HomeMy WebLinkAbout04 - CC-4 - Award Contract for Intersection Safety - 10/3/2017CITY COUNCIL AGENDA REPORT MEETING DATE: OCTOBER 3, 2017 ITEM NUMBER: CC -4 SUBJECT: AWARD CONTRACT FOR INTERSECTION SAFETY LIGHTING PROJECT - CITY PROJECT NO. 17-15 DATE: SEPTEMBER 21, 2017 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER (714) 754-5335 RECOMMENDATION 1. Adopt plans, specifications, and working details for the Intersection Safety Lighting Project, City Project No. 17-15. 2. Approve Budget Adjustment No. 18-010 (Attachment 1). 3. Award a construction contract to Express Energy Services, 10610 Humbolt Street, Los Alamitos, CA 90720, in the amount of $308,095.49. 4. Authorize the City Manager to execute the Public Works Agreement. BACKGROUND The City is committed towards energy efficiency and sustainability. In this effort, staff has been coordinating with the Energy Network to take advantage of the no -cost services provided by their firm. The Energy Network evaluates projects for the energy efficiency and assists jurisdictions with the completion of these projects. One potential project is the retrofit of approximately 491 City owned streetlights and intersection lights to energy efficient and cost effective LED fixtures. By implementing this project, the City will realize an annual savings (approximately $35,500) in reduced electrical and maintenance costs to power the LED fixtures and improve safety and reliability. The City has filed with Southern California Edison (SCE) the incentive rebates application, and the On -Bill Financing (OBF) application (Attachment 2), and both have been approved. The available financial incentives are time sensitive and will be eliminated at the end of this year. ANALYSIS The Energy Network's turnkey delivery approach will allow the City to retain a qualified, competitively selected contractor for this project using procedures expressly authorized under Government Code Section 4217, et seq. instead of using the traditional design - bid -build delivery method. Staff determined that it would be more efficient and economical for the City to utilize its National Joint Powers Alliance (NJPA) membership to take advantage of the national cooperative contract purchasing program to complete this project. Since all NJPA contracts are competitively bid nationally and vendors are pre -qualified by knowledgeable committees with expertise in those trades, the City benefits from the reduced pricing made possible by large volume national contracts. The low cost proposer, Express Energy (Attachment 3), possesses a California State contractor's license classification of "C-10", and has satisfactorily completed similar LED streetlight conversion projects for other public agencies, such as, the City of Newport Beach and Placentia. FISCAL REVIEW The total contract cost of $308,095 will initially require the City to advance the entire project cost. Southern California Edison (SCE) will provide an estimated $95,145 in energy efficiency incentives (rebates) at the completion of the project as reimbursement back to the City. For the remaining $212,951 the City will receive a reimbursement check for an estimated $186,691 at the completion of the project through SCE's On -Bill Financing (OBF) program. OBF is a no -interest, no -fee program permitting public agencies to finance qualifying energy-saving projects with zero -interest loans repaid through their monthly utility bills over 10 years. The remaining $26,259 will be funded through the FY 2017-18 Maintenance and Operations budget. A Budget Adjustment in the amount of $308,095 is requested to cover the contract cost and record estimated Revenue. LEGAL REVIEW The City Attorney's office has reviewed this report. Express Energy Services, Inc. will furnish the necessary bonds and insurance, which will be reviewed by the City Attorney's office. After the award, approval of the bonds and insurance, and the subsequent execution of the contract, a "Notice to Proceed" will be issued. CONCLUSION This streetlight retrofit by the City will realize an annual savings in reduced electrical costs to power the LED fixtures and a decrease in streetlight maintenance costs. It is recommended that the City Council approve an agreement with Express Energy Services, Inc. of Los Alamitos, CA, for the retrofit of existing streetlights to LED fixture lighting in the amount of $308,095.49. RAJA SETHURAMAN Public Services Director STEPHEN DUNIVENT Interim Finance Director BALTAZAR M EJ IA City Engineer AMBER HASTON Management Analyst PJ ATTACHMENTS: 1. Budget Adjustment No. 18-010 2. Notice of On -Bill Financing (OBF) Application Approval and Funding Reservation 3. IQS Gordian Group Proposal (Express Energy Services, Inc. DISTRIBUTION: City Manager Assistant City Manger City Attorney Interim Director of Finance City Clerk r- I— z W 2 U H Q BUDGET ADJUSTMENT AUTHORIZATION Unit CITY Department Public Services Division Engineering Serial Number 18-010 Type of Transaction Program Reason for Request: ❑ Revenue Estimate ® Expenditure Appropriation CITY ❑ Estimate Increase ❑ Intra -Departmental Transfer To provide funding for the Intersection Safety Lighting ❑ Estimate Decrease ® Inter -Departmental Transfer Project; recognize $186,691 in loan funding; recognize ® Source ❑ Project -To -Project Transfer $95,145 energy efficiency rebate. ® From Existing Budget Appropriations ❑ Appropriation Increase 401 ® From Donations, Fees, or Grants ❑ Appropriation Decrease - ❑ From Unappropriated Fund Balance $95,145 - Unit Account Name Fund Organization Program Proiect/Grant Increase Decrease CITY 500000 CIP — Intersection Safety Lighting 401 19300 30112 300166 _ $308,095 - CITY 455999 Other Reimbursements 401 19300 30112 - $95,145 - CITY 460350 Loan Proceeds 401 19300 30112 - $186,691 - CITY 515300 Electricity— Street Lights 101 19300 30241 - - ($26,259) CITY 595100 Operating Transfers Out 101 90000 50240 - $26,259 - CITY 460100 Operating Transfers In 401 90000 50240 - $26,259 - Department Authorization: Department Director Date Recommendation: ® Approval Reasons for Disapproval: Director of Finance ❑ Disapproval Date City Manager Action: ® Approved ❑ Disapproved City Manager _ ❑ Not Required Date Budget Verification: The above information has been reviewed, is complete and accurate, and and/or unappropriated funds are sufficient to support the request. ® Yes ❑ No Budget Analyst the appropriations Date City Council Action: ® Approved ❑ Disapproved ❑ Not Required Date April 07, 2017 Customer Information: Daniel Baker City Of Costa Mesa 77 Fair Dr. Costa Mesa, CA 92626 ATTACHMENT 2 Sr -ND TO: Southern California Edison, Business Incentives P.O. Box 800, Rosemead, CA 91770-0800 E-mail: Businessincentives@sce.com I Fax: 626-633-3243 Authorized Agent Information: Julie Castro The Energy Coalition 47 Discovery Ste 250 Irvine, CA 92618 Questions? 800-736-4777 RE: NOTICE OF ON -BILL FINANCING (OBF) APPLICATION APPROVAL AND FUNDING RESERVATION PROJECT NUMBER: 361-16-0500921309 SA#: (MULTI -SITE) Dear Daniel Baker and Julie Castro: Your On -Bill Financing Application has been reviewed and approved, and funding for your On -Bill Financing Loan has been reserved. At this point the estimated OBF Loan funding reservation for your project of $175,639.20 has been established. Terms and Conditions of Loan Reservation: 1. The reserved amount has been calculated based on the results of the review and approval of your Energy Efficiency Project Application, and according to the provisions and methodology of the OBF Loan Term Calculation [LTC1a]. Since the loan reservation amount is based on an approved project proposal, it is an estimate of what the actual loan amount may be. 1 a. An OBF Loan Term Calculation [LTC1 a] is attached. 2. The actual loan amount will be calculated based on the results of the review and approval of your Energy Efficiency Project Installation Report, and according to the provisions and methodology of the OBF Loan Term Calculation [LTC]. Therefore, the actual amount of the OBF Loan may differ from the reserved . amount presented above. 2a. The actual amount of the OBF loan may be less than the reserved amount presented above. 2b. The actual amount of the OBF loan shall not exceed the reserved amount presented above. 3. The expiration of the loan reservation shall be consistent with that of the project incentive. Next Steps: • You submit the completed Installation Report [IR] to SCE, and SCE will review it. • SCE will calculate the actual final loan amount, based on the results of the IR approval, and the LTC provisions. • SCE will issue 2 copies of the OBF Loan Agreement to you. • You will sign, and have notarized, the Agreements and return to SCE. • SCE will counter -sign the Agreements. • SCE will provide you with 1 copy of the fully -executed Loan Agreement and will process the loan proceeds. SEND TO: Southern California Edison, Business Incentives ' �; P.O. Box 800, Rosemead, CA 91770-0800 E D I S E-mail: Businessincentives@sce.com I Fax: 626-633-3243 An K91WV ?e'� NAV01VA4*- emwy Questions? 