Loading...
HomeMy WebLinkAbout- - Presentation - 3/10/2026City of Costa Mesa Facilities Master Plan Development City Council Study Session March 10, 2026 City of Costa Mesa | Facilities Master Plan2 Meet the Project Team Mike AdkinsKevin Rosenstein Xiuwen Qi Aspen Arnthorsdottir Steering Committee Alma Reyes Raja Sethuraman Patrick Bauer Khoa Nguyen Ryan Wilson City of Costa Mesa Master Planning Consultant – Gensler Facilities Conditions Assessment Consultant – Bureau Veritas City of Costa Mesa | Facilities Master Plan3 Agenda •Project Introduction Project Purpose / Project Methodology •Facilities Master Plan Overview Planning Goals / Facilities in Scope •Facilities Evaluation Evaluation Matrix / Facilities Scoring •Key Findings What was Learned •Future Planning Option Implementation Timeline / Financial Analysis •Looking Ahead City of Costa Mesa | Facilities Master Plan4 PROJECT INTRODUCTION City of Costa Mesa | Facilities Master Plan5 Gensler is engaged with City of Costa Mesa to complete a Facilities Master Plan (FMP) that will improve program and service efficiencies, streamline workflows, and position the City for effective municipal administration in the years ahead. The goals of the projects are: »Evaluate the conditions of City facilities »Assess their ability to meet the needs for current service, anticipated growth and future services delivery requirements »Analyze gaps in providing services and identify problems that could affect building performance or integrity »Create an action plan to address these issues with cost estimates Project Purpose City of Costa Mesa | Facilities Master Plan6 Analysis and Findings 11 Departments surveyed and interviewed 17 Facility Condition Assessment Site Tours Facilities Conditions Report City Demographic and Staffing Projections Demand & Supply Gap Analysis Evaluation Matrix Develop Planning Option Implementation Guide and Occupancy Cost Analysis Refined Facilities Master Plan Mar – May 2025 Jun 2025 – Dec 2026 1 Steering Committee Visioning Workshop 2 Steering Committee Key Findings + Options Workshop City Council Study Session Facilities Conditions Evaluations Activities Milestones Action Plan Jan – Mar 2026 Project Methodology 4 Work sessions with Fire, Police, and Park City of Costa Mesa | Facilities Master Plan7 FACILITIES MASTER PLAN OVERVIEW City of Costa Mesa | Facilities Master Plan8 City Council Goals Facilities Master Plan Goals Recruit & retain high-quality staff Strengthen the public’s safety & improve the quality of life Maintain & enhance the City’s facilities, equipment, and technology Diversify, stabilize & increase housing to reflect community needs Achieve long-term fiscal sustainability Advance environmental sustainability and climate resiliency Created by Amazona Adorada •Provide safe, modern, and functional workplaces that enhance employee experience and collaboration. •Increase equitable service access through strategic planning. •Integrate public safety into design and operations. •Optimize existing facilities and reinvest strategically to meet current and future operational needs. •Align facility investments and improvement priorities with long- term land use, housing, and community growth needs. •Develop implementable and data-informed improvement strategies with realistic funding mechanisms. •Integrate low- impact design, energy efficiency, and climate- resilient features across all facilities. Planning Goals City of Costa Mesa | Facilities Master Plan9 Facilities Master Plan Scope The scope includes the City’s owned and leased portfolio*, totaling 20 facilities for approximately 326,000 SF. * Facilities excluded from the FMP are Donald Dungan Library (County-managed), Norma Hertzog Community Center, Communication