Loading...
HomeMy WebLinkAbout01 - Presentation - Bikeway and Walkability Committee Annual - 3/16/2021COSTA MESA BIKEWAY AND WALKABILITY COMMITTEE ANNUAL REPORT MARCH 16, 2021 1 COMMITTEE FORMATION AND CURRENT MEMBERS Formed by the City Council on April 7, 2015 City Council Liaisons: Council Members Jeff Harlan, Loren Gameros and Arlis Reynolds Chamber of Commerce Liaison: Brent Stoll Newport-Mesa Unified School District Liaison: Dr. Kirk Bauermeister James Erickson, Vice Chair Bryan Estrada Bridget Gleason Richard Huffman II John Lux, Alternate Flo Martin David Martinez Ibarra Cynthia McDonald,Chair Michael Moses Nolf Ralph Taboada Jimmy Vivar, Alternate Emily Webb Trace Yulie 2 PURPOSE Mission Statement Focus on the review and update of the City's Active Transportation Plan and improvements to be made to bikeways and pedestrian facilities in the City; and Evaluate the bikeability and walkability of our City in order to make recommendations for improvement to the City Council. 3 ACTIVE TRANSPORTATION IS IMPORTANT TO COSTA MESA Physical and Mental Health: Extends and enhances our lives, makes us more productive and our kids do better academically. Cost Efficiency: Reduces allocation of space and cost of maintenance. Business: Contributes to economy through jobs, income and tax revenue nationwide and locally. Real Estate: Increases property values and can be a catalyst for development. Important to Community: Residents desire easy and safe active transportation. Environment:Reduces noise, air pollution and greenhouse gas emissions, while reducing vehicle traffic. Bicycles are cleaner to manufacture than toxic batteries. 4 SUBCOMMITTEES Public Outreach Governmental Regulatory/Grants Mobility Share Safe Routes/Accessibility Economic Growth Presentation Walk Audits Open Streets 5 ACTIVITY Pedestrian Master Plan (PMP): Through a grant provided by SCAG and City matching funds, KOA, the lead consultant for this project, will complete the PMP by September. KOA has defined its schedule and walk audits will begin soon. Committee members will assist with the walk audits and be heavily engaged in providing input into the plan and recommendations. Public input and feedback survey began in March. The final PMP will be incorporated into the City’s General Plan. 6 Since our last report in February 2020, the committee met four times. Our activities include: ACTIVITY Class II and III Bike Facilities:Committee continues to work with staff to install/enhance Class II and III bike facilities. Some projects may require updated designs such as green paint for demarcation of conflict zones, sharrows, and/or striping modifications. Committee anticipates staff will implement our prioritization. 7 ACTIVITY Bike Racks: City Racks:We continue to work with staff on the installation of bicycle racks in parks, facilities and public rights-of-way. Bike Racks: Commercial Bike Rack Program:The framework for a commercial bike rack program has been identified and potential program will be brought to the City Council for consideration. The Chamber of Commerce has shown interest in this program. 8 ACTIVITY Mobility Share: A memorandum outlining the Committee’s recommendations for elements of a pilot program was submitted to staff in May 2019. Since that time, California Assembly Bill 1286 was enacted requiring providers of shared mobility devices to enter into an agreement or obtain a permit from cities or counties, and also provide insurance before distributing said devices. HEAL Resolution:Committee drafted a resolution that is under review by multiple departments at the City. Annual Bike/Walk Events: Committee previously identified Bike to Work and Open Streets events as projects for committee members to organize. Planning for the Open Streets event has been postponed due to COVID. 9 ACTIVITY Education:Monthly committee meetings include staff presentations to educate public and committee members about active transportation trends and new regulations. Active Transportation Improvement Projects: Committee reviews active transportation improvement projects to provide input into the planning and design of active transportation projects. Easement and Right-of-Way Vacations:Committee reviews easement and right-of-way vacations to identify bike and pedestrian potential impacts. Walk to School Day, Bike to School Day, Bike Rodeo and Outreach at local events:Postponed due to COVID. 10 ACTIVITY Virtual Safety Training−August 2020 Community Bicycle and Safety Training online meeting to improve walking and cycling. Hosted by California Walks California Walks and Berkeley SafeTREC using a grant from California Office of Transportation Safety. 