Loading...
HomeMy WebLinkAbout07-87 - Adopt General Plan Amendment GP-06-03 (Wyndham Boutique Hotel/High-Rise Residential)RESOLUTION NO. 07-87 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COSTA MESA, CALIFORNIA, TO ADOPT GENERAL PLAN AMENDMENT GP -06-03 FOR THE WYNDHAM BOUTIQUE HOTEL / HIGH-RISE RESIDENTIAL PROJECT AT 3350 AVENUE OF THE ARTS. THE CITY COUNCIL OF THE CITY OF COSTA MESA DOES HEREBY RESOLVES AS FOLLOWS: WHEREAS, the City Council of the City of Costa Mesa adopted the 2000 General Plan on January 22; 2002; WHEREAS, the General Plan is a long-range, comprehensive document that serves as a guide for the orderly development of Costa Mesa; WHEREAS, by its very nature, the General Plan needs to be updated and refined to account for current and future community needs; WHEREAS, the proposed Wyndham Boutique Hotel / High -Rise Residential project involves the construction of a mixed-use development by Maker Properties at 3350 Avenue of the Arts consisting of the following: (1) Certification of Final EIR No. 1054 which consists of a comprehensive analysis of the environmental impacts and any required mitigation measures for the proposed project pursuant to State Law; (2) General Plan Amendment GP -06-03 to amend the Land Use Element of the General Plan to incorporate provisions for high-rise residential development in the project area; (3) North Costa Mesa Specific Plan Amendment SP -07-01 to establish development standards and other related provisions in the NCMSP for the project; (4) Final Master Plan PA -06-75 for a boutique hotel with 200 rooms, meeting rooms, restaurant, spa and fitness facilities; a 23 -story high-rise residential building with 120 for -sale condominium units, a 3,450 square foot lounge/bar, and 1,740 square foot of ancillary retail uses; and a seven -level, 480 -space parking structure; (5) Vesting Tentative Tract Map No. 17172 for the subdivision of the property for condominium purposes; WHEREAS, an amendment to the General Plan Land Use Element is required to allow for development of the proposed high-rise residential use at a maximum 44 dwelling units per acre and as analyzed in Final Environmental Impact Report (EIR) No. 1054 (SCH#2007011125); WHEREAS, the General Plan amendment also reflects that the Federal Aviation Administration is the sole authority in the United States for making determinations of no hazard to air navigation; WHEREAS, duly noticed public hearings were held by the Planning Commission on September 10, 2007 and September 24, 2007 and by the City Council on November 20, 2007 to allow for public comment on the proposed project and with all persons having been given the opportunity to be heard both for and against the proposed project; WHEREAS, the project has been reviewed for compliance with the California Environmental Quality Act (CEQA), the CEQA Guidelines, and the City environmental procedures, and Final EIR No. 1054 was prepared and available for public review from June 5, 2007 to July 19, 2007; WHEREAS, the City Council has reviewed all environmental documents comprising the Final EIR and has found that the Final EIR considers all environmental impacts of the proposed project and a reasonable range of alternatives, and the Final EIR is complete and adequate and fully complies with all requirements of CEQA, the CEQA Guidelines, and the City of Costa Mesa Environmental Guidelines; WHEREAS, the Planning Commission recommended that City Council certify Final EIR No. 1054 and adopt General Plan Amendment GP -06-03 by adoption of resolutions PC -07-65 and PC -07-66; WHEREAS, the City Council adopted Final EIR No. 1054 for the Wyndham Boutique Hotel / High -Rise Residential by separate resolution; BE IT RESOLVED that, based on the evidence in the record, the City Council DOES HEREBY ADOPT General Plan Amendment GP -06-03 which amends the Land Use Element as set forth in Exhibit "A" attached to this resolution; BE IT FURTHER RESOLVED that the City Council has also considered and finds that the benefits of the project outweigh the unavoidable adverse impacts that remain after mitigation and DOES HEREBY ADOPT the Statement of Facts and Findings (Exhibit 'B") and Statement of Overriding Considerations (Exhibit "C'), as attached to this General Plan resolution. PASSED AND ADOPTED this 20'h day of November, 2007. ATTEST: Juo Folcik, City Clerk 4411" c / ✓t L, Allan R. Mansoor, Mayor APPROVED AAS/TnO0FORM: 1 Kimberly Hall Barlow, City Attorney STATE OF CALIFORNIA ) COUNTY OF ORANGE ) ss CITY OF COSTA MESA ) I, JULIE FOLCIK, City Clerk of the City of Costa Mesa, DO HEREBY CERTIFY that the above and foregoing is the original of Resolution No. 07-87 and was duly passed and adopted by the City Council of the City of Costa Mesa at a regular meeting held on the 2& day of November, 2007, by the following roll call vote, to wit: AYES: COUNCIL MEMBERS: MANSOOR, BEVER, DIXON, FOLEY, LEECE