Loading...
HomeMy WebLinkAbout02-78 - Approving Planning Application PA-02-33 (Two Town Center)RESOLUTION NO. 02-78 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COSTA MESA APPROVING PLANNING APPLICATION PA -02-33, A FINAL MASTER PLAN FOR TWO TOWN CENTER, AND ADOPTING THE MITIGATED NEGATIVE DECLARATION FOR TWO TOWN CENTER. THE CITY COUNCIL OF THE CITY OF COSTA MESA HEREBY RESOLVES AS FOLLOWS: WHEREAS, Planning Application PA -02-33 was filed by David Armstrong of Commonwealth, Partners, with respect to the real property located in the Two Town Center subarea at 3201 Park Center Drive of South Coast Plaza Town Center; WHEREAS, the applicant requests final master plan approval of an 18 -story, approximately 400,000 square foot building in Two Town Center and a minimum 705 -space, five -level parking structure, and related demolition of existing structures and relocation of surface parking; WHEREAS, Planning Application PA -02-33 also includes an amendment to South Coast Plaza Town Center (SCPTC) Preliminary Master Plan PA -00-38 and variance from the Bristol Street setback requirement for the proposed parking structure (20' -required, 0' -proposed); WHEREAS, the applicant submitted a parking analysis for the Two Town Center project area, that analyzed existing parking demand, applied appropriate parking rates established in the South Coast Plaza Town Center's shared parking analysis and concluded the additional parking demand associated with the proposed project can be met by the proposed 5 -level parking structure; WHEREAS, a mitigated negative declaration was prepared to identify any environmental impacts from changes to the Two Town Center project previously examined in Final Program EIR No. 1047, and the public review and comment period was from August 28, 2002 to September 16, 2002; and "WHEREAS, a duly noticed public hearing was held by the Planning Commission on September 23, 2002, at the conclusion of which, Planning Commission recommended that City Council approve said application; WHEREAS, a duly noticed public hearing was held by City Council on October 21, 2002. BE IT RESOLVED that, based on the evidence in the record and the findings contained in Exhibit "A", subject to the conditions contained in Exhibit "B", and subject to the mitigation measures contained in Exhibit "C", the City Council hereby approves Planning Application PA -02-33 with respect to, the property described above; BE IT RESOLVED that the City Council hereby adopts the mitigated negative declaration which indicates that the proposed project will not result in any potentially significant impacts other than previously identified in Final Program EIR No. 1047; BE IT RESOLVED that Table 2 and Figure 1 of the SCPTC Preliminary Master Plan is hereby amended as shown in Exhibit "D"; and BE IT FURTHER RESOLVED that the City Council does hereby find and determine that adoption of this resolution is expressly predicated upon the activity as described in the staff report for Planning Application PA -02-33 and upon applicant's compliance with each and all of the conditions and mitigation measures contained in Exhibits "B" and "C". Any approval granted by this resolution shall be subject to review, modification or revocation if there is a material change that occurs in the operation, or if the applicant fails to comply with any of the conditions of approval or mitigation measures. PASSED AND ADOPTED this 21St day of ctober, 2002. Mayor of the City of Costa Mesa ATTEST: APPROVED AS TO FORM: De*y City Clerk of the City of Costa Mesa (Pity Attorney STATE OF CALIFORNIA) COUNTY OF ORANGE ) ss CITY OF COSTA MESA ) I, Julie Folcik, Deputy City Clerk and ex -officio Clerk of the City Council of the City of Costa Mesa, hereby certifies that the above foregoing Resolution No. o2 -7R was duly and regularly passed and adopted by said City Council at a regular meeting thereof held on the 21St day of October, 2002, by the following roll call vote: AYES': Dixon, Monahan, Cowan, Steel NOES: Robinson ABSENT: None IN WITNESS WHEREOF, I have hereby set my hand and affixed the Seal of the City of Costa Mesa this 22nd day of.October, 2002. C�v Z --D i t -6D DeputLOiiy Clerk and ex -officio Clerk of the City Council of the City of Costa Mesa f' 0 EXHIBIT "A" FINDINGS APPL. PA -02-33 A. The information presented substantially complies with Costa Mesa Municipal Code Section 13-29(g)(5)(a) in that the proposed Two Town Center Master Plan meets the broader goals of the General Plan, the North Costa Mesa Specific Plan, and the Zoning Code, by exhibiting excellence in design, site planning, integration of 5 -level parking structure and 18 -story high rise office building in the existing Town Center development, and protection of the integrity of the existing commercial and cultural arts development in the South Coast Plaza Town Center. B. The proposed project complies with Costa Mesa Municipal Code Section 13-29 (e) because: a. There is a compatible and harmonious relationship between the proposed project and site development and the building and site developments and uses that exist or have been approved for South Coast Plaza Town Center. b. Safety and compatibility of the design of the buildings, parking areas, landscaping, luminaries, and other site features including functional aspects of the site development such as automobile and pedestrian circulation have been considered. c. The proposed project complies with applicable performance standards prescribed in the Zoning Code. d. The project is consistent with the City of Costa Mesa 2000 General Plan and the North Costa Mesa Specific Plan. e. The planning application is for a project -specific case and does not establish a precedent for future development. f. The cumulative effects of all planning applications have been considered. C. The information presented substantially meets required conditions for variance approval specified in Costa Mesa Municipal Code Section 13-29(g)(1) in that special circumstances applicable to the property exist to justify granting of the variance from the Bristol Street setback requirement (0' -proposed, 20' -required). Strict application of development standards deprives the property of privileges enjoyed by owners of other property in the vicinity under identical