HomeMy WebLinkAbout04 - CC-5 - Costa Mesa Council Chambers/ First Floor - 12/3/2019Change Order No. Description 1 Perform electrical investigation in the electrical room and panel D1 to identify existing conditions that were different from the as-built plans 2 Requested by the City to remove and dispose the existing audience seats to make room for installation of the new audience seating 3 Add an additional panel in the electrical room that was needed based on the existing field conditions to provide the required electrical capacity for the new improvements 4 Requested by the City to add framing around existing conduits in the electrical room to upgrade the existing condition to be in compliance with the latest code 5 Additional work requested by the City to remove the VCT flooring under the audience seats and replace with new carpet 6 Additional work requested by the City to relocate outlets, speakers, screen and white board, repair and paint drywall in Conference Room 1A 7 Requested by the City to install additional control wiring for Lutron switches in the Council Chambers that was not originally included in the design 8 Requested by City to relocate existing lights, PA speaker and conduits to provide clearance per code for the newly installed transformer in the IT office area 9 A credit processed due to changes in the design 10 Requested by the City to add one exit sign and modify two existing exit signs in Council Chambers to meet latest code requirements ATTACHMENT 2 6 1 CITY COUNCIL AGENDA REPORT MEETING DATE: DECEMBER 3, 2019 ITEM NUMBER: CC-5 SUBJECT: COSTA MESA COUNCIL CHAMBERS / FIRST FLOOR IMPROVEMENT PROJECT – CITY PROJECT NO. 18-06 DATE: NOVEMBER 18, 2019 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER (714) 754-5335 BALTAZAR.MEJIA@COSTAMESACA.GOV RECOMMENDATION: Staff recommends that the City Council: 1. Accept the work performed by Optima RPM, Inc. for the subject project, and authorize the City Clerk to file the Notice of Completion. 2. Authorize the City Manager to release the Labor and Material Bond seven (7) months after the filing date, release the Faithful Performance Bond if appropriate, at the conclusion of the one-year warranty period, and release the retention monies immediately after the Notice of Completion filing date. BACKGROUND: On August 7, 2018, a contract in the amount of $565,000 was awarded by the City Council to Optima RPM, Inc. The work included the removal of existing big screen projectors and video monitors located in the Council Chambers, as well as video equipment in the basement control room; construction of a new control room and machine room including addition of a wall and door, flooring and new T-bar ceiling in the two new rooms; removal and replacement of carpeting; addition of 17 mounting units for support of the new AV in the Council Chambers, old print shop, and conference room 1A; concrete slab trenching for installation of new electrical and signal conduits; and installation of signal conduits throughout City Hall’s First floor for the new AV and broadcasting system. 2 ANALYSIS: The work required by the contract documents was completed on June 17, 2019 to the satisfaction of the City Engineer. The final contract cost amount is $597,250.97. A report of the final costs is included herein as Attachment 1. A summary of the costs is as follows: Original Contract Cost: $ 565,000.00 Change Orders 1-10: $ 32,250.97 Final Contract Cost: $ 597,250.97 The change orders are briefly described in Attachment 2. The final contract cost reflects a 5.7% increase to the original contract. As of this date, there are no Stop Notices filed against the monies due to Optima RPM, Inc. ALTERNATIVES CONSIDERED: There are no alternatives considered for this item. Before Construction ↑ After Construction ↓ 3 FISCAL REVIEW: This project was one component of a larger facility