800-736-4777 If you have any questions, please contact your SCE Account Representative. You may also call us at (800) 736-4777 Monday through Friday, from 8:00 a.m. to 5:00 p.m., or send an e-mail to Business! ncentives@sce.com. Please have your Project Number available for reference when you call, or include it in your e-mail. Sincerely, Delia Williams Program Manager - On Bill Financing Southern California Edison Company Notice: The Federal Equal Credit Opportunity Act prohibits creditors from discriminating against credit applicants on the basis of race, color, religion, national origin, sex, marital status, age (provided the applicant has the capacity to enter into a binding contract); because all or part of the applicants income derives from any public assistance program; or because the applicant has in good faith exercised any right under the Consumer Credit Protection Act. The federal agency that administers compliance with this law concerning SCE is the Federal Trade Commission, Equal Credit Opportunity, Washington DC 20580. On -Bill Financing Program - Final Loan Term Calculation (LTC1a) Completion Date/Time: 4/6/2017 2:35 PM Market Segment: "` LTC1a Project Number: See Schedule A COSTA MESA, CITY OF 119 subsequent monthly payments $1,463.66 Service Account to be Billed: 3-001-4588-34 Estimated Annual kWh Savings x Average Rate = $ savings (B.1 x A) FINAL TERMS CALCULATED BASED ON FINAL Customer Number: 1-0-000-7022 City, CA Zip: REVIEW AND VERIFICATION OF THE PROJECT Customer Account Number: See Schedule A INSTALLATION REPORT Loan ID: 0-000-0086-70 From Approved Installation Report C.2. Excess Project Cost Bundle ID: BDL0317 Based on 20% Basic Lighting Cap Rule C.3. Actual Total Rebate/Incentive OBF Application Receipt Date: 12/29/2016 From Approved Installation Report CA. Other PROJECT ECONOMIC SUMMARY EXPLANATION A. AVERAGE ELECTRIC BILLING RATE — past 12 months (Cents/kWh) $ 0.08133 Based on Billing History (All sites included) B. ENERGY EFFICIENCY PROJECT SAVINGS LTC1a Reserved Amount is $175,639.20 Market Segment: Government and Institutions First month payment is $1,463.66 Business Name: COSTA MESA, CITY OF 119 subsequent monthly payments $1,463.66 Reference Name: OBF-CITY OF COSTA MESA SAFETY LTS PT 1 Estimated Annual kWh Savings x Average Rate = $ savings (B.1 x A) Address: SUNFLOWER AV 1,463.66 City, CA Zip: SANTA ANA, CA 92701 PROJECT ECONOMIC SUMMARY EXPLANATION A. AVERAGE ELECTRIC BILLING RATE — past 12 months (Cents/kWh) $ 0.08133 Based on Billing History (All sites included) B. ENERGY EFFICIENCY PROJECT SAVINGS B.1. Estimated Combined Annual Kilowatt Hour Savings (kWh) 215,959.3 From Approved Installation Report B.2. Estimated Combined Annual Dollar($) Savings $ 17,563.97 Estimated Annual kWh Savings x Average Rate = $ savings (B.1 x A) B.3. Estimated Combined Monthly Dollar($) Savings $ 1,463.66 Estimated Monthly $ Savings (B.2 / 12) C. COSTS C.1. Actual Total Combined Project Cost $ 398,979.66 From Approved Installation Report C.2. Excess Project Cost $ - Based on 20% Basic Lighting Cap Rule C.3. Actual Total Rebate/Incentive $ 87,462.27 From Approved Installation Report CA. Other $ C.5. Actual Potential Loan Amount (Gross Amount) $ 311,517.39 (C.1) - (C.2) - (C.3) - (C.4) C.6. LTC1 Reserved Amount $ 175,639.20 From LTC1 calculation following Approved Project Application C.7. LTC2 Reserved Amount $ 311,517.39 LTC2 Loan Amount per policy cannot be greater than LTC1 amount D. LOAN D.1. Gross Amount for Potential Financing $ 311,517.39 Lesser of (C.5) or (C.6) or other rules apply D.2. Monthly Loan Repayment Amount $ 1,463.66 (B.3) D.3. Actual loan term (Months) Time required to repay loan in months (subject to 213 exception analysis below) DA. Actual loan tens (Years) 17.8 Time required to repay loan in years: (D.3) /12 E. LOAN LIMIT TESTS E.I. Market Segment Amount of Loan Test (Min/Max Loan Amount) E.1.1. Market Segment Minimum Loan Amount $ 5,000 Minimum Loan Amount per Service Account or Bundle E.1.3. Within Market Segment Limit? E.2. Customer Loan Limit Test (Previous Loans for this Customer Account) Is D.1 within loan amount limits YIN? E.2.2. Previous Loans Reserved for this Customer $ Total of previous OBF loans + reservations Number E.2.4. Within 10% of Total Budget? Y E.3. Length of Loan Test E.3.1. Loan Length Limit (months) 120 CIA (lighting) = 36, CIA (non -lighting) = 60, G81 = 120 months E.3.2. Within Loan Length Limit? N Is D.3 within limit Y/N? E.4. Expected Useful Life (EUL)* Loan Length Limit Test E.4.1. Applicable Measure EUL (months) 120 EUL in months of measure with greatest kWh contribution E.4.2. Within EUL Loan Length Limit? Is D.3 within limit Y/N? E.5. EXCEPTION ANALYSIS (If any EA thru EA. yields a "No") Exception Analysis Loan Minimum Requirement Test Does the loan amount from Exception Analysis meet the $5K loan minimum requirement? YES E.5.1. First Payment Amount $ 1,463.66 E.5.2. Subsequent Monthly Loan Repayment Amount $ 1,463.66 Based on minimum loan requirement of $5K and supplemental E.5.3. Subsequent Monthly Payments 119 Exception Analysis, this amount qualifies for an 08F loan. E.5.4. Net Amount for Financing $ 175,639.20 Evected Useful Life (EUL): Each measure Is expected b perform sati4acto ly for a pe of time. An EUL for inch enegy aHciency measue is asegned by the Cardorna Energy Commisson (CEC). Lcen Is eaicUated usirq the energy saangs values approved by Ne incentive Program. LTC ID: 12022 Customer Name: COSTA MESA, CITY OF OBF-CITY OF COSTA MESA SAFETY Customer Reference: LTS PT 1 Loan ID: 0-000-0086-70 Bundle ID: BDLO317 SCHEDULE A LTC1a Customer Account to be Billed: 2-01.195-363 Service Account to be Billed: 3 -001 -4588 - Amount Financed: $175,639. Months to Pay: 1 1st Month Payment: $1,463. $1,463.66 per month for, 119 Remaining Monthly Payments: months Multiple ,Sites Site # Project Number Customer Account Site Service Account Number Site LoanArnount 1 361-16-0500921309 2-01-196-6405 _ 3-005-1743-33_ $5,370.80 2 361-16-0500921309 2-01-196-6405 3-001-4588-37 3 361-16-0500921309 2-01-196-6405 3-001-4588-38 __$259,270.39 $1,342.71 4 361-16-0500921309 2-01-196-6421 3-001-4588-39 $2,685.41 5 361-16-0500921309 2-01-196-6405 3-001-45_88-40 $';,928.28 6 361-16-0500921309 2-01-196-6405 3-001-4588-41 $3,104.27 7 361-16-0500921309 2-01-196-6405 3-005-1743-26 $2,685.40 8 361-16-0500921309 2-01-196-6405 3-005-1743-29 $2,685.40 9 361-16-0500921309 2-01-195-3635 3-001-4588-34 $2,964.67 10 361-16-0500921309 2-01-196-6405 3-005-1743-32 $2,685.40 11 361-16-0500921309 2-01-196-6405 3-005-1743-42 $2,685.110 12 361-16-0500921309 2-01-196-6405 3-005-1743-34 $2,685.40 13 361-16-0500921309 2-01-196-6405 _ 3-005-1743-3 `_i $2,014.05 14 361-16-0500921309 2-01-196-6405 _ 3-005-1743-36 $2,014.06 15 361-16-0500921309 _ 2-01-196-6405 3-005-1743-3-) $2,014.06 16 361-16-0500921309 2-01-196-6405 3-005-1743-38 $;1,857.22 17 361-16-0500921309 2-01-196-6405 3-005-1743-39 $2,014.05 18 361-16-0500921309 2-01-196-6405 3-005-1743-40_ $2,685.110 19 361-16-0500921309 2-01-196-6405 3-005-1743-31 $2,825.02 Uncapped Amount: Financed: :?31],517.39 * Prepared by: Jay Hervey 04/07/2017 March 13, 2017 Customer Information: Daniel Baker City Of Costa Mesa 77 Fair Dr. Costa Mesa, CA 92626 ENO TO: Southern California Edison, Business Incentives P.O. Box 800, Rosemead, CA 91770-0800 E-mail: Businesslncentives@sce•com I Fax: 626-633-3243 Authorized Agent Information: Julie Castro The Energy Coalition 47 Discovery Ste 250 Irvine, CA 92618 Questions? 800-736-4777 RE: NOTICE OF ON -BILL FINANCING (OBF) APPLICATION APPROVAL AND FUNDING RESERVATION PROJECT NUMBER: 361.16-0500921371 SA:`: (MULTI -SITE) BDLO301 Deg Daniel Baker and Julie Castro: Your On -Bill Financing Application has been reviewed and approved, and funding for your On -Bill Financing Loan has been reserved. At this point the estimated OBF Loan funding reservation for your project of $15.616.80 has been established. Terms and Conditions of Loan Reservation: 1. The reserved amount has been calculated based on the results of the reviey,v and approval of your Energy =iiiClenOy Project Application, and according to the provisions and methodology of the OBF Loan Tel -M Calculation [LTC1 a]. Since, the loan reservation amount is based on an approved project proposal, it is an estimate of what the actual loan amount may be. 1a. An OBF Loan Term Caiculation [LTC1a] is attached. 2. The actual loan amount will be calculated based on the results of the review and approval of your Energy Efficiency Project Installation Report, and according to the provisions and methodology of the OBF Loan Term Calculation [LTC]. Therefore, the actual amount of the OBF Loan may differ from the reserved amount presented above. 2a. The actual amount of the OBF loan may be less than the reserved amount presented above. 2b. The actual amount of the OBF loan shall not exceed the reserved amount presented above. 3. The expiration of the loan reservation shall be consistent with that of the project incentive. Next Steos: • You submit the completed Installation Report [IR] to SCE, and SCE will review it. • SCE will calculate the actual final loan amount, based on the results of the IR approval, and the LTC provisions. • SCE will issue 2 copies of the OBF Loan Agreement to you. • You will sign, and have notarized, the Agreements and return to SCE. • SCE will counter -sign the Agreements. • SCE will provide you with 1 copy of the fully -executed Loan Agreement and will process the loan proceeds. 1SI� dk5 F„f3WN J:tMU:? A 770NAL i lvv,tpL?p March 13, 2017 Customer Information: Daniel Baker City Of Costa Mesa 77 Fair Dr. Costa Mesa, CA 92626 ENO TO: Southern California Edison, Business Incentives P.O. Box 800, Rosemead, CA 91770-0800 E-mail: Businesslncentives@sce•com I Fax: 626-633-3243 Authorized Agent Information: Julie Castro The Energy Coalition 47 Discovery Ste 250 Irvine, CA 92618 Questions? 800-736-4777 RE: NOTICE OF ON -BILL FINANCING (OBF) APPLICATION APPROVAL AND FUNDING RESERVATION PROJECT NUMBER: 361.16-0500921371 SA:`: (MULTI -SITE) BDLO301 Deg Daniel Baker and Julie Castro: Your On -Bill Financing Application has been reviewed and approved, and funding for your On -Bill Financing Loan has been reserved. At this point the estimated OBF Loan funding reservation for your project of $15.616.80 has been established. Terms and Conditions of Loan Reservation: 1. The reserved amount has been calculated based on the results of the reviey,v and approval of your Energy =iiiClenOy Project Application, and according to the provisions and methodology of the OBF Loan Tel -M Calculation [LTC1 a]. Since, the loan reservation amount is based on an approved project proposal, it is an estimate of what the actual loan amount may be. 1a. An OBF Loan Term Caiculation [LTC1a] is attached. 