Center, Boys & Girls Club, Golf Course Clubhouse. Office (~74,000 SF) Public Safety (~124,000 SF) Community (~86,000 SF) Infrastructure (~43,000 SF) Office Facilities Public Safety Facilities Community Facilities Infrastructure Facilities City Hall Fire stations #1 Balearic Community Center (Leased) Corp Yard Building A&B Communications Center Fire stations #2 Bridge Shelter Corp Yard Warehouse/Fleet Airport Loop Office (Leased) Fire stations #3 CM Tennis Center Fire stations #4 Downtown Recreation Center Fire stations #5 Historical Society Building Fire stations #6 Mesa Verde Library (County-managed) Police Facility Senior Center Police Substation 26% 13% 23% 38% 326,000 SF City of Costa Mesa | Facilities Master Plan10 10 2 81920 16 6 15 11 18 4 17 14 9 1 7 12 135 3 City Facilities in the Study & Current Occupants 1.City Hall (77 Fair Dr.) •City Manager’s Office •City Clerk •City Attorney •Communications and Marketing •Economic and Development Services •Finance •Fire & Rescue •Human Resources •Information Technology •Parks and Community Services •Public Works 2.Communications Center (79 Fair Dr.) •Emergency Management and Dispatch 3.Airport Loop (3190 Airport Loop Dr.) •Economic and Development Services 4.Fire Station #1 (1570 Adams Ave.) •Fire & Rescue 5.Fire Station #2 (800 Baker St.) •Fire & Rescue 6.Fire Station #3 (1865 Park Ave.) •Fire & Rescue 7.Fire Station #4 (2300 Placentia Ave.) •Fire & Rescue 8.Fire Station #5 (2450 Vanguard) •Fire & Rescue 9.Fire Station #6 (3350 Sakioka Dr.) •Fire & Rescue 1 2 3 4 5 6 7 8 9 •Police Facility (99 Fair Dr.) •Police •Police Substation (567 W. 18th St.) •Police •Balearic Community Center (Leased) (1975 Balearic Dr.) •Parks and Community Services •Bridge Shelter (3175 Airway Ave.) •CM Tennis Center (880 Junipero) •Parks and Community Services •Downtown Recreation Center (1860 Anaheim Ave.) •Parks and Community Services •Historical Society Bld. (1870 Anaheim Ave.) •Costa Mesa Historical Society •Mesa Verde Library (2969 Mesa Verde Dr. East) •Parks and Community Services •Senior Center (695 W. 19th St.) •Parks and Community Services •Corp Yard Bldg A&B (2310 Placentia Ave.) •Public Works •Corp Yard Warehouse/Fleet (2300 Placentia Ave.) •Public Works 10 11 12 13 14 15 16 17 18 19 20 City of Costa Mesa | Facilities Master Plan11 FACILITIES EVALUATION City of Costa Mesa | Facilities Master Plan12 Operational Functionality Space Adequacy Facilities Condition Index (10-Year FCI) Effective Building Age Compliance Concerns Sustainability and Resiliency Location & Access FUNCTIONAL PERFORMANCEASSET HEALTH STRATEGIC ALIGNMENT Facilities Evaluation A score that compares the cost of needed repairs to the cost of replacing the building. Whether the facility provides enough space for current and future needs. How well the facility supports daily operations, service delivery, and staff recruitment and retention. Identification of known or potential gaps in ADA, fire/life safety, seismic, or other regulatory requirements. How well the facility’s location supports in-person services, response times, and service coverage Whether the facility supports the City’s sustainability and climate resilience goals. The age of the facility based on its original construction or most recent major renovation. City of Costa Mesa | Facilities Master Plan13 Facilities Evaluation Weighting Operational Functionality Space Adequacy Facilities Condition Index (10-Year FCI) Effective Building Age Compliance Concerns Sustainability and Resiliency Location & Access FUNCTIONAL PERFORMANCEASSET HEALTH STRATEGIC ALIGNMENT 20% 25% 15% 20% Base Score x 0.5 12% 8% Facilities are first scored using weighted criteria. If a life-safety or code-critical compliance risk exists, the overall score is