Loading...
HomeMy WebLinkAbout09 - CC-7 - Professional Engineering Services for - 4/20/2021 1 CITY COUNCIL AGENDA REPORT MEETING DATE: APRIL 20, 2021 ITEM NUMBER: CC-7 SUBJECT: PROFESSIONAL ENGINEERING SERVICES FOR THE NEWPORT BOULEVARD REHABILITATION PROJECT FROM BRISTOL STREET TO 19TH STREET DATE: MARCH 23, 2021 FROM: PUBLIC SERVICES DEPARTMENT / ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: SEUNG YANG, P.E. CITY ENGINEER, (714) 754-5633 RECOMMENDATION: Staff recommends that the City Council: 1. Award a Professional Services Agreement (PSA) to KOA Corporation for the design of the Newport Boulevard Rehabilitation Project in the amount of $432,797 (Attachment 1) and authorize the City Manager and the City Clerk to execute the agreement and future amendments to the agreement; and 2. Approve a ten percent (10%) contingency for unforeseen services in the amount of $43,280. BACKGROUND: The Newport Boulevard frontage road is a divided collector with State Route 55 running along the center. This section of Newport Boulevard is a major thoroughfare with commercial establishments along both directions with the Orange County Fairgrounds at the northwest corner of Newport Boulevard and Fair Drive. The divided nature of Newport Boulevard culminates towards the south end at 19th Street in which it merges as a singular boulevard with two-way traffic. Newport Boulevard Frontage Roads between Bristol Street to 19th Street were last rehabilitated in the early 1990s. On December 23, 2020, staff issued a Request for Proposals (RFP) for professional engineering services for the design of the rehabilitation project of Newport Boulevard Frontage Roads from Bristol Street to 19th Street along both the northbound and southbound directions. The project’s primary goal is street rehabilitation due to its very low Pavement Condition Index. However, staff will look for opportunities to incorporate improvements to active transportation elements to improve overall mobility. The scope of work for this project includes street rehabilitation, concrete parkway removal and repair, 2 reconstruction of damaged curb/gutter and sidewalks, bicycle and pedestrian infrastructure improvements, drainage, and installation of new striping and legends. ANALYSIS: On January 12, 2021, staff received two (2) proposals for the requested professional engineering services. They were reviewed for compliance with the City’s RFP, and evaluated based on project understanding and scope of services, qualifications and experience, price proposal, and innovative and/or creative approach to providing the services. After careful review of the proposals, staff unanimously found KOA to be well qualified to perform the identified services. The submitted proposal and the responses by KOA represent a thorough understanding of the project, complies with City specifications, and documents technical ability and experience with similar projects. KOA is currently providing civil engineering design services for the Adams Avenue Rehabilitation / Multi-Purpose Trail Project, which includes plan preparation, specifications and construction support services. ALTERNATIVES CONSIDERED: One alternative would be to perform the work in-house. However, the volume of work associated with the large number of projects presently handled by staff exceeds its resources and time. FISCAL REVIEW: Funding is included in the budget. LEGAL REVIEW: The City Attorney’s Office has reviewed this agenda report, prepared the attached agreement, and approves them both as to form CITY COUNCIL GOALS & PRIORITIES: In 2021, the City Council adopted a list of goals and priorities. This project works toward achieving the following City Council goals and objectives: “Maintain and Enhance the City’s Infrastructure, Facilities, Equipment, and Technology.” CONCLUSION: Staff recommends that the City Council award a Professional Services Agreement (PSA) to KOA Corporation for the design of the Newport Boulevard Rehabilitation Project in the amount of $432,797; approve a 10 percent (10%) contingency in the amount of $43,280 for unforeseen services; and authorize the City Manager and City Clerk to execute the proposed PSA and future amendments to the agreement. 3 SEUNG YANG, P.E. RAJA SETHURAMAN City Engineer Public Services Director CAROL MOLINA KIMBERLY HALL BARLOW Finance Director City Attorney ATTACHMENT: 1. Proposed Professional Services Agreement Attachment 1 • • • • • • • • • • • • • • • • 1. 2. 4. 5. 6. 7. 8. 9. CALTRANS PAVEMENT REPAIR LIMITS PROPOSAL PROFESSIONAL ENGINEERING SERVICES FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET CITY OF COSTA MESA JANUARY 12, 2020 1 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET TABLE OF CONTENTS TABLE OF CONTENTS 1 COVER LETTER 2 SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING 4 Project Approach SECTION 2 | PROJECT TEAM 12 SECTION 3 | LIST OF SIMILAR PROJECTS 14 SECTION 4 | SCHEDULE 19 SECTION 5 | FEE PROPOSAL 19 *KOA’S F SECTION 6 | SUGGESTED EDITS TO THE PROFESSIONAL SERVICES AGREEMENT 20 SECTION 7 | APPENDIX Addendum #1 Resumes 2 2141 W. Orangewood Avenue, Orange, CA 92868 T: (714) 573-0317 | F: (714) 573-9534 | www.koacorp.comMONTEREY PARK ORANGE ONTARIO SAN DIEGO LA QUINTA CULVER CITY Dear Mr. Kelly Dalton: team to the City of Costa Mesa (City) to provide engineering services to successfully deliver this project from inception to completion. Our team has substantial recent experience with the design of pavement rehabilitation projects and Complete Street improvements for local agencies, including the Cities of Anaheim, Long Beach, La Mirada, La Habra, Claremont, Culver City understands the issues that will be important on this pavement rehabilitation project. THE COMPANY Complete Streets projects. This blend of capabilities provide us with a unique in-house skill set. We currently have over 100 public works employees serving local municipalities in Southern California. We do very little work for private developers and devote our services to public agencies. We have several staff Capital Project Delivery professionals. OUR PROJECT MANAGER The KOA Team is led by Senior Project Manager, Matt Stepien, PE. Matt will be the primary point of contact and will manage the contracted work. He brings more than 30 years of experience with arterial roadway design, including recent roadway rehabilitation projects in the Cities of Anaheim, Long Beach, La Mirada, La Habra, Santa Fe Springs, Costa Mesa, and Downey. Matt has built a strong reputation on creating value for municipal clients with innovative designs that result in decreased design fees as well as construction cost savings. KEY SUBCONSULTANT TEAM MEMBERS Russell Hansen, PLS (Huitt-Zollars), has in depth knowledge and expertise in the preparation of aerial and ground surveys for agencies throughout Southern California. He has worked with KOA staff on a regular basis for over 20 years. Marie Marston, PE, QSD/QSP (Civil Works Engineers), has over 30 years of experience in preparing civil engineering PS&E throughout Southern California. From 2017 to the present, they have been working with Caltrans District 12 on nine (9) task orders for improvements on various Caltrans facilities. Additionally, Civil Works has worked for the City of Costa Mesa on numerous civil design projects during the last 15 years. UNDERSTANDING OF ISSUES We believe that after reviewing our proposal, it will be obvious to the City that we have an in-depth understanding of the project and the design issues. This understanding will help us to deliver a quality product that proceeds on a predictable schedule, is designed within budget and is constructed without problems. TO Mr. Kelly Dalton Associate Engineer City of Costa Mesa Public Services Department P.O. Box 1200 Costa Mesa, CA 92626 FROM Mr. Stephen Bise, PE Principal-in-Charge KOA Corporation 2141 W. Orangewood Avenue Orange, CA 92868 sbise@koacorp.com T: (714) 573-0317 RFP Frontage Road Rehabilitation Project - DATE January 12, 2021 3 2141 W. Orangewood Avenue, Orange, CA 92868 T: (714) 573-0317 | F: (714) 573-9534 | www.koacorp.comMONTEREY PARK ORANGE ONTARIO SAN DIEGO LA QUINTA CULVER CITY REFERENCES Construction is the true litmus test for how well the design was completed. Projects that are successfully constructed • City of Long Beach, Onofre Ramirez, Principal Engineer, (562) 570-6183 • City of Downey, Desi Gutierrez, Principal Engineer, (562) 904-7110 • City of Claremont, Vincent Ramos, Associate Engineer, (909) 399-5395 • City of Whittier, Cesar Rangel, Senior Engineer, (562) 567-9504 • County of Los Angeles, Christopher Hudson, Senior Engineer, (626) 458-7940 • City of Laguna Beach, Mark Trestik, City Engineer, (949) 497-0300 included in Section 6 at (949) 370-3164 if you have any questions or need any additional information. We look forward to hearing from you and Sincerely, KOA Corporation VP | Principal 3 2141 W. Orangewood Avenue, Orange, CA 92868 T: (714) 573-0317 | F: (714) 573-9534 | www.koacorp.comMONTEREY PARK