2. The actual loan amount will be calculated based on the results of the review and approval of your Energy Efficiency Project Installation Report, and according to the provisions and methodology of the OBF Loan Term Calculation [LTC]. Therefore, the actual amount of the OBF Loan may differ from the reserved amount presented above. 2a. The actual amount of the OBF loan may be less than the reserved amount presented above. 2b. The actual amount of the OBF loan shall not exceed the reserved amount presented above. 3. The expiration of the loan reservation shall be consistent with that of the project incentive. Next Steos: • You submit the completed Installation Report [IR] to SCE, and SCE will review it. • SCE will calculate the actual final loan amount, based on the results of the IR approval, and the LTC provisions. • SCE will issue 2 copies of the OBF Loan Agreement to you. • You will sign, and have notarized, the Agreements and return to SCE. • SCE will counter -sign the Agreements. • SCE will provide you with 1 copy of the fully -executed Loan Agreement and will process the loan proceeds. If you wish to proceed with the project after all eligible solutions are installed, complete and sign 1V -.- I i�V P.i'.l:_.-� 1.-_1_11 �1:_._ P9_�_.i=..L.__:a al_ _ the Ci iciosed Express oluiio is ii i�`ii,iaiiuiiol i 1 �i:NUi L. vuUi I lit Ll is following documents to resume Ie the application process: • Signed Express Solutions Installation Report • Itemized proof of purchase, including invoice(s), purchase and installation dates • Specification sheet(s) for the installed solution(s)/measure(s) • SCE Product Location Form • Authorized Participant Agreement i A i uil • v� ..rCWv • W9 Upon receipt of these documents, we will confirm eligibility. After successful review, SCE will provide the appropriate incentive to you or your designated payee. You may be contacted if information is missing or incomplete. If you have any questions, please contact your SCE Account Representative. You may also call us at (800) 736-4777 Monday through Friday, from 8:00 a.m. to 5:00 p.m., or send an e-mail to Businesslncentives@sce.com. Please have your UPN available for reference when you call, or include it in your e-mail. $(yitriRM4 CAUFO tNIA Energy Management Solutions Incentives ������, 2013 - 2014 Express Installation Report 08, AnagAL- y DIRECTIONS: After your Proposed Express Solutions project is installed and operational, enter the project installation date in the field provided. Review the information from your original Incentive Application below. If nothing has changed, complete and sign Section 10 on this Installation Report (IR) Form and submit it to SCE at one of the addresses below. If any information has changed on your application since you sent it to SCE, indicate the change on Page 2 of this form, sign Section 10 and return both pages to SCE. Business Incentives E-mail: Businesslncentives@sce.com Southern California Edison Fax: 626-633-3243 P.O. Box 800 Questions? Call 800-736-4777 Rosemead, CA 91770-0800 UPN #: 1361-16-0500921309 R NOTE. *If submitting a project for more than one service account or more than 5 SA #`: 3 - 001458834 MULTI SITE Express Solutions complete and attach the Mulitple Site Form www.sce.com/solutions) with this completed Installation Report. Installation Date: (Date all installations were complete and operating properly) Section 1A) Customer Information (From • .. CITY OF COSTA MESA DANIEL BAKER mpany uslness Name Mmea Name e 77 FAIR DRIVE L COSTA MESA CA-) 92626 ompany usiness Mailing Aaaress City State ,p 714-754-5156 DANIE -.BAKER@COSAMESACA.GOV Contact Phone Number Contact E-Mail Address SectionCustomer's• '• A•'nt (From Original Application) THE ENERGY COALITION JULIE CASTRO EustomerlAuthorizect Agentbusiness Name on'taci t7 ame" 47 DISCOVERY SUITE 250 IRVINE CA 92618 949-732-1080 JCASTRO@ENERGYCOALITION.ORG ustome s Authorized Agent Phone Number Customefs ..ftnzed Agent -Mail Address Section 3) Express Solubons* (From Original; Application) fAUffrU-rU115fffiLT1nncen Description of Replaced Equipment (e.g., lighting type, Installed ve41 Incentive Total Per Unit Solution Code I Solution Description wattage, etc.) s , .,,,...SEE MULTI SOLUTION SHEET r 1 1 Note: If your project consists of more than 5 solutions please refer to the attachment. YOUR ESTIMATED INCENTIVE TOTAL: $0.00 Section• • Original Application) A. Form Of Payment: INCENTIVE CHECK orm o aymen B. Payee Information: CITY OF COSTA MESA DANIEL BAKER xm�rtr'lnaprd�msara _ 77 FAIR DRIVE [---,COSTA MESA �M Y CA 92626 Company/Business Mailing Address Crty State Zip 714-754-5156 DANIEL.BAKER@COSAMESACA.GOV Contact Phone Number Contact E-Mail Address - C. Tax Identification Type: employer ID Number (EIN)l Social Securi 956005030 I Corporation Federal T.ID,Ermloyer lD Number (EINy Sod•I Securay Nufta ISSN) Identification Number Tax Status D. Utility Bill Credit: Exempt Reason _ 3- 2. Service Account Number Customer Account Number Section• • •n (From Original Application) se is ox o up a e us omer tln orma ion eren roma ova Contact Name Title tM, Page t UPN # 381-18-0500921309 SA # 001458834 MULTI SITE Use this box to update Authorized Agent information (if different from page 1): Customer's Authorized Agent Business Name Contact Name F Customers Authorized Agent Mailing Address City slats Zip Customers Authorized Agent Phone Number Customer's Authorized Agent E -Mail Address Section• • •ns* (From Original Use this box to update Express Solutions information (If different from page 1): Refer to the Energy Management Solutions Guide or www.sce.com/solutions for Solution Codes, Solution Descriptions, Incentive Amounts and Program Equipment Eligibility Requirements. Then calculate your Express Solutions incentive total'. # of Units Incentive $ Incentive Total $ Description of Replaced Equipment (e.g., lighting type, Installed Per Unit Solution Code ISolution Description wattage, etc.) k'. E... eek .iY9 L"n` 8 ,.........,__... > _ ..,,., .................._,. t 0.00 0.00 .,-.,. ..-v... - �, ,.....v.....,.,._..- 0.00 _ 0.00 0.00 •If submitting more than 5 Express Solutuions complete and attach the Express YOUR ESTIMATED REVISED Solution page of the Multiple Site/Solution Worksheet at www.sce.com/solutions. INCENTIVE TOTAL: $0.00 Section 9) Payment Information (From Original Application) Use this box to update Payment Information (if different from page 1): A. Form of Payment (Please check one) C. Tax Identificatlon Type ease J Check to Customer [Complete B & C] check one) ❑ Utility Bill Credit to Customer [Complete C & DI Federal Tax ID/Employer ID ❑ Check to Authorized 3rd Party [Complete B, C & E. Provide 3rd party information in section C] Number (EIN) B. Payee Information Payee-Customer/Business Name Contact Name Title ❑ Social SecuriNumber Tax Status Company/Business Mailing Address City slate Zip (Please check one) L1 C1 Corporation/LLC Contact Phone Number contact E -Mail Address Individual/Sole n Proprietor/General Partnership ❑ Tax-exempt, Non-profit D. Utility Bill Credit (Please complete this section if you prefer payment in the form of a bill credit to the customer of record) Exempt Reason E. Payment Release Authorization (Please complete this section if an Authorized Agent is to receive the check) As the Customer, I am authorizing this payment of my incentive to the Third Party named in section B, above, and I understand that I will not be receiving the incentive check from SCE. I also understand that my release of this payment to the Authorized Agent does not exempt me from the requirements outlined in the Application package. Customer Name (please print) Signature Title Data Section1) Installabon and Operation 1, the Customer or Authorized Agent below, certify that (i) the Express Solutions have been completely installed, functionally tested and proven capable of operating and being maintained to perform in conformity with their design intent, and (ii) that a licensed contractor was used, where applicable, and all applicable permitting requirements for this installation were followed. The instnllatinn date of nperatinn of the Express Solution is also certified. Name (Please print) Signature Title Date To be completed only if you are requesting an H VA C Rebate: 1. HVAC Permit (if reauired). Il a'permit is required for any HVAC installation/replacement, f have provided the permit number below. (If no permit is required, leave this section blank.) Permit# Agency 2. Contractor Certification. If a contractor was used for any HVAC installation/replacement, this section must be completed by the contractor. By checking this box, I certify I am a licensed contractor and have followed applicable permiiling requirements and, if required, that the HVAC permit information above is correct Signature of Contractor Name (please print) Date Multiple Project Site/Solution Worksheet 2013-2014 Express Solutions SEND -TO: Southern California Edison, Business Incentives vaumew c�uroaan P.O. Box 800, Rosemead, CA 91770-0800 EDIS0N• Fax: 626.633-32431 E-mail: Businesslncentives@sce.com I Questions? 800-736-4777 ••�++++x•�� NEW Your project may be eligible for a Comprehensive Project Bonus. See cover sheet for eligibility requirements. Use this spreadsheet when installing solutions at more than one aroiect site or more than four Exoress Solutions at all oroiect sites. Web Confirmation: W##042740 1, If your project includes Express Solutions, fill out and submit this form with your completed application. 2. If you have more than 20 sites to list, use the drop down menu to the right to add more rows. 3. Use a separate line item for each solution located in a different location at the project site (e.g., warehouse, parking lot, room#). To avoid processing delays and ensure all eligible incentives are provided, please provide exact and detailed equipment location and description information. 