improvement project budgeted in prior fiscal years from the Capital Improvement Fund. This project budget includes improvements completed as part of the Council Chambers / First Floor Improvement Project discussed herein as well as the City Hall Audio Visual (A/V) Improvement and Broadcast Production Upgrade Project. The $3.357 million budget includes a budget adjustment approved by City Council at the November 5, 2019 City Council meeting that covers unexpected expenses related to work required to meet current building code requirements in the Community Room. The breakdown below provides a summary of the project expenses and remaining balance. Total Project Budget $3,357,000.00 Total Council Chambers/First Floor Improvement Project Expenditures (this project) $597,250.97 Total AV Improvements Expenditures $1,766,933.68 Design, Construction Management, Community Room and Restroom $836,808.13 Projected Remaining Project Expenses $120,000.00 Remaining Project Balance $36,007.22 The original contract amount for this project was $565,000 and the final expenditures amounted to $597,250.97. Since there was sufficient funding in the overall project budget, the increased contract costs did not require additional project appropriation. This project account number is also being used to fund the Community Room improvements, Restrooms and Americans with Disabilities Act (ADA) upgrades, which have not been completed. The current preliminary cost estimate to complete the upgrades to the Restrooms and Community Room is $330,000. Additional funding of approximately $294,000 will be requested for consideration in future CIP budgets to complete the remaining construction work. LEGAL REVIEW: The City Attorney’s Office has reviewed this report and approves it as to form. CITY COUNCIL GOALS & PRIORITIES: In 2019, the City Council adopted a list of goals and priorities. This project works toward achieving the following City Council goals and objectives: Goal 3: Keep the City Fiscally Sustainable. To address our long-term obligations as well as immediate needs: (a) Take measures to reduce expenditures by including but not limited to:  Implementing energy efficiencies and sustainability practices at city hall, in public buildings, parks and public spaces; and, 4 Goal 6: Good Government and Community Engagement: (b) Improve the way that we listen to and provide information to our residents and businesses, including providing more information in Spanish and English; (f) Maintain up-to-date and accessible information about public works projects, significant private development sites, and other city activities. CONCLUSION: The Costa Mesa Council Chambers / First Floor Improvement Project, City Project No. 18-06, was completed to the satisfaction of the City Engineer. Staff recommends that the City Council accept the work performed by Optima RPM, Inc. for the subject project, authorize the City Clerk to file the Notice of Completion; release the retention monies immediately after the Notice of Completion filing date and authorize the City Manager to release the Labor and Material Bond seven (7) months after the filing date, and release the Faithful Performance Bond if appropriate, at the conclusion of the one-year warranty period. _________________________________ _____________________________ BALTAZAR MEJIA RAJA SETHURAMAN City Engineer Director of Public Services ________________________________ _____________________________ KELLY A. TELFORD, CPA KIMBERLY HALL BARLOW Director of Finance City Attorney ATTACHMENTS: 1 – 2 – Cost Summary Change Order Summary DISTRIBUTION: City Manager City Attorney City Clerk Staff File CITY OF COSTA MESAFOR PAYMENT ON THE WARRANT LIST OF: 8/23/19DATE: 08/15/19Final PAYMENT TO: Optima RPM, Inc.19745 Skypark Circle, Suite D Irvine, CA 92614PROJECT: City Hall Remodel Project - City Project No.18-06ITEMUNIT PREVIOUSQUANTITYTOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACTNODESCRIPTIONPRICE QUANTITYTHIS ESTIMATETO DATE AMOUNTTHIS ESTTO DATEPRICE11LSMoblization $ 6,000.00 100.00 % 0.00 % 100.00 % $6,000.00$0.00 $6,000.00 $6,000.0021LSDemobilization $ 2,000.00 100.00 % 0.00 % 100.00 % $2,000.00$0.00 $2,000.00 $2,000.0031LSSite Supervision $ 27,000.00 100.00 % 0.00 % 100.00 % $27,000.00$0.00 $27,000.00 $27,000.0041LSProject Management $ 8,000.00 100.00 % 0.00 % 100.00 % $8,000.00$0.00 $8,000.00 $8,000.0051LSSite Daily Clean up $ 10,000.00 100.00 % 0.00 % 100.00 % $10,000.00$0.00 $10,000.00 $10,000.0061LSBond & Insurances $ 12,000.00 100.00 % 0.00 % 100.00 % $12,000.00$0.00 $12,000.00 $12,000.0071LSAsbestos removal $ 10,000.00 100.00 % 0.00 % 100.00 % $10,000.00$0.00 $10,000.00 $10,000.0081LSConcrete demolition $ 25,000.00 100.00 % 0.00 % 100.00 % $25,000.00$0.00 $25,000.00 $25,000.0091LSSelective demolition ( Carpet , T-Bar, furniture , base , Fixtures, remove 2 seats..etc) $ 25,000.00 100.00 % 0.00 % 100.00 % $25,000.00$0.00 $25,000.00 $25,000.0010 1 LSFloor, ceiling, wall patching $ 25,000.00 100.00 % 0.00 % 100.00 % $25,000.00$0.00 $25,000.00 $25,000.0011 1 LSMechanical screen steel Material $ 35,000.00 100.00 % 0.00 % 100.00 % $35,000.00$0.00 $35,000.00 $35,000.0012 1 LSMechanical Screen Labor $ 10,000.00 100.00 % 0.00 % 100.00 % $10,000.00$0.00 $10,000.00 $10,000.0013 1 LSRoof Patching $ 10,000.00 100.00 % 0.00 % 100.00 % $10,000.00$0.00 $10,000.00 $10,000.0014 1 LSDoor and frames & HW $ 8,000.00 100.00 % 0.00 % 100.00 % $8,000.00$0.00 $8,000.00 $8,000.0015 1 LSMetal Stud framing $ 15,000.00 100.00 % 0.00 % 100.00 % $15,000.00$0.00 $15,000.00 $15,000.0016 1 LSDry wall $ 15,000.00 100.00 % 0.00 % 100.00 % $15,000.00$0.00 $15,000.00 $15,000.0017 1 LSCarpet flooring & Sealed concrete $ 21,000.00 100.00 % 0.00 % 100.00 % $21,000.00$0.00 $21,000.00 $21,000.0018 1 LSPainting $ 12,000.00 100.00 % 0.00 % 100.00 % $12,000.00$0.00 $12,000.00 $12,000.0019 1 LST-Bar Ceiling $ 9,000.00 100.00 % 0.00 % 100.00 % $9,000.00$0.00 $9,000.00 $9,000.0020 1 LScondensation line $ 5,000.00 100.00 % 0.00 % 100.00 % $5,000.00$0.00 $5,000.00 $5,000.0021 1 LSSplit system units & Refrigerate connection $ 34,000.00 100.00 % 0.00 % 100.00 % $34,000.00$0.00 $34,000.00 $34,000.0022 1 LSLight fixtures material and installation $ 110,000.00 100.00 % 0.00 % 100.00 % $110,000.00$0.00 $110,000.00 $110,000.0023 1 LSElectrical wiring and installation $ 31,000.00 100.00 % 0.00 % 100.00 % $31,000.00$0.00 $31,000.00 $31,000.0024 1 LSAllowance $ 100,000.00 100.00 % 0.00 % 100.00 % $100,000.00$0.00 $100,000.00 $100,000.00LSCO #1 - Electrical investigation $ 3,420.00 100.00 % 0.00 % 100.00 % $3,420.00$0.00 $3,420.00$0.00LSCO #2 - Remove and dispose the existing audience seats $ 3,608.00 100.00 % 0.00 % 100.00 % $3,608.00$0.00 $3,608.00$0.00LSCO #3 - Additional panel in the electrical room $ 6,426.69 100.00 % 0.00 % 100.00 % $6,426.69$0.00 $6,426.69$0.00LSCO #4 - Framing around existing conduits $ 1,965.00 100.00 % 0.00 % 100.00 % $1,965.00$0.00 $1,965.00$0.00LSCO #5 - Removal of the VCT flooring $ 8,555.70 100.00 % 0.00 % 100.00 % $8,555.70$0.00 $8,555.70$0.00LSCO #6 - Relocate outlets, speakers, repair drywall in CR1A $ 1,909.60 100.00 % 0.00 % 100.00 % $1,909.60$0.00 $1,909.60$0.00LSCO #7 - Additional control wiring for Lutron switches $ 2,733.10 100.00 % 0.00 % 100.00 % $2,733.10$0.00 $2,733.10$0.00LSCO #8 - Provide clearance per code for new transformer $ 2,427.37 100.00 % 0.00 % 100.00 % $2,427.37$0.00 $2,427.37$0.00LSCO #9 - Credit to City due to changes in the design $ (1,184.32) 100.00 % 0.00 % 100.00 % -$1,184.32$0.00 -$1,184.32$0.00LSCO #10 - Addition and modification of exit signs $ 2,389.83 0.00 % 100.00 % 100.00 %$0.00 $2,389.83 $2,389.83$0.00BID TOTAL: $594,861.14 $2,389.83 $597,250.97 $565,000.00BID QUANTITYATTACHMENT 15