Loading...
HomeMy WebLinkAbout155 INDUSTRIAL WAY - Building Permits OWNER G & M MOTOR Company DATE 1-20-65 JOB ADDRESS 155 Industrial Way BUILDING PERMIT NO. 231441 GENERAL CONTRACTOR A-A Neon Co. DESCRIPTION OF WORK Elee.Gnrtd.SiEn AP No.117-052-09 LOT TRACT FIRE ZONE VALUE $ 1,300.00 INSPECTIONS Signature I Date GROUP TYPE ZONE C-2 Soil PERMITS ISSUED Gas - SUBCONTRACTOR I Date I Number I Signature Water Plumbing Rough Plumbing Prop. Swr. Line 0 House Con..0 Sprinkling System Miscellaneous Rough Heating and Air Conditioning Temporary Service or Pole Underground 0 Power 0 Rough Wiring Heating and Vent. Trenches 0 Forms 0 Steel Reinf. 0 ../641,g 1-5 -&S Floor System _ . Bond Beam 0 Steel Reinforce 0 Sheathing Frame and Flashing Lathing— In 0 Out 0 Plaster, Brown Coat Structural, Final Electric Heating, Vent, Refrig. and A.C., Final a_-a Ja-,v, 7/.2.04 &3fyo Plumbing, Final and Gas Test 0 Electric, Final f•AI'&L Building, Final l t/e 6.,5 Special Requirements Applicant to fill in all spaces except those within heavy border lines and sign all appropriate declarations. PERMIT O. RACT LOT' NO. 11 CITY OF COSTA MESA CONSTRUCTION PERMIT �F �BaTUNIT NO. 5343 4/03/87 24.011 • TU Project Address / SC ' -,ree —'3li¢'/ Gc. /( Y SO /' USE; 6rITS PO R r► TYPE OF CONSTRUCTION ILTNEW ❑ ADD H ALTERATION LI REPAIR r Apfeent's Mailing Add dress SQ +f✓? V CONSTRUCTION AND PLANNING POOL &SPA APPROVALS Permit# Date Inspector APPROVALS Permit# _ Date Inspector 1. Temporary Electrical Service or Pole 52. Pool & Equipment Location 2. Soil Pipe-Undrgrnd. 53. Steel Reinforcement 3. Electrical Conduit Utility-Undrgrnd. 54. Forms 4. Electrical Conduit-Undrgrnd. 55. Electrical Bonding • 5. Steel Reinforcement 56. Rough Plumbing & Pressure Test 6. Electrical UF.ER Grnd. 57. APPROVAL TO COVER-GUNITE 7. Footings .-)"31 6.1/4 58. Electrical Conduit-Undrgrnd., 8. Foundation 7'3( D7 (3A, 59. Gas Pipe, 0 Undrgrnd.,Test 9. Water Pipe-Undrgrnd. . 17 60. Backwash Lines,P-Trap, 0 Undrgrnd. 10. Structural Floor System 61. APPROVAL TO DECK 11. Property Sewer Line & House Connection 62. Backwash & Receptor-Final 12. Sewer Cap 63. Heater & Vent-Final • 13. Roof Drains 64. Plumbing System - Final 14. Rough Plumbing 65. Electrical-Final 15. Rough Electrical-Conduit 66. Solar System-Final . 16. Rough Electric Wiring 67. Fencing &Access Approval • - 17. Rough Wiring Sign 68. APPROVED FOR PLASTERING • 18. Rough Electrical-T Bar Ceiling 69. POOL/SPA SYSTEMS FINAL • 19. Rough Heating& Air Conditioning FIRE DEPT. REQUIREMENT i . 20. Rough Factory Fireplace APPROVALS Permit# _ 21. Ducts, in Structure . 70. Underground Hydro 22. Ducts, Ventilating 71. Product Piping 0 Gas 0 Oil 23. Gas Pipe-Rough & Test 72. Underground Flush •` 24. Roof Framing , • ' 73. Undergrnd:Storage Tank 0 Gas 0 Oil 25. Roof Sheathing • _ 74. Overhead Hydro • 26. T-Bar Ceiling (Structural) & Monocoat ' , 75.: Dry,Chemical - - 27. Frame and Flashing 76. Dry Standpipe - ' 28. Lathing & Siding i 77. FIXED SYSTEM FINAL , 29. Insulation 78. FIRE PREV. FINAL _ 30. Drywall Nailing • HEALTH DEPT. REQUIREMENT , 31. Plaster Brown Coat 79. FINAL INSPECTION 32. Electrical Power Meter-Final 80. FOOD CERTIFICATE ISSUED 33. Final Electric Notes: ' 34. Final Heating & Air Conditioning / 35. Final Gas Pipe-Test 36. Hood or Canopy - i 37. Final Factory Fireplace • 38. Final Plumbing • • 39. Water Service-Final 40. Gas Service-Final ' 41. Solar Domestic-Final , 42. Backflow Preventer . 43. Backflow Irrigation , "44. Landscape Irrigation System . 45. Sound Attenuation / , f • 46. Handicap Regulations 7../8/C�O . 47. FINAL STRUCTURE & BUILDING 2I r<, 3a 3� 01 8ro---B C : 48.,•Special Requirements Completed /� B ia 49., Electric Release to Edison , 50. Gas Release to Southern California Gas Co 11. 51. CERTIFICATE OF OCCUPANCY r r ' - No. Date -