4. To obtain a Description of Existing Equipment refer to either your project proposal or contractor invoice. Refer to the Solutions Directory (www.sce.com/nrclems/download/solutionsdirectory.pdo for Solutions Codes, Solution Descriptions, Incentive Amounts, and Program and Equipment Eligibility Requirements. Read and answer the eligibility requirements before proceeding with your equipment purchase. Then calculate your incentive total. 5. For installed projects, submit the following: 1) Invoice receipt(s) and 2) Specification sheet(s) for each installed solution(s) from vendor. Number of Rows F 40 Page 1 2/1/2011 Company Name: City of Costa Mesa Utility Use Only (Project #) Express Solutions Only Existing Equipment Location and Description New Equi ment Incentive Calculations Project Site Exact and Detailed Location Has the Date of Actual or Unit of Number of Incentive S Number Exact and Detailed Location Qty Description of Existing Solution Solution Description of Solution Proposed Measure (e.g., Units Per Unit Incentive Total Estimated (From of Existing Equipment Equipment Code New Solution Already Been Installation lamp, fixture, Installed Project Costs Page 1 Installed sq.ft., hp, etc.) A X B = C Office roof, NE comer of Office roof, NE comer of Ex building i Air handler unit #4 AC -97352 Variable -frequency drives for HVA C fans building Yes 812112013 HP -1 $80.00 $80.00 $200.00 > 90 to 130 -watt LED fixture, replacing HPS 1 SUNFLOWER AV/PLAZA >_ 250W HPSV Streetlight LT -78130 fixture SUNFLOWER AV/PLAZA No 3/1/2017 Fixture 2 $140.00 1,280.00 $1,711.26 > 130 to 150 -watt LED fixture. replacing HPS; 1 SUNFLOWER AV/PLAZA 2 400 HPSV LT -35164 fixture SUNFLOWER AV/PLAZA No 3/1/2017 Fixture 2 $212,00 $42400 $2,123.44 250W HPSV Streetlight, 20OW > 90 to 130 -watt LED fixture, replacing HP$ 2 VARIOUS 305 HPSV Streetlight LT -78130 fixture VARIOUS No 3/1/2017 Fixture 305 $140.00 542.700.00 $260,967.15 > 130 to 1430 -watt LED fixture, repiaCinq HPS 2 VARIOUS 60 700 MV, 400 HPSV, 310 HPSV LT -35164 fixture VARIOUS No 3/1/2017 Fixture 60 $212.00 S12;720.00 $63,703.20 28 to 43 -watt L.D fixture. replacing MPS '. 2 VARIOUS 14 175 MV LT -73136 fixture VARIOUS No 3/1/2017 f-,xture 14 $98.00 $1.372.00 $7,490.70 > 90 to 130 -watt LED fixtwe, replacing HPS 3 BAKER/MILBRO ST 2 250W HPSV Streetlight LT -78130 fixture BAKERIMILBRO ST No 3/1/2017 Fixture 2 $140.00 ,5280.00 $1,711.26 > 90 to '130 -watt LED fiTt rePlaring HPS :. 4 BAKER/ROYAL PALM q 250W HPSV Streetlight LT -78130 fixture BAKER/ROYAL PALM No 3/1/2017 Fixture 4 $140.00 $560.00 $3,422.52 250W HPSV Streetlight, 20OW p 90 to LED fixture, replacing HPS. 5 BEAR / BAKER ST 7 HPSV Streetlight LT -78130 fixture BEAR / BAKER ST No 3/1/2017 Fixture 7 $140.00 $980.00 $5,989.41 > 130 to t90 -watt LED fixture, replacing HPS 5 BEAR / BAKER ST 'I 400 HPSV LT -35164 fixture BEAR / BAKER ST No 3/1/2017 Fixture 1 5:.12.00 1,212.00 $1,061.72 - 28 to 43 -watt LED fixture, replacing HPS 5 BEAR / BAKER ST 1 175 MV LT -73136 fixture BEAR / BAKER ST No 3/1/2017 Fixture 1 $98.00 $98.00 $535.05 > 90 to 130 -watt i,ED fixture, replacing HPS 6 CDM FRWY/BRISTOL 1 20OW HPSV Streetlight LT -78130 fixture CDM FRWY/BRISTOL No 3/1/2017 Fixture 1 $140.00 $140.00 $855.63 > 136 to 196 -watt LED fixture, replacing NPS 6 CDM FRWY/BRISTOL 3 400 MV LT -35164 fixture CDM FRWY/BRISTOL No 3/1/2017 Fixture 3 $21200 5636.00 $3,185.16 > 90 to 13Q -watt LED fixture, replacing HPS 7 NPT BLVD / 15TH ST .I 20OW HPSV Streetlight LT -78130 fixture NPT BLVD / 15TH ST No 3/1/2017 Fixture 4 $14090 $5(u) (""1 $3,422.52 > ;i0 to 130 -watt LED fixture, replacing HP$ 8 REDHILL/BRISTOL 4 250W HPSV Streetlight LT -78130 fixture REDHILL/BRISTOL No 3/1/2017 Fature 4 $1110,00 $5(30.00 $3,422.52 > 4r0 to 130 -watt LED fixture, replacing !-IPS 9 HARBOR/NPT BLVD CM 3 20OW HPSV Streetlight LT -78130 fixture HARBOR/NPT BLVD CM No 3/1/2017 F uturo 3 $140.00 $420A0 $2,566.89 > 130 to 190 -watt LED fixture, replacing HPS 9 HARBOR/NPT BLVD CM .1 310 HPSV LT -35164 fixture HARBOR/NPT BLVD CM No 3/1/2017 Fixture 1 $212.00 $212.00 $1,061.72 100 to 130 -watt LED fixture, replacing HPS` 10 16THINPT BLVD CM .I 20OW HPSV Streetlight LT -78130 fixture 16TH/NPT BLVD CM No 3/1/2017 Future 4 5140.00 360.00 $3,422.52 250W HPSV Streetlight, 20OW > 90 to 130 -watt LED fixture, replacing HPS 11 17TH / NEWPORT 8 HPSV Streetlight LT -78130 fixture 17TH / NEWPORT No 3/1/2017 Fixvrre 8 11140.00 1,1.120.00 $6,845.04 190 to 130 -watt LEU fixture, replac)ng HPS 12 TBLVD/ROCHESTER 4 20OW HPSV Streetlight LT -78130 fixture NPT BLVD/ROCHESTER No 3/1/2017 Fixture 4 k'140.00 $560.00 $3,422.52 > 90 to 130 -watt LED fixture, repiacing HPS --•- 13 NPT BLVD/BROADWAY 3 20OW HPSV Streetlight LT-78120L_fixture NPT BLVD/BROADWAY No 3/1/2017 Fixture 3 $140.110 5420.00 $2,566.89 Page 1 2/1/2011 Multiple Project Site/Solution Worksheet SEND TO: Southern California Edison, Business incentives eou ci cs,rg.r.,, 2013-2014 Express Solutions P.O. Box 800, Rosemead, CA 91770-0800 6 _jl EDIISON• p Fax: 626-633-32431 E-mail: Businessincentives@sce.com I Questions? 800-736-4777 r..aww�nrnrenan.ue•a...... NEW Your project may be eligible for a Comprehensive Project Bonus. See cover sheet for eligibility requirements. Use this spreadsheet when installing solutions at more than one project site or more than four Express Solutions at all prom2ct sites. Web Confirmation: I/V#042740 1. If your project includes Express Solutions, fill out and submit this form with your completed application. 2. If you have more than 20 sites to list, use the drop down menu to the right to add more rows. 3. Use a separate line item for each solution located in a different location at the project site (e.g., warehouse, parking lot, rooms To avoid processing delays and ensure all eligible incentives are provided, please provide exact and detailed equipment location and description information. 4. To obtain a Description of Existing Equipment refer to either your project proposal or contractor invoice. Refer to the Solutions Directory (www.sce.cominrclemsldownloadlsolufionsdirectory.pdf) for liolutions Codes, Solution Descriptions, Incentive Amounts, and Program and Equipment Eligibility Requirements. Read and answer the eligibility requirements before proceeding with your equipment purchase. There calculate your incentive total. 5. For installed projects, submit the following: 1) Invoice receipt(s) and 2) Specification sheet(s) for each installed solution(s) from vendor. Number of Rows F 40 -7 2/1 /2011 Company Name: City of Costa Mesa utility Use Only (Project #) _— Express Solutions Only Existing Equipment Location and Description New Equi ment Incentive Calculations Project Site Number Pare 1 Exact and Detailed Location of Existing Equipment Qty Description of Existing Equipment Solution Code Solution Description Exact and Detailed Location of New Solution Has the Solution Already Been Installed Date of Actual or Proposed Ins Date III: of Measure (e.g., lamp, fixture, sq'ft" hip, etc.) Number of Units Installed A Incentive $ Incentive Total Per unit X B - C Estimated Project Costs 14 NPT BLVD/FAIRVIEW 3 25OW HPSV Streetlight, 20OW HPSV Streettight LT -7813)_ > 90 to 130 -watt LED fixture, iiireplacing HP fatwe NPT BLVD/FAIRVIEW No 3/1/2017 Fir: ire. 3 11 K, -�' 00 $2,566.89 15 16 NPT BLVD/SANTA ISAB NPT BLVD/BAY ST CM 3 1 25OW HPSV Streetlight, 20OW HPSV Streetlight 15OW HPSV Streetlight LT -78130_ LT -24820 EE90 to130-watt LED fixture ,replac'no f fixture 54 to � )-watt LED fixture,repwc nIIPS fixture NPT BLVD/SANTA ISAB NPT BLVD/BAY ST CM No No 3/1/2017 3/1/2017 j T Fc-,ue ilMF �na 3 1 i $110. '1 6( `-'c♦�00 $2,566.89 $668.63 16 NPT BLVD/BAY ST CM 5 250W HPSV Streetlight, 20OW HPSV StreeOight LT -7813) t0 to 1;:0=putt LED fixtu e, rep�rf, mg HPS fixture NPT BLVD/BAY ST CM No 3/1/2017 --- -- 5 3191.�i< S7(r)(i0 $4,278.15 17 NET BLVD/22ND ST CM 3 20OW HPSV Streetlight LT -78130 Y D i) to 13030-wat L E D ixlu rep acing HPS fxtu e NPT BLVD/22ND ST CM No 3/1/2017 — �� Eu arz: i.�.....,-......_. 3 '� C 1 0 - $2,566.89 18 FAIR DR W/O NEWPORT 4 20OW HPSV Streetlight LT -78130_ s -U to1,0— 40t I ED fixtw e. �epwdng Hi fixture FAIR DR W/O NEWPORT No 3/1/2017 Fu re I, rte 4 4 at�� 0=: 66 t o i.�.K ;;56) r�0 v ;n) u0 $3,422.52 $3,422.52 19 NPT BLVD/SANTA ISBL 4 20OW HPSV Streetlight LT -78130 > 9D to) f'3Q--waft'EED fixture, replacing HP5 W � fxture: NPT BLVD/SANTA ISBL No 3/1/2017 YFz _ i Revised W13/2016 TOTAL _@$,fhdQ�O" •$398#i7$.