HomeMy WebLinkAbout01-51 - Approving Planning Application PA-01-12RESOLUTION NO. O (- 5-1
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
COSTA MESA, CALIFORNIA, APPROVING PLANNING
APPLICATION PA -01-12.
THE CITY COUNCIL OF THE CITY OF COSTA MESA DOES HEREBY
RESOLVE AS FOLLOWS:
WHEREAS, an application was filed by David Emmes with respect to the real
property located at 655 Town Center Drive, requesting final master plan approval
for an approximately 32,500 -square -foot, 336 -seat expansion of South Coast
Repertory in the TC zone and an amendment to Preliminary Master Plan PA -00-38;
�l
WHEREAS, the applicant submitted a parking study for the entire South
Coast Plaza Town Center that analyzed existing parking demand, determined
appropriate parking rates for use in the City's shared parking analysis, and
concluded the additional parking demand associated with the South Coast
Repertory expansion can be more than adequately met by the existing parking
available in the South Coast Plaza Town Center; and
WHEREAS, a duly noticed public hearing was held by the Planning
Commission on July 9, 2001; and
WHEREAS, on July 9, 2001, the Planning Commission recommended
approval of Planning Application PA -01-12; and
WHEREAS, the City Council held a duly noticed public hearing on August 6,
2001;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Costa Mesa that based on the evidence in the record and the findings contained in
Exhibit "A", and subject to the conditions contained in Exhibit "B", the City Council
hereby approves Planning Application PA -01-12 with respect to the property
described above;
BE IT FURTHER RESOLVED that Table 2 of the South Coast Plaza Town
Center Preliminary Master Plan is hereby amended as shown in Exhibit "C"; and
BE IT FURTHER RESOLVED that the Costa Mesa City Council hereby
approves the parking rates for use in the City's shared parking analysis for South
Coast Plaza Town Center contained in Exhibit "D"; and
BE IT FINALLY RESOLVED that the Costa Mesa City Council does hereby
find and determine that adoption of this resolution is expressly predicated upon the
activity as described in the staff report for Planning Application PA -01-12, and
upon applicant's compliance with each and all of the conditions contained in Exhibit
"B". Should any material change occur in the operation, or should the applicant fail
to comply with the conditions of approval, then this resolution, and any
recommendation for approval herein contained, shall be deemed null and void. Any
approval granted by this resolution shall be subject to review, modification, or
revocation if there is a material change that occurs in the operation, or if the
applicant fails to comply with any of the conditions of approval.
PASSED AND ADOPTED this 6th day of August, 2001.
ATTEST:
Deputy City flerk of the City of Costa Mesa Mayor of the City of Costa Mesa
STATE OF CALIFORNIA) APP OWED AS TO FORM
COUNTY OF ORANGE ) ss
CITY OF COSTA MESA)
CIT ATT NEY
I, MARY T. ELLIOTT, Deputy City Clerk and ex -officio Clerk of the City
Council of the City of Costa Mesa, hereby certify that the above and foregoing
Resolution No. 6 1 - !3-1 was duly and regularly passed and adopted by the said
City Council at a regular meeting thereof held on the 6th day of August, 2001.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the seal of
the City of Costa Mesa this 7th day of August, 2001.
-7;
Deputy City qerk and ex -officio Clerk of
the City Council of the City of Costa Mesa
EXHIBIT "A"
FINDINGS
APPL. PA -01-12
A. The information presented substantially complies with Costa Mesa Municipal
Code section 13-29(g)(5)(a) in that the proposed SCR expansion meets the
broader goals of the General Plan, the North Costa Mesa Specific Plan, and the
Zoning Code, by exhibiting excellence in design, site planning, integration of
uses and structures, and protection of the integrity of neighboring
development.
B. The proposed project complies with Costa Mesa Municipal Code Section 13-
29 (e) because:
a. The proposed development and use are compatible and harmonious with
uses both on-site as well as those on surrounding properties.
b. Safety and compatibility of the design of the buildings, parking areas,
landscaping, luminaries, and other site features including functional
aspects of the site development such as automobile and pedestrian
circulation have been considered.
c. The proposed project complies with applicable performance standards
prescribed in the Zoning Code.
d. The project is consistent with the 1990 General Plan and the North Costa
Mesa Specific Plan.
e. The planning application is for a project -specific case and does not
establish a precedent for future development.
f. The cumulative effects of all past and present planning applications have
been considered for both the subject property and surrounding properties.