reduced using a single multiplier, so the issue is clearly reflected. Facility evaluation scores establish a consistent basis for comparing facilities, while final priorities are determined by the City based on strategic needs. Final Score = Base Weighted Score (100% in total) × Compliance Multiplier (1 or 0.5) City of Costa Mesa | Facilities Master Plan14 Facilities Evaluation Scoring FUNCTIONAL PERFORMANCEASSET HEALTH STRATEGIC ALIGNMENT Operational Functionality Space Adequacy Facilities Condition Index (10-Year FCI) Effective Building Age Compliance Concerns Sustainability and Resiliency Location & Access •4: 0-9 years •3: 12-29 years •2: 30-39 years •1: 40+ years •4: Excellent, optimal operation (0-5%) •3: Good, monitor replacement needs (6-10%) •2: Fair, investment needs in expired systems (11-30%) •1: Poor, consider repurposing (31-100%) •4: Ample (>120% of benchmark need) •3: Adequate (100-120% of benchmark need) •2: Undersized (70-99% of benchmark need) •1: Very Undersized (70% of benchmark need) •4: Fully Functional (Workflows and adjacencies met) •3: Mostly Functional (Minor inefficiencies) •2: Constrained (Noticeable operational impacts) •1: Inadequate (Major operational impacts) •N: No Elevated Risk (Built to code at time of construction; modernization needs identified but can be addressed through phased upgrades) •Y: Elevated Risk (Issues identified that have life-safety, accessibility, operational, or legal risk and require priority evaluation) •4: Optimal (Meets response, access, or equity targets) •3: Adequate (Generally meets needs with minor gaps) •2: Limited (Access or response gaps exists) •1: Poor (Location significantly limits service delivery) •4: Fully Upgraded (Solar, EV charging, backup power) •3: Partially Equipped (Upgrade is being planned) •2: Limited (Few measures in place) •1: Poor (No measures in place) City of Costa Mesa | Facilities Master Plan15 Facilities Scores *Fire station #2 and the Communications Center are under construction and are not included in this evaluation. Types City Facilities*Effective Building Age 10-year FCI Space Adequacy Operational Functionality Location & Access Sustainability & Resilience Compliance Concerns Base Score Final Score Public Safety Fire Station #3 1 1 1 1 4 1 Y 1.36 0.68 Public Safety Fire Station #4 1 1 1 1 4 1 Y 1.44 0.68 Public Safety Westside Substation 1 2 1 1 3 1 Y 1.49 0.75 Public Safety Fire Station #5 2 1 1 1 4 1 Y 1.56 0.78 Public Safety Fire Station #6 2 2 3 2 4 1 Y 2.31 1.16 Community Historic Society Building 1 2 3 2 3 1 N 1.99 1.99 Community CM Tennis Center 1 1 4 2 4 1 N 2.01 2.01 Office City Hall 1 2 2 2 4 3 N 2.12 2.12 Community Balearic Community Center (Leased)1 2 2 3 4 1 N 2.16 2.16 Office Police Facility 3 2 2 2 4 2 N 2.44 2.44 Community Senior Center 2 2 3 3 4 1 N 2.51 2.51 Community Downtown Recreation Center 3 2 3 3 4 1 N 2.71 2.71 Infrastructure Corp Yard 2 3 3 3 4 2 N 2.84 2.84 Community Bridge Shelter 4 2 4 2 4 2 N 2.94 2.94 Public Safety Fire Station #1 4 3 4 4 4 2 N 3.59 3.59 City of Costa Mesa | Facilities Master Plan16 $0 $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 $16,000,000 0.0% 5.0% 10.0% 15.0% 20.0% 25.0% 30.0% Facility Condition Assessment City Hall Facility Condition Assessment for each of the facilities that were part of the study is available. 