$T;s 2/1 /2011 Work Order Signature Document ATTACHMENT 3 221 APRIAhk &VRjb,- THE GORDI;I GROUP NJPA EZIQC Contract No.: CA-GL1 OD -082013 -EES 7 New Work Order ❑ Modify an Existing Work Order Work Order Number.: 051544.00 Work Order Date: 08/21/2017 Work Order Title: Cost Mesa Street Lighting Owner Name: City of Costa Mesa Contractor Name: Express Energy Services, Inc. Contact: Thom Coughlin Contact: Jacob Williams Phone: (714) 754-5123 Phone: Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of NJPA EZIQC Contract No CA-GL10D-082013-EES. Brief Work Order Descriotion: TEN LeoTek LS -2 Street Lighting. Time of Performance Estimated Start Date: Estimated Completetion Date: Liquidated Damages Will apply: 11 Will not aooly: Work Order Firm Fixed Price: $308,095.49 Owner Purchase Order Number: Approvals Owner Work Order Signature Document Date Contractor Date Page 1 of 1 8/21/2017 '41 C Detailed Scope of Work THE GORDIAN GROUP o: 01"iW o iliams Express Energy Services, Inc. 10610 Humbolt Street Los Alamitos, CA. 90720 Los Alamitos, CA 90720 No Data Input Date Printed: August 21, 2017 Work Order Number: 051544.00 Work Order Title: Cost Mesa Street Lighting Brief Scope: TEN LeoTek LS -2 Street Lighting. From: Thom Coughlin City of Costa Mesa 77 Fair Drive Costa Mesa, CA 92626 (714)754-5123 7 Preliminary 0 Revised 51 Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the items set forth below shall be considered part of this scope of work. Below is the SOW for the Costa Mesa Street Light Project: Quantity 396- Leotek GCL1-60G-MV-NW-3R-GY-530-WL-PCR7-LLPC replacing existing 150-250w HPSV Quantity 57- Leotek GCL1-80G-MV-NW-3R-GY-700-WL-PCR7-LLPC replacing existing 310-400w HPSV Quantity 15- Leotek GCL1-60G-MV-NW-3R-GY-530-WL-PCR7-LLPC replacing existing 175w MV quantity 23- Leotek GCL1-80G-MV-NW-3R-GY-700-WL-PCR7-LLPC replacing existing 400-700w MV All fixtures will be ordered with both shorting caps and photocells depending on which is needed per fixture. All existing material will be recycled properly, and removed from the site each day after work. Subject to the terms and conditions of JOC Contract CA-GL10D-082013-EES. Contractor Owner Date Date Scope of Work Page 1 of 1 8/21/2017 Contractor's Price Proposal - Summary Date: August 21, 2017 Re: IQC Master Contract #: CA-GL10D-082013-EES Work Order #: 051544.00 Owner PO #: Title: Cost Mesa Street Lighting Contractor: Express Energy Services, Inc. Proposal Value: $308,095.49 Category - No Category Input $308,095.49 Proposal Total $308,095.49 Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 90.29% Contractors Price Proposal - Summary Page 1 of 1 8/21/2017 Contractor's Price Proposal - Detail Date: August 21, 2017 Re: IQC Master Contract #: CA-GL10D-082013-EES Work Order #: 051544.00 Owner PO #: Title: Cost Mesa Street Lighting Contractor: Express Energy Services, Inc. Proposal Value: $308,095.49 Sect. Item Mod. UOM Description Labor Equip. Material (Excludes) Line Total Category - No Cateaory Input 1 01 22 16 00 0002 2 01 22 20 00 0082 to Reimbursable FeesReimbursable fees will be paid to the contractor for the actual cost, without mark-up, for which a receipt or bill is received. The Adjustment Factor applied to Reimbursable Fees will be 1.0000. The labor cost involved in obtaining all permits is in the Adjustment Factor. The base cost of the Reimbursable Fee is $1.00. The quantity used will adjust the base cost to the actual Reimbursable Fee (e.g. quantity of 125 = $125.00 Reimbursable Fee). If there are multiple Reimbursable Fees, each one shall be listed separately with a comment in the "note" block to identify the Reimbursable Fees (e.g. sidewalk closure, road cut, various permits, extended warrantee, expedited shipping costs, etc.). A copy of each receipt shall be included with the Proposal. Installation Quantity Unit Price Factor 19,625.00 x 1.00 x 1.0750 Bonds, Permits, Fees, Etc. Total 21, 096.88 DAY Traffic Control SystemNote: Includes 1 truck, 1 arrow board, 1 licensed traffic control person, traffic cones Factor Installation Quantity Unit Price _ Total $21,096.88 $8,141.13 Contractor's Price Proposal - Detail Page 1 of 2 8/21/2017 Contractor's Price Proposal - Detail Continues.. Work Order Number: 051544.00 Work Order Title: Cost Mesa Street Lighting Category - No Category Input 9 16006 - . 0081; § � , � � �eotek GCL4-S0G �/-ttW 3"R-GY-7C0-WL QCR7-ELPC &C k � + q ^,73 20 �,iUar;cl4 NPP nstalfa,cn r n., Pace acfor Total 52.00 X 625.98 x 42^ = 37,173.20 Includes beth Sharting Caps and Phc,ccels 1Q "6000 003'; _ect= GC 1-8G fir, fv`vh Rv,- _�_, PC -SC $7,14869 Czua tiry (nSia�latiCn unit P-ce ` Totai 0.00 x 625.98 x _ 1-,42C 1:148.9 it li€des both Shorting Caps and Pnotocelis 11 26 01 50 51 0154 EA Recycle HID Lamps $692.31 Quantity Installation Unit Price Factor Total 491.00 x 1.41 x _ 1.0000 - 692.31 Subtotal for Category - No Category Input $308,095.49 Proposal Total $308,095.49 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: 90.29% Contractors Price Proposal - Detail Page 2 of 2 8/21/2017 Subcontractor Listing Date: August 21, 2017 Re: IQC Master Contract #: CA-GL10D-082013-EES Work Order #: 051544.00 Owner PO #: Title: Cost Mesa Street Lighting Contractor: Express Energy Services, Inc. Proposal Value: $308,095.49 No Subcontractors have been selected for this Work Order a THE GORDIAN GROUP $0.001 0.00 Subcontractor Listing Page 1 of 1 8/21/2017 Project Summary The city of Costa Mesa enrolled with The Energy Network in November 2016 to take advantage of the no -cost services available to help the agency move energy efficiency projects from conception to completion. Staff expressed a high level of interest in upgrading the City's safety lights. This Project Proposal summarizes the recommendations of the street lighting audit conducted by TRC. By implementing this project at a cost of $308,095 Costa Mesa can reduce energy annual energy and maintenance costs by an estimated $35,499 per year. Project Benefits • Capture $95,145 in utility incentives • Reduce greenhouse gas emissions equal to taking 908 cars off the road • Improve safety and reliability • Reduce maintenance costs • Position the city of Costa Mesa as a community leader • Hedge against increasing utility costs Additional costs, such as construction management or staff time, are not included in this table. Incentive and OBF reimbursements are not received until after the project has been completed and approved by the Utilities. Project Financial Metrics Net Present Value (NPV) $319,7247 NPV with OBF & cash $346,993 Savings to Investment Ratio (SIR) 2.01 On -Bill Financing Payback 10 years Return on Investment (ROI) 164.4 Financial metrics definitions can be found in Appendix A. Energy Savings Measures Project Milestones and Activities The Energy Network will assist your agency with completing your energy efficiency projects in an expedited manner, with an anticipated construction start date of November, 2017. Your Project Manager, Julie Castro, will work with you to refine these proposed dates and the project activities. You may contact Julie Castro at (949)732-1080 or jcastro@energycoalition.org. Date Project Proposal Approval I April, 2017 Draft Scope of Work approval I May, 2017 I Council Approval Date September 2017 I Construction Start Date I November, 2017 I Turnkey Project Delivery and the National Joint Powers Alliance (NJPA) The Energy Coalition's Turnkey Delivery approach allows the city of Costa Mesa to retain a qualified, competitively selected contractor for energy efficiency projects in a manner that significantly reduces the time and expense associated with a traditional local government procurement process, the National Joint Powers Alliance (NJPA). The city of Costa Mesa is an existing NJPA member with full access to their cooperative procurement services. More details about the NJPA can be found in Appendix C. Additional Project/ Gross Project Estimated SCE Funds Facility Energy Efficiency Measure kWh Savings Cost Incentive Estimated OBF Required Costa Mesa Retrofit HPSV and MV LS -2 Street Lights with 236,652 kWh $308,095 $95,145 $186,691 $26,259 Safety Lights energy-efficient LED fixtures Project Milestones and Activities The Energy Network will assist your agency with completing your energy efficiency projects in an expedited manner, with an anticipated construction start date of November, 2017. Your Project Manager, Julie Castro, will work with you to refine these proposed dates and the project activities. You may contact Julie Castro at (949)732-1080 or jcastro@energycoalition.org. Date Project Proposal Approval I April, 2017 Draft Scope of Work approval I May, 2017 I Council Approval Date September 2017 I Construction Start Date I November, 2017 I Turnkey Project Delivery and the National Joint Powers Alliance (NJPA) The Energy Coalition's Turnkey Delivery approach allows the city of Costa Mesa to retain a qualified, competitively selected contractor for energy efficiency projects in a manner that significantly reduces the time and expense associated with a traditional local government procurement process, the National Joint Powers Alliance (NJPA). The city of Costa Mesa is an existing NJPA member with full access to their cooperative procurement services. More details about the NJPA can be found in Appendix C. Cost Breakdown over Project Lifetime Up -front capital requirements are often the greatest obstacle in pursuing energy efficiency retrofit projects. However, by utilizing the estimated $9,1455 in incentives and the estimated $186,691 in OBF, the city of Costa Mesa will be left with only $26,259 in out-of-pocket cost. Cash Flow Analysis The Energy Network provides expert guidance identifying financing opportunities available for public agencies and applying and securing them for eligible agencies. Financing options that are available to the city of Costa Mesa include: On -Bill Financing (OBF). Additional details about OBF can be found in Appendix B. The projected annual cash-flow for Costa Mesa is outlined below. �. csc. �I.c I csz. 3c,t ver I i Principal I T,-rm I $186,691 Year f Incentives ( Est. utility ! C _ n Est. Maintenance ce Savings ( Total Cash II Inflators � Est. SCE OBF Payment Net Cash Flows 6 $281,836 $281,836 I ($26,259) 1 $ 29,265 $4,462 $33,727 ($18,278) $35}'156 2 $ 29,549 $4,419 $33,968 ($17,745) $16,223 3 $ 29,836 $4,376 $34,212 ($17,228) $16,984 4 $ 30,126 $4,333 $34,459 ($16,727) $17,733 5 $ 301,418 $4,291 $34,710 ($16,239) $18A70 6 $ 3{7,714 $4,2501 $34,963 ($15,766) $19,197 7 $ 31,632 $4,2(78 $35,224 (.$15,367) $19,913 8 $ 31,313 $4,168 .