HomeMy WebLinkAbout06 - CC-6 - Installation of Emergency Generators at - 11/7/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: NOVEMBER 07, 2017
ITEM NUMBER: CC -6
SUBJECT: INSTALLATION OF EMERGENCY GENERATORS AT POLICE FACILITY, FIRE
STATION NO. 4 AND CORPORATION YARD - CITY PROJECT NO. 17-11
DATE: OCTOBER 26, 2017
FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335
RECOMMENDATION
Adopt plans, specifications, and working details for the Installation of Emergency Generators
at the Police Facility, Fire Station No. 4 and Corporation Yard — City Project No. 17-11.
2. Approve Budget Adjustment No. 18-013 in the amount of $90,000 towards the project.
3. Award a construction contract to Global Power Group, Inc., 3309 East Miraloma Avenue, Suite
104, Anaheim, California, 92040, in the amount of $255,000.00.
4. Authorize the Mayor and the City Clerk to execute the Public Works Agreement.
BACKGROUND
The existing generators located at the Police Facility (99 Fair Drive) and Fire Station No. 4 (2300
Placentia Avenue) do not have the electrical capacity to meet the needs of each facility in the
event of a power outage and have well exceeded their life expectancy. The Corporation Yard
(2300 Placentia Avenue) does not have an electrical back up power supply for fuel pumps or
communications in the event of a power outage.
The scope of work for this project consists of the installation of City -furnished emergency
generators at three City facilities - a 600 Kw emergency generator at the Police Facility, an 80 Kw
emergency generator at Fire Station No. 4 and an 80 Kw emergency generator at the Corporation
Yard - as well as other incidental work needed to complete the project in accordance with the
contract documents. The Location Map is included as Attachment 1.
The generators were ordered by the City in May 2017, following the approval by the City Council
in April 2017, and will be ready for delivery for the contractor in December 2017.
ANALYSIS
The City Clerk received and opened two (2) bids for this project on September 28, 2017.
Global Power Group, Inc. was the apparent low bidder with a bid proposal of $255,000.00. The
Engineer's estimate for the project was $488,187.00; and the average of the two (2) bids
received amounted to $446,959.50.
Analysis of the bids indicates the apparent low bidder submitted a bid proposal that is 47%
lower than the Engineer's estimate. The variance between the low bidder and the Engineer's
estimate may be attributed to the competitive conditions prevalent in the construction industry at
this time. The Bid Abstract is included as Attachment 2.
On October 7, 2017, the City received a bid protest letter from Amtek Construction, the second
lowest bidder (Attachment 3). In its protest letter, Amtek Construction indicates that Global
Power Group, Inc is unable to perform the work specified in the contract without the solicitation
of a subcontractor to perform masonry work and a subcontractor for excavation that includes
storm water control. Amtek Construction believes that Global Power Company's bid proposal
should be deemed non-responsive and the contract should be awarded to Amtek Construction.
Following receipt of the Amtek Construction protest letter, staff requested clarification from
Global Power Group, Inc. relating to the listing of the Storm Water Control subcontractor. As
can be seen from Global Power Group Inc.'s response letter (Attachment 4), the cost to
perform this work is less than one-half of one percent (0.5%) of the total bid and the contractor
is not required to list them in the bid proposal.
Further, Global Power Group, Inc. is a licensed "A" General Engineering Contractor. According
to the Contractors State Licensing Board description of classification and definitions, a licensed
"A" contractor can perform the work of a single trade (specialty work) if that specialty work is an
integral part of the scope of work for a general engineering contractor; therefore, masonry work
can be self -performed by Global Power Group, Inc.
Based on the aforementioned information, staff finds that this firm has submitted a responsive
bid that is compliant with the bidding requirements and recommends that City Council award
the contract for the above mentioned project to Global Power Group, Inc.
The license and references of Global Power Group, Inc., were checked and staff has found
them to be in good standing. Global Power Group, Inc. has successfully completed similar
projects in the City of Anaheim and the City of Coronado.
ALTERNATIVES CONSIDERED
The alternative to this Council action would be to reject all the bids. If all the bids are rejected, the
City would need to readvertise or cancel the project. Staff believes that readvertising the project
will not result in lower bids.
FISCAL REVIEW
Funding for this project in the amount of $165,000 is available from the Capital Improvement Fund
appropriated in prior fiscal years. The Budget Adjustment in the amount of $90,000 (Attachment
5) is proposed from the unencumbered Equipment Replacement Fund balance
LEGAL REVIEW
Global Power Group, Inc. has furnished the necessary bonds and insurance, which were
approved as to form by the City Attorney. After the award and subsequent execution of the
contract, a "Notice to Proceed" will be issued.
I•
CONCLUSION
The advertisement and bid opening for the Installation of Emergency Generators at the Police
Facility, Fire Station No. 4 and Corporation Yard — City Project No. 17-11, has been completed. It
is recommended that the City Council adopt the plans, specifications, and working details for said
project; approve a budget adjustment in the amount of $90,000; award the contract to the
apparent low bidder, Global Power Group, Inc. in the amount of $255,000; and authorize the
Mayor and the City Clerk to execute the Public Works Agreement.