C. The proposed project is consistent with the South Coast Plaza Town Center
Preliminary Master Plan as amended by adoption of this resolution.
D. The project, as conditioned, is consistent with Chapter IX, Article 1 1,
Transportation System Management, of Title 13, of the Costa Mesa
Municipal Code in that the development project's traffic impacts will be
mitigated by the payment of traffic impact fees and the implementation of
certain intersection improvements.
E. Section 15168 (c) (2) of the CEQA guidelines allows a lead agency to use a
previously -certified final program EIR for subsequent activities, if the finding
can be made that no new effects would occur and no new mitigation measures
would be required. The proposed project is within the scope of Final Program
EIR #1047 for the following reasons:
a. The proposed project will not allow a land use intensity and/or density
that would be inconsistent with the corresponding 1990 General Plan
land use designation. Therefore, the proposed project will not alter the
impact analyses contained in Final Program EIR #1047.
APPL. PA -01-12
b. There have not been substantial changes with respect to the
circumstances under which the project will be unde, taken that would
require important revisions to previous Final Program EIR #1047 due
to the involvement of new significant environmental impacts not
covered in the Final Program EIR #1047.
C. No new information of substantial importance to the project has
become available in respect to the significant effects of the project, the
severity of the significant effects, the feasibility of the mitigation
measures and alternatives, or the identification of new mitigation
measures or alternatives that could lessen the significant effects of the
project.
d. Because there is no change to the impact analyses contained in Final
Program EIR #1047 and no new information of substantial importance
has become available, no new mitigation measures would be required
as a result of approval of the project.
EXHIBIT "B"
CONDITIONS OF APPROVAL
APPL. PA -01-12
Ping. 1.
The project shall comply with applicable mitigation measures of
Final Program Environmental Impact Report #1047 (copy
attached for reference) and the Owner's obligations specified in
Development Agreement DA -00-03.
2.
Street addresses shall be displayed on the freestanding sign or, if
there is no freestanding sign, on the fascia or store front adjacent
to the main entrance of the building, in a manner visible to the
public street and on the building face/wall/fence visible to the
public alley, if applicable. Numerals shall be a minimum 12" in
height with not less than %" stroke and shall contrast sharply with
the background. Identification of individual units shall be provided
adjacent to the unit entrances. Letters or numerals shall be 4" in
height with not less than '/4 " stroke and shall contrast sharply with
the background.
3.
The conditions of approval and ordinance or code provisions of
Planning Application PA -01-12 shall be blueprinted on the face of
the site plan.
4.
The applicant shall contact the Planning Division to arrange a
Planning inspection of the site prior to the release of occupancy.
This inspection must confirm that Planning Division's conditions of
approval and code requirements have been satisfied, in addition to
those of other applicable divisions and departments of the City, to
obtain the release for occupancy.
5.
Any new transformers, backflow preventers, and any other above-
ground utility improvements, shall be located outside of the
required street setback area and shall be screened from view,
under the direction of Planning staff.
6.
Every attempt shall be made to relocate existing trees affected by
the expansion. If possible, these trees shall be relocated in the
same general area. This condition shall be completed to the
satisfaction of the Planning Division.
Eng. 7.
Maintain the public right-of-way in a "wet -down" condition to
prevent excessive dust and promptly remove any spillage from the
public right-of-way by sweeping or sprinkling.
Ping. 8.
Weekday matinee performances are prohibited for South Coast
Repertory Theatre with the exception of performances where the
audience arrives and departs via bus or other mass
transportation.
EXHIBIT "C"
AMENDMENT TO TABLE 2 OF SOUTH COAST" PLAZA TOWN
CENTER PRELIMINARY MASTER (PA -00-38)
Table 2
STATISTICAL SUMMARY OF SCPTC COMPONENTS
Overall Net
Previously
Increase
Unbuilt
Slated for
New
(Unentitled
Building
Land Use
Entitlements
Demolition
Construction
Uses)
Height/Story
A.
Segerstrom
0
(84,025 sq. ft.)
339,025 sq. ft.