$35,481 ($14,861) $20,619 9 $ 31,617 $4,127 $35,7411 ($14,429) $21,316 10 $ 31,924 $4,687 $36,611 ($3.2,841) $23,170 11 $ 32,234 $4,047 $36,281 $6 $36,281 12 $ 32,547 $4,008 $36,555 $6 $36,555 13 $ 32,863 $3,969 $36,832 % $36;832 14 $ 33,182 $3,931 $37,113 $0 $37,113 15 $ 33,504 $3,892 $37,397 $0 $37,397 Totals $470,1O5 1 $62,569 $814,510 ($159,422) $346,993 Appendix A: Financial Metrics Definitions Gross Project Cost the total of all construction costs for each measure including direct labor, materials, equipment, the contractor's adjustment factor and all task order processing fees. Net Benefit: The net savings after payments for construction costs and interest on loans. Includes estimated incentives. Net Present Value (NPto: NPV takes into account the time value of money and indicates what a project's lifetime cash flow is worth today. NPV is determined by taking the sum of the present value of all current and future cash flows, including purchase and installation costs, and future utility and maintenance savings. Return on Investment (ROI): the percentage return from a project, where savings includes the net present value of both utility cost savings and maintenance cost savings over the life of the project, per CEC Proposition 39 Guidelines. ROI = {[Savings ($) - Gross Project Cost] / Gross Project Cost ($)} *100% Reimbursable Costs: Money returned by the utilities after the project has been installed with the Installation Report submitted and approved. Simple Payback Period (SPP): the amount of time required to recover the initial costs of a project from its savings. A simple payback period ignores the time value of money and assumes that future savings occur in even amounts each year. For example, a $1,000 investment that saves $500 each year has a two-year simple payback period. A project is economically acceptable if the payback period is less than the length of the project life. SPP = Net Project Cost ($) / Annual Savings ($/yr) Savings -to -Investment Ratio (SIR): the value of benefits from a project divided by its cost. Per CEC Proposition 39: SIR = NPV / (Gross Project Cost — Incentives — Other Grants — Non -energy Benefits) With the exception of maintenance savings, TEN does not use "Non -energy Benefits" in its financial models. Financing Assumptions Discount Rate 0.03 Utility Escalation Rate 0.04 Inflation Rate 0.02 Maintenance Savings (% of Gross Project Cost) 0.02 Project Lease Interest Rate 10.035 Appendix B: On -Bill Financing FAQs What is On -Bill Financing? On -Bill Financing, or OBF, assists eligible customers finance their qualified energy efficiency projects. The loan is a no -interest, no -fee loan repaid through the customer's monthly energy bill. Who is Eligible? All SCE business customers are eligible. To participate, you must: • Apply for one or more of eligible energy efficiency solutions • Have an active SCE account for a minimum of the past two years • Be in good credit standing with SCE What are the Loan Limits? Loan terms are a maximum of 10 years. Loan amounts must be between $5,000-$250,000, with a one-time option of a $1 million loan. Certain caps may apply, your TEN project manager will know if these caps apply to your project. How do I Apply? Since this form of financing is available to current utility customers, the application and implementation process is relatively streamlined and allows for easy adoption of energy efficient measures. Your TEN project manager will be happy to assist you in this process. How does it work? Your TEN project manager will help along every step of the way to securing your OBF funds: 1. Submit the OBF application along with the Incentives Application on SCE's Online Application Tool 2. SCE will review the OBF Application and the agency's payment history 3. An SCE engineer or approved third -party inspector will conduct a pre -inspection 4. Upon approval and inspection, the OBF funds will be reserved 5. Equipment Installation may begin upon receipt of loan approval 6. When installation is complete, submit an Installation Report to SCE 7. SCE will review the installation report 8. If approved, OBF funds will be distributed at this time 9. The first zero -interest loan repayment will appear on the next scheduled SCE bill. Appendix C: Turnkey Project Delivery and the National Joint Powers Alliance (NJPA) The Turnkey approach involves the following steps, taking advantage of membership in the NJPA as well as the flexible procurement procedures available to all local governmental agencies under California Government Code section 4217.10, et seq., for the installation of energy efficiency projects: The agency joins as a member of NJPA at no cost or liability, and thereby can access contractors previously selected by NJPA based upon both the contractors' qualifications to perform the type of work involved in the agency's project, and competitive bid prices for that type of work. Working with The Energy Coalition, the agency (a) determines the specific bid items that comprise the energy efficiency project, (b) selects a contractor based upon the competitive bids submitted to NJPA for the specified bid items that make up the project, and (c) estimates the likely cost savings from implementing the project using the Turnkey Delivery approach and the selected contractor, in order to confirm the benefits of the implementing the project in this manner. The agency conducts a public hearing, and makes a formal finding that the agency's energy efficiency project is anticipated to result in cost savings to the agency. The agency enters into a contract with the selected contractor for the performance of the energy efficiency contract based upon that contractor's competitively bid price for the work. This Turnkey Delivery approach provides the agency with the benefits and protections of the traditional "design, bid and build" public works procurement process, but at a lower cost and with less time and staff resource commitments. These savings result because the agency takes advantage of NJPA's services to identify each of the specific work components of an energy efficiency project, and select qualified contractors based upon their competitive bids for these project components. This approach allows the agency to forego detailed engineering and design of the project, and to solicit bids from the previously qualified, competitively selected contractors to perform the agency's proposed energy efficiency project. f .e1 1er ! of p� f OT K pubiic agencies taking uVtiVnii tv va v!e en0 y�! LS -2 safety Lighting Phase 1 Contractor Scope of Work The Energy Network Project ID A71CSL1 Prepared for City of Costa Mesa Prepared by The Energy Network Scope of Work Developed by TRC Energy Services 3/20/2017 This page intentionally left blank t Energy Network This page intentionally left blank Off6genergynetwork public agencies taking action to save energy The Energy Network 1 Summary of Scope of Work The City of Costa Mesacurrently owns and operates (491) LS -2 safety lights at intersections throughout the City. The City's inventory predominantly consists of high pressure sodium (HPSV) and mercury vapor (MV) cobrahead fixtures. The City has identified an energy conservation opportunity through the replacement of the City - owned streetlights with Light -Emitting Diode (LED) fixtures. This project will replace existing LS - 2 streetlights with LED fixtures. Table 1 presents the inventory of existing fixtures to be removed and replacement fixtures to be installed: Table 1: Existing Fixtures and LED Replacement Fixtures Existing Fixtures New Fixtures Fixture Type: Qty, of Fixture Type Wattage Manufacturer/Model Wattage HPSV 150 Leotek GCL1-60G-MV-NW-3R-GY-530-WL- 105 Cobrahead 1 PCR7-LLPC-WL HPSV 200 Leotek GCL1-60G-MV-NW-3R-GY-530-WL- 105 Cobrahead 124 PCR7-LLPC-W L HPSV 250 Leotek GCL1-60G-MV-NW-3R-GY-530-WL- 105 Cobrahead 271 PCR7-LLPC-W L HPSV 310 Leotek GCL1-80G-MV-NW-3R-GY-700-WL- 185 Cobrahead 5 PCR7-LLPC-W L HPSV 400 Leotek GCL1-80G-MV-NW-3R-GY-700-WL- 165 Cobrahead 52 PCR7-LLPC-W L MV 175 Leotek GCL1-60G-MV-NW-3R-GY-530-WL- 105 Cobrahead 15 PCR7-LLPC-W L MV 400 Leotek GCL1-80G-MV-NW-3R-GY-700-WL- 185 Cobrahead 13 PCR7-LLPC-WL MV 700 Leotek GCL1-80G-MV-NW-3R-GY-700-WL- 185 Cobrahead 10 PCR7-LLPC-WL Total 491 The LED retrofit shall maintain the existing controls in place. All intersection safety lights will have photocells installed on each fixture as specified. However, if it is found that the existing fixture is on a circuit which is controlled by a photocell, it shall receive a shorting cap. A full list of specific streetlights to be replaced with LED luminaires is provided separately in a spreadsheet, titled Closeout Checklist. Also provided is a list of Southern California Edison (SCE) - maintained inventory maps, in a zipped folder, titled Project Maps. The following part ies are involved during the project construction: • Agency CM: Public agency representative assigned as Construction Manager • Contractor: The installation contractor Page 1 ID 66 ienergYnetwork public agencies falling action 10 save energy The Energy Network 2 General 2.1 Terms and Conditions Contractor will adhere to the following terms and conditions throughout the project: a) Contractor will conduct all work between Monda,, and Frid;;v durinq normal working hours, defined as 7:00 am to 4:00 PM. b) Contractor will comply with safety requirements and practices in accordance with Agency requirements and Cal/OSHA. c) Contractor will do all that is necessary to maintain a safe working environment for Contractor's employees, Agency and facility employees and the general public who might be present. d) Contractor will work with the Agency facility staff to understand and abide by any site- specific security procedures. e) Contractor will be diligent in following the technical specifications set forth in this Scope of Work and leave the construction sites with no damage to streets and roadways, sidewalks, medians, traffic signals, street and roadway signage, fixture poles and arms, landscaping, and other site features and characteristics. f) The site will be, at the conclusion of work, left in a condition of cleanliness such that no adverse evidence of work remains. g) Contractor is responsible for securing all necessary permits (including business license and encroachment permit) and will abide by local laws and regulations. h) All work will be performed in accordance with all national, state, and