NOES: COUNCIL MEMBERS: NONE ABSENT: COUNCIL MEMBERS: NONE IN WITNESS WHEREOF, I have hereby set my hand and affixed the seal of the City of Costa Mesa this 21't day of November, 2007. JUM FOLCIK, CITY CLERK (SEAL) Exhibit "A" Costa Mesa 2000 General Plan Amended Land Use Element intense uses to the existing land use mix as the availability of developable land decreases and property values increase. This will create an overall increase in population and employment and all of the associated impacts of traffic congestion, noise, public safety, etc. Residential infill projects in the way of small lot subdivisions could have negative impacts on established smaller scale neighborhoods. The design quality of such subdivisions is a key issue to be addressed during the design review process. The preservation of stable, quiet, and homogeneous neighborhoods is a prime concern of this 2000 General Plan. One area that is experiencing a disproportionate amount of land use conflict is Westside" Costa Mesa. The Westside was among the earliest areas in the City to develop and is characterized by a considerable diversity of people, land uses, job opportunities, and housing choices. In an effort to address issues relating to economic redevelopment, deterioration of the 19e Street corridor, incompatible land uses (particularly in the area south of le Street), lack of code enforcement, deteriorating infrastructure, and blighted appearance of the stmetscapes, the City Council commissioned the Westside Specific Plan'. Although not adopted, the plan will be used as a resource document for future planning and improvement work efforts in the area. NOISE The Noise Element defines noise as unwanted sound. Although this definition could encompass a wide spectrum of sound types, the most common noise sources In Costa Mesa are traffic and aircraft. Thus, existing and future noise levels have been examined and the Noise Element provides information on community noise impacts and appropriate mitigation measures. AIRPORT CONSIDERATIONS Both the Federal Aviation Administration (FAA) and the Airport Land Use Commission for Orange County have concem for the safety of air navigation around John Wayne Airport. Under Part 77 of the Federal Aviation Regulations (FAR), the FAA requires notice of proposed construction in excess of certain heights, which may affect the safety of aircraft operations. The authority of the FAA in these matters extends only as far as issuing a notice of hazard to air navigation; the FAA does not have jurisdiction to prohibit construction. The issuance of a hazard notice, however, may adversely affect the ability of a developer to obtain financing and insurance. The FAA standard that is of most of concern in Costa Mesa is the horizontal surface for John Wayne Airport. This surface is 203.68 feet above mean sea level and extends nearly two miles from the airport. The South Coast Plaza Town Center Master Plan (the area east of Bristol Street and north of the 1-405) was approved subject to the condition that building height be limited to that specifed by FAR Part 77 unless evidence is presented that the structure will not pose a hazard to air navigation nor interfere with instrument guidance systems. Evidence may be in the form of an FAA determination of no hazard­or�-� qualified-aviauARw asultaru4hath�rUfaed-bHhe FAA. PAGE LW12 • LAND USE ELEMENT The maximum density of 20 dwelling units per acre is exceeded by approximately 46 percent of existing High -Density development. Existing non -conforming developments, that are voluntarily destroyed, may be rebuilt to the original density subject to other standards of the zoning code and the following: the allowable density or number of units to be redeveloped would be limited to the 2000 General Plan density plus a 50 percent density incentive bonus or the existing number of units, whichever is less. In order to encourage the development of additional residential ownership opportunities in the Westside, City Council may designate an overlay area by adoption of the Mesa West Residential Ownership urban plan. For existing developments that exceed 20 dwelling units per acre, the Mesa West Residential Ownership urban plan may allow redevelopment of residential projects to existing densities provided that certain development standards are met for encouraging ownership housing. With an average household size of 2.74, the projected population density within this designation would be 54.8 persons per acre. High -Density areas should be located in proximity to transportation routes, especially those served by public transit, and also within convenient distances to shopping and employment centers. Although proximity to the above uses and transportation routes often results in a residential development being subject to adverse impacts, High -Density Residential development can be less susceptible to impacts