zoning classification. Specifically, since the surroundings include the approximately 25 -foot wide landscaped area between the western property line and Bristol Street, and the 1- 405 freeway off -ramp area, the immediate surroundings satisfies the intent of a street setback for landscaping purposes for screening the prominence of the parking structure. Granting the variance shall not constitute a grant of special privileges inconsistent with the limitation upon other properties in the vicinity and zone in which the property is situated. D. The proposed project is consistent with the South Coast Plaza Town Center Preliminary Master Plan.PA-00-38 as amended by adoption of this resolution. E. The project, as conditioned, is consistent with Article 22 1/2, Transportation System Management of Title 13, of the Costa Mesa Municipal Code in that the development project's traffic impacts will be mitigated by the payment of traffic impact fees and the implementation of specified intersection improvements. APPL. PA -02-33 F. Section 15168 of the California Environmental Quality Act (CEQA) Guidelines allows a lead agency to use a previously -certified Final Program EIR for subsequent activities. Since the proposed project will have effects that were not examined in Final Program EIR No. 1047 for South Coast Plaza Town Center, Section 15168 (c) (1) requires preparation of a new Initial Study leading to a Negative Declaration. The proposed project is within the scope of Final Program EIR No. 1047 which adequately describes significant environmental effects for the purposes of CEQA. Since Final Program EIR No. 1047 provides the basis in the Initial Study/Negative Declaration for determining whether the proposed project may have any significant effects, it is incorporated into the Negative Declaration by reference. The proposed project will not result in any potentially significant impacts other than previously identified in Final Program EIR No. 1047. The proposed project is within the scope of Final Program EIR #1047 for the following reasons: a. The proposed project will not allow a land use intensity and/or density that would be inconsistent with the corresponding 2000 General Plan land use designation. Therefore, the proposed project will not alter the impact analyses contained in Final Program EIR #1047. b. There have not been substantial changes with respect to the circumstances under which the project will be undertaken that would require important revisions to previous Final Program EIR #1047 due to the involvement of new significant environmental impacts not covered in the Final Program EIR #1047. c. Modifications to the proposed project subsequent to the approval of Final Program EIR are within the scope described in the Program EIR, and there are no substantial changes to the environmental analysis on the significant effects of the, project, the severity of the significant effects, the feasibility of the mitigation measures and alternatives. d. New mitigation measures provided in the Negative Declaration relate to consistency with applicable land use plans and policies involving the following: (1) approval of a Final Master Plan, (2) an amendment to the South Coast Plaza Preliminary Master Plan and (3) approval of a variance from the Bristol Street setback requirement. CONDITIONS OF APPROVAL Ping. 1. 9 3. 4. 5. 6. Eng. 7. 8. Trans. 9. '10. 11. APPL. PA -02-33 EXHIBIT "B" The project shall comply with applicable mitigation measures of Final Program Environmental Impact Report #1047 (Mitigation Monitoring Program attached for reference) and the Owner's obligations specified in Development Agreement DA -00-04. Street addresses shall be displayed on the freestanding sign or, if there is no freestanding sign, on the fascia or store front adjacent to the main entrance of the building, in a manner visible to the public street and on the building face/wall/fence visible to the public alley, if applicable. Numerals shall be a minimum 12" in height with not less than W stroke and shall contrast sharply with the background. Identification of individual units shall be provided adjacent to the unit entrances. Letters or numerals shall be 4" in height with not less than 1/" stroke and shall contrast sharply with the background. The conditions of approval and ordinance or code provisions of Planning Application PA -02-33 shall be blueprinted on the face of the site plan. The applicant shall contact the Planning Division to arrange a Planning Division inspection of the site prior to issuance of a final certificate of occupancy. This inspection is to confirm that the conditions of approval and code requirements have been satisfied. Any new transformers, backflow preventers, and any other above- ground utility improvements, shall be located outside of the required street setback area and shall be screened from view, under the direction of Planning staff. The proposed 5 -level parking structure shall be screened with plant materials at the south and west elevations and the rooftop level, or enhanced with any other comprehensive and appropriate beautification effort to the satisfaction of the Planning Division. The applicant shall extend the existing right -turn lane to the new driveway approach and shall dedicate a street and highway easement behind the existing right-of-way line on Anton Boulevard at the proposed driveway entrance. The applicant shall have haul routes approved by the Engineering Division prior to issuance of a building permit. The applicant shall relocate the street light and traffic signal pull box to accommodate the new driveway on Anton Boulevard. The applicant shall close unused driveway approach(es) with full height curb and gutter. The applicant shall remove or relocate the parkway tree to accommodate proposed extension of the right -turn pocket on Anton Boulevard to the new entry. 12. The applicant shall close the median opening on Anton Boulevard to prohibit left -turn access into and out of the expanded driveway. 13. The applicant shall remove or relocate. the parkway tree to accommodate the proposed extension of the right -turn pocket on Anton Boulevard to the new entry. APPL. PA -02-33 14. The applicant shall install appropriate striping on the proposed driveway to allow for two entrance lanes into the project site to prevent stacking of vehicles on Anton Boulevard. 