local codes. I) It is the Contractor's responsibility to include the proper Adjustment Factor(s) and the necessary tasks and quantities in the Price Proposal for completion of the work described herein. The risk associated with incorrect Adjustment Factor(s), missing tasks, and inaccurate quantities from the Price Proposal shall be borne by the Contractor. j) Contractor's Price Proposal is based on the final and approved Detailed Scope of Work and per the inventory shown on the Closeout Checklist (provided as a separate spreadsheet file) and the corresponding replacement fixture mapping Tables 1, considered as the Base Price. Contractor is to provide unit -based pricing, for each fixture type and size, as part of this Price Proposal. Unit prices to be listed on Appendix F. k) Prior to ordering of equipment and fixtures, and starting work the Contractor is to verify fixture quantities, types, circuit voltages, locations of glare shields and any other installation needs. The Agency will not be incur additional costs for restocking fees based on discrepancies in the inventory, as it is the Contractor's responsibility to verify the inventory prior to ordering materials. =energYnetwork public aganc,es taking amen io save energy Page 2 The Energy Network 1) Contractor will be compensated for work performed and fixtures installed. Any increase on the Base Price due to larger inventory will require written approval by the Agency and will follow procedures set forth for change orders. Any decrease on Base Price due to smaller inventory will result in a lower Base Price to the Contractor. m) Contractor will provide clear and complete invoices with sufficient project information per utility requirements (Appendix G). 2.2 Prevailing Wages Contractor shall be required to pay the prevailing rate of wages in accordance with the Labor Code and the State of California prevailing wage laws. 2.3 Project Management Contractor will fulfill the following requirements to facilitate project management: a) Contractor will perform the roles and assume responsibilities as per the responsibility matrix provided in Appendix A. b) If Contractor proposes substituting a piece of equipment different from the design, Contractor will submit a substitution request — Appendix B. Substitution requests must be provided to the City and approved before the submittal of the proposal. c) Contractor will provide an overall schedule for each week, and a minimum one week look -ahead schedule identifying work areas for each day and/or night. d) At the end of each shift, Contractor will prepare a daily progress report log for that shift to the Agency Construction Manager to facilitate next -day verification/inspection via email: communication will also include problems (e.g. access issues) and details for the next day's work schedule — Appendix "C". e) The contractor and/or the Agency can initiate a supplemental task order. All parties are responsible for reviewing supplemental task orders f) Contractor will notify the Agency CM when the project has been completed. • Close-out will include true -up of the quantity of each retrofit code installed. • Agency CM will generate punch list items. Contractor will perform punch list items. • Contractor will furnish the final construction As -Built Documents as described below. • Contractor will cooperate with testing process and final inspection. 2.4 Meetings The Contractor will attend the following meetings complete with preparation and follow-up: a) Pre -construction logistics meeting — for introduction to team members, to understand roles and responsibilities, to discuss the construction schedule, and to learn the Page 3 ®mnergynetwork 46public agencies taking action to save energy The Energy Network submittal transmittal process. At the pre -construction meeting, the Agency CM and the Contractor will establish a mechanism for ongoing verification and inspection of work. b) Construction kick-off meeting — to resolve any remaining pre -construction issues and begin onsite construction. c) Submittal review meetings as required - for discussion of major submittal -related issues that cannot be resolved through the submittal transmittal process. d) Periodic construction meetings, as needed — to discuss punch list items, safety issues and the construction progress. e) Final job walk — to convey substantial completion to project team members and request final acceptance. The Contractor will schedule this meeting and the Agency CM plus facility personnel shall attend. f) Contractor will review meeting minutes circulated after key meetings and resolve all action items assigned to the Contractor by the due date indicated therein. 2.5 Logistics Contractor will coordinate logistics with the Agency to ensure safe and timely execution of the work. At a minimum the Contractor will perform the following activities: a) Contractor will conduct a safety briefing to its staff and provide items presented to the Agency upon approval of the construction schedule and prior to the start of construction. b) Contractor will work with the Agency to coordinate and develop an appropriate traffic safety plan for the various locations for Agency's review/approval prior to the start of construction. c) Contractor will comply with safety requirements and practices in compliance with local Agency requirements and in accordance with Cal/OSHA. d) The Agency will be responsible for notifying residents and businesses in the area of construction as scheduled and will be responsible for arranging traffic control procedures. e) Contractor will do everything necessary to maintain a safe working environment for its employees, Agency employees, facility tenants, and the general public. f) A plan for storage and staging area(s) will be determined during the pre -construction meeting. g) Contractor will be responsible for the security of the Contractor's property, equipment, construction materials and all other items on the staging area or construction site. h) Contractor will check in with the Agency CM at the start of each shift by means of email, and include a list of scheduled locations for the day in coordination with the project work schedule. The Agency will facilitate access to scheduled locations. ID065energynetwork pubIrc agencies taking action to save enemy Page 4 The Energy Network i) All equipment and materials demolished under the terms of this project are to become the property of the Contractor and are to be removed from the site and will be disposed of in accordance with state and city requirements. Recyclable, non -hazardous material will be recycled. Work areas will be cleaned up prior to vacating for the day. j) Contractor will coordinate with the Agency CM prior to moving the Contractor's equipment, tools, and materials onto the construction site at the start of the project. Page 5 ® 916 MnergYnetwork public agencies taking action to save energy The Energy Network 3 Submittals Contractor will provide submittals as outlined below: 3.1 Preconstruction Submittals Within ten (10) working days of approval of the construction schedule, Contractor will provide the following submittals: • Proposed construction schedule with major milestones indicated. May include but not limited to: o Inventory and circuit voltages verification. o Equipment order o Anticipated equipment delivery date o Construction start and completion by site or major area o Project walk through and punch list development o Project sign off • Work Plan • Traffic Control Plan • Safety Plan submittal per Cal OSHA standards • Construction Permits • Product data for the equipment specified o All new fixtures as specified in Table 1 • Mounting details for new fixtures 3.2 Close -Out Within ten (10) working days of notifying the Agency CM of substantial completion, Contractor will provide the following: a) Final updated "as built' records of all newly installed LED streetlights, including all wattages, pole numbers, locations, additional equipment installed on the fixtures and other associated attributes. This includes a copy of the Closeout Checklist spreadsheet that has been updated by the Contractor to reflect the full inventory of removed and installed fixtures, as verified in the field. b) Final signed -off punch list — Appendix D c) Executed Notice of Construction Completion and Warranty Period — Appendix E d) O&M manuals for installed equipment e) Materials list of components installed for reordering purposes 0196=energynetwork public agencies taking action to save energy Page 6 The Energy Network f) Material recycling documents g) Warranty documentation for installed equipment Submittals will not be considered complete until they are reviewed and approved by the Agency. Contractor will make corrections noted and transmit the revised submittal for approval. Page 7 Off6�,enersynetwork public agencies Wing action to save energy The Energy Network 4 Execution 4.1 Technical Specifications 4.1.1 Installations a) The contractor will remove existing HID street lighting fixtures and replace the fixtures with LEDs as specified in Table 1. In the event that the fixture in the field does not match the fixture specified in the Closeout Checklist for a particular pole, the contractor shall install a fixture to replace what is in the held, according to the replacement fixture mappings specified in Table 1. The contractor shall then correct the Closeout Checklist to list the actual fixture removed (type and wattage) and the actual fixture installed (type and wattage). b) The contractor will ensure that installed fixtures are level to the ground;, c) The contractor will verify in the field that the photocells function properly after installation. d) The contractor will furnish labor, materials and incidentals including, but not limited to, complete lighting fixtures and wiring necessary for the streetlights to be replaced on existing street lighting poles for 120/240 volt circuit street lighting systems. e) The contractor will manage delivery and staging of material to the site, including any secured storage considerations. f) The contractor will properly dispose of all removed fixtures and non -recyclable materials including hazardous waste, such as lead-based material. g) The contractor will be responsible for maintaining traffic control during installation. h) During installation, the contractor will ensure that all fixtures and poles have Utility - compliant labeling and badging and will install or replace all labels and/or stickers as required. i) The Contractor shall purchase-glare_shields to be installed in situations where glare - ------------------------------------------- shields are installed on the existing fixtures. For bidding purposes, the Contractor may assume (25) glare shields are required. However, before ordering materials, the Contractor is to verify the quantity of glare shields during their verification of the inventory. The agency shall approve locations as necessary. 