ORANGE ONTARIO SAN DIEGO LA QUINTA CULVER CITY REFERENCES Construction is the true litmus test for how well the design was completed. Projects that are successfully constructed • City of Long Beach, Onofre Ramirez, Principal Engineer, (562) 570-6183 • City of Downey, Desi Gutierrez, Principal Engineer, (562) 904-7110 • City of Claremont, Vincent Ramos, Associate Engineer, (909) 399-5395 • City of Whittier, Cesar Rangel, Senior Engineer, (562) 567-9504 • County of Los Angeles, Christopher Hudson, Senior Engineer, (626) 458-7940 • City of Laguna Beach, Mark Trestik, City Engineer, (949) 497-0300 included in Section 6 at (949) 370-3164 if you have any questions or need any additional information. We look forward to hearing from you and Sincerely, KOA Corporation VP | Principal 4 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET STATEMENT OF PROJECT UNDERSTANDING experience on other similar design projects, we have , so that we can provide the most appropriate personnel and level of effort, and that surprises are eliminated or minimized during the design the following; • Review of existing record plans provided by the City, especially the 1992 pavement rehabilitation plans for Newport Boulevard; • Obtained and reviewed the Caltrans right-of-way maps for the project limits; • Thorough review of the RFP; • conditions, non-compliant curb ramps, and Complete Streets elements; • Numerous discussions amongst the Team regarding issues. As a result of the effort described above, our review of previous experience on other similar projects, we have • agreement with the proposed paving improvements proposed by Caltrans for the segment of Newport Boulevard between 17th and 19th Streets, our preliminary view is that the pavement can generally • Most of the existing curb ramps are not ADA- compliant • There are several locations in the southbound direction where sidewalk popouts are needed to provide a minimum 3 foot wide pathway around existing obstructions (trees, poles). • Bike lane signage and striping is inconsistent and • The Caltrans right-of-way maps indicate that most of Newport Boulevard is City owned and therefore Caltrans involvement will primarily be at the south end of the project and at on and off ramps from SR55. SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING One of KOA’s primary objectives on pavement rehabilitation projects is to stretch the City’s design pavement, which is the same approach that Caltrans is proposing for Newport Boulevard between 17th and 19th Streets. Additionally, we are recommending limited vertical information due to the fair condition of the existing pavement. Newport Boulevard serves as the frontage road for State Route 55 (SR 55). There are several off-ramp and on-ramps between 19th Street and Bristol Street that are Caltrans-owned roadways. While no improvements are planned to the Caltrans-owned facilities, temporary to perform the construction work on Newport Boulevard and therefore, an encroachment permit will be required to be obtained from Caltrans. This would also cover the area of convergence of Newport Boulevard at the begin/ end of SR 55 at 19th Street. We will set up a pre-permit application meeting with Caltrans. Caltrans may request other documents be provided such as the pavement report, Newport Boulevard plans, etc. which we can provide upon their request. From 2017 to the present, Civil Works Engineers has been working with Caltrans District 12 on nine (9) task orders for improvements on various Caltrans facilities. This has provided them with the opportunity to work with the staff of numerous Caltrans units to process these. Additionally, their staff has worked with Districts 7, 8, 11, and 12 on projects since 1982 including both encroachment permit projects and project development projects, giving them a thorough understanding of all Caltrans requirements. One of the elements of the design of a project that KOA pays special attention to is the preparation of realistic construction estimates. Our estimates are based on contractor bids for similar recent construction projects supplemented by direct discussion with KOA’s construction personnel and contractors. We prepare a 5 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET Our management philosophy consists of the following: One of our trademarks is attempting to understand the details of the project during the RFP stage, so that we can avoid surprises during the design phase of the project. As a part of due diligence, we will typically review available existing information (geotech, alignments, studies, etc.), ascertain the purpose of the project, identify potential stumbling blocks, determine all of the stakeholders, and identify budgetary deadlines and constraints. The APP team has extensive, relevant experience in performing pavement rehabilitation design for public agencies in Los Angeles and Orange Counties. The team that has been formed will hit the ground running, delivering quality reviews within the schedule set by the City. Our team members have excellent track records communicating with clients and stakeholders. Frequent communication and tracking of project progress is integral to our approach to every plan check review. We have project management tools that forecast staff requirements and labor allocations to meet the City’s needs. A key component to any project is QA/QC. Quality Control will be an ongoing task throughout the project. The initial effort will be to establish the City’s preferences for plan check review tracking, plan review correction formats, and communications protocol. KOA’s project manager will be responsible for overall QA/QC, and will ensure that all project plan reviews are being handled in accordance with City requirements. Quality control starts with understanding the project as we discussed above. The Project Management task is directed at the organization, planning and control of the project team. 1. Maintain communication with the City’s Project Manager throughout the duration of the project, including meetings to review the conceptual and preliminary cost estimate at the early design stage to determine whether the project is within the construction budget or if adjustments need to be made. for this project, on the exhibit on the next page we opportunities between 19th and 22nd. A project cannot be successful without effective project management. KOA was founded on the philosophy of providing hands-on, experienced, proactive project management on all projects. This project will be no exception. Our proposed Project Manager, Matt Stepien, PE, brings more than 30 years of design and project management experience to the APP Team. Matt will not only be involved with project management and oversight, but will also be involved in day-to-day design of the project. are the words that our project team loves to hear and has become accustomed to hearing consistently. Problems during construction can negatively affect everyone associated with a project. By utilizing our construction personnel during design, paying attention to the details and by carefully reviewing our quantities and bid items, we can hear those words on this project. SCOPE OF WORK The proposed project will rehabilitate Northbound and Southbound Newport Boulevard from 19th Street to Bristol Avenue. KOA will supervise, coordinate, and monitor the work on a continuous basis in conformance with the City of Costa Mesa’s requirements. KOA will coordinate between City staff, subconsultants, Caltrans, and other affected agencies and utility companies. KOA will prepare meeting agendas and minutes for every meeting, and provide progress reports, invoices and the schedule updates as needed. SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING 6CITY OF COSTA MESAPROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING 7 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET A visual pavement condition assessment will be performed to aid in pavement evaluation and selection of exploratory coring locations within the project limit. The type of distress on the pavement will be logged. This information will be used to assist in developing pavement structural design recommendations and identifying exploratory coring locations based on the existing during this task. The coring locations will be submitted to the City for review and approval. In order to determine the existing structural thickness of the pavement, we will perform coring on the pavement section. We will notify Underground Service Alert (USA) of the proposed subsurface exploration locations at least the proposed locations and underground utilities can be built utility plans for the areas proposed for exploration We will perform a minimum of 30 cores, 10 of them to a depth of approximately 5 feet or refusal, whichever is shallower. We anticipate performing the cores in three 8-hour shifts. The thickness of existing asphalt concrete pavement, thickness and type of base, and depth to subgrade will also be recorded. The coring will or geologist, who will log the subsurface conditions encountered and will obtain bulk samples for laboratory observation and testing. At each exploration location, dynamic cone penetrometer (DCP) test will be performed to help evaluate the consistency of the subgrade materials below the aggregate base layer. Samples obtained from the exploratory borings will be testing. Laboratory tests will be performed by Twining on selected samples obtained from the borings to aid in the of the subgrade soils, including R-value, density and optimum moisture content. evaluated and engineering analysis will be performed in order to provide recommendations for the design and construction of the proposed pavement rehabilitation. Pavement structural thickness design will be performed following the latest California Highway Design Manual. preliminary plans as well as project status at 35%, 65%, and 95% design levels. 