15. The applicant shall identify traffic flow, access control gates, and parking alignment (if any) for the drive aisle located north of the proposed courtyard. 16. The applicant shall install stop signs for traffic exiting the new access drive at the south end of Park Center Drive. Police 17. Prior to issuance of a building permit, the applicant shall cooperate with the Police Chief regarding incorporation of proper design features into building plans to increase safety, deter criminal activity, and provide for emergency vehicle access, to the satisfaction of the Police Chief or his designee. These features shall be based on suggestions provided to the applicant by the Police Department. 18. To encourage and facilitate pedestrian activity between the west and east sides of Park Center Drive, the applicant, in conjunction with Planning and Transportation Services staff, shall prepare a pedestrian circulation study and make recommendations related to a mid -block crossing, as needed. This plan shall be subject to review and approval by the Planning Commission prior to building permit issuance. 19. With regards to the landscaped areas along Bristol Street and the Interstate -405 off -ramp area, the applicant shall do the following: a. Obtain an encroachment permit from the City of Costa Mesa to maintain a landscaped area within the City's right-of-way along the east side of Bristol Street, from Interstate -405 to Anton Boulevard. b. Enter into an agreement with the City of Costa Mesa which shall require the applicant to assume the City's maintenance responsibilities for the landscaped areas within the State of California Department of Transportation (CALTRANS) right-of- way, located on the south and west property lines of the Two Town Center area. Exhibit C Mitigation Monitoring Program from Final Program EIR No. 1047 South Cocrst Plaza Town Center BIR — Mitigation Monitoring Plan � TABLE 1 SOUTH COAST PLAZA TOWN CENTER EIR MITIGATION MONITORING PROGRAM EIR Section Mitigation Measures Timing Of Mitigation Measure Responsible Party Funding Source's _JK 5.1 Land Use and Related Standard Conditions and Requirements Planning Programs The be proposed project will subject to all Final Master Plan review Costa Mesa Development Planning application of the applicable conditions and regulations Conditions of Approval Services Department fees set forth in the North Costa Mesa Specific Plan, the City of Costa Mesa zoning ordinance, and all requirements and enactments of federal, state, -county, city and other governmental entities with jurisdiction. All such requirements and enactments of these agencies will become conditions of project implementation. 1-1 Prior to the issuance of a building Prior to issuance of building Project applicant Project applicant permit located within the FAA Notice permits AREA for John Wayne Airport, the project applicant shall submit a Notice of Proposed Construction to the FAA. The ALUC will review the project for consistency with the Commission's AELUP. The project shall comply with the provisions and restrictions imposed by the FAA and the ALUC. This condition shall be included in the North Costa Mesa Specific Plan and the final project -specific master plans, and shall be verified by the Costa Mesa Planning Division. 1-2 The City of Costa Mesa will review the Final Master Plan review Costa Mesa Development Planning application final master plans 'for development Services Department fees within the SCPTC project area for consistency with any adopted plans for the area. NOTE: * Indicates Applicable Conditions and Mitigation Measures for Two Town Center Project H:/Client/0080/00800014/00800014.MMP.doc 3-2 Mitigation Monitoring Program South Coast Plaza Town Center EIR - Mitigation Monitoring Plan - EIR Section Mitigation Measures `°: `.::.. Timing Of Mitigation Measure Responsible Party Ponding Sources 5.2 Transportation and Project Design Features Circulation These are circulation features or Final Master Plan review - Costa Mesa Public Services Planning application improvements that are included as part of verification during final Department fees the proposed project, and are included in project design the traffic impact analysis prior to initigation. The only design feature that falls into this category is the proposed street vacation of a portion of Town Center Drive between Park Center Drive and Avenue of the Arts (with related amendment to the City's Master Plan of Highways. Standard Conditions and Requirements The long-range general plan improvements Final Master Plan review Costa Mesa Public Services Project applicant within the City of Costa Mesa which are Conditions of Approval Department assumed in the background conditions will be funded mostly by an areawide circulation system funding mechanism such as the City Traffic Impact Fee Program or special benefit district fees. The proposed South Coast Town Center project will be responsible for the payment of fees to the City of Costa Mesa as set forth below. • The project applicants shall participate in the implementation of Master Plan of Highways improvements through the payment of development impact fees. The payment of development impact fees shall be submitted to the City of Costa Mesa Planning Division for the mitigation of offsite traffic impacts based on the average daily trips generated by the development and payable at the time of issuance of certificates of issuance. The required fee _ shall be paid pursuant to the prevailing schedule of charges ado ted by the Ci H:/Cliend0080/00800014/00800014.MMP.doc 3-3 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Mitigation Measures Timing Of Miti ation Measure Responsible -Party ; :°- _ `•>.Fgnding;Soi%tces Council in effect at the time of issuance of certificates of occupancy. • The project applicants shall be " responsible -for the payment of fees in accordance with the San Joaquin I -fills Transportation Corridor Fee i Ordinance. Fees shall be paid to the Costa Mesa Planning Division prior to the issuance of building permits. • The project applicants shall comply with the Transportation Demand Management (TDM) requirements of the City of Costa Mesa TDM Ordinance (Costa Mesa Municipal Code S 13-880 through 13-888) through the provision of one or more improvements set forth in Costa Mesa Municipal Code 513-994. f Mitigation Measures * 2-1 As the subsequent phases of the SCPTC Final Master Plan review Costa Mesa Public Services Planning application project are submitted to the City of Department fees Costa Mesa, the project traffic study area intersections' performance shall be monitored against the City's Annual Development Phasing and Monitoring Report to determine when future improvements are required. 