30 0 5 10 15 20 25 EXCELLENT GOOD FAIR POOR $4M $8M $12M $16M $0 Es t i m a t e d C o s t s , E s c a l a t e d Fa c i l i t y C o n d i t i o n I n d e x ( P e r c e n t ) 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 FCI (Percent)Reserve Costs Deferred Costs Needs by Year with Unaddressed FCI Over Time City of Costa Mesa | Facilities Master Plan17 Facility Condition Assessment City Hall 1% 73% 26% Retrofit/Adaptation Aged But Functional Lifecycle/Renewal 10-Year Needs by Plan Types* *Primary reason or for the recommended replacement or repair. System Expenditure Forecast System Immediate Short Term Near Term Med Term Long Term TOTAL(1-2 yr)(3-5 yr)(6-10 yr)(11-20 yr) Structure ----5,819,000 5,819,000 Facade 27,000 1,773,000 35,000 -158,000 1,993,000 Roofing --579,000 --579,000 Interiors -1,078,000 493,000 817,000 2,195,000 4,583,000 Conveying -44,000 --51,000 95,000 Plumbing -1,251,000 15,000 53,000 249,000 1,568,000 HVAC 56,000 1,485,000 16,000 447,000 143,000 2,147,000 Fire Protection --450,000 6,000 8,000 464,000 Electrical -1,538,000 250,000 103,000 2,062,000 3,953,000 Fire Alarm & Electronic Systems -212,000 43,000 440,000 672,000 1,367,000 Equipment & Furnishings -96,000 -73,000 371,000 540,000 Special Construction & Demo --11,000 --11,000 Site Development -102,000 147,000 5,000 30,000 285,000 Site Utilities --25,000 6,000 102,000 134,000 Site Pavement ---810,000 704,000 1,514,000 Follow-up Studies 9,000 ----9,000 TOTALS (3% inflation)92,000 7,579,000 2,064,000 2,760,000 12,564,000 25,060,000 City of Costa Mesa | Facilities Master Plan18 KEY FINDINGS City of Costa Mesa | Facilities Master Plan19 Existing facilities are facing space constraints. >>Investment over the next 10 years will be critical to maintaining facility conditions. The City has invested in underserved areas, including Westside, but service gaps remain. Some key facilities were built to prior code standards and need updates over time to better align with current requirements. Sustainability is emerging as a priority, in areas like solar power, EV infrastructure, and energy-efficient systems. Existing facilities do not fully support operational continuity during emergencies. City Hall remains a central hub for in-person engagement with opportunities to improve service delivery. The city will need to invest an average of $4M annually for deferred maintenance and lifecycle replacements. Space standards vary across departments, and existing facilities do not fully reflect modern way of working. ASSET HEALTH FUNCTIONAL PERFORMANCE STRATEGIC ALIGNMENT Key Findings >> >> >> >> >> >> >> >> City of Costa Mesa | Facilities Master Plan20 Key Findings | Facility Conditions Facility Conditions Index (FCI)* In new or well- maintained condition Subjected to wear but still in a functioning condition. Nearing the end of its useful or serviceable life. Has reached the end of its useful or serviceable life Facility (year built)Current 3-Year 5-Year 10-Year 20-Year Balearic Community Center (1965)0.8%2.6%5.1%18.8%25.7% Bridge Shelter (1972)1.8%4.4%8.1%10.3%25.2% City Hall (1965)0.2%17.5%22.0%28.3%56.7% Communications Center (1981)3.4%5.7%7.3%13.9%26.1% Corp Yard Buildings/Warehouse/Fleet (1989)0.5%0.6%4.3%9.5%17.5% Costa Mesa Tennis Center (Shop & Patio) (1962)0.0%3.0%7.1%54.3%105.2% Downtown Recreation Center (2001)0.5%4.6%7.6%16.1%35.3% Fire Station #1 (2018)0.6%3.7%3.7%6.8%19.9% Fire Station #3 (1979)12.5%22.5%29.0%32.2%44.8% Fire Station #4 (1967)8.6%16.3%33.2%37.3%58.3% Fire Station #5 (1988)4.2%7.0%13.9%41.1%56.9% Fire Station #6 (1992)2.9%5.1%9.3%24.3%38.6% Historical Society Building (1980)1.3%14.3%22.0%24.0%40.2% Mesa Verde Library (1965)1.7%2.2%4.7%25.1%38.5% Police Facility & Helipad (1967)0.1%1.0%4.2%15.9%39.8% Police Substation (1958)9.8%11.4%16.8%19.9%27.6% Senior Center (1992)3.5%9.4%15.3%24.9%40.7% *FCI provides a theoretical objective indication of a facility’s physical conditions. It scores over a 20-year term assuming no system replacements. Age of City Facilities 326,000 SF 54% 25% 21% Under 30 years old 30-50 years old Over 50 years old City of Costa Mesa | Facilities Master Plan21 Facility (year built)2025 2026-2030 2031-2035 