2. Prepare agendas of any special items of discussion and minutes serving as a communication record and listing any required follow-up actions. 3. Prepare and provide a detailed project schedule with updates as necessary. 4. Remain cognizant of the status of each task as it proceeds and make provisions to expeditiously resolve any issues that may impede progress. 5. Proactively initiate communication efforts with the City to address key issues in a timely fashion and bring any potential complex issues to the attention of the Project Manager as quickly as possible. 6. Coordinate project and approvals with the City. Once the contract has been signed, Mr. Matt Stepien, PE, the KOA Project Manager will organize an initial meeting with the City to kick-start the project, along with key staff from our team. The meeting will serve to ensure the design team and City staff have a mutual understanding of tasks to be completed, the schedule of work, and any other logistics that need to be discussed. KOA will begin the Project by requesting from the City record drawings and documents relevant to the project site(s). In addition to the street improvement plans already provided by the City during the proposal phase, other record drawings and documents could include, but are not limited to studies, reports, topographic maps, centerline ties, corner records, or other as-built plans. any/all underground and above ground utilities in a relevant design plans and clearly labeled to identify utility type, size, owner, etc. This will allow us to identify any potential impacts and modify the design as necessary. SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING 8 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET Concept plans will be prepared using the base maps prepared above. The concept plans will consist of identifying non-compliant curb ramps, proposed bike lane and striping improvements, proposed storm drain improvements and preliminary recommendations for pavement rehabilitation. A construction cost estimate with a healthy contingency will also be prepared. project is a categorical exemption. ECORP will provide support to the City on an as-needed basis, and will negotiate a fee for any work required. KOA will attend a PDT meeting in conjunction with the 35% submittal to discuss the deliverables. As an optional task, KOA will provide the services acquisition. The KOA Team will prepare a quality PS&E package at the 65% submittal stages of the project. Based on our understanding of the RFP and the improvements, below is a list of anticipated plans. • Title Sheet • General notes • Horizontal control – a control line will be established for both sides of Newport Boulevard, similar to what was done with the 1992 pavement rehabilitation plans • Typical sections, details, and notes. • Street improvements – plans will be prepared to rehabilitate the pavement, which preliminarily will include providing sidewalk popouts in areas where an existing 3’ wide ADA path does not exist. We have assumed no street widening for this A report will be prepared to summarize the data collected and present our conclusions, and recommendations for design and construction of the proposed project. For all the recommended options, a preliminary cost analysis will be provided to help the City in selecting the most effective strategy. Huitt-Zollars will research at the County of Orange Department of Public Works for survey records alignment to be used for the initial centerline monument recovery survey. Huitt Zollars will then calculate the centerline alignment based on the location of those found monuments and ties. The Basis of Bearings for the project will be based on recorded subdivision mapping in the area. The vertical datum will be based on the County of Orange Department of Public Works. Work will include level run and horizontal control. mapping, with one-foot contour intervals. Work includes and map compilation. The project will utilize GPS Static Survey methods and the Basis of Bearings will be in California State Plane Coordinates. Based on available recorded subdivision mapping and Assessor’s Parcel Map data, Huitt-Zollars will calculate the record Right-of-Way lines for the streets as described above. Without current title report information for all adjacent parcels, it is not possible to guarantee that the right-of-way lines are correct. ramps 27 along Newport Boulevard from Bristol Street to E 19th Street. Topo of handicap ramps will extend 5-feet past curb returns and will collect enough shots to evaluate ramp condition. Two days of survey for miscellaneous items is also included. The survey information collected above will be used as the base map. In addition to the aerial topopgraphy obtained, right-of-way information, and utility information will be shown. The plans will be setup as 20-scale double-stacked plan-view only. SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING 9 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET and Fair Drive. Reconstruction of catch basins or drainage pipes other than the aforementioned are not anticipated. Civil Work’s approach to the drainage aspect of this City such as existing as-built plans, drainage reports, GIS (SIMS). From GIS information and as-built plans, a storm drain base map will be prepared for reference in the improvement plans. It is assumed that the existing hydrology model resulting discharges at key nodes will be used to size proposed improvements. Revisions to the City hydrology model and/or preparing a new hydrology model and study are not included in the project scope. To improve overall conveyance of the existing storm drain system, it is also proposed to use the same pipe size for the City proposed replacement of all CMP segments to RCP. A brief drainage study report will be prepared to summarize the methodology and parameters used for the sizing of the new inlet between Mesa Drive and Fair Drive and its connection to the existing system in Newport Boulevard. A draft report will be prepared for the 65% submittal, revised to respond to plan check comments All improvements will be designed to current City standards and requirements. Drainage plans will be prepared to delineate proposed improvements. Layouts, referencing the storm drain base, the topographic base, the centerline, right of way and the utility base, will be prepared to show CMP lateral replacement work. the constructions of new facilities. It is assumed the topographic, centerline and right of way base, and the utility base maps will be provided by KOA. Continued utility coordination will continue. We have included the potholing of up to 15 utilities, to be used as needed for proposed storm drain reconstruction. 65% PS&E will be submitted to the City as referenced above and as stated in the RFP. project and that no cross-sections will be provided. Since the preparation of curb ramp details was as an optional task. • ADA curb ramps details – based on our preliminary review, we have assumed 67 ramps are non- compliant for ADA and should be reconstructed. We have assumed standard plan construction notes can be used with no detailed design required. • Drainage – the plans will only include the segments • Landscape and Irrigation – only sleeving plans will be prepared in conjunction with the landscape plans included in Addendum 1, specifying that landscape improvements will be constructed as a separate project. • Signing and Striping – plans will be prepared to show striping for the entire project, incorporating additional bicycle striping where possible. • • We understand the special provisions will serve as a Works Construction (SSPWC) and Caltrans Standard A construction cost estimate will be prepared itemizing anticipated bid items, quantity of material, and unit cost year cost unless directed otherwise. comments from the City. The drainage related project scope includes review of and improvements to the existing drainage system. Improvements are expected to include correcting the the project limits with RCP and adding a new catch basin south of the existing catch basin between Mesa Drive SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING 10 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET convergence of Newport Boulevard at the begin/end of SR 55 at 19th Street. within their jurisdiction. They will also require a cost estimate for the work within their right of way, Water Pollution Control Program, and Water Pollution Control Plans as we assume there would be less than one acre of disturbed soil area within Caltrans R/W. The WPCP will need to be prepared using the Caltrans Access template. These documents would be submitted to Caltrans along with the encroachment permit application. We have assumed we would make three submittals with comments third submittal. We will work closely with the City on the encroachment permit application and documents. We will set up a pre-permit application meeting with Caltrans. Caltrans may request other documents be provided such as the pavement report, Newport Boulevard plans, etc. which we can provide upon their request. KOA will attend a PDT meeting in conjunction with the 95% submittal to discuss the deliverables. A second utility notice will be sent to all utilities with facilities within the project limits. 