Loading...
HomeMy WebLinkAbout13 - CC-9 - Citywide Street Slurry Seal Project - 8/3/20211 CITY COUNCIL AGENDA REPORT MEETING DATE: AUGUST 3, 2021 ITEM NUMBER: CC-9 SUBJECT: CITYWIDE STREET SLURRY SEAL PROJECT (MAINTENANCE ZONES 6 AND 7), CITY PROJECT NO. 21-02 DATE: JULY 27, 2021 FROM: PUBLIC SERVICES DEPARTMENT/ENGINEERING DIVISION PRESENTATION BY: RAJA SETHURAMAN, PUBLIC SERVICES DIRECTOR FOR FURTHER INFORMATION CONTACT: SEUNG YANG, P.E. CITY ENGINEER (714) 754-5633 RECOMMENDATION: Staff recommends that the City Council: 1. Adopt plans, specifications, and working details for the Citywide Street Slurry Seal Project (Maintenance Zones 6 and 7), City Project No. 21-02. 2. Award a Public Works Agreement (PWA) to American Asphalt South, Inc., 19792 El Rivino Road, Riverside, CA 92509 in the amount of $617,048 (Attachment 1). 3. Authorize the City Manager and City Clerk to execute the PWA and future amendments to the agreement within Council authorized limits. 4. Authorize an additional ten percent (10%) contingency totaling $61,705 as needed for unforeseen costs. BACKGROUND: As part of the Citywide Street Maintenance Program, the Slurry Seal portion of the project includes the application of a surface coating and sealing of the roadway on streets that do not require full pavement reconstruction. The renewed Measure M (M2) funding program requires that cities in Orange County maintain a uniform approach to rating and evaluating streets utilizing a standardized Pavement Management Program (PMP). Based on pavement analysis recommendations and field review, staff prepared a priority list and recommendations of streets to be repaired. Some of these streets receive full rehabilitation, whereas others may just require slurry seal. These recommendations were included in the scope of work for the Citywide Street Maintenance Project. 2 The streets proposed for slurry seal improvements are located Citywide, but most of the work is concentrated in the following areas covering Maintenance Zones 6 and 7, and largely encompassing the following neighborhoods: Westside, Downtown West, Mesa del Mar, Mesa Verde, and College Park (Attachment 2). In addition, portions of the streets that exhibited structural deficiencies were addressed as localized repairs through the Citywide Street Rehabilitation Project. Upon completion of these localized repairs, these streets are now qualified to be slurry sealed. A copy of specifications and working details are available for review in the Office of the City Clerk or in the Public Services Department, and are posted on the City website at: https://www.costamesaca.gov/city-hall/city-departments/public-services/capital- improvement-projects ANALYSIS: The scope of work for this phase of the project includes the application of a Type II slurry seal pavement coating, and the replacement of traffic markings, striping, and traffic control implementation. The contractor is required to complete all of the tasks necessary to perform the work as outlined in the contract documents. The City Clerk received and opened six (6) bids for this project on June 2, 2021. American Asphalt South, Inc., the apparent lowest bidder, submitted a bid proposal in the amount of $617,048. The Engineer’s estimate was $584,354 and the average of the six (6) bids received amounted to $730,137. An analysis of the bids indicates that American Asphalt South submitted a bid proposal five percent (5%) higher than the Engineer’s estimate. The bid results are summarized in the bid abstract (Attachment 3). Upon City Council award of the Public Works Agreement (PWA), American Asphalt South will furnish the necessary bonds and insurance. After the award and subsequent execution of the agreement, staff will issue the “Notice to Proceed.” Therefore, staff requests that City Council award the agreement to American Asphalt South as the lowest responsible bidder. ALTERNATIVES CONSIDERED: The alternative to the Council action would be to reject all bids, re-advertise, and re-bid the project. Staff believes that re-advertising and re-bidding the project will not result in lower cost bids. FISCAL REVIEW: Funding for this project is available in the FY 2021-22 Gas Tax Fund (201) Street Maintenance Citywide project. LEGAL REVIEW: The City Attorney’s Office has reviewed the report, prepared the Public Works Agreement, and approves them both as to form. 3 CITY COUNCIL GOALS & PRIORITIES: In 2021, the City Council adopted a list of goals and priorities. The project works toward achieving the following City Council goal:  Maintain and Enhance the City’s Infrastructure, Facilities, Equipment, and Technology. CONCLUSION The City has received and opened bids for the Citywide Street Slurry Seal Project (Maintenance Zones 6 and 7), City Project No. 21-02. Staff has evaluated the bids and recommends that the City Council: 1. Adopt plans, specifications, and working details for the Citywide Street Slurry Seal Project (Maintenance Zones 6 and 7), City Project No. 21-02. 2. Award a Public Works Agreement (PWA) to American Asphalt South, Inc., 19792 El Rivino Road, Riverside, CA 92509 in the amount of $617,048 (Attachment 1). 3. Authorize the City Manager and City Clerk to execute the PWA and future amendments to the agreement within Council authorized limits. 4. Authorize an additional ten percent (10%) contingency totaling $61,705 as needed for unforeseen costs. _____________________________ _____________________________ SEUNG YANG, P.E. RAJA SETHURAMAN City Engineer Public Services Director _____________________________ ______________________________ CAROL MOLINA KIMBERLY HALL BARLOW Finance Director City Attorney ATTACHMENTS: 1 2 3 Public Works Agreement Map of Slurry Seal Locations Bid Abstract