2036-2040 2041-2045 Total Balearic Community Center (1965)$43,000 $228,000 $722,000 $256,000 $112,000 $1,362,000 Bridge Shelter (1972)$161,000 $546,000 $198,000 $1,107,000 $194,000 $2,207,000 City Hall (1965)$92,000 $9,643,000 $2,760,000 $8,572,000 $3,993,000 $25,060,000 Communications Center (1981)$189,000 $211,000 $364,000 $603,000 $65,000 $1,432,000 Corp Yard Buildings (1989)$178,000 $1,427,000 $1,930,000 $2,730,000 $264,000 $6,529,000 Costa Mesa Tennis Center (1962)$0 $72,000 $480,000 $151,000 $367,000 $1,070,000 Downtown Recreation Center (2001)$62,000 $955,000 $1,140,000 $341,000 $2,227,000 $4,725,000 Fire Station #1 (2018)$48,000 $250,000 $247,000 $800,000 $256,000 $1,601,000 Fire Station #3 (1979)$557,000 $739,000 $145,000 $186,000 $375,000 $2,002,000 Fire Station #4 (1967)$352,000 $1,015,000 $166,000 $417,000 $451,000 $2,401,000 Fire Station #5 (1988)$189,000 $433,000 $1,219,000 $354,000 $352,000 $2,547,000 Fire Station #6 (1992)$185,000 $403,000 $950,000 $527,000 $386,000 $2,450,000 Historical Society Building (1980)$36,000 $570,000 $56,000 $324,000 $122,000 $1,108,000 Mesa Verde Library (1965)$69,000 $120,000 $828,000 $428,000 $115,000 $1,560,000 Police Facility & Helipad (1967)$26,000 $1,642,000 $4,680,000 $8,073,000 $1,452,000 $15,873,000 Police Substation (1958)$585,000 $416,000 $183,000 $386,000 $76,000 $1,646,000 Senior Center (1992)$486,000 $1,633,000 $1,337,000 $796,000 $1,392,000 $5,643,000 Grand Total $3,257,000 $20,303,000 $17,406,000 $26,050,000 $12,198,000 $79,214,000 Replacement Reserves (minimum investment needed to address building deficiencies) By Forecast Years 0 10 20 20 2 5 20 2 6 20 2 7 20 2 8 20 2 9 20 3 0 20 3 1 20 3 2 20 3 3 20 3 4 20 3 5 20 3 6 20 3 7 20 3 8 20 3 9 20 4 0 20 4 1 20 4 2 20 4 3 20 4 4 20 4 5 Mi l l i o n s Replacement Reserve Key Findings | Replacement Reserves Average $4M annually City of Costa Mesa | Facilities Master Plan22 Many public safety facilities were constructed under prior code requirements and continue to be occupiable and fully functional today. Over the long term, updates through renovation or replacement need to be considered to align with current standards and support future service needs. Fire Station #3 Fire Station #5Fire Station #4 Fire Station #6 Westside Substation Key Findings | Compliance Concerns City of Costa Mesa | Facilities Master Plan23 224 234 247 265 0 100 200 300 Current Headcount (2025) 5 Year Projection (2030) 10 Year Projection (2035) 20 Year Projection (2045) 207 222 231 24016151515 0 100 200 300 Current Headcount (2025) 5 Year Projection (2030) 10 Year Projection (2035) 20 Year Projection (2045) FTE Temp City Hall Current and Projected Headcount1 14% 1 Current and projected headcount was gathered through departmental surveys and interviews conducted between April and May 2025. Police Facility 18% City Hall, Police Facility, Fire Station 3, 4 and 5 were reported as operating at or near capacity. Targeted reconfiguration could better accommodate modern equipment, support crew capacity, and enhance overall operational effectiveness. Key Findings | Space Constraints City of Costa Mesa | Facilities Master Plan24 Public-facing services at City Hall are currently located across multiple floors with varying security access, while some internal-facing departments occupy the first floor. This presents an opportunity to better align space use with service delivery, enhancing wayfinding and creating a more intuitive and efficient layout for the public. 