255,000 sq. ft.
315 ft./21
Office
(office)
B.
OCPAC
65,000 sq. ft.
0
65,000 sq. ft.
0
160 ft./3
Expansion
(1,000 seats)
(1,000 seats)
C.
SCR Theater
0
0
32,500 sq. ft.
32,500 sq. ft.
55 ft./3
(140 seats)
D.
Symphony
0
0
301,145 sq. ft.
301,145 sq. ft.
130 ft./5
Hall
(2,500 seats)
(2,500 seats)
E.
Art Museum/
0
0
140,000 sq. ft.
140,000 sq. ft.
80 ft./4
Academy
F.
Hotel/
186,000 sq. ft.
(15,300 sq. ft.)
186,000 sq. ft.
0
210 ft./12
Restaurant
(186 room hotel)
(restaurant)
(186 room hotel)/
15,300 sq. ft.
(restaurant)
G.
Two Town
0
0
300 spaces
300 spaces
60 ft./4
Center
Parking
Structure #1
H.
Two Town
0
0
100,000 sq. ft.
100,000 sq. ft.
150 ft./10
Center Office
Building
I.
Two Town
0
(19,200 sq. ft.)
756 spaces
756 spaces
75 ft./5
Center
(theater)
Note: 19,200 sq.
Parking
ft. of theater to be
Structure #2
recreated as
office- Building J.
J.
Two Town
0
(28,700 sq. ft.)
328,700 sq. ft.
280,800 sq. ft.
175 ft./11
Center
(restaurant)
Office/Retail/
Restaurant
K.
South Coast
—0-712,000
sq. ft.)
12,000sq. ft.
0
40 ft./2
Plaza Cinema
(theater)
(theater)
TOTAL:
251,000 sq. ft.
(159,225 sq. ft.)
1,519,670 sq. ft.
1,109,445 sq. ft.
Sq. ft. = square feet
"Overall net increase" equals "new construction" minus "previously unbuilt entitlements' and/or "slated for demolition." '
jSource: City of Costa Mesa, January 2001
June 4, 2001
EXHIBIT "D"
PARKING RATES FOR SOUTH COAST PLAZA TOWN CENTER
APPL. PA -01-12
EXHIBIT "D"
Use
Parking requirement for SCPTC*
Office
2.5 spaces/1,000 sft
Banks
5 spaces/1,000 sf
Medical
6 spaces/1,000 sf
Retail
4 spaces/1,000 sq.ft.
Restaurants
(not in hotel)
12 spaces/1,000 sf
Theatres/cinemas
1 space/3 seats
Hotel
Rooms
Restaurants
Mtg./conf.
.5 space/room
7.2 spaces/1000 sf
13.2 spaces/1,000 sf
Health club
6.5 space/1,000 sf
*All calculated on gross floor area as defined by the City's Zoning Code.
APPL. PA -01-12
MITIGATION MEASURES
(Only those applicable to this project have been included.)
Land Use
2. The City of Costa Mesa will review the final master plans for development
within the SCPTC project area for consistency with any adopted plans for the
area.
Traffic
1. As the subsequent phases of the SCPTC project are submitted to the City of
Costa Mesa, the project traffic study area intersections' performance shall be
monitored against the City's Annual Development Phasing and Monitoring
Program to determine when future improvements are required.
The project
applicants shall
be required to fund all costs
and/or implement
intersection
improvements
to the following intersections
in Costa Mesa:
Bristol St./Sunflower
Ave., Fairview Rd./South Coast Dr., Bristol
St./Paularino
Ave., Park
Center Dr./Sunflower Ave.
The following
intersection
improvements
shall be completed pursuant
to the indicated
schedule:
Town Center area.
Fairview Road & South
Intersection
Recommended Improvement
Schedule
Bristol Street & Sunflower
Convert 3`d northbound through lane to a
Complete prior to
Avenue
shared through/right-turn lane (provide 2NBL, 2
issuance of first
NBT, 1 shared NBT/NBR, and 1 NBR).
Certificate of
Occupancy in the
South Coast Plaza
Town Center area.
Fairview Road & South
Convert 2nd eastbound through lane to shared
Complete prior to
Coast Drive
through/right-turn lane (provide 1 EBL, 1 EBT,
issuance of first
1 shared EBT/EBR, and 1 EBR).