100% PS&E will be submitted to the City as referenced above and as stated in the RFP. will be submitted to Caltrans and coordinated until an approved permit is obtained. KOA will attend a PDT meeting in conjunction with the 100% submittal to discuss the deliverables. KOA will attend a PDT meeting in conjunction with the 65% submittal to discuss the deliverables. 95% PS&E will be prepared, incorporating the City’s 65% and striping plans will be prepared conforming to the Control Devices (CA MUTCD), latest edition. based on the City’s format. KOA will also provide the City with a CD of our cost estimate spreadsheet, which can be added to by the City in preparing a bid summary after the Contractor’s bids are received. The anticipated plan set will consist of the following sheets: DESCRIPTION NO. OF SHEETS Title sheet 1 Typical sections/ details 2 Street plans (20-scale plan view only)21 ADA curb ramp details 5 Drainage plans 7 Signing and Striping 12 26 Landscape sleeving 1 95% PS&E will be submitted to the City as referenced above and as stated in the RFP. While no improvements are planned to the Caltrans- needed within Caltrans right of way to perform the construction work on Newport Boulevard and therefore, an encroachment permit will be required to be obtained from Caltrans. This would also cover the area of SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING 11 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET KOA will respond to questions concerning the PS&E prior to bid opening. The City will prepare contract addenda if necessary. KOA will provide the following services during construction as necessary: • Provide responses to RFIs during construction. • Be available for up to three site visits. Quality control will be an ongoing task throughout the duration of the project. The initial effort will be in the completion date and a signature block for the project manager to sign that the task has been completed and reviewed. addition to the quality control by the project manager, a quality control committee comprised of at least two registered engineers that are not involved in the project will review the plans. The review committee will do a technical evaluation transmitted to the project manager during a subsequent meeting. We have provided an exhibit of a typical KOA Street Design Checklist in Section 7 | Appendix of this proposal. SECTION 1 | STATEMENT OF PROJECT UNDERSTANDING 12 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 2 | PROJECT TEAM - FIRM PROFILE FIRM BACKGROUND engineering, transportation planning, and construction management services for public agencies and private sector clients. We offer our clients technical knowledge, innovative solutions and responsive services. The hallmark of our success is our dedication to each and every project and our desire to leave a legacy of extraordinary contributions to our communities. Our staff includes in Southern California, KOA has provided engineering services for some of the largest public works and transportation planning projects throughout California. KOA’S STRENGTH AND STABILITY We believe KOA is the ideal size to provide attentive and responsive service to the City. Our primary business is helping public agencies in Southern California with their public works infrastructure projects. We have a nearly 30-year history and the core competency and depth of resources to meet your needs. In addition, KOA has an excellent performance track record. KOA Corporation is in KOA’S ROLE AND EXPERIENCE As a pre-approved Complete Street consultant, KOA has provided complete streets services for numerous projects in California. Encompassed within the complete street planning studies have been services such as: conducting in- depth collision analyses, comprehensive multi-modal network development, project prioritization and cost estimates, transit service improvement suggestions, and public outreach coordination and presentations. KOA has extensive experience in civil engineering design. Our staff of registered professional engineers and designers have provided civil engineering services on many award winning projects throughout Southern California. KOA provides multiple civil engineering services including, but not and relocation, Low Impact Development (LID) design and implementation, widening. All designs are meticulously reviewed by our senior staff to check compliance with current standards and guidelines. We utilize AutoCAD and Civil 3D software to simulate proposed improvements to verify our design intent. TYPES OF SERVICES Civil Engineering Transportation Planning Active Transportation Highway & Transportation Design Program Management Construction Management YEAR FOUNDED 1987 FORM OF THE ORGANIZATION S Corporation LOCATION OF OFFICES Monterey Park Orange Ontario San Diego La Quinta Culver City PROJECT OFFICE LOCATION 2141 W Orangewood Avenue Orange, CA 92868 T: (714) 573-0317 13CITY OF COSTA MESAPROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET ORGANIZATIONAL CHART for an interview. We have designated Stephen Bise, PE, as the proposed Complete Streets team member. He has extensive experience in complete streets design and implementation, which includes safe multi-modal integration with aesthetic elements such as landscape and street furniture. Resumes can be found in Section 7 | Appendix of this proposal. SECTION 2 | PROJECT TEAM - ORGANIZATIONAL CHART PRINCIPAL-IN-CHARGE & QA/QC MANAGER PROJECT MANAGER & ENGINEER LOGO COMPLETE STREETS DESIGN Stephen Bise, PE TRAFFIC Shirjeel Muhammad, MS, PE SURVEY & RIGHT-OF-WAY Russell Hanson, PLS, GISP CALTRANS COORDINATION Marie Marston, PE, QSD,QSP ROADWAY Matt Stepien, PE Manuel Barrios Jennifer Miller, EIT Marie Marston, PE, QSD,QSP (Project B PS&E) DRAINAGE Marie Marston, PE, QSD,QSP SOILS Amir Chavibazoo, PhD Paul Soltis, PE, GE LANDSCAPE DESIGN Don Wilson, PLA, ASLA Jeff Woo Kim, PLA, ASLA Matt Stepien, PE Chuck Stephan, PE KOA Civil Works Engineers Cornerstone Studios, Inc. ECORP Consulting, Inc. Twining, Inc. Huitt-Zollars Boudreau Pipeline Corporation LEGEND: ENVIRONMENTAL (OPTIONAL) Jesus “Freddie” Olmos POTHOLING (OPTIONAL) Jim Mihld 14 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 3 | LIST OF SIMILAR PROJECTS AGENCY & CLIENT CONTACT City of Downey Desi Gutierrez Principal Engineer (562) 271-3188 YEAR COMPLETED 2019 ENGINEERING FEE $50,000 - $600,000 PROJECT CONSTRUCTION COST $20 Million ON-CALL CIVIL ENGINEERING SERVICES DOWNEY, CA | KOA staff has prepared PS&E for more than $20 million in improvements under lighting, landscape and private property improvements. Several typical projects include the following: • – PS&E for the rehabilitation of over 1.3 miles of existing pavement along Brookshire Avenue, including the addition of bike lanes. •- PS&E for the rehabilitation of over 0.5 miles of Firestone Boulevard from Brookshire Street to Lakewood Boulevard including pavement reconstruction and rehabilitation, reconstruction of curb ramps per current ADA criteria, signing and striping. ON-CALL CIVIL ENGINEERING - VARIOUS RESIDENTIAL STREETS LONG BEACH, CA | As part of an on-call contract with the City of Long Beach, KOA staff improvements since 2009 and continues to work with the City. The projects encompass roadway, storm drain, complete streets, and design of more than 100 ADA-compliant curb and ramps. Several recent projects include: •- Provided design services for a Complete Street Project on Market Street between the LA River and Cherry Avenue, an approximately 1.9-mile stretch of the corridor. • - Provided plans, features, including bulbouts, to minimize pedestrian crossing distances across Atlantic Avenue. AGENCY & CLIENT CONTACT City of Long Beach Onofre Ramirez, PE Principal Engineer (562) 