5th Floor 4th Floor 3rd Floor 2nd Floor 1st Floor Basement City Clerk City Council City Manager Economic & Development Services Finance Fire Human Resources Information Technology Parks & Community Public Works Central Services Support and Storage City Hall Stacking Diagram Public Access (Yes/No) Key Findings | Service Experience City of Costa Mesa | Facilities Master Plan25 Makeshift Space SolutionsInconsistent Space Standards Remodel the front desk to fit more workstations Workstations of varying sizes Offices of varying sizes Key Findings | Employee Experience Limited Meeting Spaces Ad-hoc collaboration area without technology Subdivide space to create offices City of Costa Mesa | Facilities Master Plan26 High Vulnerability Areas (Westside, Downtown) CDC/ATSDR Social Vulnerability* Index 2022 Possible scores range from 0 (lowest vulnerability) to 1 (highest vulnerability). City Facilities * Social vulnerability refers to the demographic and socioeconomic factors (such as poverty, lack of access to transportation, and crowded housing) that adversely affect communities. The City recognized westside as a historically underserved area. Recent investments, such as the Lion Park redevelopment with a new library and community center, have improved access to services. However, challenges remain: •Underutilized assets (e.g., Historical Society Building site has untapped potential) •Limitation in expanding space for recreation (e.g., Downtown Recreation Center only has a small pool and lacks a court seating area) •Facilities need to better support programming (e.g., the current layout of the Norma Hertzog Community Center is not ideal for events) •There is a need to address broader service access gaps, such as permitting and information access for residents without private transportation. Key Findings | Service Distribution City of Costa Mesa | Facilities Master Plan27 Key Findings | Emergency Response and Continuity of Operations Emergency Operations Center •Current Emergency Operations Center (EOC) does not support long-term operations (e.g., outdated technology, limited space for storage and breakout rooms) •No designated Continuity of Operations (COOP) site. Emergency Response & Public Safety Facilities •Dispatch facility is outdated but upgrades are underway •Police department lacks room for growth and space for modern services like real-time crime centers and drone operations Community Support & Shelter Facilities •No facility is fully shelter-ready (e.g., ADA, kitchens, backup power). •Senior Center has ADA access but is prone to flooding; DRC has showers but lacks a full kitchen; Balearic’s lease status creates long- term uncertainty City of Costa Mesa | Facilities Master Plan28 Key Findings | Sustainability Solar Infrastructure and EV Charging •Not much solar infrastructure in place despite favorable conditions at the Corp Yard •Future fleet will be all electric-based •Consider shaded solar carports with EV charging Energy & Systems Modernization •Facilities lack centralized HVAC or energy management systems •Mechanical/plumbing assessments needed to identify critical infrastructure needs Sustainability Goals •The City targets LEED Silver or higher on new facilities City of Costa Mesa | Facilities Master Plan29 FUTURE PLANNING OPTION If the City choose to improve the facilities beyond baseline performance, this option outlines when renovation or replacement could occur, including projected timing and cost implications. City of Costa Mesa | Facilities Master Plan30 Implementation Timeline* *Refer to Facility Conditions Assessment for detailed deferred maintenance and lifecycle replacement schedule City of Costa Mesa | Facilities Master Plan31 - 10 20 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Mi l l i o n s Facility/Infrastructure Investments •City needs to invest an average of $11M annually ($4M on replacement reserve and $7M on new construction/ renovation) •Annual Escalation: Replacement reserve: 3%. Construction project cost