HomeMy WebLinkAboutNB-3 - 26-159 - PSA for Fairview Park Restoration - 3/17/2026CITY OF COSTA MESA
Agenda Report
77 Fair Drive
Costa Mesa, CA 92626
File #:26-159 Meeting Date:3/17/2026
TITLE:
PROFESSIONAL SERVICES AGREEMENT WITH PSOMAS FOR THE FAIRVIEW PARK WEST
BLUFF RESTORATION PROJECT
DEPARTMENT:PARKS AND COMMUNITY SERVICES
PRESENTED BY:BRIAN GRUNER. PARKS AND COMMUNITY SERVICES
DIRECTOR
CONTACT INFORMATION:KELLY DALTON, FAIRVIEW PARK ADMINISTRATOR (714) 754-
5135
RECOMMENDATION:
Staff recommends the City Council:
1.Award a Professional Services Agreement to PSOMAS to provide engineering design,
environmental planning,cultural resource management,and related professional services for
the Fairview Park West Bluff Restoration Project in an amount not to exceed $533,189 for a
term of two (2)years from March 17,2026 to March 16,2028 with three (3)additional one-
year renewal options.
2.Authorize a ten percent (10%) contingency in the amount of $53,319 for unforeseen costs.
3.Authorize the City Manager and the City Clerk to execute the Professional Services
Agreement (Attachment 1)and future amendments to the agreement within City Council-
authorized limits.
BACKGROUND:
Fairview Park is the City’s largest park,spanning over 200 acres of open space that forms an integral
component of the lower Santa Ana River ecological corridor.Within Fairview Park’s 208 acres,the
site includes sacred tribal ancestral lands,a Nationally Registered Cultural Resource Historic Site,
and several distinct habitat communities that provide critical habitat for an array of sensitive,rare,
and endangered plant and animal species.The park provides passive and unique recreational
opportunities while serving as a critical open space resource within the City.Due to the presence of
protected habitats,sensitive cultural resources,and special-status wildlife species,projects within
Fairview Park require careful planning,interdisciplinary coordination,and compliance with applicable
local, state and federal environmental protection regulations.
The Fairview Park Master Plan (2008)is currently in the process of being updated,with an
Page 1 of 5
File #:26-159 Meeting Date:3/17/2026
The Fairview Park Master Plan (2008)is currently in the process of being updated,with an
anticipated final adoption in summer 2026.The Fairview Park Master Plan establishes long-term
goals for protecting,preserving,and enhancing the park’s natural and cultural resources while
allowing for compatible public access and recreation.
As part of these long-term objectives,the City has identified the Fairview Park West Bluff as a priority
area,requiring stabilization and ecological restoration.The west bluffs of Fairview Park have been
the subject of study since the 1990s due to slope stability and slope erosion concerns,which pose
long-term risks to park resources, trails, and public safety if left unaddressed.
The Fairview Park West Bluff Restoration Project is intended to address these concerns through a
comprehensive planning and design effort that integrates geotechnical stability improvements with
habitat restoration and resource protection elements.The design project will emphasize solutions
that minimize disturbance,restore native plant communities,protect sensitive cultural resources,and
maintain the park’s natural character,consistent with the Fairview Park Master Plan and the City’s
environmental stewardship goals.
Project Description
The Fairview Park West Bluff Restoration Project focuses on the evaluation,design,planning,and
permitting of stabilization and restoration measures for erosional features along the park’s western
bluffs.The project is a planning and design effort that will culminate in the preparation of construction
-ready plans,specifications,and cost estimates for future implementation.The City is seeking
professional services that include, but are not limited to:
·Project coordination and management
·Review of existing studies, plans, and technical data
·Geotechnical and engineering site design evaluations
·Engineering design for slope stabilization and erosion control
·Habitat restoration and revegetation design
·Environmental planning and California Environmental Quality Act (CEQA) documentation
·Resource agency coordination and environmental permitting support
·Cultural Resource Management Plan preparation
·Preparation of construction quantities, cost estimates, and bid documents
·Public outreach and stakeholder coordination
·Bidding and construction support services
The integrated approach to this project is intended to improve long-term slope stability,reduce
erosion risks,enhance native habitat,and protect sensitive biological and cultural resources,while
maintaining public use and trail access for park visitors.
Page 2 of 5
File #:26-159 Meeting Date:3/17/2026
ANALYSIS:
On June 5,2025,a Request for Proposal (RFP No.25-23)for professional engineering and
environmental planning services was released for the Fairview Park Bluff Restoration Project.In
response to the City’s RFP, the City received three (3) proposals from the following firms:
·Dudek
·PSOMAS
·S2SERM
Proposals were reviewed and scored by an interdisciplinary panel of subject matter experts with
expertise in environmental planning,civil design,and public works professional services.Proposals
were reviewed for compliance and responsiveness to the City’s Request for Proposals,qualifications
of key personnel,method of approach,qualifications and experience of the firm,cost,and
references.
Following the initial screening and review of proposals,each of the three consultants were invited to
participate in an oral interview to assist in the evaluation process.Based on the composite scores
from the evaluation panel,PSOMAS was determined to be the highest rated and most qualified
proposer (Table 1).