570-6183 YEAR COMPLETED 2019 - Present ENGINEERING FEE $10,000 to $300,000 PROJECT CONSTRUCTION COST $15 Million ADAMS AVENUE IMPROVEMENT PROJECT COSTA MESA, CA | KOA a landscaped median and a multi-use separated bike and pedestrian facility surveys, goetechnical engineering, and landscape architecture. Project elements included pavement and parkway rehabilitation, PCC improvements, landscape/irrigation, street lighting, storm drain facilities, utility coordination, quality control, and active transportation. KOA Project Manager: Matt Stepien, PE AGENCY & CLIENT CONTACT City of Costa Mesa Engineering Division – Public Services Department Kelly Dalton Associate Engineer (714) 754-5275 YEAR COMPLETED In-Progress ENGINEERING FEE $320,000 PROJECT CONSTRUCTION COST $6 Million 15 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 3 | LIST OF SIMILAR PROJECTS SLAUSON AVENUE REHABILITATION LOS ANGLES, CA | KOA KOA was the prime consultant on the rehabilitation of Slauson Avenue for the County of Los Angeles. This project was one of our on-call work orders for LA County Department of Public Works. The purpose of the project was to enhance the physical and aesthetic condition of the public right-of-way to correspond with revitalization investments in the adjacent businesses. The project included sidewalk and curb repairs, pavement patching, grind detection, pedestrian lighting, landscaping, and bioswale construction. KOA’s responsibilities included coordination with multiple divisions at LACDPW and KOA Project Manager: Giuseppe Canzonieri, PE AGENCY & CLIENT CONTACT LACDPW - Programs Development Division Christopher Hudson (now with the Design Division) Project Manager (626) 458-7940 YEAR COMPLETED 2017 ENGINEERING FEE $178,889 PROJECT CONSTRUCTION COST $1.6 million LA HABRA STREET REHABILITATION & WATER MAIN REPLACEMENT PROJECTS LA HABRA, CA | KOA KOA has provided engineering design and project management services for the City of La Habra’s annual street rehabilitation and water main replacement projects since 2005. The pavement rehabilitation scope of work includes a complete assessment of pavement condition, geotechnical investigation, analysis of rehabilitation options and cost tradeoffs, development of plans, construction. The water pipeline replacement scope of work includes a complete assessment of pipeline conditions and break history, valve condition, construction. Work included removal and replacement of curb, gutter, sidewalk, and driveways; construction of ADA curb access ramps; replacement of water pipelines, valves, hydrants, and services; full depth asphalt, and asphalt overlay. KOA Project Manager: Chuck Stephan, PE AGENCY & CLIENT CONTACT City La Habra Sam Makar Senior Civil Engineer (562) 905-9720 YEAR COMPLETED In-Progress ENGINEERING FEE $80,000 PROJECT CONSTRUCTION COST $3,500,000 ORANGE GROVE BOULEVARD RESURFACING, ON-CALL PROJECT MANAGEMENT PASADENA, CA | KOA staff provided engineering design services for the resurfacing of 3.0 miles of Orange Grove Boulevard. The resurfacing method is CIR with an ARHM for Segment 2A, the existing curb will be replaced with curb and gutter. The design included: ground survey; curb ramp design; design of reconstructed curb where gutter ponding is currently occurring; design of CIR and ARHM overlay; and preparation of quantities and construction cost estimates. KOA Project Manager: Matt Stepien, PE AGENCY & CLIENT CONTACT City of Pasadena Frank Lujan, PE Principal Engineer (661) 510-0840 YEAR COMPLETED 2018 ENGINEERING FEE $250,000 PROJECT CONSTRUCTION COST $4 Million 16 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 3 | LIST OF SIMILAR PROJECTS 2016 PAVEMENT REHABILITATION PROJECT CULVER CITY, CA | KOA KOA was contracted to provide engineering services to the City of Culver City for the 2016 Pavement Rehabilitation Project. KOA provided pavement evaluation, design, and cost estimates for 16 project locations throughout the City. The project locations included both arterial and residential roadways. KOA provided pavement rehabilitation recommendations to the City that worked with their overall project budget of $3 million. KOA prepared pavement project. KOA also assisted the City in acquiring a Caltrans encroachment permit for two of the project locations. KOA Project Manager: Giuseppe Canzonieri, PE AGENCY & CLIENT CONTACT City of Culver City Hong Wang Senior Civil Engineer (310) 253-5604 YEAR COMPLETED 2018 ENGINEERING FEE $118,149 PROJECT CONSTRUCTION COST $3 million FOOTHILL BOULEVARD MASTER PLAN PS&E CLAREMONT, CA | KOA to implement the Foothill Boulevard Master Plan. The project is contained to a two mile stretch along Foothill Boulevard between Town Avenue and The City Boundary. The initial phases of the project included a comprehensive and hydrology study. The design team utilized the preliminary data to develop three concept plans including protected intersections, Class IV bikeway The preferred alternative included roadway improvements, bio-retention planters, 21 drywells, 900-feet of new storm drains, Class II & IV bicycle lanes, entry monuments. KOA led the team of consultants throughout the design, bid, and construction phases. In addition, KOA provided construction management and inspection service. KOA Project Manager: Chuck Stephan, PE AGENCY & CLIENT CONTACT City of Claremont Vincent Ramos Associate Engineer (909) 399-5395 YEAR COMPLETED 2020 ENGINEERING FEE $1.8 Million PROJECT CONSTRUCTION COST $17 Million AGENCY & CLIENT CONTACT City of Coachella Oscar Espinoza, PE Senior Civil Engineer (760) 398-5744 YEAR COMPLETED 2019 ENGINEERING FEE $292,197 PROJECT CONSTRUCTION COST Project has not been constructed. AVENUE 50 COMPLETE STREET IMPROVEMENTS COACHELLA, CA | KOA Avenue 50 between Harrison Street and Calhoun Street has been designated in the City of Coachella’s General Plan as a Major Arterial with Bicycle Facility. KOA was contracted to evaluate alternative typical sections and alignments for the improvement of Avenue 50 to meet future transportation demands. We evaluated existing conditions in the 1.5 mile long corridor, prepared and typical sections were prepared for four alternatives, with the preferred alternative undergoing a CEQA evaluation. The recommended alternative included four travel lanes with a center median and dedicated turn bays at key intersections, buffered Class II bike lanes, sidewalks on each side, and dedicated transit stops. KOA Project Manager: Charles Schwinger, PE, TE, PTOE 17 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET AGENCY & CLIENT CONTACT City of Culver City Gabriel Garcia Transportation Engineering Manager (310) 253-5633 YEAR COMPLETED 2017 ENGINEERING FEE $29,294 PROJECT CONSTRUCTION COST N/A AGENCY & CLIENT CONTACT City of Pasadena Richard Dilluvio Senior Transportation Planner (626) 744-7254 YEAR COMPLETED 2017 ENGINEERING FEE $25,000 PROJECT CONSTRUCTION COST Project has not been constructed. SECTION 3 | LIST OF SIMILAR PROJECTS NORTH HILL AVENUE COMPLETE STREETS PROJECT CONCEPTUAL DESIGNS PASADENA, CA | KOA mile-long roadway segment of North Hill Avenue where the City desires to lower vehicular speeds and to improve the safety of pedestrian’s bicyclists and motorists. The corridor has four signalized intersections and 11 intersections with stop control on side streets. KOA provided Geometric Conceptual Plans roundabouts and bulbouts.3D photo simulation or rendering were provided for selected study intersections. KOA planners and engineers worked directly with the residents who advocated for this project through four community work geometric conceptual designs. The project was well received in the 2nd council district of Pasadena and the project has been adopted into the City’s Capital Improvement Program. KOA Project Manager: Min Zhou, PE OVERLAND AVENUE COMPLETE STREETS FEASIBILITY STUDY CULVER CITY, CA | KOA KOA worked with the City of Culver City to conduct a preliminary feasibility study to assess the impacts of implementing complete streets elements such as Culver City. KOA assessed roadway geometry barriers and prepared conceptual design plans to help the City in implementing complete street elements on installing such facilities. KOA staff worked closely with City staff to conduct public outreach in order to incorporate resident concerns and provide a plan that is consistent with residents’ priorities and concerns. KOA Project Manager: Carlos Velasquez, AICP 18 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 3 | LIST OF SIMILAR PROJECTS AGENCY & CLIENT CONTACT City of Newport Beach Andy Tran Associate Civil Engineer (949) 644-3315 YEAR COMPLETED 2018 ENGINEERING FEE $218,000 PROJECT CONSTRUCTION COST $2.9 Million AGENCY & CLIENT CONTACT City of Newport Beach Patrick Arciniega Senior Civil Engineer (949) 644-3347 YEAR COMPLETED 2016 ENGINEERING FEE $192,300 PROJECT CONSTRUCTION COST $3.5 Million DOVER DRIVE IMPROVEMENTS NEWPORT BEACH, CA | A major Orange County Sanitation District aged trunk line sewer was replaced As a result, the