HomeMy WebLinkAbout04 - CC-4 - West Bay St Improvements Project- City - 11/21/2017CITY COUNCIL AGENDA REPORT
MEETING DATE: NOVEMBER 21, 2017 ITEM NUMBER: CC -4
SUBJECT: WEST BAY STREET IMPROVEMENTS PROJECT- CITY PROJECT NO. 17-06 (CDBG)
DATE: NOVEMBER 2, 2017
FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION
PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR
FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335
RECOMMENDATION:
1. Accept the work performed by Copp Contracting, Inc. and authorize the City Clerk to file the
Notice of Completion.
2. Release the Labor and Material Bond seven (7) months after the filing date; release the
Faithful Performance Bond one (1) year after the filing date; and release the retention monies
35 days after the Notice of Completion filing date.
BACKGROUND:
On June 20, 2017, a construction contract in the amount of $179,149.00 was awarded to Copp
Contracting, Inc., 6751 Stanton Avenue, Buena Park, California, 90621, for the West Bay Street
Improvements Project, City Project 17-06. The scope of work included removal and
reconstruction of damaged pavement sections, cold milling, overlaying with new asphalt concrete,
traffic signal loop construction, protection and re-establishment of existing survey monuments and
installation of lane markings, striping, pavement legends, and raised pavement markers,
adjustments of associated utilities, mobilization, traffic control, and other incidental work needed
to complete the project in accordance with the contract documents. A map of the project limits
is included as Attachment 1.
West Bay Street Before Improvements West Bay Street After Improvements
ANALYSIS:
The work required by the contract documents was completed on October 11, 2017, to the
satisfaction of the City Engineer. The final contract cost amounted to $192,968.69. A report of the
final costs is included herein as Attachment 2.
A summary of the costs is as follows:
Original Contract Cost: $ 179,149.00
Change Order No. 1: $ 17,279.69
Final Quantity Adjustments: ($ 3,460.00)
Final Contract Cost: $ 192,968.69
Change order No. 1 for the total amount of $17,279.69 was issued for the reconstruction of Thurin
Street from West Bay Street to Victoria Street. This change order provided the City the
opportunity to rehabilitate deteriorating Thurin Street (approximately '/4 mile) by utilizing the
competitive contract unit prices established at the time of bid and eliminating additional costs
associated with mobilization and other incidental work.
The final contract price reflects a 7.7% increase to the original contract due to the change order
and final quantity adjustments.
As of this date, there are no Stop Notices filed against the monies due to Copp Contracting, Inc.
ALTERNATIVES CONSIDERED:
There were no alternatives considered for this item.
FISCAL REVIEW:
This project was funded with Community Development Block Grant (CDBG) funds appropriated in
Fiscal Year 2015-2016 and 2016-2017.
LEGAL REVIEW:
There is no legal review required on this item.
CONCLUSION:
The West Bay Street Improvements Project,
recommended that the City Council authorize
remaining retention monies 35 days after the
bonds accordingly.
RAJA SETHURAMAN
Public Services Director
ATTACHMENTS:
DISTRIBUTION
1 - Location Map
2- Cost Summary
City Manager
Assistant City Manager
City Attorney
City Clerk
Staff
File
City Project 17-06, has been completed. It is
staff to file the Notice of Completion; release the
Notice of Completion filing date; and release the
BALTAZAR M EJ IA
City Engineer
II
CITY OF COSTA MESA ATTACHMENT 1
ort
N.T.S. Public Services/Engineering
Z J Z J A
Lli WILSON ST.
[-L]
> F w_ U)
a V) z
z
Q
F
a c�
n Uj AVOCADO ST.
J
} � O
w U
a
f
O
w
Q
L
VICTORIA ST.
VICTORIA ST. a
U
W
V)
z w RALCAM PL.
V) J O
U
Q U O
O
HAMILTON ST. L HAMILTON ST,
CTR.
070
JO'
NZ03
KNOWELL PL, o
QQ�
ao _
E:B�ZST:7 � BAY ST.
V)
N
W
J
ST YORKSHIRE
U
ST.
ST.
ALLEY #40
eqY
ST. v~ ST
L FORD RD.
:S1:1J
a a ALLEY #41
a w<
o w
a � ERNARD ST.
ST. a a
w w BERNARD ST.
a ALLEY #18 a
Q; ti
Qom.