2-2a The project applicants shall be required to fund all costs associated with implementation • 'of intersection improvements to -the following intersections: Bristol/ Sunflower, Fairview/ South Coast, Bristol/ _ Paularino, and Park Center/ Sunflower. H:/Client/0080/00800014/00800014.MMP.doc 3-4 Mitigation Monitgring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Mitigation.Measiire§ ..: Timing Of Mrti ation Measure . Responsible Party Funding Sources The following intersection improvements shall be completed pursuant to the indicated schedule: • Bristol/Sunflower: Convert 31d Final master plan review Costa Mesa Public Services Project applicant northbound through lane to a shared Condition of approval- Department and project through/right turn lane (provide 2NBL, complete prior to issuance applicant 2 NBT, 1 shared NBT/NBR, and 1 of first certificate of i NBR). occupancy in the South Coast Plaza Town Center area. • Fairview/South Coast: Convert 2nd Final master plan review Costa Mesa Public Services Project applicant eastbound through lane to a shared Condition of approval- Department and project .through/right turn lane (provide 1 complete prior to issuance applicant EBL, 1 EBT, 1 shared EBT/EBR, and of first certificate of 1 EBR). occupancy in the South Coast Plaza Town Center area. • Bristol/Paularino: Add a second Final master plan review Costa Mesa Public Services Project applicant northbound left -tum lane. Add a Condition of approval- Department and project second westbound left -turn lane instead complete prior to issuance applicant of the second right -turn lane. of final certificate of occupancy in the South Coast Plaza Town Center area. • Park Center/Sunflower: Convert Final master plan review Costa Mesa Public Services Project applicant northbound through lane to a shared Condition of approval- Department and project left-tum/through lane. Convert complete prior to issuance applicant southbound left -turn lane to a shared of final certificate of left-turn/through lane and convert occupancy. southbound through lane to a right -turn lane. Implement split phasing in the north/south direction! (provide 1 NBL, 1 shared NBL/NBT/NBR, 1 shared SBL/SBT, and 1 SBR). H:/CIient/0080/00800014/00800014.MMP.doc 3-5 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section !Mitigation Measures : Timing Of Mid anon McA8ure Responsible;Party .: <.::. �: Firidirig5ources 2-2bThe project applicants shall pay their To be determined by the Costa Mesa Development Project applicant respective pro -rata share of the costs of City of Costa Mesa Director Services and Public the planned improvements, as identified of Development Services. Services Departments, City in Final Program EIR #/1047, at the - of Santa Ana, and project following intersections in the City of applicant Santa Ana listed below. The terms for ' these payments, including payment calculation and timing, shall be determined by the Director of Development Services, in order to coordinate with the City of Santa Ana. • Main/MacArthur: Provide right -turn overlap signal phasing for northbound .and southbound right turns. • Main and Sunflower: Convert Yd southbound lane to a right turn lane with overlap phasing. • Bristol/Segerstrom: General Plan Improvements: Add a second left tum for each approach, Yd and 4th eastbound through lanes, 3rd westbound through lane, and right -turn lanes for each approach. Non -General Plan Improvements: Add a 4th westbound through lane. • Bristol/MacArthur: General Plan' Improvements: Add right turn lanes E for southbound, eastbound, and westbound approaches. Non -General Improvements: Add 41h eastbound and westbound through lanes, add right turn overlap for westbound right turn lanes. • Flower/MacArthur: General Plan Improvements: None. Non -General H:/CIient/0080/00800014/00800014.MM P.doc 3-6 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section::Mitigation;Wasures :. Timing Of Res orisible PartyFuridiri . Sburca Mitigation Measure. Plan Improvements: Add northbound and westbound right turn lanes. • SR -55 NB Ramps and MacArthur: General Plan Improvements: None. Non -General Plan Improvements: Add Yd northbound right turn lanes. 5.3 Air QuAlity Standard Conditions and Requirements All construction contractors shall comply Final Master Plan review Costa Mesa Development Project applicant with South Coast Air Quality Management Conditions of Approval Services Department District (SCAQMD) regulations, including Rule 402, the Nuisance Rule, and Rule 403, Fugitive Dust. Prior to the issuance of a grading permit where grading permit will occur on more than 50 acres at one time, the applicant shall submit a grading plan or grading contingency plan to the SCAQMD in accordance with Rule 403. All grading (regardless of size) shall applybest available control measures . for fugitive dust in accordance with Rule 403. To ensure that the project is in full compliance with applicable SCAQMD dust regulations and that there is no nuisance impact off the site, the contractor will implement each of the following: a. Develop a project grading plan or contingency plan and submit the plan to the SCAQMD consistent with the provisions of Rule 403. (Note: only applicable where more than 50 acres are graded). b. Moisten soil not more than 15 minutes prior to moving soil or conduct whatever watering is necess to prevent visible dust H:/C1ient/0080/00800014/00800014.MMRdoc 3-7 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Timing Of Mitigation Measure ' Responsible Party' ' ' `_j.'