City initiated a street improvement project with along Dover Drive and Westcliff Drive to improve the pavement and to improve the street aesthetics. The project involved the rehabilitation of the two existing roadways and construction of new and in some locations, widened landscaped medians. The improvements on Dover Drive extended between Coast Highway and Irvine Avenue, approximately 1.4 miles and on Westcliff Drive from Dover Drive to Irvine Avenue. A change in aesthetics was requested by the City and therefore, our team developed alternative landscape palettes from which the City could choose the preferred new look. The project additionally included catch basin upgrades, and new irrigation and landscaping. Coordination and an encroachment permit were necessary from Caltrans for the work on Dover existing utility companies including AT&T, City of Newport Beach water, The Gas Company, Southern California Edison, Orange County Sanitation District, and Time Warner. Civil Works Project Manager: Marie Marston, PE, QSD/QSP OVERLAND AVENUE COMPLETE STREETS FEASIBILITY STUDY CULVER CITY, CA | The City desired to improve the wearing surface of MacArthur Boulevard Management Program indications. The rehabilitation extended on MacArthur Boulevard from Ford Road/Bonita Canyon Drive to the SR-73 (4,050’) and on University Drive from Jamboree Road to the east side of the SR-73 northbound ramps (2,450’). MacArthur Boulevard is a heavily traveled 8-lane street in this section and University Drive is a 4-lane street leading to UCI. The City also cross section. After preparation of the Pavement Investigation Reports, the agreed upon pavement rehabilitation strategy on MacArthur Boulevard was also inventoried, and plans were prepared for new signs with greater retro Civil Works Project Manager: Marie Marston, PE, QSD/QSP 19 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 4 | SCHEDULE SECTION 5 | FEE PROPOSAL FEE PROPOSAL SCHEDULE complete each task, the time for the City’s review, and the tentative completion of each task. This schedule has been developed based upon the start date of PHASE DATE Notice to Proceed 04/27/2021 Utility Search, Research and Survey 05/24/2021 Submit Conceptual Plans and Estimate 08/02/2021 City Conceptual Plans and Estimate Comments 08/16/2021 Submit 65% Plans and Engineer’s Estimate 10/25/2021 City 65% Plans and Estimate Comments 11/15/2021 Submit 90% PS&E 01/17/2022 City 90% PS&E Comments 02/07/2022 Submit 100% PS&E 03/07/2022 City 100% PS&E Comments 03/14/2022 Submit Final PS&E 03/21/2022 20 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 6 | SUGGESTED EDITS TO THE PROFESSIONAL SERVICES AGREEMENT SUGGESTED EDITS TO THE PROFESSIONAL SERVICES AGREEMENT KOA concurs with any and all provisions of the City of Costa Mesa’s Professional Services Agreement but due to limitations from the liability insurance policies available in our industry regarding defense, KOA respectfully suggests that the following items be adjusted, as shown below. We have included certain suggested edits in red to the draft agreement below. Consultant agrees to defend, employees, at Consultant’s sole expense, from and against any and all claims, actions, suits or other legal proceedings or willful misconduct of the Consultant, its employees, and/or authorized subcontractors, in the performance of the work undertaken pursuant to this Agreement. The defense obligation provided for hereunder shall apply without any advance showing of with negligence or wrongdoing by the Consultant, its employees, and/or authorized subcontractors, but shall be required whenever any claim, action, complaint, or suit asserts as its basis the negligence, errors, omissions or misconduct of the Consultant, its employees, and/or authorized subcontractors, and/or whenever any claim, upon negligence, recklessness, or willful misconduct in the work performed by the Consultant, its employees, and/ or authorized subcontractors under this Agreement, whether or not the Consultant, its employees, and/or authorized sole active negligence or willful misconduct of the City. In no event shall the cost to defend charged to Consultant exceed Consultant’s proportionate percentage of fault. CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - ADDENDUM #1 CITY OF COSTA MESA Received by: _______________________________________________________________ Company: _________________________________________________________________ Stephen Bise, PE, VP | Principal KOA Corporation, 2141 W Orangewood, Orange, CA 92868 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - ADDENDUM #1 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - RESUMES EDUCATION BS, Civil Engineering, California State Polytechnic University, Pomona, CA REGISTRATIONS Professional Engineer (PE), Civil, CA #35500 MATT STEPIEN, PE PROJECT MANAGER | SENIOR ENGINEER Mr. Stepien has over 30 years of working on roadway and infrastructure improvement projects, almost exclusively focused on public works projects for local municipalities in Southern California. Matt has substantial experience with Southern California cities, including El Monte, La Habra, Long Beach, Downey, La Mirada, Laguna Beach, Anaheim, and the Los Angeles County Department of established a strong and consistent reputation for providing design documents that are thorough and complete. Matt provides a quality end-product that proceeds on a predictable schedule, is designed within budget and does not have problems during construction. Consequently, his project management procedures include safeguards to provide the City with a project that responds to planning and design issues and is completed on-time. RELEVANT EXPERIENCE • La Habra Boulevard Street Rehabilitation, La Habra • Various Pavement Rehabilitations, Manhattan Beach • Alondra Boulevard Street Rehabilitation, Norwalk • Richmond Street Improvements, El Segundo • Spring Street Rehabilitation, Long Beach • La Palma/Kraemer Intersection Improvements, Anaheim • Atlantic Avenue Street Rehabilitation, Long Beach • Camino Capistrano Street Rehabilitation, San Juan Capistrano • Broadway Street Improvements, Laguna Beach • Whittier/Hacienda Intersection Improvements, La Habra • Various Parking Lot Rehabilitations, Santa Monica • Various Arterial Pavement Rehabilitations, Lake Forest • Ximeno Street Rehabilitation, Long Beach • La Palma/Tustin Intersection Improvements, Anaheim • 10th Street Rehabilitation, Long Beach • Camino Las Ramblas Street Rehabilitation, San Juan Capistrano • Brookshire Avenue Street Rehabilitation, Downey • Mountain View Roundabout and Street Rehabilitation, El Monte • Various Pavement Rehabilitations, La Habra • Atlantic Avenue Street Rehabilitation, Long Beach • Parkmead Street Rehabilitation, Santa Fe Springs • Various Pavement Rehabilitations, Rancho Palos Verdes • Anaheim Resort Improvement Project, Anaheim • Kermore Lane Street Improvements, Stanton • Alondra/Valley View Street Widening, Santa Fe Springs, • Various Street Rehabilitations, La Mirada • Temple Hills Drive Street Rehabilitation, Laguna Beach CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - RESUMES CHUCK STEPHAN, PE PRINCIPAL-IN-CHARGE & QA/QC MANAGER | PRINCIPAL KOA Mr. Stephan has 38 years of experience in civil engineering design and project diverse project experience in planning, design, management, and construction of transportation, educational, institutional, industrial, aerospace, municipal, residential and commercial projects in both the civil and construction management disciplines. Mr. Stephan specializes in project management, civil engineering design, and construction management for municipal Capital Improvement Projects, including pavement design and rehabilitation; ADA improvements; water pipelines; storm drain and sanitary sewers; medians and landscaping; parking lots; site improvements; plan checking; NPDES requirements. RELEVANT EXPERIENCE • Engineering Services, Program Management, Project Management, Design, and Construction Management, La Habra • Engineering Services, Program Management, Project Management, Design, and Construction Management, Torrance • Cherry Avenue Improvement Project, Signal Hill • Residential Overlay and Slurry Seal, Rancho Palos Verdes • Pavement Rehabilitation Projects and Residential Water Main Replacements, Torrance • Pavement Rehabilitation Project, Culver City EDUCATION BS, Civil Engineering, California State Polytechnic University Pomona, CA REGISTRATIONS Professional Engineer (PE), Civil, CA #76775 Registration Number) EDUCATION BS, Agricultural Engineering, California Polytechnic State University, San Luis Obispo, CA REGISTRATIONS Professional Engineer (PE), Civil, CA #50481 STEPHEN BISE, PE COMPLETE STREETS DESIGN ENGINEER | SENIOR ENGINEER KOA several municipalities throughout Southern California. His project experience for various improvements to roadways/highways, intersections, drainage, signing/striping, and planning for future development. He also has extensive experience in complete