Loading...
HomeMy WebLinkAbout05 - CC-5 - Bear St Improvement Project No.20-14 - 2/16/2021CITY OF COSTA MESA FOR PAYMENT ON THE WARRANT LIST OF:1/15/2021 DATE:1/12/2021 2nd and Final Payment to: ALL AMERICAN ASPHALT PAGE:1 OF 2 P.O. BOX 2229, CORONA, CA 92878 PERIOD:11/21/2020-1/4/2021 PROJECT: BEAR STREET IMPROVEMENT PROJECT - I-405 TO BAKER ST. CITY PROJECT 20-14 BASE BID SCHEDULE ITEM BID UNIT PREVIOUS QUANTITY TOTAL QUANTITY PREVIOUS AMOUNT TOTAL CONTRACT NO QUANTITY DESCRIPTION PRICE QUANTITY THIS ESTIMATE TO DATE AMOUNT THIS EST TO DATE PRICE 1 1 L.S.Mobilization $20,106.00 0.5 L.S.0.50 L.S.1.00 L.S.$10,053.00 $10,053.00 $20,106.00 $20,106.00 2 1 F.A.Additional Work Items $25,000.00 0.0 F.A.0.00 F.A.0.00 F.A.$0.00 $0.00 $0.00 $25,000.00 3 500 S.F.Remove & Reconstruct Asphalt Concrete Section at I-405 Bridge Approach $17.00 500.0 S.F.0.00 S.F.500.00 S.F.$8,500.00 $0.00 $8,500.00 $8,500.00 4 1,700 TONS Type "C" Asphalt Concrete Leveling Course $70.00 822.3 TONS 896.91 TONS 1,719.17 TONS $57,558.20 $62,783.70 $120,341.90 $119,000.00 5 2,800 TONS Type "GG-C" Asphalt Rubber Hot Mix (ARHM) Surface Course $84.00 0.0 TONS 2,833.61 TONS 2,833.61 TONS $0.00 $238,023.24 $238,023.24 $235,200.00 6 7 EA Remove and Construct ADA Curb Ramps $7,000.00 7.0 EA 0.00 EA 7.00 EA $49,000.00 $0.00 $49,000.00 $49,000.00 7 874 S.F.Remove and Reconstruct Concrete Sidewalk $14.00 0.0 S.F.447.00 S.F.447.00 S.F.$0.00 $6,258.00 $6,258.00 $12,236.00 8 1 L.S.Install Lane Markings, Striping, Pavement Legends, and Raised Pavement Markers (RPM)$34,000.00 0.0 L.S.1.00 L.S.1.00 L.S.$0.00 $34,000.00 $34,000.00 $34,000.00 9 2 EA Adjust and Reset Existing Survey Monuments and Ties $1,020.00 0.0 EA 2.00 EA 2.00 EA $0.00 $2,040.00 $2,040.00 $2,040.00 10 3 EA Adjust Manhole Covers to Grade $1,200.00 0.0 EA 2.00 EA 2.00 EA $0.00 $2,400.00 $2,400.00 $3,600.00 11 17 EA Adjust Water Valve to Grade $850.00 0.0 EA 18.00 EA 18.00 EA $0.00 $15,300.00 $15,300.00 $14,450.00 12 225,000 S.F.Cold Mill (3" MIN Depth)$0.34 221862 S.F.0.00 S.F.221,862.00 S.F.$75,433.08 $0.00 $75,433.08 $76,500.00 13 1 L.S.Temporary Traffic Control $31,000.00 0.5 L.S.0.50 L.S.1.00 L.S.$15,500.00 $15,500.00 $31,000.00 $31,000.00 14 2 EA Install No. 6 (T) Traffic Pull Box $1,070.00 0.0 EA 2.00 EA 2.00 EA $0.00 $2,140.00 $2,140.00 $2,140.00 15 85 L.F.Install 4" Dia. Conduit PVC Sch. 80 $87.00 0.0 L.F.85.00 L.F.85.00 L.F.$0.00 $7,395.00 $7,395.00 $7,395.00 16 51 EA Remove and Install Type E Traffic Signal Loop Detector $250.00 0.0 EA 57.00 EA 57.00 EA $0.00 $14,250.00 $14,250.00 $12,750.00 17 18 EA Remove and Install Type F or Type D Circular Traffic Signal Loop Detector $270.00 0.0 EA 15.00 EA 15.00 EA $0.00 $4,050.00 $4,050.00 $4,860.00 BASE BID SCHEDULE TOTAL: $216,044.28 $414,192.94 $630,237.22 $657,777.00 Attachment 2 Attachment 1 1 CITY COUNCIL AGENDA REPORT MEETING DATE: FEBRUARY 16, 2021 ITEM NUMBER: CC-5 SUBJECT: BEAR STREET IMPROVEMENT PROJECT (I-405 FREEWAY TO BAKER STREET) – CITY PROJECT NO. 20-14 DATE: FEBRUARY 9, 2021 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: SEUNG YANG, P.E. CITY ENGINEER, (714) 754-5633 RECOMMENDATION: Staff recommends that the City Council: 1. Accept the work performed by All American Asphalt, Inc., and authorize the City Clerk to file the Notice of Completion. 