•,7Fitritling Source§ emissions from exceeding 100 feet in any direction. c. Apply chemical stabilizers to disturbed surface areas (completed grading areas) within five days of completing grading or apply dust suppressants or vegetation sufficient to maintain a stabilized surface. d. Water excavated soil piles hourly or cover with temporary coverings. e. Water exposed surfaces at least twice a day under calm conditions. Water as often as needed on windy days when winds are less than 25 miles per day or during very dry weather . in order to maintain . a surface crust and prevent the release of visible emissions from the construction sites. f. Wash mud -covered tires and under -carriages of trucks leaving construction sites. g. Provide for street sweeping, as needed, on adjacent roadways to remove dirt dropped by construction vehicles or mud which would otherwise be carried off by trucks departing project sites. h. Securely cover loads with a tight fitting t2M ori any truck leaving }l;/Client/0080/00800014/00800014.MMP.doc 3-8 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Mitigation Measures g Of �Miti2�altio-nlMeasure Responsible Party - Funding Sources:° the construction sites to dispose of debris. i. Cease grading during periods when winds exceed 25 miles per hour. To reduce emissions from project -related Final Master Plan review Costa Mesa Development Project applicant vehicle trips, the project applicant shall Conditions of Approval Services Department adhere to the City of Costa Mesa Municipal Code §13-880 through 13-888 (Transportation Demand Management) and the South Coast Air Quality Management District Regulation XV to reduce vehicle traveled to the maximum extent feasible. The code includes measures such as: • Preferential parking for carpool vehicles; — • Bicycle parking and shower facilities; • Information provided to ,employees on transportation alternatives; • Rideshare vehicle loading areas; • Vanpool vehicle accessibility; and • Bus stop improvements. To reduce emissions from the power plant Final Master Plan review Costa Mesa Development Project applicant providing electricity to the site, prior to the Conditions of Approval Services Department issuance of building permits, the project applicant shall demonstrate to the satisfaction of the City of Costa Mdsa Building Safety Division that the project shall adhere to Title 24 of the California Code which requires new development to use energy efficient electrical and mechanical stems. H:/ClienV0080/00800014/00800014.MMP.doc 3-9 Mitigation Monitoring Prograin South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Mitigation Measures Timing Of Responsible Party - Funding Sources ' Miti ation Measure 5.4 Noise Standard Conditions and Requirements Short -Term Impacts _ • Local Control of Construction Hours - Final Master Plan review Costa Mesa Development Project application The most effective method of Conditions of Approval Services Department fees controlling construction noise is through local control of construction hours. The City of Costa Mesa has adopted a Noise Ordinance that excludes control of construction activities during the hours between 7 a.m. and 8 p.m. All noise generating construction activities within 500' of residential areas should be limited to these hours. Truck Routes - Truck routes in general should be steered away from residential areas. In addition to the above measures, temporary noise barriers should be used Final Master Plan review Costa Mesa Development Project -applicant during the construction of the hotel portion Conditions of Approval for Services Department of the project adjacent to the existing hotel. Building F The barriers should be a combination of walls along the edge of the construction site as well as movable barriers to be used with more stationary sources of noise such as jackhanuners. Long -Term Off -Site Impacts 4-1 All activities on the project site will be required to conform - with the noise Final Master Plan review Costa Mesa Development Project applicant ordinance. Any potentially noise Conditions of Approval Services Department generating uses should be located away ; from residential areas if possible. HICIient/0080/00800014/00800014.MMP.doc 3-10 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Mitigation Measures Timing Of Responsible.Party ; Furiduig.,Soiirces 1Vliti at i6n Measure Mitigation Measures - NA 4-2 Prior to the issuance of building per s Final Master Plan review Costa Mesa Development Project applicant for the new hotel (Building an Conditions of Approval for Services Department and acoustical study shall be prepa by a Building F project applicant qualified acoustical consu nt and submitted to the City. The udy should predict the future ultim a noise levels impacting the buildin d calculate the outdoor -to -indoor noise reduction provided by the cture. Compliance with the 45 L standard shall be demonstrat with any required building mponent upgrades. The require noise reduction is only slightly grea than what would be expected the 45 CNEL standard is a hievable. 5.5 Geology and Soils Standard Conditions and Requirements Compliance with Uniform Building Code Final Master Plan review Costa Mesa Development Project application provisions and standard subdivision Conditions of Approval Services Department fees engineering requirements, as specified in the city's conditions of approval, will satisfactorily address the geotechnical issues described in this section of the EIR. Mitigation Measures 5-1 All future development on the SCPTC Final Master Plan Costa Mesa Development Building plan check- hecksite siteshall be designed to comply with all review/Prior to building Services Department and permit fees applicable geological and seismic safety permit issuance f requirements of the Uniform Building Code and mitigation as defined in the Public Resources Code Section 2693(c). Verification of such compliance will be confirmed during the city's plan review and building permit issuance processes. H:/Client/0080/00800014/00800014.MMP.doc 3-11 Mitigation Monitoring Program , South Coast Plaza Town Centel- EIR — Mitigation Monitoring Plan EIR Sectiori _Mitigation Measures ;:...... Timing Of Mitr ati6n Measure ;:. Responsible Party ..' . - . "FtindingSources: .. : 4.... 