streets design and implementation, which include safe multi-modal integration with aesthetic elements such as landscape and street furniture. Stephen’s keys to success include clear, concise communication and diligent quality control. RELEVANT EXPERIENCE • Foothill Blvd Master Plan Improvements, Claremont • Reche Vista Drive Realignment, Moreno Valley • Calabasas Road Street Design Services Project, Calabasas • Glendale Avenue & Monterey Road SR134 Freeway Access Improvement Project, Glendale • Carson Street Master Plan Implementation Project, Carson • Paramount Median PS&E, Pico Rivera • Whittier Lambert Road TSSP, Whittier • Stewart & Pennsylvania Improvement Project PS&E, Santa Monica CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - RESUMES SHIRJEEL MUHAMMAD, MS, PE TRAFFIC ENGINEER | SENIOR ENGINEER KOA simulations, parking demand, internal/external circulation, site access, accident most recent work includes managing contracts from preliminary engineering to notice of completion and ITS which includes establishment of citywide GIS infrastructure procurement strategy. RELEVANT EXPERIENCE • Installation of Replacement of IRWL to RRFB Project, Costa Mesa • • • • • Intelligent Transportation System Construction Management, Moreno Valley EDUCATION BS, Civil Engineering, University of California, Irvine, CA REGISTRATIONS Professional Engineer (PE), Civil, CA (In-Progress) EDUCATION MS, Civil Engineering - Transportation Engineering, California State University, Long Beach, CA BS, Engineering, NED University of Engineering and Technology, Karachi, Pakistan REGISTRATIONS Professional Engineer (PE), MANNY BARRIOS ROADWAY ENGINEER | SENIOR ASSOCIATE ENGINEER KOA Mr. Barrios has worked on a variety of public agency projects involving roadway design and plan preparation and a wide range of public works, capital improvement and land development projects for various cities throughout Los Angeles and Orange Counties. Manuel has delivered projects for both horizontal and vertical design for public agencies such as the Los Angeles County Metropolitan Transportation Authority (Metro) and the Los Angeles Bureau of Engineering/Department of Transportation (LABOE/DOT). He has served as project engineer for several public agencies to construct, widen and improve roadways, determine utility relocations, design and prepare grading, drainage, sewer and water utility and site improvement plans. He has extensive experience and knowledge of Orange County and Los Angeles County Public Works Construction in order to deliver projects from the preliminary stage RELEVANT EXPERIENCE • La Habra Boulevard Street Rehabilitation, La Habra • Various Pavement Rehabilitations, Manhattan Beach • McBean Parkway Street Improvements, Santa Clarita • Descanso Avenue Street Rehabilitation, Buena Park • Richmond Street Improvements, El Segundo CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - RESUMES JENNIFER MILLER, PE ROADWAY ENGINEER | ASSOCIATE ENGINEER KOA Ms. Miller, is an associate engineer with three years of civil engineering experience. Jennifer has been involved with roadway projects in the Cities of Placentia, Santa Monica, Long Beach, Anaheim, Santa Ana, and Costa Mesa, and also in unincorporated areas of Los Angeles and San Bernardino Counties. She is skilled in utilizing design programs such as AutoCAD, Civil 3D, Microstation, and ArcGIS. RELEVANT EXPERIENCE • Bloomington Ave Rehabilitation, Bloomington • LACDDPW Rowland Heights Rehabilitation, Rowland Heights • Santa Monica Stewart St & Pennsylvania Ave PS&E, Santa Monica • Placentia HSIP Cycle 9, Placentia • • • Big Bear Moonridge Road Roundabout Design, Big Bear Lake • Oceanside ADA Pedestrian Path, Oceanside • Coachella Ave 50 PS&E, Coachella • San Bernardino Sig SIC PS&E, San Bernardino • Orange HSIP Signal PS&E, Orange EDUCATION BS, Civil Engineering, San Diego State University, San Diego, CA REGISTRATIONS Professional Engineer (PE), Civil, CA (Passed, Awaiting Registration Number) Engineer in Training (EIT), Civil, CA #164489 MARIE MARSTON, PE, QSD/QSP CALTRANS COORDINATION, DRAINAGE, AND ROAWAY | PRINCIPAL Ms. Marston has 39 years of civil engineering experience with an extensive background in preparing and processing projects through Caltrans on the state highway and interstate systems. In her early career, she worked at Caltrans and she has continuously worked on Caltrans projects since. Her projects have included corridor studies for freeway mainline lane additions, new and and highways. She has overseen project development at all phases including feasibility studies, project initiation documents (primarily PSRs), project reports (PS&E), and construction. She has extensive experience in geometrics through the development of alternatives analysis. She also has experience with quantity and drainage, storm water and water quality, right of way engineering including right of way data sheets including utility and railroad, staging and RELEVANT EXPERIENCE • I-605 Carson Street Interchange PR-PSR & PS&E, Long Beach • I-710 / I-5 Missing Connectors PSR, Los Angeles • SR 60 & SR 67 at Grand Avenue Interchange PSR, PR, PS&E, City of Industry EDUCATION MBA, Business, University of California, Irvine, California BS, Civil Engineering, Oregon State University, Corvallis, Oregon REGISTRATIONS Professional Engineer (PE), Civil, CA #38798 Developer (QSD/QSP), CA #23572 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - RESUMES EDUCATION BS, Landscape Architecture, University of California, Berkeley, CA REGISTRATIONS Professional Landscape Architect (PLA), CA #1746 Member of American Society of Landscape Architects (ASLA), CLARB Registration DON WILSON, PLA, ASLA LANDSCAPE DESIGN | PRINCIPAL-IN-CHARGE Mr. Wilson is skilled in coordination of multi-disciplinary teams of technical consultants toward completion of project designs. He has over 35 years variety of projects with extensive experience in design and alteration of new data gathering, site analysis and documentation, design, and construction observation. He has prepared master plans, visual studies, water conservation studies, and guidelines for parks, schools, and housing communities. He has been responsible for the preparation of landscape architectural designs that emphasize lower maintenance, compatible plant associations, accessibility for all, and re-use of sites and materials. RELEVANT EXPERIENCE • Bristol Street Median, Costa Mesa • Brookhurst Street Medians, Garden Grove • Imperial Highway Median Landscape Improvements, Downey • Firestone Blvd. Streetscape and Downtown Gateway, Downey JEFF WOO KIM, PLA, ASLA LANDSCAPE DESIGN | PRINCIPAL/PROJECT MANAGER Mr. Kim has over twenty years of experience with Cornerstone Studios. He brings a thoughtful and creative approach to each of his clients and projects. His keen sense of design, project management skills, and attention to detail are integral to the success of his projects. With extensive experience working with numerous government agencies, he excels in projects at the city, county, or federal level and possesses a good understanding of the requirements needed to complete the project. He is responsible for implementation of conceptual design through completion of construction documents as well as coordination with teams of sub-consultants. RELEVANT EXPERIENCE • Bristol Street Median, Costa Mesa • Adams Avenue Improvement, Costa Mesa • Randolph Avenue Improvement, Costa Mesa • Century Boulevard, Inglewood • Daisy Bike Boulevard, Long Beach • OC Streetcar, Santa Ana EDUCATION BS, Landscape Architecture, California Polytechnic University, Pomona, CA REGISTRATIONS Professional Landscape Architect (PLA), CA #6082, American Society of Landscape Architects (ASLA), Asian American Architects/Engineers Association (AAa/e) CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - RESUMES EDUCATION BA, Environmental Analysis & Design, with a minor in Urban & Regional Planning, University of California, Irvine, CA REGISTRATIONS Caltrans Environmental Compliance Training Course for Local Agency Partners and Consultants – Categorical Exemptions and Categorical Exclusions, Caltrans PROJECT ROLE | CEQA/NEPA COMPLIANCE TASK MANAGER Mr. Olmos’ professional experience involves CEQA and NEPA analysis and document preparation for government agencies and private clients. He has prepared and managed a variety of environmental documents, including Initial Studies/Mitigated Negative Declarations (IS/MND), EIRs, Environmental Impact, including Addendum CEQA/NEPA documentation. While his experience focuses on environmental report writing and permit preparation, he also has experience with biological resources monitoring and surveying for public facilities construction and research projects. Mr. Olmos is experienced in the bilingual English-Spanish translation of notices, documents, and handouts for CEQA and biological/cultural resources projects. RELEVANT EXPERIENCE • Bristol Street Median Improvement Project, Costa Mesa • CEQA Compliance for Lions Park