3 routes were assessed. Newport Blvd between 17th and 19th Streets West 19th Street Fairview Road near Orange Coast College 11 ACTIVITY Virtual Safety Training−August 2020 Recommendations to improve safety and facilities were provided in the final report from the project team: Pedestrian and Bicycle Infrastructure Enhancements along West 19th Street. Bike Lane Demonstration. Community Engagement Campaign. Implementation of a Safe Routes to School Walking School Bus for hybrid learning. Shade Tree Assessment along the 19th Street Corridor. Costa Mesa City Streets Bike Rack Program. Administer a Senior Safety Zone Assessment. 12 ACTIVITY Reimagine 19th Street−September 2020 Demonstration project by Costa Mesa Alliance for Better Streets using a grant from SCAG in cooperation with City that included: Traffic Circles on Wallace/Center and Monrovia/19th Streets. Bulb-outs on Wallace and 19th Street. Surveys and community outreach before during, and after project: Overall positive feedback on Wallace/Center and Wallace/19th Streets projects. Mostly negative feedback on Monrovia and 19th Street traffic circle, primarily because motorists were confused or felt intersection was too small (but were able to navigate it). 13 FUTURE WORK Continue to work with consultant on PMP and participate in walk audits for the PMP. Recommend implementation of projects from Active Transportation Plan for FY 21/22 Budget. Perform bikeability/walkability audits. Continue recommendations of bike rack installations and wayfinding signage. 14 FUTURE WORK Review active transportation projects. Review Shared Mobility comments from City. Review HEAL City resolution comments from City. Continue planning of Open Streets event(s). Committee to provide input to staff for prioritization of implementing the ATP and PMP. Committee to request City Council consideration of future funding for pedestrian and bicycle infrastructure improvements as recommended and identified in the ATP and upcoming PMP. 15 ATP PROJECTS The following projects are in progress or under construction: Merrimac Way: Multi-use trail from Harbor Blvd. to western edge of OCC and buffered bike lanes from western edge of OCC to Fairview Road. An important East-West connection. Project includes midblock pedestrian HAWK signal. Project anticipated to be complete near end of summer 2021. Citywide Bicycle Racks: Installation of new bike racks citywide. 16 ATP PROJECTS The following project is in progress: Fairview Road (Adams to Baker) Improvements: Construction of new traffic signal at Fairview and Village Way, striped bike lanes, new raised concrete medians, enhanced pedestrian crosswalks, new ADA access ramps, and sidewalk replacement. Project will improve bicycle and pedestrian mobility and improve traffic flow and safety. Traffic signal procurement underway and full construction is anticipated to being in April 2021. 17 ATP PROJECTS The following projects are in design phase: Adams Avenue Multi-Purpose Trail: Multi-use trail from Santa Ana River Trail to Royal Palm. Improves multimodal traffic with raised center median and Class I path with landscaped buffer. Grant funding application for construction has been submitted. Adams Avenue Bicycle Facility Improvements: Design of bike lanes from Fairview Road to Harbor Boulevard. 18 ATP PROJECTS The following projects are in design phase: Adams/Pinecreek Intersection Improvements: Intersection Improvements to provide improved bicycle and pedestrian access to OCC. Class II and III Bicycle Projects: Implementation of new Class II/Class III bicycle facilities throughout the City. Design package for a project to install sharrows and signage on 10 streets is complete and in the public bidding phase for construction. 19 ATP PROJECTS Design Plans for the following project were completed in 2020: Randolph Avenue/St. Clair Street Improvements: Design has been completed. Construction of new signing, striping, and traffic calming improvements, including roundabout at Randolph/St. Clair. In addition, Randolph Avenue design includes speed cushions and mid-block raised crosswalk and pedestrian warning system. Design is complete, but funding for construction is needed. 20 ATP PROJECTS The following projects have completed design in 2020: West 17th Street: Roadway and bike lane improvements. Final design plans, specifications, and cost estimates complete. Future grant funding opportunities to be identified for its construction. West 19th Street Bicycle Improvements: New Class II and III bike lanes, high visibility lane markings, sharrows and pedestrian crossings along W. 19th St. between Pomona and Marina View Park. Enhances multimodal traffic and improve roadway safety. Project design is complete. Project to be advertised for construction in spring 2021. 21