5-2 Grading and foundation plans, Prior to grading permit Costa Mesa Development Building plan check including foundation loads, shall be issuance Services Department and permit fees reviewed by a registered soils engineer, and approved by the City of Costa Mesa _ Building Safety Division. * 5-3 All grading and earthwork shall be Prior to grading permit Project applicant Project applicant performed under the observation of a issuance registered geotechnical engineer in order to achieve proper sub -grade preparation, selection of satisfactory materials, and placement and compaction of all structural fill. 5-4 Prior to approval of each grading plan Prior to grading. permit Project applicant Project applicant by the City of Costa Mesa, the property issuance owner/developer shall submit a soils and geological report for the area to be graded, based on proposed grading and prepared by registered soils engineer and approved by the City of Costa Mesa Building Safety Division. 5-5 Prior to issuance of each building Prior to building permit Project applicant Project applicant permit by the City of Costa Mesa, the issuance property owner/developer shall submit for review and approval by the City of Costa Mesa Building Safety Division, a detailed foundation design information for the subject building(s), prepared by a registered civil engineer, based on recommendations by a geotechnical f engineer. 5-6 Prior to issuance of each building Prior to building permit Project applicant Project applicant permit by the City of Costa Mesa, the issuance property owner/developer shall submit plans showing that the proposed structure has been analyzed . by a registered civil engineer for earth lake H:/ClienV0080/00800014/00800014.MMP.doc 3-12 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mit Plan EIR Section MifigationM6asut`es ' ' Timing Of. ReSporisilile Pairhy . ' :undirig Sbiu'ces `= Measure loading and designed according to the -Mitigation most recent standards in the Uniform Building Code adopted by the City of Costa Mesa. • 5-7 If a permit is required for discharge of Prior to discharge of Regional Water Quality Project applicant perched groundwater encountered perched groundwater Control Board and project during excavation for site applicant / improvements, the applicant shall acquire such pennit(s) from the applicable agency(ies) (e.g., Santa Ana Regional Water Quality Control Board, County Flood Control or County Sanitation District) and provide evidence of permit issuance to the Costa Mesa Building Safety Division prior to initiating any such discharge. 5.6 Hydrology and Water Project Design Features Quality The project incorporates the following design features hydrology, Final Master Plan review — Costa Mesa Development Planning application related to flood verification during final Services Department fees hazard, and water quality: project design • Construction of structural BMPs as identified in the SWPPP, and required by the NPDES Stormwater Permit issued to the project site by the County of Orange/City of Costa Mesa to capture urban runoff contaminants from developed areas prior to discharge to onsite storm drain facilities. Standard Conditions and Requirements Compliance with Uniform Building Code provisions and standard subdivision engineering requirements, as specified in the city's conditions of approval, will satisfactorily address the hydrology and drainage issues described in this section of H:/Clien00080/00800014/00800014.MMP.doc 3-13 Mitigation Monitoring Program South Coast Plaza Tomi Center EIR — Mitigation Monitoring Plan EIR Section Mitigation Measures Timing Of `Responsible Party Fundii9g Mitiatibn Measure the EIR. Mitigation Measures 6-1 Prior to issuance of a grading permit, Prior to issuance of grading Regional Water Quality Project applicant the applicant shall obtain an NPDES permit Control Board and project Storniwater Permit from the County of applicant Orange. Applicable BMP provisions shall be incorporated into the NPDES Permit 5.8 Public Services, Utilities, 5.8.2 Fire and Emergency Medical and Energy Services Consumption Project Design Features A water delivery system designed to provide Final Master Plan review — Costa Mesa Development Planning application adequate fire flows to the project site and verification during final Services Department fees maintain a roadway system to provide project design adequate access to and through the site are a part of the design of the project. Standard Conditions And Requirements • Concurrent with the issuance of Final Master Plan review Costa Mesa Development Planning application building permits the applicants shall pay Conditions of Approval Services Department fees the North Costa Mesa Fire Fee in effect at that time, as applicable. • Each final master plan for the project Final Master Plan review Costa Mesa Fire Planning application site shall provide sufficient capacity for Conditions of Approval Department fees fire flows required by the Costa Mesa fire Department. • Vehicular access to all fire hydrants Final Master Plan review Costa Mesa Fire Planning application must be provided and maintained Conditions of Approval Department fees throughout constructian. H:/Cliend0080/00800014/00800014.MMP.doc 3-14 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section `,iYliEiigatioriher uses ` Timing.Of _ Mitigation Measure Respoiisible.Party Puriditig Sours 5 ; 5.8.3 Police Services — * Standard Conditions and Requirements • As final building plans are submitted to Final Master Plan review Costa Mesa Police Project application the City of Costa Mesa for review and Conditions of Approval Department fees approval, the Police Department shall review all plans for the purposes of ensuring that the proper design features are incorporated into the building plans to increase safety. • Environmental design considerations Final Master Plan review Costa Mesa Police Project application shall be incorporated into the Conditions of Approval Department fees development and maintenance of the proposed project to deter such criminal activity as burglary and robbery. • All buildings shall be well marked with Final Master Plan review Costa Mesa Police Project application names and addresses to enhance rapid Conditions of Approval Department fees response, rooftops shall be marked for building identification by police helicopter, and there shall be designated emergency vehicle parking areas close to buildings. Mitigation Measures 8-1 Prior to the initiation of grading, a Prior to issuance of grading Project applicant Project application construction security service. shall bepermit fees established at the construction site. f Initially, the service shall ensure that no unauthorized entry is made into the _ construction area. For the duration of each phase of construction, the project applicant shall provide sufficient onsite security personnel on a 24-hour, seven days a week basis, to patrol all areas of construction and prohibit unauthorized entry. xacuewoo8otoo800014/00800014.MM11.doe 3-15 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Mitigation Measures g Tinting Of g Mitigation Measure Res orisible Pa p Party F.undirigSoii%ces:; 8-2 Private on-site security is to be provided Final Master Plan review Project applicant Project applicant by the project applicants as the project Conditions of Approval. is developed and operational. 