Improvements, Costa Mesa • Market Street Pedestrian & Streetscape Enhancements Project, Long Beach • CEQA Documents with Supporting Technical Assessments for the City Creek and Alabama Street Bikeways Project, Highland AMIR GHAVIBAZOO, PHD SOILS | PAVEMENT ENGINEER Dr. Ghavibazoo will serve as pavement engineer for this contract. He will oversee the pavement assessment and contribute to geotechnical/soils report outlining its condition and suggested soils stabilization options. Amir has extensive research experience and in-depth understanding on many aspects of asphalt pavement materials. His experience includes characterization of rubberized asphalt binders and developing mix designs following Superpave RELEVANT EXPERIENCE • 2018-2019 Street Improvement Project, South Pasadena • Loma Alta Pavement Rehabilitation, Fullerton • Studebaker Road Pavement Evaluation, Long Beach • Bush Street Bicycle Boulevard Design, Santa Ana • Fisher Park Neighborhood Water Main Improvements, Santa Ana • Santa Ana Boulevard & 5th Street Protected Bike Lane, Santa Ana • Arterial Rehabilitation Project, Pavement Investigation, • Huntington Beach EDUCATION PhD, Civil and Environmental Engineering, North Dakota State University, Fargo, North Dakota MS, Railways Engineering, Iran University of Science and Technology, Tehran, Iran BS, Industrial Engineering, University of Technology, Tehran, Iran CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - RESUMES PAUL SOLTIS, PE, GE SOILS | LEAD GEOTECHNICAL ENGINEER Mr. Soltis brings more than 27 years of technical expertise to Twining. His experience includes geotechnical investigations and analyses relative to roads, bridges, highways, and other California infrastructure projects. His focus is on interaction with the design team during development of construction site preparation techniques. As lead geotechnical engineer, he will oversee, write, and sign the geotechnical/soils report. RELEVANT EXPERIENCE • Aviation Boulevard, Redondo Beach • Studebaker Road Pavement Evaluation, Long Beach • Del Amo Boulevard, Los Angeles • Bush Street Bicycle Boulevard Design, Santa Ana • Fisher Park Neighborhood Water Main Improvements, Santa Ana • Santa Ana Boulevard & 5th Street Protected Bike Lane, Santa Ana • Arterial Rehabilitation Project, Pavement Investigation, • Huntington Beach EDUCATION MA, Geotechnical Engineering, University of Colorado, Boulder, CO BS, Civil Engineering, California Polytechnic State University, San Luis Obispo, CA REGISTRATIONS Professional Engineer (PE), Civil, CA #56140 Geotechnical Engineer (GE), CA, #260 RUSSELL HANSON, PLS, GISP SURVEY & RIGHT-OF-WAY | ASSOCIATE SURVEYOR Mr. Hanson has 22 years of experience in the preparation of Tract Maps, Parcel Maps, Records of Survey, Right-of-Way maps, Legal Descriptions, ALTA Surveys and Lot Line Adjustments. He has been involved in numerous rehabilitation projects for streets and intersections using conventional survey, GPS survey California. RELEVANT EXPERIENCE • Division Street, Long Beach • Imperial Hwy and Del Sur Ave, La Habra • Mountain View Road, El Monte • Alley Topography, Alhambra • Atlantic Avenue, Long Beach EDUCATION BS, Civil Engineering, California Polytechnic State University, Pomona, CA REGISTRATION Professional Land Surveyor (PLS), Survey, CA #8873 Geographic Information System Professional (GISP), CA #64594 CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - RESUMES JIM MIHLD POTHOLING | SUBSURFACE UTILITY ENGINEERING MANAGER Jim Mihld has 32 years of experience in underground utility location. He provides project management and estimates for subsurface utility engineering projects for Boudreau Pipeline Corporation. During his career he has served as Gas Technician, Vac Rig Foreman, General Foreman, and Field Superintendent. He holds an active registration with the National Association of Corrosion Engineers (NACE) International, and he is trained to comply with OSHA’s 19CFR RELEVANT EXPERIENCE • Gateway South Bldg 6, San Bernardino • First Nandina II Logistics Center, Moreno Valley • Marshall & Belvedere Street Improvements, San Bernardino EDUCATION Engineers (NACE) International OSHA’s 19CFR 1910.146 permit CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET SECTION 7 | APPENDIX - KOA STREET DESIGN CHECKLIST KOA STREET DESIGN CHECKLIST Date Completed Initials Description 1.Research and Data Gathering a. Meet with client to review project b. Obtain as-built plans, maps, utility records, etc. c. Preliminary job-walk, photos, etc. d. Determine review process, including outside agencies e. Meet with outside agencies f. Research in-house files and mapping logs to obtain pertinent information from previous projects. 2.Conduct preliminary in-house design team meeting a. Review project assignment b. Clarify responsibilities c. Identify potential problems d. Develop project approach 3.Develop preliminary list of plans to be prepared 4.Review design checklists for types of plans to be prepared (street, storm drain, structural, etc.) 5.Refine project schedule from proposal 6.Submit first utility notice 7.Identify design constraints 8.Request outside services: Geotech Structural Landscaping Environmental Survey Other (specify) 9.List design assumptions 10. Prepare preliminary design (60%) a. Alignment study b. Preliminary layouts c. Preliminary cost estimate (compare with budget) d. Alternatives analysis 11. QA/QC REVIEW 12. Revise per QA/QC Comments 13.Submit to client CITY OF COSTA MESA PROPOSAL FOR THE NEWPORT BOULEVARD FRONTAGE ROAD REHABILITATION PROJECT - 19TH STREET TO BRISTOL STREET KOA STREET DESIGN CHECKLIST Date Completed Initials Description 14. Develop design parameters a. Stationing b. Cross sections c. Drawing scales d. Calculations e. Min longitudinal slopes f. Min and max cross-slopes g. Standard plans h. Specs 15. Prepare 90% plans and cost estimate 16. Review with designer to identify: a. Intent b. Format c. Items to be added later (notes, details, etc.) d. Intermediate deadlines for present assignment 17. Establish submittal and internal deadlines 18. Review completed plans and calculations 19. Obtain plans prepared by consultants 20. Develop list bid items and prepare quantity estimates 21. Prepare specifications (see flowchart for specifications) 22. Prepare cost estimate 23. QA/QC REVIEW 24. Revise per QA/QC comments 25. Make revisions; evaluate impacts of revisions on rest of project 26.Submit plans to client and outside agencies for review 27.Submit plans to utility owners for review 28. Make revisions following reviews 29. Submit final plans to client and agencies for approvals SECTION 7 | APPENDIX - KOA STREET DESIGN CHECKLIST www.koacorp.com LOS ANGELES | CORPORATE OFFICE 1100 Corporate Center Drive, Suite 201 Monterey Park, CA 91754 (323) 260-4703 ORANGE COUNTY OFFICE 2141 W. Orangewood Avenue Orange, CA 92868 (714) 573-0317 INLAND EMPIRE OFFICE 3190 Shelby Street, Bldg C. Ontario, CA 91764 (909) 890-9693 SAN DIEGO OFFICE 5095 Murphy Canyon Road, Suite 330 San Diego, CA 92123 (619) 683-2933 COACHELLA VALLEY OFFICE 78-405 Via Caliente La Quinta, CA 92253 (760) 694-1716 WEST LOS ANGELES OFFICE 300 Corporate Pointe, Suite 470 Culver City, CA 90230 (310) 473-6508 MC03134 Project Sr Associate Senior Senior Associate Associate Manager Engineer Designer Planner Planner Engineer $210 $210 $150 $125 $120 $100 $110 Huitt Zollars ECORP Twining Cornerstone Boudreau 60 20 $14,800 Kickoff and PDT Meetings (4)12 12 12 $3,600 $9,420 Research and Review 2 8 4 16 $2,025 $5,905 Utility Coordination 1 12 30 $5,310 Site Assessment and Inspection 4 12 6 12 $1,650 $6,360 Geotechnical (allowance only)1 4 $23,348 $24,158 Topo Survey 2 4 $39,879 $40,899 35% Concept Plans 20 48 68 80 $11,530 $40,230 CEQA Clearance (optional)$0 (optional)$0 PS&E 50 126 160 232 $66,805 $2,100 $143,825 Hydrology and Hydraulics 1 2 $4,170 $4,680 Utility Coordination 1 6 8 $23,060 $25,050 PS&E 24 66 88 112 $10,980 $1,400 $50,640 Caltrans Permit 2 2 $1,630 $2,300 Final Hydrology and Hydraulics 1 2 $7,340 $7,850 Final Utility Coordination 1 4 4 $1,250 PS&E 10 24 30 44 $8,600 $350 $23,240 Caltrans Permit 2 2 $6,290 $6,960 Bid and Award Support 2 4 4 $1,370 $2,890 RFI and Change Order Support 4 8 8 $2,410 $5,450 Review / QA / QC 48 $10,080 48 200 342 384 0 0 558 128,400 39,879 0 23,348 3,850 23,060 431,297 $1,500 $10,080 $42,000 $51,300 $48,000 $0 $0 $61,380 $128,400 $39,879 $0 $23,348 $3,850 $23,060 $432,797TOTAL COST TOTAL HOURS (PRIME) & TOTAL COST (SUBS) ODC Civil, Caltrans Drainage Civil Works TASKS Hourly Billing Rate TOTAL COST Phase 1 - Preliminary Engineering and Base Maps Phase 5 - 100% Submittal Phase 0 - Project Administration and Management Phase 2 - Right-of-Way Engineering Environmental Geotech Landscape Potholing FEE PROPOSAL City of Costa Mesa - Newport Boulevard Frontage Road Rehabilitation - Phase 3 - 65% PS&E Phase 4 - 95% PS&E $1,500 Phase 6 - Bid and Award Phase Phase 8 - Constructability Review / QA / QC Survey Phase 7 - Construction Engineering Support PIC QA/QC