Certificate of
Occupancy in the
South Coast Plaza
Town Center area.
1. The project applicants shall pay their respective pro -rata share of the costs of
the planned improvements, as identified in Final Program EIR #1047, at the
intersections in the City of Santa Ana listed below. The terms for these
payments, including payment calculation and timing, shall be determined by
the Director of Development Services, in order to coordinate with the City of
Santa Ana.
The following intersection improvements are required:
a. Main St./MacArthur Blvd. Provide right -turn overlap signal phasing for
northbound and southbound right turns.
b. Main St. and Sunflower Ave.: Convert 3`d southbound lane to a right
turn lane with overlap phasing.
APPL. PA -01-12
C. Bristol St./Segerstrom Ave.: General Plan Improvements: Add a
second left turn for each approach, 3 I and 4" eastbound through
lanes, 3`d westbound through lane, and right -turn lanes for each
approach. Non -General Plan Improvements: Add a 4th westbound
through lane.
d. Bristol St./MacArthur Blvd.: General Plan Improvements: Add right
turn lanes for southbound, eastbound, and westbound approaches.
Non -General Improvements: Add 4" eastbound and westbound
through lanes, add right turn overlap for westbound right turn lanes.
e. Flower St./MacArthur Blvd.: General Plan Improvements: None. Non -
General Plan Improvements: Add northbound and westbound right
turn lanes.
f. SR -55 NB Ramps and MacArthur Blvd.: General Plan Improvements:
None. Non -General Plan Improvements: Add 3`d northbound right turn
lanes.
3. The project applicants shall participate in the implementation of Master Plan
of Highways improvements through the payment of development impact
fees. The payment of development impact fees shall be submitted to the City
of Costa Mesa Planning Division for the mitigation of offsite traffic impacts
based on the average daily trips generated by the development and payable
at the time of issuance of certificates of occupancy. The required fee shall
be paid pursuant to the prevailing schedule of charges adopted by the City
Council in effect at the time of issuance of certificates of occupancy.
4. The project applicants shall be responsible for the payment of fees in
accordance with the San Joaquin Hills Transportation Corridor Fee
Ordinance. Fees shall be paid to the Costa Mesa Planning Division prior to
the issuance of building permits.
5. The project applicants shall comply with the Transportation Demand
Management (TDM) requirements of the City of Costa Mesa TDM Ordinance
(Costa Mesa Municipal Code 8 13-193 through 13-200) through the
provision of one or more improvements set forth in Costa Mesa Municipal
Code S 13-197.
APPL. PA -01-12
Air Quality
1. All construction contractors shall comply with South Coast Air Quality
Management District (SCAQMD) regulations, including Rule 402, the
Nuisance Rule, and Rule 403; Fugitive Dust. Prior to the issuance of a
grading permit where grading permit will occur on more than 50 acres at
one time, the applicant shall submit a grading plan or grading
contingency plan to the SCAQMD in accordance with Rule 403. All
grading (regardless of size) shall apply best available control measures
for fugitive dust in accordance with Rule 403. To ensure that the
project is in full compliance with applicable SCAQMD dust regulations
and that there is no nuisance impact off the site, the contractor will
implement each of the following:
b. Develop a project grading plan or contingency plan and submit the
plan to the SCAQMD consistent with the provisions of Rule 403.
(Note: only applicable where more than 50 acres are graded).
c. Moisten soil not more than 15 minutes prior to moving soil or
conduct whatever watering is necessary to prevent visible dust
emissions from exceeding 100 feet in any direction.
d. Apply chemical stabilizers to disturbed surface areas (completed
grading areas) within five days of completing grading or apply dust
suppressants or vegetation sufficient to maintain a stabilized surface.
e. Water excavated soil piles hourly or covers with temporary
coverings.
f. Water exposed surfaces at least twice a day under calm conditions.
Water as often as needed on windy days when winds are less than
25 miles per day or during very dry weather in order to maintain a
surface crust and prevent the release of visible emissions from the
construction sites.
g. Wash mud -covered tires and under -carriages of trucks leaving
construction sites.
h. Provide for street sweeping, as needed, on adjacent roadways to
remove dirt dropped by construction vehicles or mud, which would
otherwise be carried off by trucks departing project sites.
i. Securely cover loads with a tight fitting tarp on any truck leaving the
construction sites to dispose of debris.
j. Cease grading during periods when winds exceed 25 miles per hour.