than lower densities if visual and acoustical shielding techniques are incorporated into the project. In addition to the above locational preferences, viable High -Density development is also dependent upon site characteristics. A site should be of appropriate size and dimension before the higher densities within this designation are allowed. Because of their location and intensity of development, High -Density Residential areas are also appropriate for quasi -residential uses (e.g., convalescent hospitals, and group residential homes). Schools, churches, parks, libraries, and related public facilities are also appropriate, Complementary commercial uses within this designation may be allowed in planned development projects provided that the commercial uses will have Floor LAND USE ELEMENT • PAGE LU -25 LU -1A.2 Consider the effects of new employment, particularly in relation to housing impacts, when new commercial or industrial development is proposed. LU -1A.3 Locate high-intensity developments or high traffic generating uses away from low-density residential in order to buffer the more sensitive land was from the potentially adverse impacts of the more intense development or uses. LIJAAA Strongly encourage the development of low-density residential uses and owner -occupied housing where feasible to improve the balance between rental and ownership housing opportunities. LU -1A.5 Provide housing and employment opportunities within planned development areas to the extent feasible. LU-tA.6 Aggressively pursue methods to discourage the development of multiple units on long, narrow, single parcels. Possible methods could include a lot combination zoning incentive or the creation of new lower density zoning to be applied to lots with less than a certain minimum frontage. Objective LUAB. Ensure the long tens productivity and viability of the community's economic base. LU -1B.1 Permit adequate quantifies and locations of commercial land to serve residential neighborhoods. Objective LU -1C. Promote land use patterns and development, which contribute to community and neighborhood identity. LU -1C.1 Permit the construction of buildings over two stories or 30 feet only when it can be shown that the construction of such structures will not adversely impact surrounding developments and deprive existing land uses of adequate light, air, privacy, and solar access. LU -1C.2 Limit building height to four stories above grade south of the 1- 405 Freeway, except for special purpose housing, such as elderly, affordable, or student housing. An exception is for the Newport Plaze property at 1901 Newport Boulevard where a five -level parking structure is allowed. LU -i C.3 Prohibit construction of buildings which would present a hazard to air navigation as determined by the FAA,-or-indepeadent "—Iha4ltave-beea�eF ified by -the -FAA. LU -1C.4 Require building setbacks, structure orientation, and the placement of windows to consider the privacy of adjacent residential structures within the same project and on adjacent properties. LIJAC.S Develop incentives for lot combination, or disincentives for development without lot combination. Consider policies such as zoning designations, which fall between zones, or development standards, which be density to lot width as well as area. LAND USE ELEMENT • PAGE LU -47 Exhibit "B" Statement of Facts and Findings Wyndham Boutique HOWPHigh-Rise Residential FINDINGS OF FACT IN SUPPORT OF FINDINGS FOR SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE WYNDHAM BOUTIQUE HOTELI HIGH-RISE RESIDENTIAL PROJECT 1.0 INTRODUCTION The City of Costa Mesa (the City) proposes to approve the Wyndham Boutique Hotel/High Rise Residential Project. Because the proposed action constitutes a "project' under the California Environmental Quality Act of 1970 (CEQA), as amended (Public Resources Code §21000 at. seq.) and the State Guidelines for the implementation of CEQA, as amended. The City has prepared a Final Environmental Impact Report (EIR) No. 1054, State Clearinghouse Number 2007011125. Pursuant to State CEQA Guidelines §15132, the Final EIR consists of the Draft EIR, the comments received and Responses to Comments on the Draft EIR (including a list of commenters), and any associated documents Including the Mitigation Monitoring Program. These Findings of Fact, the Staff Report, and the Final EIR are part of the public record and identify certain significant effects which may occur as a result of the project, or which may occur on a cumulative basis in conjunction with the project and other past, present, and reasonably foreseeable future projects. The Final EIR is intended to address all of the impacts, the mitigation program, and the project alternatives associated with the Wyndham Boutique Hotel High -Rise Residential Project. An Initial Study for the project was prepared by the City and a Notice of Preparation (NOP) for an