19TH ST. a 19TH ST. P,' rT �{ P�� sl
P Gj
GAJ �� Oh
(CDBG) WEST BAY STREET IMPROVEMENTS
PROJECT #17-06 (AS -BUILT)
STREET IMPROVEMENT LOCATIONS 3
Page 1 of 1
L:
N 'IT
F --
Z CITY OF COSTA MESA
LU
U ATTACHMENT 2
Q FOR PAYMENT ON THE WARRANT LIST OF 11/4/17 DATE: 10/30/17
Q3rd(FINAL) Payment to: Copp Contracting, Inc. PAGE: 1 OF 2
6751 Stanton Ave. Buena Park, CA 90621
#REF! West Bay Street Improvements (CDBG)
City Project No. 17-06
ITEM
NO
BID
QUANTITY DESCRIPTION
UNIT
PRICE
PREVIOUS
QUANTITY
QUANTITY
THIS ESTIMATE
TOTAL QUANTITY
TO DATE
PREVIOUS
AMOUNT
AMOUNT
THIS EST
TOTAL
TO DATE
CONTRACT
PRICE
1
1
LS MOBILIZATION
11,530.00
100.00
%
0.00 %
100.00 %
$11,530.00
$0.00
$11,530.00
$11,530.00
2
30,000
SF COLD MILL 2" MAX DEPTH
0.32
30,000.00
SF
0.00 SF
30,000.00 SF
$9,600.00
$0.00
$9,600.00
$9,600.00
3
100
TON R&R A/C 8" MAX DEPTH
167.00
100.00
TON
0.00 TON
100.00 TON
$16,700.00
$0.00
$16,700.00
$16,700.00
4
150
TON TYPE "D" A/C LEVELING
107.00
150.00
TON
0.00 TON
150.00 TON
$16,050.00
$0.00
$16,050.00
$16,050.00
5
1,200
TON TYPE "B" A/C OVERLAY
65.35
1,200.00
TON
0.00 TON
1,200.00 TON
$78,420.00
$0.00
$78,420.00
$78,420.00
6
14
EA ADJ.M/H TO GRADE
435.00
14.00
EA
0.00 EA
14.00 EA
$6,090.00
$0.00
$6,090.00
$6,090.00
7
10
EA JADJ. WN TO GRADE
385.00
10.00
EA
0.00 EA
0.00 EA
$3,850.00
$0.00
$3,850.00
$3,850.00
8
5
EA REFLECTIVE BLUE MARKERS
10.00
5.00
EA
0.00 EA
5.00 EA
$50.00
$0.00
$50.00
$50.00
9
2
EA INSTALL TYPE E LOOPS
310.00
2.00
EA
0.000 EA
0.00 EA
$620.00
$0.00
$620.00
$620.00
10
8
EA INSTALL TYPE D LOOPS
350.00
8.00
EA
0.00 EA
8.00 EA
$2,800.00
$0.00
$2,800.00
$2,800.00
11
1
LS STRIPING,MARKING LEGEND
5,600.00
100.00
%
0.00 %
100.00 %
$5,600.00
$0.00
$5,600.00
$5,600.00
12
10
EA ADJ/RESET SURVEY MONUMENT
275.00
10.00
EA
-1.00 EA
9.00 EA
$2,750.00
-$275.00
$2,475.00
$2,750.00
13
1
LS TRAFFIC CONTROL
5,089.00
100.00
%
0.00 %
100.00 %
$5,089.00
$0.00
$5,089.00
$5,089.00
14
1
FA ADDITIONAL WORK ITEMS
20,000.00
1.00
FA
0.00 FA
1.00 FA
$20,000.00
$0.00
$20,000.00
$20,000.00
Subtotal Original Contrac
$179,149.00
,$275.00
$178,874.00
$179,149.00
Change Order No.1 Thurin St from W. Bay St to Victoria St
161.89
TON TYPE "B' A/C OVERLAY
65.35
0.00 TON
161.89 TON
161.89 TON
$0.00
$10,579.51
$10,579.51
$10,579.51
16,610
SF COLD MILL 2" MAX DEPTH
0.32
0.00
SF
16,610.00 SF
16,610.00 SF
$0.00
$5,315.20
$5,315.20
$5,315.20
8
EA ADJ.M/H TO GRADE
435.00
0.00
EA
7.00 EA
7.00 EA
$0.00
$3,045.00
$3,045.00
$3,480.00
6
EA ADJ. W/V TO GRADE
385.00
0.00
EA
6.00 EA
6.00 EA
$0.00
$2,310.00
$2,310.00
$2,310.00
COt
1
LS TRAFFIC CONTROL
5,089.00
0.00
%
100.00 %
100.00 %
$0.00
$5,089.00
$5,089.00
$5,089.00
10
EA ADJ/RESET SURVEY MONUMENT
275.00
0.00
EA
0.00 EA
0.00 EA
$0.00
$0.00
$0.00
$2,750.00
1
LS STRIPING MARKING LEGEND
5,600.00
0.00
%
100.00 %
100.00 %
$0.00
$5,600.00
$5,600.00
$5,600.00
2.87
TON R&R A/C 8" MAX DEPTH
167.00
0.00
TON
2.870 TON
0.00 TON
$0.00
$479.29
$479.29
$479.29
15.67
TON TYPE "D" A/C LEVELING
107.00
0.00
TON
15.67 TON
15.67 TON
$0.00
$1,676.69
$1,676.69
$1,676.69
-1
FA ADDITIONAL WORK ITEMS
20,000.00
0.00
FA
-1.00 FA
-1.00 FA
$0.00
-$20,000.00
-$20,000.00
$20,000.00
Subtotal Change Order No. 1
$0.00
$14,094.69
$14,094.69
$17,279.69
PROJECT TOTAL:
$179,149.00
$13,819.69
$192,968.69$196,428.69