HomeMy WebLinkAbout06 - CC-7 - Acceptance of Fire Station No.1 Reconst - 12/3/2019CITY OF COSTA MESA ATTACHMENT 2 COST SUMMARY Final Payment to: Horizons Construction Co., Int'l. 432 W. Meats Ave., Orange, CA 92865 PROJECT: Fire Station No. 1 Reconstruction CITY PROJECT 16-16 ACCOUNT NUMBER AMOUNT TOTAL RETENTION OTHER PREVIOUS AMOUNT ENCUMBERED EARNED MONIES PAYMENT DUE THIS TO DATE WITHHOLD(*)ESTIMATE A 500000 401 16200 50905 200076 $7,767,000.00 $7,549,682.71 $0.00 $7,549,682.71 $0.00 $0.00 Total:$7,767,000.00 $7,549,682.71 $0.00 $0.00 $7,549,682.71 $0.00 P.O. No. 11509ATTACHMENT 25 1 CITY COUNCIL AGENDA REPORT MEETING DATE: DECEMBER 3, 2019 ITEM NUMBER: CC-7 SUBJECT: ACCEPTANCE OF FIRE STATION NO. 1 RECONSTRUCTION, CITY PROJECT NO. 16-16 DATE: NOVEMBER 26, 2019 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: BALTAZAR MEJIA, CITY ENGINEER (714) 754-5335 BALTAZAR.MEJIA@COSTAMESACA.GOV RECOMMENDATION: Staff recommends that the City Council: 1. Accept the work performed by Horizons Construction Company, Int’l. for the subject project, and authorize the City Clerk to file the Notice of Completion. 2. Authorize the City Manager to release the Labor and Material Bonds, and release the Faithful Performance Bonds, as the one-year warranty period is complete. Retention monies have been released pursuant to Public Contract Code 7107(c). BACKGROUND: The City reconstructed Fire Station No. 1 due to its age and state of disrepair. The station, originally built in 1961, was experiencing foundation settlement resulting in structural damage. The station needed to be re-constructed to meet current building codes and standards, and to provide efficient multi-gender accommodations. The new fire station is equipped with a three-bay, double-deep apparatus room, ten fire fighter dorm rooms, administrative offices, kitchen, dining room, day room, physical training room, EMS training room, mechanic shop area, and an emergency medical supply room within the 11,740 square foot building. Additional site features include an emergency generator, fuel station, hose drying tower, a City emergency supply storage unit, and a new traffic signal. In an effort to minimize emergency response time, the floor plan was designed to ensure that usability and circulation are maximized. A project location map is included as Attachment 1. 2 Before Improvements After Improvements ANALYSIS: The work required by the contract documents was completed on September 4, 2018, to the satisfaction of the City Engineer. The final contract cost for Horizons Construction amounted to $7,549,682.71. A report of the final costs is included as Attachment 2. A summary of the costs is as follows: Original Contract Cost: $ 7,767,000.00 Reduction of PO due to estimated cost savings* (200,000.00) Final Quantity Adjustment: $ (17,317.29) Final Contract Cost: $ 7,549,682.71 *This represents a portion of the net reduction in project costs totaling $350,000 that was identified during the FY 2019-20 budget adoption. The final contract price reflects a 2.8% net decrease to the original contract. As of this date, there are no Stop Notices filed against the monies due to Horizons Construction Company, Int’l. ALTERNATIVES CONSIDERED: There are no alternatives considered for this item. FISCAL REVIEW: The overall project cost came in under budget. In anticipation of these savings, a net of $350,000 was deprogrammed from this project as part of a budget balancing measure to reduce the FY 2019-20 use of General Fund reserves. The breakdown below provides a summary of the project expenses and remaining balance. 3 Total Project Estimated Cost Total Allocations to date $10,000,000.00 9,953,005.00 Total Construction Contract Expenditures 7,549,682.71 Total Adjustments and deprogrammed amounts 350,000.00 Total Design, Construction Management, and Misc. Expenditures 2,019,748.82 Remaining Project Balance $ 33,573.47 The remaining project balance in the amount of $33,573.47 includes encumbrances and anticipated expenditures for the close out of the project. The final project balance will be returned to the unassigned fund balance in the Capital Improvement Fund after project closeout. LEGAL REVIEW: The City Attorney’s Office has reviewed this report and approves it as to form. CITY COUNCIL GOALS & PRIORITIES: In 2019, the City Council adopted a list of goals and priorities. This project works toward achieving the following City Council goals and objectives: Goal 1: Keep our Community Safe. (a) Upgrade our public safety infrastructure. CONCLUSION: The Fire Station No. 1 Reconstruction, City Project No. 16-16, was completed to the satisfaction of the City Engineer. Staff recommends that the City Council accept the work performed by Horizons Construction Company; authorize the City Clerk to file the Notice of Completion; and authorize the City Manager to release the Labor and Material Bonds, and Faithful Performance Bonds, as the one-year warranty period is complete. _________________________________ _____________________________ BALTAZAR MEJIA RAJA SETHURAMAN City Engineer Director of Public Services ________________________________ _____________________________ KELLY A. TELFORD, CPA KIMBERLY HALL BARLOW Director of Finance City Attorney ATTACHMENTS: 1 – Location Map 2 – Cost Summary DISTRIBUTION: City Manager City Attorney City Clerk Staff File FIRE STATION NO. 1 RECONSTRUCTION CITY PROJECT NO. 16-16 PROJECT LOCATION ATTACHMENT 1 4