2. Authorize the City Manager to release the Labor and Material Bond seven (7) months after the filing date; release the Faithful Performance Bond at the conclusion of the one-year warranty period; and release the retention monies 35 days after the Notice of Completion filing date. BACKGROUND: On September 1, 2020, the City Council awarded a construction contract for $657,777 to All American Asphalt, Inc., 400 East Sixth Street, Corona, California 92879 for the Bear Street Improvement Project, City Project No. 20-14. The scope of work for this project consisted of removal and reconstruction of damaged asphalt pavement, milling and overlaying of new asphalt; reconstruction of damaged parkway improvements; adjustment of utility covers to grade; addition of bicycle lanes; and signing and striping improvements. Project construction was along Bear Street from the I-405 Freeway to Baker Street. A location map is included herein as Attachment 1. Improved bike lanes and new bike facilities will contribute to the community’s goal of implementing the Active Transportation Plan. In addition to bicycle lanes, the project also implemented a bike box at Baker Street/Bear Street intersection. This new street reconstruction project increases traffic mobility options and improves the quality of life for the surrounding community. 2 Bear Street before construction Bear Street after construction ANALYSIS: The work required by the contract documents was completed on January 8, 2021, to the satisfaction of the City Engineer. The final contract cost amounted to $630,237.22. A report of the final costs is included herein as Attachment 2. A summary of the costs is as follows: Original Contract Cost: $ 657,777.00 Final Quantity and Unit Cost Adjustment: ($ 27,539.78) Final Contract Cost: $ 630,237.22 3 The final contract price reflects a 4.2% decrease to the original contract as a result of final quantity adjustments. As of this date, there are no Stop Notices filed against the monies due to All American Asphalt, Inc. ALTERNATIVES CONSIDERED: There were no alternatives considered for this item. FISCAL REVIEW: There is no fiscal impact with this item. LEGAL REVIEW: The City Attorney’s Office has reviewed this report and approves it as to form. CITY COUNCIL GOALS & PRIORITIES: This project works toward achieving the following City Council goals and objectives: Goal 2: Improve our Neighborhoods and Quality of Life: (g) Invest in infrastructure improvements including streets, sidewalks, bikeways, alleyways, storm drains, parkways, medians, and trees to ensure all areas of town (especially Districts 4 and 5) are raised to the same high standard for infrastructure. This includes updating our Parkway and Median Standards and exploring the possibility of becoming a Tree City USA. (h) Improve key travel corridors to beautify and improve appearance, to comply with the Active Transportation Plan and reducing speeds. Goal 5: Improve Mobility and Parking: (a) Prioritize supporting the Active Transportation Plan. (d) Ensure strong investment in our roads. CONCLUSION: The Bear Street Improvement Project, from I-405 Freeway to Baker Street – City Project No. 20-14, has been completed to the satisfaction of the City Engineer. It is recommended that the City Council accept the work performed by All American Asphalt, Inc., authorize the City Clerk to file the Notice of Completion; release the retention monies 35 days after the Notice of Completion filing date; and authorize the City Manager to release the Labor and Material Bond seven (7) months after the filing date, and Faithful Performance Bond at the conclusion of the one-year warranty period. 4 _________________________________ _________________________________ SEUNG YANG, P.E. RAJA SETHURAMAN City Engineer Public Services Director ________________________________ _________________________________ CAROL MOLINA KIMBERLY HALL BARLOW Finance Director City Attorney ATTACHMENTS: 1 - Location Map 2 - Cost Summary