inflation: 4%. •Funding & Timeline: Funds accumulate during planning. Full project cost is evenly distributed across all planning and execution years. •Reserve Adjustment: Part of replacement reserves are removed as renovations or demolitions occur. Insights and Assumptions New Construction/ Renovation Costs Replacement Reserve Key Capital Projects (2026-27) Police Facilities Refresh (2028-31) Fire Station #4 Replacement (2031-34) Westside Substation Replacement (2032-34) City Hall Ground Floor Renovation (2033-34) Fire Station #6 Renovation (2032-36) Police Helipad Demo and New Parking Structure (2035-36) Fire Station #5 Renovation (2041-43) New EOC (2044) Police Facilities Refresh (2036-39) New Westside City Facility Replacing Historic Society Building (2038-39) Corp Yard Refresh (2028-32) City Hall Office Floor Renovation (2031-32) Fire Station #3 Renovation Average $11M annually City of Costa Mesa | Facilities Master Plan32 - 110,000 220,000 330,000 - 4 8 12 16 20 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 Ow n e d B u i l d i n g S F Mi l l i o n s Lease of Airport Loop terminated Operating Expenses •Owned Operating Costs: Increase over time with inflation and as new facilities open. •Balearic Lease: Continues for the next 20 years with a 5% annual rent escalation. •Airport Loop Lease: Continues with 4% annual rent escalation and ends after 2035 when the Westside Substation is completed. Lease Expenses Owned Operating Expenses Insights and Assumptions City of Costa Mesa | Facilities Master Plan33 Explore ways to efficiently accommodate growing headcount in City facilities. >>Plan for an average of $4M annually in baseline maintenance and lifecycle replacement. Westside communities could benefit from neighborhood- scale satellite services. Integrate sustainability goals into facility upgrades and new capital projects. Assess where facility readiness can be improved for emergency response and community support. Improve public access with clear, intuitive, and welcoming service environments. Standardize and modernize spaces to meet the needs and expectations of today’s workforce. ASSET HEALTH FUNCTIONAL PERFORMANCE STRATEGIC ALIGNMENT FMP Highlights >> >> >> >> >> >> >> >> Facilities built under previous code standards may require substantial upgrades or replacement. Consider long term strategy for each facility – to maintain or replace. City of Costa Mesa | Facilities Master Plan34 Next Steps »Finalize Facilities Conditions Assessment Report »Identify Critical Improvements Needed at Various Facilities over the Next Five Years and Develop a Funding Strategy »Utilize the Facility Conditions Assessment in Developing the CIP and Long-term CIP Strategy to Address Future Facility Needs »Review Facilities Conditions Assessment Every 5 Years City of Costa Mesa | Facilities Master Plan35 APPENDIX A FACILITY CONDITIONS ASSESSMENT DATA SUMMARY City of Costa Mesa | Facilities Master Plan36 Building Year Built Age GSF Current FCI 3-Year FCI 5-Year FCI 10-Year FCI 20-Year FCI Immediate Needs (2025) Mid-Term Needs (2025-2035) Long-Term Needs (2036-2045) 20-Year Total (2025-2045) Balearic Community Center 1965 60 7,857 0.8%2.6%5.1%18.8%25.7%43,000 992,000 368,000 1,360,000 Bridge Shelter 2021 4 26,710 1.8%4.4%8.1%10.3%25.2%161,000 905,000 1,301,000 2,206,000 City Hall 1965 60 64,150 0.2%17.5%22.0%28.3%56.7%92,000 12,495,000 12,565,000 25,060,000 Communications Center 1981 44 7,960 3.4%5.7%7.3%13.9%26.1%189,000 765,000 668,000 1,433,000 Corp Yard Buildings 1989 36 42,520 0.5%0.6%4.3%9.5%17.5%178,000 3,536,000 2,994,000 6,530,000 Costa Mesa Tennis Center 1973 52 1,476 0.0%3.0%7.1%54.3%105.2%-552,000 518,000 1,070,000 Downtown Recreation Center 2001 24 19,450 0.5%4.6%7.6%16.1%35.3%62,000 2,156,000 