EIR was distributed to local responsible and trustee agencies, the State Clearinghouse, and other interested parties on January 29, 2007. Various agencies and individuals provided written comments within the State -mandated 30 -day public review period for the NOP. Upon completion of this review, copies or notification of availability of the Draft EIR were forwarded to all responslbleltrustee agencies and interested groups and individuals. As was also the case for the NOP, the Draft EIR was forwarded to the State Clearinghouse for distribution to and review by various involved State agencies. The State -mandated 45 -day public review of the Draft EIR began on June 5, 2007, and ended on July 19, 2007. In addition to the City departments responsible for review of the Draft EIR, State and local agencies, special districts, and individuals have reviewed and commented on this EIR. Nine comment letters were received. Responses to the comment letters were prepared. Pursuant to California Public Resources Code §21082.1, the City has independently reviewed and analyzed the information contained in Final EIR No. 1054. The conclusions and discussions contained herein reflect the independent judgment of the City as to those issues at the time of publication. The CEQA Guidelines §15091 provide that: No public agency shall approve or carry out a project for which an EIR has been certified which identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding. The possible findings are: (1) Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the final EIR. n+s,yxuroww�sr u,pz.oezem.eoc 1 Findings of Fed and Statment of Ouemding Conslderations Wyndham Boutique HdeVHgh-Riso Res nfief PA*d Final EIR No. 1050 (2) Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency. (3) Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the final EIR. CEQA Guidelines §15093 requires that ...the decision-making agency to balance, as applicable, the economic, legal, social, technological, or other benefits of a proposed project against its unavoidable environmental risks when determining whether to approve the project. If the specific economic, legal, social, technological, or other benefits of a proposed project outweigh the unavoidable adverse environmental effects, the adverse environmental effects may be considered 'acceptable...: When the lead agency approves a project which will result in the occurrence of significant effects which are identified In the final EIR but are not avoided or substantially lessened, the agency shall state in writing the specific reasons to support its action based on the final EIR and/or other information In the record. The statement of overriding considerations shall be supported by substantial evidence in the record. The City has determined that Final Environmental Impact Report (EIR) No. 1054 for the Wyndham Boutique Hotel/High-Rise Residential project has been completed in compliance with CEQA, the requirements of the CEQA Guidelines, and the City of Costa Mesa environmental guidelines. The Final EIR was subject to review and the Costa Mesa City Council certified the following: • Final EIR No. 1054 has been completed in compliance with CEQA. • Final EIR No. 1054 was presented to the City Council and the Council reviewed and considered the information in the Final EIR prior to taking action on the Wyndham Boutique Hotel/High-Rise Residential project. Because the Wyndham Boutique Hotel/High-Rise Residential Project Final EIR No. 1054 identified significant effects that may occur as a result of the project and in accordance with the provisions of CEQA and CEQA Guidelines, the City of Costa Mesa hereby adopts these findings as set forth herein as a part of the approval of the project and related applications. 2.0 LOCATION AND CUSTODIAN OF DOCUMENTS The City of Costa Mesa Development Services Department serves as the custodian of the documents constituting the record of proceedings upon which the City has based its decision related to the project. The contact for this material is: Rsm4a�isu:ow�w�s�dnwamam0oc 2 FWings of Fed end Slefemed of o""dmg crosl mfbns WYodham Bo.1R. Hd kH10h-Rise RsWOWW Po Jj d FMWEIRNo. 