APPL. PA -01-12
2. To reduce emissions from project -related vehicle trips, the project
applicant shall adhere to the City of Costa Mesa Municipal Code §13-
193 through 13-200 (Transportation Demand Management) and the
South Coast Air Quality Management District Regulation XV to reduce
vehicle traveled to the maximum extent feasible. The code includes
measures such as:
a. Preferential parking for carpool vehicles;
b. Bicycle parking and shower facilities;
c. Information provided to employees on transportation alternatives;
d. Rideshare vehicle loading areas;
e. Vanpool vehicle accessibility; and,
f. Bus stop improvements.
Noise
3. To reduce emissions from the power plant providing electricity to the
site, prior to the issuance of building permits, the project applicant shall
demonstrate to the satisfaction of the City of Costa Mesa Building
Safety Division that the project shall adhere to Title 24 of the California
Code which requires new development to use energy efficient electrical
and mechanical systems.
1. The project applicant shall prepare a truck route plan for review and
approval by the City of Costa Mesa Engineering Division prior to the
approval of the construction access permit. The truck route permit shall
preclude truck routes through residential areas.
2. All activities on the project site are required to comply with the City of
Costa Mesa Noise Ordinance. Any potential noise -generating uses
should be located away from residential areas, if possible.
Geology and Soils
1. All future development on the SCPTC site shall be designed to comply
with all applicable geological and seismic safety requirements of the
Uniform Building Code and mitigation as defined in the Public Resources
Code Section 2693(c). Verification of such compliance will be
confirmed during the city's plan review and building permit issuance
processes.
APPL. PA -01-12
2. Grading and foundation plans, including foundation loads, shall be
reviewed by a registered soils engineer, and approved by the City of
Costa Mesa Building Safety Division.
3. All grading and earthwork shall be performed under the observation of a
registered geotechnical engineer in order to achieve proper sub -grade
preparation, selection of satisfactory materials, and placement and
compaction of all structural fill.
4. Prior to approval of each grading plan by the City of Costa Mesa, the
property owner/developer shall submit a soils and geological report for
the area to be graded, based on proposed grading and prepared by
registered soils engineer and approved by the City of Costa Mesa
Building Safety Division.
5. Prior to issuance of each building permit by the City of Costa Mesa, the
property owner/developer shall submit for review and approval by the
City of Costa Mesa Building Safety Division, a detailed foundation
design information for the subject building(s), prepared by a registered
civil engineer, based on recommendations by a geotechnical engineer.
6. Prior to issuance of each building permit by the City of Costa Mesa, the
property owner/developer shall submit plans showing that the proposed
structure has been analyzed by a registered civil engineer for earthquake
loading and designed according to the most recent standards in the
Uniform Building Code adopted by the City of Costa Mesa.
7. If a permit is required for discharge of perched groundwater encountered
during excavation for site improvements, the applicant shall acquire
such permit(s) from the applicable agency(ies) (e.g., Santa Ana Regional
Water Quality Control Board, County Flood Control or County Sanitation
District) and provide evidence of permit issuance to the Costa Mesa
Building Safety Division prior to initiating any such discharge.
Hydrology and Water Quality
Construction of structural BMPs as identified in the SWPPP, and
required by the NPDES Stormwater Permit issued to the project site by
the County of Orange/City of Costa Mesa to capture urban runoff
contaminants from developed areas prior to discharge to onsite storm
drain facilities.
APPL. PA -01-12
2. Prior to issuance of a grading permit, the applicant shall obtain an
NPDES Stormwater Permit from the County of Orange. Applicable BMP
provisions shall be incorporated into the NPDES Permit.
Public Services, Utilities, and Energy Consumption
1. A water delivery systern designed to provide adequate fire flows to the
project site and maintain a roadway system to provide adequate access
to and through the site are a part of the design of the project.
2. Concurrent with the issuance of building permits the applicant shall pay
the North Costa Mesa Fire Fee in effect at that time, as applicable.
3. Each final master plan for the project site shall provide sufficient
capacity for fire flows required by the Costa Mesa Fire Department.
