER f1AH EL X00 1 N5:,'aiJa n QN OF A NEW 4JD P.I'+P GAF FOR A LEIIE L 2 ELErTP W, VLWLE OihkA PSR MA.;Afi=ACMlEF5INS-ALLA704 iNYMtC KM MD CAU FORMA ELECiTR UL CON. VEMCLE BATTERIE5 _IS --D AS SUTTOME FOR OFARGJW HDOMS YMTHDM U3*TIL37LM Mib*W i OERVU RSL OLFE M BE M ALCOR W4GE W TH THE RMIDEWTIALEY C!- MER nutUNES FICWE Sample Electrical Plan for Level 2 Electric Vehicle Charger Circuit Installation (Source: City of Riverside) CITY OF COSTA MESA UTILITY REQUIREMENTS Though an individual Level 2 EV charger may have a negligible impact on the utility electric system, the combined effect of several chargers in the same neighborhood could result in overloads on utility secondary wires and transformers. It is important that the City of Costa Mesa Utilities be notified of any Level 2 charger installations to ensure that utility electrical system components are adequately sized to maintain high levels of service reliability. OTHER HELPFUL INFORMATION FOR EV CHARGER INSTALLATIONS The table below illustrates the type and size of wire and conduit to be used for various Electric Vehicle Charger circuits. Size of EV Charger Circuit Breaker Required Minimum Size of Conductors (THHN wire; THHW wire for exterior) Conduit Type and Size * Electrical Metallic Tubing (EMT) Rigid Nonmetallic Conduit —Schedule 40 (RNC) Flexible Metal Conduit (FMC) 20 amps #12 1/2" 1/2" 1/2" 30 amps #12 1/2" 1/2" 1/2" 40 amps #10 1/2" 1/2" 1/2" 50 amps #8 3/4" 3/4" 3/4" 60 amps #6 3/4" 3/4" 3/4" 70 amps #6 3/4" 3/4" 3/4" * Based on 4 wires in the conduit (2 -current carrying conductors, 1 -grounded conductor, and 1 -equipment ground). (CEC Chapter 9 Tables) As an alternate, Nonmetallic Sheathed Cable (NMC) (e.g., Romex cable) may be used if it is protected from physical damage by placing the cable inside a wall cavity or attic space which is separated from the occupied space by drywall or plywood. The table below illustrates the required supports for various types of electrical conduit or cable. Conduit Support Electrical Metallic Rigid Nonmetallic Flexible Metal Nonmetallic Tubing (EMT) Conduit —Schedule Conduit (FMC) Sheathed Cable (CEC 358.30 (A)) 40 (RNC) (CEC 348.42(B)) (NMC) (CEC 352.28(B)) (CEC 334.30) Conduit Support 10' 3' 4-1/2' 4-1/2' Intervals Maximum Distance 3' 3' 1' 1' from Box to Conduit Support In addition to the above noted requirements, the California Electrical Code contains many other provisions that may be applicable to the installation of a new electrical circuit. Installers are cautioned to be aware of all applicable requirements before beginning the installation. For additional information or guidance, consult with the Building Department staff at the Development Center or a qualified and experienced Electrical Contractor. 4 SERVICE LOAD CALCULATOR Instructions: Review the list of electrical loads in the table below and check all that exist in your home (don't forget to include the proposed Level 2 charger). For each item checked, fill in the corresponding "Watts Used" (refer to the "Typical Usage" column for wattage information). Add up all the numbers that are written in the "Watts Used" column and write that number in the "TOTAL WATTS USED" box at the bottom of the table. Then go to the next page to determine if your existing electric service will accommodate the new loads. Note: Loads shown are rough estimates; actual loads may vary. For a more precise analysis, use the nameplate ratings for appliances and other loads and consult with a trained electrical professional. Check All Applicable Loads Description of Load Typical Usage Watts Used GENERAL LIGHTING AND RECEPTACLE OUTLET CIRCUITS Sq. ft. of the house: (multiply by 3 watts/sq. ft.) 3 watts/sq. ft. KITCHEN CIRCUITS Kitchen Circuits 3000 watts Electric Oven 2000 watts Electric Stove Top 5000 watts Microwave 1500 watts Garbage Disposal under Kitchen Sink 1000 watts Automatic Dish Washer 3500 watts Garbage Compactor 1000 watts Instantaneous Hot Water at Sink 1500 watts LAUNDRYCIRCUITS Laundry Circuit 1500 watts Electric Clothes Dryer 4500 watts HEATING AND AIR CONDITIONIONG CIRCUITS Central Heating and Air Conditioning 6000 watts Window Mounted Air Conditioning 1000 watts Whole -House or Attic Fan 500 watts Central Electric Furnace 8000 watts Evaporative Cooler 500 watts OTHER ELECTRIC LOADS Electric Water Heater (Storage Type) 4000 watts Electric Tan kless Water Heater 15000 watts Swimming Pool or Spa 3500 watts Other (Describe) watts Other (Describe) watts Other (Describe) watts ELECTRIC VEHICLE CHARGER CIRCUIT Level 2 EV Charger Wattage: (multiply by 1.25) watts TOTAL WATTS USED Instructions: Using the "TOTAL WATTAGE USED" number from the previous page, check the appropriate line in column 1 and follow that line across to determine the minimum required size of the electrical service panel shown in column 3. In column 4, write in the size of your existing service panel (main breaker size). If your existing service panel (column 4) is smaller than the minimum required size of the existing service (column 3), then you will need a new upgraded electrical service panel to handle the added electrical load from the proposed Level 2 charger. The table below is based on CEC 220.83(A) and Annex D. 1 2 3 4 Check the Appropriate Line Total Watts Used (from Previous Page) Minimum Required Size of Existing 240 -Volt Electrical Service Panel (Main Service Breaker Size) Identify the Size of Your Existing Main Service Breakers (Amps) Up to 48000 100 amps 48001 — 63000 125 amps 63001 — 78000 150 amps 78001-108000 200 amps 108001-123000 225 amps *Note: The size of your existing service (column 4) MUST be equal to or larger than the Minimum Required size (column 3) or a new larger electrical service panel will need to be installed in order to satisfy the electrical load demand of the EV charger. STATEMENT OF COMPLIANCE By my signature, I attest that the information provided is true and accurate. Job Address: Signature: Date: In addition to this document, you will also need to provide a copy of the manufacturer's installation literature and specifications for the Level 2 charger you are installing. Note: This is a voluntary compliance alternative and you may wish to hire a qualified individual or company to perform a thorough evaluation of your electrical service capacity in lieu of this alternative methodology. Use of this electrical load calculation estimate methodology is at the user's risk and carries no implied guarantee of accuracy. Users of this methodology and these forms are advised to seek professional assistance in determining the electrical capacity of a service panel. 11