5.8.4 Solid Waste .x. Project Design Features Although no significant impacts to solid Final Master Plan review - Costa Mesa Development Project application waste disposal ' are anticipated as a pact of verification during final Services Department fees the project, the following project design project design features are recommended to minimize waste disposal and assist the City of Costa Mesa in compliance with AB 939: 1. In accordance with the requirements of AB 939, construction contractors shall reuse construction forms where practicable or applicable, attempt to balance soils on the site, minimize over cutting of lumber and polyvinyl chloride (PVC) piping where feasible, and reuse landscape containers to the extent feasible. 2. Recycling bins for glass, metals, paper, wood, plastic, green waste, and cardboard shall be placed on the construction sites for use by - construction workers. t 3. In construction specifications and bid packages, require building materials made of recycled materials, to the extent feasible and economically practical. 4. As a part of the ongoing operations of the SCPTC project, the following H:/Cliend0080/00800014/00800014.MMP.doc 3-16 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Mitigation Meastires Timing Of .. Mitigation Measure Responsible Party Funding Soiit'ces :;: measures shall be integrated into project design: • Source reduction, source separation and recycling measures shall focus on paper goods, yard waste, plastic, wood waste, and glass; • "Buy -recycled" policies, such as price references for recycled products; _ • Source reduction policies; • In-house recycling; • Drop-off sites; • Employee education; • Customer education; and, • Manufacturing design modification to promote source reduction or recycling. 5.8.5 Wastewater Project Design Features • All onsite wastewater sewer lines will be Final Master Plan review — Costa Mesa Development . Project application provided and ties to the existing sewer verification during final Services Department fees line system. project design Standard Conditions and Requireinents • Prior to the issuance' of building Final Master Plan review Costa Mesa Sanitary Project applicant Permits, a letter shall be obtained from Conditions of Approval District, Orange County the CMSD and the OCSD verifying Sanitation Distiict and that there is sufficient capacity in the project applicant receiving trunk lines to serve the H:/C1ient/0080/00800014/00800014.MM Hoc 3-17 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section 'Mitigation Measures.": Timing Of Mitigation Measure. Responsible Party =Funding S646*6' proposed project. - • Prior to the issuance of connection Final Master Plan review Costa Mesa Sanitation Project applicant permits(s), the applicant shall pay all Conditions of Approval District, Orange County applicable fees. Sanitation District and project applicant 5.8.6 Water ' Project Design Features • All onsite irrigation lines for recycled Final*Master Plan review - Costa Mesa Development Project application water would be identified so as to avoid verification during final Services Department fees connection with potable water lines. project design • Design requirements would be specified Final Master Plan review - Costa Mesa Development Project application to the City for potable and recycled verification during final Services Department fees water plumbing systems within Project design proposed buildings. Standard Conditions and Requirements • Prior to the issuance of an Application Final Master Plan review Mesa Consolidated Water Project applicant Permit the Application Plan Conditions of Approval District and project Check/Inspection Fee and applicant Performance Guarantee Bond shall be paid by the applicant to the MCWD. • Prior to the approval of plans or the Final Master Plan review Mesa Consolidated Water Project applicant execution of a service agreement, a Conditions of Approval District and -project Development Impact Fee shall be applicant collected by the MCWD from the t applicant. • Water conservation plans as required by Final Master Plan review Mesa Consolidated Water Project applicant the State of California shall be Conditions of Approval District and project incorporated. into building plans for the applicant project. The measures to be implemented include, but ' are not limited to: H:/C1ient/0080/00800014/00800014.MMRdoe 3-18 Mitigation Monitoring Program South Coast Plaza Town Center EIR — Mitigation Monitoring Plan EIR Section Mitigatioh 1VI(easures . Timing.Of : ,. Miti ation Measure Responsible Party ' -FUridifi - Solit - Low -flow fittings, fixtures, and equipment, including low flush toilets and urinals (Health and Safety Code 17921.3) - Use of self closing valves for drinking fountains and lavatory faucets in public facilities (Government Code Section 7800) - Insulation of water pipes and water heating systems. (Title 24, California Administrative Code, Section 25352) - Use of low flow sprinkler heads in irrigation systems (California Conservation in Landscaping Act, AB 325). 