4. Vehicular access to all fire hydrants must be provided and maintained
throughout construction.
5. Environmental design considerations shall be incorporated into the
development and maintenance of the proposed project to deter such
criminal activity as burglary and robbery.
6. If deemed necessary, all buildings shall be well marked with names and
addresses to enhance rapid response, rooftops shall be marked for building
identification by police helicopter, and there shall be designated emergency
vehicle parking areas close to buildings. Final building plans shall indicate
where these improvements will be located.
7. Prior to the initiation of grading, a construction security service shall be
established at the construction site. Initially, the service shall ensure that
no unauthorized entry is made into the construction area. For the duration
of each phase of construction, the project applicant shall provide sufficient
onsite security personnel on a 24-hour, seven days a week basis, to patrol
all areas of construction and prohibit unauthorized entry.
8. Private on-site security is to be provided by the project applicants, as the
project is developed and operational.
9. All on-site irrigation lines for recycled water shall be identified so as to
avoid connection with potable water lines.
10. Design requirements would be specified to the City for potable and
recycled water -plumbing systems within proposed buildings.
APPL. PA -01-12
11. Prior to the issuance of an Application Permit, the Application Plan
Check/Inspection Fee and Performance Guarantee Bond shall be paid by the
applicants to the MCWD.
12. Prior to the approval of plans or the execution of a service agreement, a
Development Impact Fee shall be collected by the MCWD from the
applicants. Water conservation plans as required by the State of California
shall be incorporated into building plans for the project. The measures to be
implemented include, but are not limited to:
g. Low -flow fittings, fixtures, and equipment, including low flush toilets and
urinals (Health and Safety Code 17921.3)
h. Use of self closing valves for drinking fountains and lavatory faucets in
public facilities (Government Code Section 7800)
i. Insulation of water pipes and water heating systems. (Title 24, California
Administrative Code, Section 25352)
j. Use of low flow sprinkler heads in irrigation systems (California
Conservation in Landscaping Act, AB 325).
13. All on-site wastewater sewer lines will be provided and ties to the existing
sewer line system.
14. Prior to the issuance of building permits, a letter shall be obtained from the
CMSD and the OCSD verifying that there is sufficient capacity in the
receiving trunk lines to serve the proposed project.
15. Prior to the issuance of connection permits(s), the applicant shall pay all
applicable fees.
16. In accordance with the requirements of AB 939, construction
contractors shall reuse construction forms where practicable or
applicable, attempt to balance soils on the site, minimize over cutting of
lumber and polyvinyl chloride (PVC) piping where feasible, and reuse
landscape containers to the extent feasible.
17. Recycling bins for glass, metals, paper, wood, plastic, green waste, and
cardboard shall be placed on the construction sits for use by
construction workers.
18. In construction specifications and bid packages, require building
materials made of recycled materials, to the extent feasible and
economically practical.
19. As a part of the ongoing operations of the SCPTC project, the following
measures shall be integrated into project design:
APPL. PA -01-12
a. Source reduction, source separation and recycling measures shall
focus on paper goods, yard waste, plastic, wood waste, and glass;
b. "Buy -recycled" policies, such as price preferences for recycled
products; source reduction policies; in-house recycling; drop-off
sites; employee education; customer education; and, manufacturing
design modification to promote source reduction or recycling.
20. Prior to issuance of building permits, the applicant shall provide to the City
of Costa Mesa, a letter from Southern California Edison Company and
Southern California Gas Company indicating the ability to provide service to
the project.
21. The applicant shall comply with the guidelines provided by the Southern
California Edison Company with respect to easement restrictions,
construction guidelines, and potential amendments of right-of-way in any
existing Southern California Edison easements on the project site.
23. Prior to the issuance of each building permit, the building owner/developer
shall submit plans showing that each structure will comply with the State
Energy Efficiency Standards for nonresidential buildings (Title 24, Part 6,
Article 2, California Code of Regulations).
Aesthetics
The project incorporates the following design features related to
aesthetics and visual resources:
a. The proposed SCPTC project will incorporate signage, landscaping,
and exterior lighting that comply with applicable city requirements.
b. The size, height, building materials, and orientation of structures
associated with the SCPTC project will conform to City
requirements.