Loading...
HomeMy WebLinkAbout05 - CC-5 - Mesa Verde Median Landscape and Irrigat - 11/21/2017CITY COUNCIL AGENDA REPORT MEETING DATE: NOVEMBER 21, 2017 ITEM NUMBER: CC -5 SUBJECT: MESA VERDE MEDIAN LANDSCAPE AND IRRIGATION IMPROVEMENTS PROJECT - CITY PROJECT NO. 16-19 DATE: NOVEMBER 13, 2017 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER, (714) 754-5335 RECOMMENDATION: 1. Accept the work performed by KASA Construction, Inc. and authorize the City Clerk to file the Notice of Completion. 2. Release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond one (1) year after the filing date; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On December 6, 2016, a construction contract in the amount of $457,737.00 was awarded to KASA Construction, Inc., 15148 Sierra Bonita Lane, Chino, California for the median landscape and irrigation improvements in Mesa Verde Drive from Adams Avenue west to Adams Avenue east. The scope of work for this project included replacing existing grass with drought tolerant landscaping and the installation of a new, high efficiency irrigation system throughout the medians along the mentioned segment for the Mesa Verde Drive. W Before Improvements ANALYSIS: After Improvements The work required by the contract documents was completed on September 18, 2017, to the satisfaction of the City Engineer. The final contract cost amounted to $389,863.76. A report of the final costs is included herein as Attachment No. 1. 1 A summary of the costs is as follows: Original Contract Cost: $ 457,737.00 Change Orders #1 & 2: ($ 41,334.00) Final Quantity Adjustments: ($ 26,539.24) Final Contract Cost: $ 389,863.76 Change Orders No. 1 and No. 2, for a total amount of ($41,334.00) were issued for deletions from the scope of the project, the procurement, delivery and installation of four (4) irrigation controllers and installation of 3 out of 4 hydrometers that were determined usable and did not require to be replaced. The final contract cost reflects a 14.83% decrease to the original contract cost as a result of the change orders and the final quantity adjustments. As of this date, there are no Stop Notices filed against the monies due to KASA Construction, Inc. ALTERNATIVES CONSIDERED: There are no alternatives considered for this item. FISCAL REVIEW: This project was funded from Capital Improvement Funds from Fiscal Year 2014-2015. Staff also acquired a $44,440.50 rebate from the Municipal Water District of Orange County as part of an incentive program to reduce irrigation runoff and increase water efficiency. The funding was utilized to replace 34,185 sq. ft. of turf with drought tolerant materials along the Mesa Verde medians. LEGAL REVIEW: There is no legal review required on this item. CONCLUSION: The Median Landscape and Irrigation Improvements Project - City Project No. 16-19 has been completed. It is recommended that the City Council authorize staff to file the Notice of Completion; release the remaining retention monies 35 days after the Notice of Completion filing date; and release the bonds accordingly. RAJA SETHURAMAN Public Services Director ATTACHMENTS: DISTRIBUTION 1 - Cost Summary City Manager Assistant City Manager City Attorney City Clerk Staff File BALTAZAR MEJIA City Engineer 1► FOR PAYMENT ON THE WARRANT LIST OF 4th (Final) Payment to: KASA Construction Inc. 15148 Sierra Bonita Lane, Chino, CA 91710 PROJECT: Median Landscape and Irrigation Improvements CITY PROJECT NO. 16-19 7/28/17 CITY OF COSTA MESA ATTACHMENT DATE: 07/28/2017 PAGE: 1 OF 2 ITEMBID NO QUANTITY DESCRIPTION UNIT PRICE PREVIOUS QUANTITY QUANTITY THIS ESTIMATE TOTAL QUANTITY TO DATE PREVIOUS AMOUNT AMOUNT THIS EST