Loading...
HomeMy WebLinkAbout05 - CC-5 - Downtown Costa Mesa Gateway Landscape - 11/7/2017CITY COUNCIL AGENDA REPORT MEETING DATE: NOVEMBER 7, 2017 ITEM NUMBER: CC -5 SUBJECT: DOWNTOWN COSTA MESA GATEWAY LANDSCAPE IMPROVEMENTS, FEDERAL PROJECT NO. STPE-P055 (055), CITY PROJECT NO. 13-06 DATE: OCTOBER 20, 2017 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: BALTAZAR MEJIA, CITY ENGINEER FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept work performed by Horizons Construction Co. International, and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Materials Bond seven (7) months after the filing date; release the Faithful Performance Bond six (6) months after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On December 3, 2013, a construction contract in the amount of $554,460.00 was awarded to Horizons Construction Co. International, 432 W. Meats Avenue, Orange, CA 92865. The project improved the streetscape at the terminus of the SR -55 freeway directly north of 19th Street by installing enhanced landscaping and irrigation, decorative median barriers, a gateway entry monument sign, and other engineering improvements. Before Construction After Construction ANALYSIS: The work required by the contract documents was completed on March 10, 2017, to the satisfaction of the City Engineer. The final contract cost amounted to $609,850.55 A report of the final costs is included herein as Attachment 1. A summary of the costs is as follows: Original Contract Cost: $554,460.00 Change Orders Nos. 1 & 2 and Final Quantity Adjustment: $55,390.55 Final Contract Cost: $609,850.55 Change Order No. 1 addressed three extra work items for a total of $36,967.83. The first work item was for changes to the irrigation system requirement from potable water supply to reclaimed water supply. The second work item was for changes to the sign location to comply with Caltrans criteria. The third work item was for the relocation of the power supply location for the monument sign at the request of Caltrans and Southern California Edison (SCE). This change order was approved by the City Manager per Council Policy No. 700-1 on June 23, 2016. Change Order No. 2 in the amount of $18,422.72 addressed costs incurred to repair reclaimed water lines and irrigation heads. In addition, the change order addressed extra work to the landscaping required during the construction and during the time frame the project was under maintenance. This change order was approved by the City Manager per Council Policy No. 700-1 on September 22, 2017. The final cost reflects an approximately ten percent increase to the original contract as a result of the aforementioned change orders. As of this date there are no Stop Notices filed against the monies due to Horizons Construction Co. International. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: Staff captured a Transportation Enhancement Activities (TEA) grant which covered up to $500,000.00 of the project costs, with the remaining balance funded through the City's available Gas Tax and Measure M funds. LEGAL REVIEW: There is no legal review required for this item. CONCLUSION: The Downtown Costa Mesa Gateway Landscape Improvements on SR -55 Freeway, City Project No. 13-06 has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion, release the remaining retention monies 35 days after the Notice of Completion filing date, and release the bonds accordingly. E RAJA SETHURAMAN Public Services Director ATTACHMENT: 1 — Cost Summary BALTAZAR MEJIA City Engineer DISTRIBUTION: City Manager Assistant City Manager City Attorney Transportation Services Manager City Clerk Staff File ATTACHMENT CITY OF COSTA MESA 8th and Final Payment to: HORIZONS CONSTRUCTION CO. INT'L, INC. 432 W Meats Ave, Orange, CA 92865 PROJECT: DOWNTOWN COSTA MESA GATEWAY LANDSCAPE IMPROVEMENT ON SR -55 FREEWAY FEDERAL PROJECT NO. STPE-P055(055), CITY PROJECT No. 13-06 ITEM NO BID QUANTITY DESCRIPTION UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 1 LS MOBILIZATION $24,000.00 100.0 % 0.000 % 100.0 % $24,000.00 $0.00 $24,000.00 $24,000.00 2 1 LS WATER POLLUTION CONTROL $2,500.00 100.0 % 0.0 % 100.0 % $2,500.00 $0.00 $2,500.00 $2,500.00 3 1 LS TEMPORARY TRAFFIC CONTROL $27,500.00 100.0 % 0.0 % 100.0 % $27,500.00 $0.00 $27,500.00 $27,500.00 4 1 LS REMOVE IRRIGATION SYSTEM $7,500.00 100.0 % 0.0 % 100.0 % $7,500.00 $0.00 $7,500.00 $7,500.00 5 1 LS CLEARING AND GRUBBING $32,000.00 69.20 % 0.0 % 69.2 % $22,143.59 $0.00 $22,143.59 $32,000.00 6 3,620 CY EARTHWORK $7.00 1,500.0 CY 0.0 CY 1,500.0 CY $10,500.00 $0.00 $10,500.001 $25,340.00 7 1 EA CONSTRUCTION GATEWAY MONUMENT SIGN $185,000.00 1.D0 EA 0.D0 EA 1.00 EA $185,000.00 $0.00 $185,000.00 $185,000.00 8 1 EA FURNISH AND INSTALL 2 -INCH WATER METER AND $3,500.00 0 EA 0 EA 0 EA $0.00 $0.00 $0.00 $3,500.00 9 1 LS LANDSCAPE AND IRRIGATION IMPROVEMENT $210,000.00 100.0 % 0.000 % 100.0 % $210,000.00 $0.00 $_210,000.00 $210,000.00 10 1 LS ELECTRICAL AND LIGHTING IMPROVEMENTS $37,120.00 100.0 % 0.D0 % 100.0 % $37,120.00 $0.00 $37,120.00 $37,120.00 Supplemental Work for Various Bid Items in Lieu of Quantity Adjustment SW1 1 LS Replace all Irrigation Equipment & Material to Reclaimed Water $ 14,293.01 100 % 0 % 100 % $14,293.01 $0.00 $14,293.01 SW2 1 LS Additional Cost due to Delay by All American Asphalt $ 1,658.62 100 % 0 % 100 % $1,658.62 $0.00 $1,658.62 SW3 1 LS Permit Fee $ 2,200.00 100 % 0 % 100 % $2,200.00 $0.00 $2,200.00 j SW4 1 LS Cut & Cap 12'Clay Pipe Fill with Concrete $ 347.21 100 % 0 % 100 % $347.21 $0.00 $347.21 SW5 1 LS Additional Cost to Backfill and Re -Excavate Monument Sign FootingI $ 9,697.57 100 % 0 % 100 % $9,697.57 $0.00 $9,697.57 TOTAL: 1 $554,460.001 $0.00 $554,460.001 $554,460.00 CHANGE ORDERS Change Order No.1 1 LS Additional Irrigation $ 6,634.83 100 % 0 % 100 % $6,634.83 $0.00 $6,634.83 $6,634.83 C01 1 LS Sign Backing$ 13,335.00 100 % 0 % 100 % $13,335.00 $0.00 $13,335.00 _ $13335.00 1 LS Electrical Service $ 16,99&00 100 % 0 % 100 % $16,998.0 $0.00 $16,998.00 $16,998.00 TOTAL CHANGE ORDERS NO. 1 $36,967.83 $O.00F $36,967.83 $36,967.83 Change Order No. 2 CO2 1 LS Repair Irrigation System & Replace and Maintain Landscaping until December 2016 $ 18 422.72 0 % 100 % 100 % $0.00 $18,422.72 $18,422.72 $18,422.72 TOTAL CHANGE ORDER NO. 2 $0.00 $18 2.721 $18,422.72 TOTAL BASE BID PLUS CHANGE ORDERS): $591,427.831 $18,422.721 $609,850.55F $609,85(