4.2 Warranty Requirements All Work furnished shall be guaranteed against defective materials, workmanship and/or improper performance for a period of one year after final acceptance of the Work. Contractor is to provide extended warranty options as separate line items on Price Proposal for the Agency's consideration if requested. 4.3 Implementation Verification W � W6 s"energYnet work public agencies taking action to save ece,-jy Page 8 The Energy Network a) Contractor will provide a list of fixtures that have been removed and fixtures that have been installed each week, in the form of an updated Closeout Checklist. b) At the completion of the project, the Contractor will supply to the Agency a completed Closeout Checklist spreadsheet listing the existing street lighting fixtures removed and new fixtures installed including wattage, fixture type, location, what additional equipment was installed with the fixture and any other information requested by the Agency above using a template provided by the Agency. C) The Agency will observe a sample of streetlights to confirm proper operation of photocells and fixtures. The Agency will observe operation of the street lights during daylight hours to confirm lights are off, and during night time hours to confirm lights are on. The Agency will notify the Contractor of any non-functioning photocells and/or fixtures for repair or replacement. 4.4 Close -Out For project close out, Contractor will complete the following tasks: a) The Contractor will participate with the Agency in review of the punch list and the final job walk. The Contractor will correct any remaining punch list items before final acceptance is granted. b) Within ten (10) working days of notifying the Agency CM of substantial completion, the Contractor will train City personnel in all aspects of routine operation, maintenance, and safety of the LED lighting fixtures installed. c) Deliver all required close out documents, as listed in Section 3.2. d) Invoices shall show installation locations, fixture types, wattages and model numbers (conducive to SCE incentive required invoices) Page 9 1'!S .energYnetwork Wpublic agencies taking action to save energy The Energy Network This page intentionally left blank ® ;energYnetwork public agencies taking action to save energy Page 10 The Energy Network Appendix A: Responsibility Matrix Task.,Agency CM Contractor. Gonstre ciion Secures Construction Permit S/R P Prepares Construction Schedule R/A P Perform Construction P Construction Documentation P Submittals and RFIs R/A P Review & Approve Invoices P Process Invoices P Inspection of Work P Construction Progress Reports/Log R P Initiate Change Orders R/A P/R Prepare Meeting Agendas/Minutes P R Attend Project Meetings P P Develop Punch Lists S P Correct Punch List Items R/A P O&M Manuals and Training R/A P Final Inspection P/A S Acceptance P/A P = Primary; S = Support; R = Review, A = Approval Agency CM = Public Agency Assigned Construction Manager Contractor = Construction Firm Page 11 ID 016 $energynetwork public agencies taking action to save energy The Energy Network Appendix B: Substitution Request Form [Sample Form] Substitution Request Form SR #: Task Order #: Project Name: Contractor: Subject: Spec. Section: Dwg. #: Page #: Sub: PRIORITY: ❑ Routine ❑ Urgent ❑ Please Expedite PM USE ONLY Directed To: Date Received: Date Transferred: Date Received: Date Transferred: INFORMATION NEEDED Bid Item: Justification: Cost Comparison to Original Product: Time Impact: Quality Impact: Maintenance Impact: Warranty Impact: Safety Impact: Energy Usage Impact: Product Lifecycle Impact: Date Contractor REPLY Date Reviewer ®� -*enerpnetwork public agencies taking action to save em gy Page 12 The Energy Network Appendix C: Daily Report Log Form [Sample Form] Task Order #: Project Name: [Category] Contractor: DAILY REPORT LOG Daily Report #: Date Submitted: Date of Shift: CREW MEMBER LOG (All names of those present on jobsite on date of shift indicated above, including; PM, Consultant, vendors, deliveries, etc.) NAME NAME 1. 6. 2. 7. 3. g. 4. 9. 5. 10. Date Contractor Foreman/Supervisor Signature Daily record of work performed, location, work completed, any issues that occurred onsite during the work shift, including but not limited to project milestones, problems, complaints, and safety related issues: Date Contractor Foreman/Supervisor Signature Page 13 5energYnetwork public agencies faking action to save energy The Energy Network Appendix D: Construction Punch List (Sample Form) CONSTRUCTION PUNCHLIST ❑ Lighting ❑ Mechanical/Controls ❑ Other Contractor: Task Order #: Facility Name: [Category] Facility Address: Note: Refer to the line-by-line construction record by reference number when available. Approximate Date Item # Description of Punch List Item Value Completed Approximate Total Value: ❑ There are no Punch list Items at this time. Punch List Created by: Contractor Representative Date ® 5energYnetworic public agencies taking action to save energy Page 14 The Energy Network Appendix E: Notice of Construction Completion and Warranty Period To: Agency Representative From: (Contractor's Name and Company) Task Order #: Project Name: 1) Date of final inspection: 2) Date of construction completion: 3) Warranty period begins: Ends: Warranty Length: 4) Additional Warranties, if any: Warranty Type: Warranty Period begins: Ends: Warranty Length: 5) Have as-builts and other Project documents been submitted? Yes No Not Applicable Date: Contractor Signature Date: Agency Representative Signature (Contractor: After completion of the project, send signed form to Agency Representative to complete Performance Evaluation on back page. This form must be completed prior to final invoice and payment.) Page 15 $energYnetwork public agencies taking action to save energy The Energy Network PERFORMANCE EVALUATION Agency Representative: After completion of the performance evaluation below, send signed form to The Energy Network Project Manager. This form must be completed prior to approval of the final invoice and payment. Contractor Evaluation Value: 0 -Low; 4 -High Note: Quality of Work: Timely Performance: Working Relationship with Agency and facility Staff: Competency to Perform Work/Service: Sensitivity to Citizen Contact: Understanding of Project: Problems Encountered After Project Completed: Responsiveness to Problems During Project: Date: Agency Representative Signature Date: The Energy Network Project Manager Off6mnergynetwork public agencies ta.4ng action to save energy Page 16 The Energy Network Appendix F: Fixture Unit Base Pricing Existing Fixtures New Fixtures Installed Lamp Wattage Make/Model Wattage Cost Type W/TAX Leotek GCL1-60G-MV-xx-3R- HPSV 150 GY-530-WL-PCR7-LLPC-WL 105 Leotek GCL1-60G-MV-xx-3R- HPSV 200 GY-530-WL-PCR7-LLPC-WL 105 Leotek GCL1-60G-MV-xx-3R- HPSV 250 GY-530-WL-PCR7-LLPC-WL 105 Leotek GCL1-80G-MV-xx-3R- HPSV 310 GY-700-WL-PCR7-LLPC-WL 185 Leotek GCL1-80G-MV-xx-3R- HPSV 400 GY-700-WL-PCR7-LLPC-WL 185 Leotek GCL1-60G-MV-xx-3R- MV 175 GY-530-WL-PCR7-LLPC-WL 105 Leotek GCL1-80G-MV-xx-3R- MV 400 GY-700-WL-PCR7-LLPC-WL 185 Leotek GCL1-80G-MV-xx-3R- MV 700 GY-700-WL-PCR7-LLPC-WL 185 Leotek GCL1-60G-MV-xx-3R- HPSV 150 GY-530-WL-PCR7-LLPC-WL 105 Page 17 -,energynetwork public agencies taking action to save energy The Energy Network Appendix G: Invoicing & Post Installation In order to quickly and effectively support the Agency in obtaining Utility incentives and On Bill Financing funds, the Contractor shall use the following Invoice Template without exception. In addition, the Contractor shall use the Closeout Checklist to document any modifications such as changes existing or installed equipment, location. Any changes to location or installed equipment shall be approved by the Agency prior to installation. A blank Contractor Invoice Sheet Template and Closeout Checklist are included in the document links below. (Insert Contractor Logo) Vendor Name INVOICE vaev Aearms Veraar AtlGmp efvorw N Qdomar Name(Rial Cuiama agieeae_ Versa Cama Nana Tam, eertha.e fMa: Sold To: Installation Address paaanmiM eNe mx Nwuaion Do.: Nana' Name: Tame of Ppmem: Atlareae: - cWsv: CtylamlNLp Ceyr5rMs2p carina: ...: ..: .: «V Medal Numbr Duaipt6:n iw a of Equlpavm LMt MalaNatCmc Vna Eabol cert ': TOW - _.. eE BOW - aeE a - ace=-1 AacauM CoQs. Qdomar Name(Rial Cuiama agieeae_ caaraaa Nare larval _CaaeaorS"— Contractor Invoice Costa Mesa SL Cover Sheet Template Closeout Cheddist 7.2 Total e Dine ID 016 -*enersynetwork public agencies taking action to save energy Page 18 The Energy Network Page 19 ®ienergYnetwork O46public agencies taking action to save energy The Energy Network Appendix H: Post Installation ®046 ,energynetwork public agencies taking action to save energy Page 20