TOTAL TO DATE CONTRACT PRICE 1 1 LS PAYMENT AND PERFORMANCE BOND (NOT USED) 0.00 0.00 % 0.00 % 0.00 % $0.00 $0.00 $0.00 $0.00 2 1 LS MOBILIZATION AND TRAFFIC CONTROL 22,900.00 100.00 % 0.00 % 100.00 % $22,900.00 $0.00 $22,900.00 $22,900.00 3 1,310 SF REMOVAL OF EXISTING BOMANITE PAVING 3.00 0.00 SF 1,310.00 SF 0.00 SF $0.00 $3,930.00 $3,930.00 $3,930.00 4 177 LF REMOVAL OF EXISTING CONCRETE CURB AT BOMANITE PAVING 14.00 177.00 LF 0.00 LF 177.00 LF $2,478.00 $0.00 $2,478.00 $2,478.00 5 1,740 LF REMOVAL OF EXISTING V CONCRETE BAND ON MEDIAN #9 3.00 1,738.00 LF 0.00 LF 1,738.00 LF $5,214.00 $0.00 $5,214.00 $5,220.00 6 177 LF REPLACEMENT OF CONCRETE CURB AND ASPHALT AT CURB 64.00 177.00 LF 3.00 LF 180.00 LF $11,328.00 $192.00 $11,520.00 $11,328.00 7 167,700 LB PROPOSED BOULDERS 131 0.06 122,000.00 LB 45,700.00 LB 167,700.00 LB $7,320.00 $2,742.00 $10,062.00 $10,062.00 8 1,060 SF PROPOSED DECOMPOSED GRANITE PAVING 4.00 0.00 SF 1,131.00 SF 1,131.00 SF $0.00 $4,524.00 $4,524.00 $4,240.00 9 1 FA ADDITIONAL WORK ITEMS 50,000.00 0.47 FA 0.024 FA 0.00 FA $23,695.00 $1,205.50 $24,900.50 $50,000.00 10 34,650 SF EXISTING SOD REMOVAL 1.00 34,638.00 SF 0.00 SF 34,638.00 SF $34,638.00 $0.00 $34,638.00 $34,650.00 11 6 EA 24" BOX TREES 550.00 6.00 EA 0.00 EA 6.00 EA $3,300.00 $0.00 $3,300.00 $3,300.00 12 96 EA 15 GAL. ACCENT PLANTS (NEW ZEALAND FLAX LILY) 80.00 0.00 EA 96.00 EA 96.00 EA $0.00 $7,680.00 $7,680.00 $7,680.00 13 120 EA 5 GAL. ACCENT PLANTS (AGAVE DESMETTIANA) 32.00 0.00 EA 0.00 EA 0.00 EA $0.00 $0.00 $0.00 $3,840.00 14 1,122 EA 2 GAL. SHRUB (DOUBLE KNOCKOUT ROSE) 6235 SF. (Substituted Salvia "Heatwave") 23.00 0.00 EA 1,122.00 EA 1,122.00 EA $0.00 $25,806.00 $25,806.00 $25,806.00 15 2,123 EA 1 GAL. SHRUB (LOMANDRA) 10110 SF. 9.00 0.00 EA 2,123.00 EA 2,123.00 EA $0.00 $19,107.00 $19,107.00 $19,107.00 16 12 EA 5 GAL. SHRUBS (DIANELLA CLUMPING) 28.00 0.00 EA 1200.EA 1200. EA $0.00 $336.00 $336.00 $336.00 17 2,158 EA 1 GAL. SHRUB (WALL GERMANDER) 4905 SF. 8.00 0.00 EA 2,158.00 EA 2,158.00 EA $0.00 $17,264.00 $17,264.00 $17,264.00 18 1,685 EA 1 GAL. SHRUB (DIANELLA) 8025 SF. 8.00 0.00 EA 1,685.00 EA 1,685.00 EA $0.00 $13,480.00 $13,480.00 $13,480.00 19 60 EA SF OUNDCOVER (DYMONDIA) DIRT FLATS 1270 50.00 0.00 EA 60.00 EA 60.00 EA $0.00 $3,000.00 $3,000.00 $3,000.00 20 1,120 LF STEEL EDGING 6.00 1,120.00 LF 0.00 LF 1,120.00 LF $6,720.00 $0.00 $6,720.00 $6,720.00 21 35,960 SF FINE GRADING, BED PREPARATION 0.35 35,960.00 SF 2,974.05 SF 38,934.05 SF $12,586.00 $1,040.92 $13,626.92 $12,586.00 22 222 CY GRO MULCH 2" 55.00 0.00 CY 238.39 CY 238.39 CY $0.00 $13,111.34 $13,111.34 $12,210.00 23 29 ZN IRRIGATION-DRIP/BUBBLERS 4,200.00 29.00 ZN 0.00 ZN 29.00 ZN $121,800.00 $0.00 $121,800.00 $121,800.00 24 4 EA NEW CONTROLLER -RAIN MASTER 12,000.00 0.60 EA 0.00 EA 0.60 EA $7,200.00 $0.00 $7,200.00 $48,000.00 25 4 EA BACK FLOW 1,800.00 4.00 EA 0.00 EA 4.00 EA $7,200.00 $0.00 $7,200.00 $7,200.00 26 3 EA ALLSPEC ENCLOSURE 1,000.00 3.00 EA 0.00 EA 3.00 EA $3,000.00 $0.00 $3,000.00 $3,000.00 27 4 EA BERMAD HYDROMETER 900.00 1.00 EA 3.00 EA 4.00 EA $900.00 $2,700.00 $3,600.00 $3,600.00 28 1 LS 90 DAY MAINTENANCE 4,000.00 0.00 % 100.00 % 100.00 % $0.00 $4,000.00 $4,000.00 $4,000.00 Change Orders PROJECT TOTAL: $270,279.00 $120,118.76 $390,397.76 $457,737.00 CO 1 1 LS DELETION IF BID ITEM NO. 24A: "PROCURE, DELIVER AND INSTALL NEW CONTROLLER RAIN MASTER" ($40,800.00) 0 % 100 % 100 % $0.00 $0.00 $0.00 ($40,800.00) CO 2 1 LS Turn over 3 - hydrometers (no install) ($534.00) 0 % 100 % 100 % $0.00 -$534.00 ($534.00) ($534.00) TOTAL CHANGE ORDERS: $0.00 -$534.001 0 $534.00 TOTAL (BASE BID PLUS CHANGE ORDERS): $270,279.00 $119,584.761 $389,863.76 $416,403.00