Table 1: RFP Results
Proposer Total Score Rank
PSOMAS 2687.5 1st
Dudek 2238.55 2nd
S2SERM 2152.1 3rd
Consultant Qualifications
During the evaluation,PSOMAS presented their firm as possessing a thorough understanding of the
project and demonstrated extensive experience and technical ability to perform the outlined scope of
work in the RFP.PSOMAS has supported several public agencies in Southern California with
engineering design,ecological restoration,and related environmental planning support for over three
decades.Throughout the evaluation process,PSOMAS also emphasized its team’s strengths in
coordinating on similar interdisciplinary and multi-benefit projects,which is of particular value for this
project,given the site’s unique planning variables and multi-benefit objectives.In addition,PSOMAS
demonstrated comparative strength in its public outreach approach,and emphasized the firm’s
careful consideration of stakeholder concerns prior to advancing the project design.This intentional
and meaningful community engagement effort will be essential to building and maintaining
community support for the Fairview Park West Bluff Restoration project and will ensure the project
team addresses key community concerns early.
PSOMAS’proposed approach emphasizes the integration of safety,efficiency,and sensitivity to
onsite resources and community feedback in developing the project design.The firm’s ability to
integrate multi-disciplinary data,develop long-term preservation strategies,and minimize impacts to
existing resources will be critical to a successful design for this project.PSOMAS also demonstrated
Page 3 of 5
File #:26-159 Meeting Date:3/17/2026
existing resources will be critical to a successful design for this project.PSOMAS also demonstrated
a strong understanding of the site’s environmental complexity,and the importance of balancing
geotechnical stabilization with habitat restoration and cultural resource protection.This
comprehensive and collaborative design philosophy aligns closely with the City’s goals for long-term
stewardship and conservation of Fairview Park’s natural resources.
The evaluation panel determined that PSOMAS’technical proposal and interview responses
distinguished the firm through the strength of its multidisciplinary team,its relevant experience with
complex habitat restoration and slope stabilization projects,and its clearly articulated project
approach.In particular,PSOMAS emphasized that the final design solution would not be
predetermined but instead developed through detailed evaluation of the specific conditions
associated with each erosion feature along the west bluff.This adaptive methodology recognizes the
unique geotechnical,biological,and cultural resource conditions present at the site and emphasizes
tailoring stabilization and restoration strategies accordingly,while also incorporating input from the
local community and cultural resource stakeholders.Dudek and S2SERM also submitted qualified
proposals demonstrating relevant experience and technical capabilities,however their responses
presented more predefined design approaches with less emphasis on an adaptive methodology
tailored to site-specific conditions and stakeholder considerations identified for the project.Based on
the evaluation criteria established in the RFP,including firm qualifications,team expertise,and
project approach,the evaluation panel determined that PSOMAS’proposal represented the highest
ranked and most responsive proposal for the project.
Project Funding
In 2023,the City was awarded a significant parks and open space investment through state budget
allocations from then-Senator Dave Min (current Congressman).As part of the 2022-2023 California
State Budget,a total of $10M was awarded to the City of Costa Mesa to support park improvements,
habitat restoration,and open space enhancements,including $2.0M allocated towards this project in
Fairview Park.This historic grant provides the funding source to support the planning and design
phase of the Fairview Park West Bluff Restoration project,as well as the future construction and
implementation phase.The remaining project balance from the grant (approximately $1.45M)will be
used to fund the construction phase once the design and planning phase is completed by PSOMAS.
The Fairview Park Bluffs Restoration Project was postponed due to the prioritization of several
projects,such as the draft Fairview Park Master Plan,the new Mesa Restoration Project,and
ongoing restoration efforts.These projects are well underway and staff is now able to proceed with
the Bluffs Restoration Project and is recommending the award of contract to PSOMAS.
ALTERNATIVES:
Staff does not recommend any alternatives at this time.
FISCAL REVIEW:
Funding for this agreement inclusive of a ten percent (10%)contingency for a total amount of
$586,508 is available from the City’s State Grants Fund (231)and was funded by a grant from the
Office of former Senator Dave Min (current U.S.Representative)through the California State Parks
Department. The current available project balance is approximately $1.6 Million.
Page 4 of 5
File #:26-159 Meeting Date:3/17/2026
LEGAL REVIEW:
The City Attorney’s Office has reviewed this report and the agreement and approves them as to form.
CITY COUNCIL GOALS AND PRIORITIES:
This item supports the following City Council Goal:
·Advance Environmental Sustainability and Climate Resiliency
CONCLUSION:
Staff recommends the City Council:
1.Award a Professional Services Agreement to PSOMAS to provide engineering design,
environmental planning,cultural resource management,and related professional services for
the Fairview Park West Bluff Restoration Project in an amount not to exceed $533,189.00 for a
term of two (2)years from March 17,2026 to March 16,2028 with three (3)additional one-
year renewal options.
2.Authorize a 10 percent (10%) contingency in the amount of $53,319, for unforeseen costs.
3.Authorize the City Manager and the City Clerk to execute the Professional Services
Agreement (Attachment 1)and future amendments to the agreement within City Council-
authorized limits.
Page 5 of 5