RAJA SETHURAMAN
Public Services Director
ELIZABETH ANDREW
BALTAZAR MEJIA
City Engineer
Interim Assistant Finance Director
ATTACHMENTS: 1. Location Map
2. Bid Abstract
3. Protest Letter from Amtek Construction
DISTRIBUTION
4. Response to Protest from Global Power
5. Budget Adjustment No. 18-013 for $90,000
City Manager
Assistant City Manager
City Attorney
City Clerk
Staff
File
3
�1
ATTACHMENT 1
{--- . PROPOSED LOCATION OF GENERATOR ,
ESTANCIA
HIGH SCHOOL
MUNICIPAL GOLF COURSE
PROPOSED LOCATION OF GENERATORS
'�7 ---F- ---
FIRE
STATION 94
CORPORATE YARD
4
ATTACHMENT 2
CITY OF COSTA MESA
DEPARTMENT OF PUBLIC SERVICES
INSTALLATION OF EMERGENCY GENERATORS
AT POLICE FACILITY, FIRE STATION NO.4 AND CORPORATION YARD
CITY PROJECT NO. 17-11
BID OPENING DATE: SEPTEMBER 28, 2017
BID OPENING RESULTS
Bidder
City
Total Bid
Pro "ects A+B+C
$255,000.00
1. GLOBAL POWER GROUP, INC..
ANAHEIM
WHITTIER
2. AMTEK CONSTRUCTION
$638,919.00
Average $446,959.50
Engineer's Estimate: $488,187.00
5
12409 SLAUSON AVE. STE "I", WHITTIER, CA 90606 (562)696-7111 FAX:(562)696-7022 J�ATZACHMENT 3
City of Costa Mesa March 13, 2017
77 Fair Drive,
Costa Mesa, CA 92628
Attn: Thom Coughran (thom.coughran@costamesaca.gov
RE: Bid Results from Costa Mesa Project No. 17-11 Installation of Emergency Generators
Subject: Protest for Lack of Subcontractor Listing
Mr. Coughran,
At the bid opening on September 28th at 2:00pm, Global Power Group, Inc. was the technical
low bidder with the lowest dollar amount when Items A, B, and C were combined. However, Global
Power did not list a single subcontractor on their subcontractor list, but most importantly they did not
list a masonry contractor. This means that Global Power will be required to complete the entire project
by only utilizing its own forces. Global Power Group, Inc. is a licensed A, B, and C-10 contractor, but none
of these licenses cover the C-29 (masonry). As noted from the California State License Board, the
licenses A and B do not include masonry as a trade. Therefore, Global Power Group cannot complete
this project with its own forces and therefore should be disqualified.
Furthermore, Global Power Group did not list a Storm Water Control subcontractor, or at the
very least a subcontractor for excavation that includes the Storm Water Control. Special Provisions
pages 22 and 23 state that the contractor shall include an SWPPP or at the very least a Water Pollution
Control Plan (WPCP). Global Power Group did not list a single subcontractor and is not qualified to
create an SWPPP or a WPCP. Global Power did not even list a subcontractor that included the SWPPP
creation in their bid to them, as AMTEK Construction did.
Due to these two facts presented above, Global Power Group Inc. cannot complete the project
for the City of Costa Mesa without employing some sort of subcontractor, but they did not list any
subcontractor. Therefore, Global Power Group should be disqualified as the technical low bidder and
AMTEK Construction should be awarded the project.
We await your response in this matter.
0& - - rooe
Alan Sayce
AMTEK Construction
Vice President
www.amtekconstruction.com email: info@amtekconstruction.com
GENERAL ENGINEERING CONTRACTORS LECENSE 490382
2
Global Powe r
GROUP, INC.
"Our Business Is Powering Your Business"
City of Costa Mesa
77 Fair Drive
Costa Mesa, CA 92628
Global Power Group, Inc.
12060 Woodside Ave
Lakeside, CA 92040
11 �� lY .LIE}I}lil }L}11LI''i'lltk Il `
Tel No. (619) 579-1221
Fax No. (619) 579-1166
ATTACHMENT 4
License No. 870741
License Classifications: A, B, C-10
Attn: Thom Coughran (ihom.cgughranppstamesaca.gov)
Subject: Response to Protest for Lack of Subcontractor Listing
Mr. Coughran,
According to the Contractors State Licensing Board, "CSLB" description of classification
and definitions. As an "A" we can perform any work on a publics work project.
The second document is from the CSLB web site asking the same question, you can see their
answer to the question is yes. We self -perform most of our work to insure
quality of the project to the highest standards you would expect for an emergency power
system.
This project is $255k, our storm water person is $ 950.00 which is less than .4% of the project
cost. So we don't have to list them.
Thank you,
Splvatol(e Martorana
7
BUDGET ADJUSTMENT AUTHORIZATION
Unit
CITY
Department
Public Services
Division
Equipment Maintenance
Serial Number
18-013
Type of Transaction
Program
Reason for Request:
❑ Revenue Estimate
® Expenditure Appropriation
CITY
❑ Estimate Increase
❑ Intra -Departmental Transfer
To increase appropriation by $90,000 for the purchase and
❑ Estimate Decrease
❑ Inter -Departmental Transfer
installation of an emergency generator and transfer switch at
❑ Project -To -Project Transfer
the Corporation Yard, as approved by City Council at the
® Source
® Appropriation Increase
November 7, 2017 meeting.
[:1 From Existing Budget Appropriations
19500
50920
E3 From Donations, Fees, or Grants
Appropriation Decrease
$90,000
Z From Unappropriated Fund Balance
Unit
Account
Name
Fund
Organization
Program
Project/Grant
Increase
Decrease
CITY
340295
Undesignated Fund Balance
601
90000
50240
-
-
$90,000
CITY
590800
Other Equipment
601
19500
50920
-
$90,000
-
Department Authorization:
Department Director Date
Recommendation: Z Approval
Reasons for Disapproval:
Director of Finance
❑ Disapproval
Date
City Manager Action:
Z Approved ❑ Disapproved
City Manager
❑ Not Required
Date
Budget Verification:
The above information has been reviewed, is complete and accurate, and the appropriations
and/or unappropriated funds are sufficient to support the request.
Z Yes ❑ No
Budget Analyst Date
City Council Action:
Z Approved ❑ Disapproved
❑ Not Required
Date
D
D
n
2
K
rn
Z
cn