1054 Ms. Claire Flynn, AICP, Senior Planner City of Costa Mesa Development Services Department Planning Division 77 Fair Drive Costa Mesa, CA 92628-1200 (714)754-5278 3.0 WYNDHAM BOUTIQUE HOTELIHIGH-RISE RESIDENTIAL PROJECT The approximately three -acre Wyndham Boutique Hotel/High-Rise Residential Project site is located at 3350 Avenue of the Arts, within the North Costa Mesa Specific Plan area of the City of Costa Mesa, Orange County, California. The project site is generally bound by Avenue of the Arts to the west, The Lakes at South Coast apartment community to the north and northeast, and The Lakes Pavilions retail center to the south and southeast. The North Costa Mesa Specific Plan area is generally bound by Sunflower Avenue to the north; the San Diego Freeway (Interstate 405) to the south; Sakioka Drive to the east; and Bristol Street to the west. Land uses within the Specific Plan area include South Coast Plaza Mall, the Orange County Performing Arts Center, the Marriott Hotel, Wyndham Hotel, and many cultural art institutions. Additional land uses in the area include additional office, commercial, and residential uses to the north and east. The project site Is wmentiy developed with the 6 -story Wyndham Hotel which contains 238 rooms, meeting facilities, and a restaurant. Adjacent to the hotel is a 3 -level, 240 -space parking structure and 24 surface spaces at the rear of the building to serve employees. The Wyndham Boutique Hotel/High-Rise Residential Project (referred herein as the project) would allow for the reuse of the project site as a mixed-use development with both hotel and residential uses. The existing Wyndham Hotel would be renovated; there would be no change to the building square footage associated with the hotel. Proposed renovations would include a reduction In hotel rooms from 238 to 200 rooms to create a boutique hotel; the construction of a spa facility on the first floor of the hotel; relocation of the hotel entrance; and renovation of the hotel lobby, restaurant, and hotel rooms. The existing parking structure for the hotel would be demolished. In its place, a 23 -story high-rise residential tower would be constructed. The luxury residential tower would have 120 for -sale condominium units on the 2' through 23itl stories; a loungelbar and ancillary retail uses would be located on the ground level. A new 7 -level, 480 -space parking structure would be constructed east of the new residential tower. The parking structure would serve both the residential tower and the hotel. The proposed high-rise residential tower would not exceed 270 feet in height above grade level (approximately 304 feet above mean sea level). The proposed boutique hotel would differ from the current operations of the existing Wyndham Hotel in that a boutique hotel offers rooms targeted to a more luxurious lifestyle. Boutique hotels differentiate themselves from larger chain/branded hotels and motels by providing personalized level accommodation and services and facilities. Boutique hotels are sometimes known as "design hotels" or'lifestyle hotels." Minor modification to the overall mix of hotel rooms and residentialunits would not exceed an overall total of 340 hotel rooms/dwelling units. nwai.new;wuw�sszwmzam.a: 3 FMMngsofFsdand Sfelsmenfof OmmdMe Candd.a m Wyndham Boutique Hdl Moh-Rise ResMenllal Fro)eal Final ElRW 1054 4.0 FINDINGS OF FACT IN SUPPORT OF FINDINGS FOR SIGNIFICANT ENVIRONMENTAL EFFECTS Final EIR No. 1054 analyzes the following areas of potential environmental impact: aesthetics; air quality; aviation safety; geology and soils; hazards and hazardous materials; hydrology and water quality; land use and planning; noise; population, housing, and employment; public services, transportation and circulation, and utilities. The analysis of population, housing, and employment determined there would be no impact; no project design features, standard conditions, or mitigation measures are required. 4.1 MITIGATED SIGNIFICANT IMPACTS The potentially significant impacts identified in Final EIR No. 1054 that can be mitigated to less than significant levels through the implementation of project design features, standard conditions, and/or mitigation measures are set forth in this section and include: esthetics; aviation safety; geology and soils; hazards and hazardous materials; hydrology and water quality; land use and planning; noise; public services (police, fire, schools, and parks); transportation and circulation; and utilities. This section also sets forth the City's findings with respect to each of the significant impacts, the facts in support of those findings, and those changes and alterations that have been made to the project to reduce or eliminate potentially significant effects to less than significant levels. The potential significant adverse impacts that would be mitigated are listed in the following subsections. The Costa Mesa City Council finds that these potential adverse impacts would be mitigated to a level that is considered less than significant after implementation of the project design features, standard conditions, and recommended mitigation measures. AESTHETICS Significant Impact The project would introduce new sources of night lighting and glare. Based on the project's location in an urban area that is currently subject to a variety of night -lighting sources as well as the low wattage of interior light sources in residential land uses, this increase has been identified as less than significant. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, Inclusion of the following standard conditions of approval, as identified in the Final EIR, would minimize nighttime light and glare from the project. rtwgambr.uoiarwnpaazao�arc 4 RrM gsof FanlaWSfefe tof Ove mg conn .Wk. Wyndham aoetpd HWBNHigh-Rise Residential Project Final EIR No. 1054 Standard Conditions SC 3.8-1 Prior to issuance of building permits, the Applicant shall submit an Electrical Engineer's Photometric Survey to be approved by the Planning Division in order to assure that minimum security lighting requirements are mel and to minimize light and glare to residents. SC 3.8-2 All exterior light standards and fixtures will be shielded to prevent light spill to further reduce potential impacts. SC 3.8-3 The intensity and location of lights on buildings shall be limited to minimize nighttime light and glare to residents and shall be subject to the Development Services Director's approval. SC 3.84 The Lighting Plan shall demonstrate compliance with the following: (1) All site lighting fixtures shall be provided with a flat glass lens; (2) Photometric calculations shall indicate the effect of the flat glass lens fixture efficiency; (3) Lighting design and layout shall limit spill light to no more than 0.5 foot-candle at the property line of the surrounding neighbors, consistent with the level of lighting that Is determined necessary for safety and security purposes on site. SC 3.8-5 Architectural features and roofs shall be appropriately finished with non -reflective materials In order to reduce glare and reflection. Structures shall use low reflective glass and building materials to minimize daytime glare to the fullest extent possible. SC 3.88 Prior to issuance of building permits, the Applicant shall submit building plans for the proposed project, to be approved by the Planning Division, which incorporate the use of non -reflective building materials to minimize light and glare impacts. Significant Impact Demolition and construction of the project would remove existing landscaping from the project site. Because the project site would be re -landscaped during project implementation, this temporary alteration has been identified as a less than significant impact. Finding Changes or alterations have been required In, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, inclusion of the following standard condition of approval, as identified in the Final EIR, would ensure that the project site is re -landscaped. Standard Conditions SC 3.8-7 Prior to the issuance of building permits, the Applicant shall submit a Final Landscape Plan, consistent with the landscape standards, for each development component to be approved by the Planning Division. aw,gsu�wuumaa,mnpsrozmrme 5 F intnp of Fact and Statement of Ovannaing ConaMeradans lvrdham Boutique Holbiffgh- tw Re engel fled Final EIR No. 1050 AVIATION SAFETY Significant Impact Project implementation could result in hazards to aviation due to building heights or changes to air traffic patterns. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by the inclusion of the following project design feature and standard conditions of approval, as identified in the final EIR. Project Design Feature PDF 3.10-1 The proposed high-rise residential tower has been designed to not exceed the established circling minimums floor for John Wayne Airport of 304 feet above mean sea level (msl). Standard Conditions SC 3.10-1 Prior to final master plan approval, the Applicant shall submit to the City of Costa Mesa, a Federal Aviation Administration (FAA) Determination of No Hazard to air navigation. If the FAA requires conditions for the finding of no hazard to air navigation, such as installation of roof -top obstruction lighting, said conditions shall be placed as conditions of approval on the final master plan. SC 3.10-2 In the event a proposed high-rise building is determined to be a hazard to air navigation by the Federal Aviation Administration (FAA), the building design shall be appropriately modified prior to issuance of building permits so that an FAA Determination of No Hazard to air navigation ran be obtained. SC 3.10-3 The Federal Aviation Administration (FAA) No Hazard Determination shall be valid at the time of building permit issuance for the high-rise structure. The City shall expressly prohibit issuance of any building permit for a structure in the absence of a current and valid FAA No Hazard Determination. SC 3.10-4 The Applicant shall comply with the final Federal Aviation Administration (FAA) No Hazard Determination issued on July 23, 2007, which established a maximum building height of 304 feet above mean sea level for the proposed high-rise residential tower at 3350 Avenue of the Arts. Amendments to the Costa Mesa 2000 General Plan and North Costa Mesa Specific Plan are not necessary to accommodate additional building height of up to 280 feet above ground level (AGL) as specified in the North Costa Mesa Specific Plan. In addition, this EIR has examined the maximum building heights as defined in the North Costa Mesa Specific Plan and concluded that no significant impacts will occur. 