2,568,000 4,724,000 Fire Station #1 2018 7 11,675 0.6%3.7%3.7%6.8%19.9%48,000 545,000 1,056,000 1,601,000 Fire Station #3 1979 46 6,486 12.5%22.5%29.0%32.2%44.8%557,000 1,441,000 561,000 2,002,000 Fire Station #4 1967 58 5,973 8.6%16.3%33.2%37.3%58.3%352,000 1,533,000 868,000 2,401,000 Fire Station #5 1988 37 6,500 4.2%7.0%13.9%41.1%56.9%189,000 1,841,000 706,000 2,547,000 Fire Station #6 1992 33 9,200 2.9%5.1%9.3%24.3%38.6%185,000 1,537,000 913,000 2,450,000 Historical Society Building 1980 45 4,000 1.3%14.3%22.0%24.0%40.2%36,000 661,000 446,000 1,107,000 Mesa Verde Library 1965 60 5,888 1.7%2.2%4.7%25.1%38.5%69,000 1,017,000 543,000 1,560,000 Police Facility & Helipad 1967 58 65,400 0.1%1.0%4.2%15.9%39.8%26,000 6,348,000 9,525,000 15,873,000 Police Substation 1958 67 8,639 9.8%11.4%16.8%19.9%27.6%585,000 1,184,000 462,000 1,646,000 Senior Center 1992 33 20,127 3.5%9.4%15.3%24.9%40.7%486,000 3,456,000 2,188,000 5,644,000 TOTAL 3,257,000 40,964,000 38,250,000 79,214,000 Appendix A | Facility Conditions Assessment Summary City of Costa Mesa | Facilities Master Plan37 Mid-Term Needs (2025-2035) by Plan Types Building Accessibility Aged But Functional Environmental Lifecycle/ Renewal Performance /Integrity Retrofit/ Adaptation Safety TOTAL Balearic Community Center 9,000 474,000 -396,000 48,000 65,000 -992,000 Bridge Shelter -100,000 -644,000 161,000 --905,000 City Hall -9,137,000 -3,266,000 -92,000 -12,495,000 Communications Center 29,000 32,000 -418,000 281,000 5,000 -765,000 Corp Yard Buildings -877,000 -1,939,000 28,000 692,000 -3,536,000 Costa Mesa Tennis Center -13,000 -539,000 ---552,000 Downtown Recreation Center -470,000 -1,624,000 62,000 --2,156,000 Fire Station #1 ---497,000 48,000 --545,000 Fire Station #3 -516,000 15,000 267,000 44,000 599,000 -1,441,000 Fire Station #4 -315,000 -698,000 -520,000 -1,533,000 Fire Station #5 ---1,648,000 28,000 165,000 -1,841,000 Fire Station #6 9,000 --1,352,000 176,000 --1,537,000 Historical Society Building 9,000 372,000 -118,000 -147,000 15,000 661,000 Mesa Verde Library 28,000 125,000 -823,000 26,000 15,000 -1,017,000 Police Facility & Helipad ---6,322,000 26,000 --6,348,000 Police Substation 9,000 289,000 -237,000 559,000 90,000 -1,184,000 Senior Center -1,555,000 -1,414,000 461,000 20,000 6,000 3,456,000 TOTAL 93,000 14,275,000 15,000 22,202,000 1,948,000 2,410,000 21,000 40,964,000 0.2%34.8%0.0%54.2%4.8%5.9%0.1%100% Appendix A | Facility Conditions Assessment Summary City of Costa Mesa | Facilities Master Plan38 APPENDIX B NEW CONSTRUCTION/RENOVATION COSTS SUMMARY City of Costa Mesa | Facilities Master Plan39 Facilities Sum of 2025 Cost Sum of Escalated Cost (Based on Implementation Timeline) City Hall Remodel Typical Office Floors (Floor by Floor)11,989,560 14,754,000 Renovate Ground Floor for Consolidated Public Services 5,898,200 8,157,000 Corp Yard Construct New Covered Parking/Storage 3,355,000 5,756,000 Remodel Workspace 1,193,500 2,028,000 Emergency Operations Center Construct New Emergency Operations Center 17,105,000 33,678,000 Fire Station Renovate FS#3 2,730,000 3,558,000 Renovate FS#5 2,730,000 4,164,000 Renovate FS#6 3,864,000 5,448,000 Replace FS#4 8,400,000 10,131,000 Historic Society Building Construction New City Facility 12,786,219 21,110,000 Police Facility Construct New Parking Structure 8,580,000 12,836,000 Demolish Helipad 206,250 280,000 Remodel for Gym/Training Space 390,390 584,000 Renovate Existing EOC at Police Facility for Police Use 994,840 2,118,000 Renovate Selected Areas (Records, Investigation Unit)1,411,410 1,512,000 Westside Substation Demolish Existing Substation and Construction New City Facility 10,545,678 14,233,000 Total 92,180,047 140,347,000 Appendix B | New Construction/Renovation Costs Summary