5.8.7 Energy Resources Standard Conditions and Requirements • Prior to the recordation of the Final Final Master Plan review Southern California Project applicant Master Plans, the applicant shall Conditions of Approval Edison, Southern provide to the City of Costa Mesa, a California Gas Company letter from Southern California Edison and project applicant Company and Southern California Gas Company indicating the ability to provide service to the project. • The applicant shall comply with the Final Master Plan review Southern California Project applicant guidelines provided by the Southern Conditions of Approval Edison and project California Edison .Company with applicant respect to' easement restrictions, construction guidelines, and potential _ amendments of right-of-way in any existing Southern California Edison H:/C1ient/0080/00800014/00800014.MMP.doe 3-19 Mitigation Monitoring Program South Coast Plaza Town Center EIR - Mitigation Monitoring Plan EIR Section Mi&gtioi:lVfeasiires ='+E >:.:p Timing Of . g Res" orlsiblePa'° P3', Ft�iidin" �Soufci~s s> g Miti anon Measure easements on the project site. • Prior to the issuance of each building Final Master Plan review Southern California Project applicant permit, the building owner/developer Conditions of Approval Edison and project shall submit plans showing that cacti applicant structure will comply with the State Energy Efficiency Standards for nonresidential buildings (Title 24, Part { 6, Article 2, California Code of Regulations). 5.9 Aesthetics Project Design Features The project incorporates the following design features related to aesthetics and visual resources: • The proposed SCPTC project will Final Master Plan review — Costa Mesa Development Project applicant incorporate signage, landscaping, and verification during final Services Department exterior lighting that comply with project design applicable city requirements. • The size, height, building materials, and Final Master Plan review — Costa Mesa Development Project applicant orientation of structures associated with verification during final Services Department the SCPTC project will comply with project design City requirements. Standard Conditions and Requirements The SCPTC project will be required to Final Master Plan review Costa Mesa Development Project applicant comply with Uniform Building Code Conditions of Approval Services Department provisions, standard subdivision engineering requirements, and applicable provisions of the Costa Mesa General Plan and North Costa Mesa Specific Plan as specified in the city's conditions of approval. 14 Client/0080/00800014/00800014.MMP.doc 3-20 Mitigation Monitoring Program Exhibit D Amendments to SCPTC Preliminary Master Plan 4-7-777767" z az--7777777777 i,a x xma..:e'" .._. 4 7-77-77-7774-77, 77 7-71 'Ire '�5i.:��(( :?M1: i `t XtS `f.JS. 'kW..tt .�X'h' i�., ? t: y%`.��/,`1w.5iliRRr�' Y �,r 4? C)htt. `E�W�"!AC{:.()'.:'7i'�'rNe�..�Y �• �N yy.-GS fill i)i'ai.4�T..:3 � �(' -; )i i 4 :�Y.iy F 'K12 Z7 W i= r �Y, Yf1'+^'(W^:`^..,,e n..: ! ,y.� t:�'V�F ,a'�,'e? .J'.j fYly. k��r((k'��-.;�5'���1`.`.. l��rv��.d:.e9 �b ,q�S... j1'�:4}i Y':�':':.lt^a •1s':X: 1`fd�.?,V S%-..dd.•{4. ltjl'Sj .Cw'M :x1{.rx'�.�..li/. ).,i+..ahyA�.'', iYYi�M '! �. .]. ..+�.i K§!n !�i..'•,f.,Y.}'^R 4..511....v 4 nS�.Jtl�i. S,«�j z....'s�: tP3 �.k':z'y{fa.1Y!tY•::i;::.,.'�•:t\^A.4t,r.'::.i.°'.r,...?y,.y�.Y y.,�Jy Joh �S'`�i t4")1C>S.i ,.r`M!.:N.. 'Y�%�'„,} ! Sll�'.�^'�`'m�... 4.. >�" WM: t^l; 4 ft1 F'XA..z<. $ ,Ji l+Y y2 <. .«4 .,..... \��t[ i. L; ,.1�: ��$.� 44 rti Y'a .A,3 :�ff. `{, i..�� [\('f y�"`1 .'vY "^��,(.t,^,. �f�'�'" LG.:;!t. �.. ��',F. ��f) l yi . lr.. 1�! .: T.ib .�tl i,.! i. kI f. Y1 ;1� .d�, li�rrtt`t �5 � t `f'p� �; k v .k� . rxl M SLC fY Y:Y Y� "S: kj LQ.�i ii 1•a+ ; ' � �k!�,t '� t�„ 5,w• .Y./�L`u5� S.'t�: .`4Y 'S 4;t -�r :'.'�.�3�.A���. �vm ,rv�, tr 7�. „jt t��• 'Z i.. X �., !t Pl 3,S i 4 -:.: Cf i:. rtv c r ;1F >, - it. r i � s•,f•s�' tn?:.� tr �., �}, 7 �o � S ��,`" nt 4 t 's .. .,: ypii'�`$ys `t4.9. Vii. �,R .�� 3 <. t!�l� truN� 4:} i ,�._� M„;:�,,� �,,�_.� ����,�:,;b�rr.�,,.!�.:;:.�S,TQ►T,1ST[CAL�SUhIIMARY�,Q.���t:SCPTAC,rCOMP,ONENTuS{,iP�,�!���:.��>?�`��4,����`�r:,�,w�:.:.,�+};>„f;��};�< d-�!" ,a S i...SY+.. t F Rin 5, .. , ?�N: x'�' t sgr]i I. ''eV,ix�=ixN.`a�V1'%.i� �C” -yr,Jt9 ,Pig �u�.. k<{.:."tea �+�, r�3 f.i+3' AU 00— n ESP rf,.� ! t"r is a, yCb s.`s' �v ..,�_ >SfJ 'G §!! i' a e ,�..$„3'Lsv s 7 �'. ¢ s',rri?y: .,➢'.i'4f ns,^yv _ V, ;fsi v D 4•t w� x�. - `Si3.,.. 1ttm ".`;„:C ueraltllefiv r .,.rn .. ry . 4dT1! Lr s i v1"` („��4 arR .tt�arh 4.?xP!,`L'C5 t'v.�'r'�''i' k{\ x• i1. A,`> eer,AJY j.>\t mYS-,..w i YeL'iip `fs5�i.4x'1 r'". 1. wy,,tnJy,, 514'Pevto�uslYS .:l.�n .,k•a.,`{ye"�?f ,''1 �.,sk ,l..H 'N �k 'Yn "n' rr'`.yy'��r; t�,7 %,�y.d.vlf'ity�... t' i .r}i vl , iC ii C:w R.''*i: {.2aFsi``i Y qa M." v'�f'�ncreaQ�;.f'c r:ev4v'�"r' ".I .NS r-) `75:. '....{ e ;ro„r 1 $t<•,!i4^r,x^.,+�_ .....0 Xff'Z�+:+i �f'+:e..! (yt4`", v'3•' .. 'L 'Fyr-..�as;r' :i' �t�,�R' ,� r: . S4' .,1.F ;Buddmx 7 's-> 'T ✓VeG'„ri'i..:.2 C�andUserwtEnfit#cements 5r !,..!�y kaX„�;'•'^Sd: WtL!u'XiirY.i ated for �: ' a�, },” .t�:.rs Deroliion�., ( �r. e i}5'�'� tl''��, :!n` Construc,,ion,,,xUs�s�r .,rr(Unent�tle ... n ?!YYh1a/K 'r. -i { 4::` t8 it . f,S'r"�:tvi i`.ic«`�`�, t( He�ghf.S`tor=; E A. Segerstrom 0 (84,025 sq. ft.) 339,025 sq. ft. 255,000 sq. ft. 315 ft./21 Office (office) B. OCPAC 65,000 sq. ft. 0 65,000 sq. ft. 0 160 ft./3 Expansion (1,000 seats) (1,000 seats) C. SCR Theater 0 0 32,500 sq. ft. 32,500 sq. ft. 55 ft./3 (140 seats) D. Symphony 0 0 301,145 sq. ft. 301,145 sq. ft. 130 ft./5 Hall (2,500 seats) (2,500 seats) E. Art Museum/ 0 0 140,000 sq. ft. 140,000 sq. ft. 80 ft./4 Academy F. Hotel/ 186,000 sq. ft. (15,300 sq. ft.) 186,000 sq. ft. 0 210 ft./12 Restaurant (186 room hotel) (restaurant) (186 room hotel)/ 15,300 sq. ft. (restaurant) G. Two Town 0 (entire structure) Min. 705 parking Min. 705 parking 60 ft./4 Center spaces spaces Parking Structure #1 H. Two Town 0 0 400,000 sq. ft. 380,800 sq. ft. 272.5 ft./18 Center Office (Note: 19,200 Building sq.ft. of theater to be recreated as Two Town Center Office Building) (. Edwards 0 (19,200 sq.ft.) 0 0 40 ft./2 Cinema Building J. Two Town 0 0 0 0 40 ft./2 Center Retail/ Restaurant K. South Coast 0 (12,000 sq. ft.) 12,000 sq. ft. 0 40 ft./2 Plaza Cinema (theater) (theater) TOTAL: 251,000 sq. ft. (130,525 sq. ft.) 1,490,970 sq. ft. 1,109,445 sq. ft. Sq. ft. = square feet "Overall net increase” equals "new construction" minus "previously unbuilt entitlements" and/or "slated for demolition." Source: City of Costa Mesa, January 2002 l FIGURE 2