0.wgsmcwaiolTameA= aol.eoc 6 FdingaorFaoland Slaf.m Gf oaertld/ng Conab'erelMns Wyndham aoulque HWOHgh-Pose ResidanYial Pnyed Final EIR Ho. 1054 SC 3.10-8 The Applicant shall work with John Wayne Airport and City staff on a "Grant of Avigation Easement" for a specified area of the subject property that penetrates the imaginary horizontal surface of John Wayne Airport above elevation 206 feet above mean sea level (NAVD 88). The Applicant shall grant this Avigation Easement to the County of Orange/John Wayne Airport to permit the unencumbered and unrestricted flight of aircraft to or from John Wayne Airport. Recordation of the Avigation Easement shall occur prior to issuance of any building permit that penetrates the imaginary horizontal surface of John Wayne Airport. SC 3.10-6 Due to the projects proximity to John Wayne Airport, the Applicant shall ensure that any prospective resident be notified of the presence of aircraft overflight in the form of a buyer's notice, as follows: "Notice of Airport in Vicinity: The Development Services Director shall review/approve the buyer's notice for form and substance prior to issuance of a building permit. This property is presently located in the vicinity of an airport, within what is known as an airport influence area. For that reason, the property may be subject to some of the annoyances or inconveniences associated with proximity to airport operations (for example: noise, vibration, or odors). Individual sensitive to those annoyances can vary from person to person. You may wish to consider what airport annoyances, K any, are associated with the property before you complete your purchase and determine whether they are acceptable to you." This notice shall be prominently displayed in the sales office for the condominium development, and a copy shall be provided to all buyers. Significant Impact The project is anticipated to be consistent with applicable aviatiorrrelated planning programs and their identified goals and policies. However, this conclusion cannot be validated until the FAA issues a final determination. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by. inclusion of standard conditions of approval SC 3.10-1 through SC 3.10-6 listed above and identified in the Final EIR. CULTURAL RESOURCES Significant Impact The project site is within an urbanized area and has been previously graded and developed with hotel uses. Because the project involves development of a previously developed site, it is not anticipated that intact subsurface archaeological and paleontological resources would be encountered during excavation and grading activities; however, it may be possible to encounter resources during grading. nwgsmcon upts>:,a,gaeM.mc r Findings of Fed and Statement of OvanIMg ConsMmalions Wymdhem Boutique HaftWgh-Rise Reddential R ject Final EIR No. 1056 Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by Inclusion of the following standard condition of approval and adoption of the following mitigation measures, as identified in the Final EIR. Standard Condition SC Cultural 1 Ste excavation and grading shall be monitored by a qualified archaeologist and Native American monitor. If archaeological materials are identified during grading and construction, all construction activities shall be temporarily halted or redirected to permit the sampling, identification, and evaluation of archaeological materials as determined by the City, who shall establish, In cooperation with the project proponent, certified archaeologist, and Native American representative, the appropriate procedures for exploration and/or salvage of the artifacts. Monitoring is only required where grading and excavation activities would disturb soils at a depth of 5 feet or more. If human remains are encountered, State Heath and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to Public Resources Code Section 5097.98, The County Coroner must be notified of the find immediately. If the remains are determined to be prehistoric, the Coroner will notify the Native American Heritage Commission (NAHC), which will determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection within 24 hours of notification by the NAHC. The MLD may recommend scientific removal and nondestructive analysis of human remains and items associated with Native American burials. GEOLOGY AND SOILS Significant Impact The addition of 300 new residents to the area would result in the project exposing a greater number of people to seismicity and ground shaking. The project she is susceptible to subsidence, liquefaction, and expansive soils. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Rw,garosinmawar,n 07m a Findings of Fed and Statement or OveMdmg Cormidaretione Wyndham 9ouhque HoleMigh-Rise Residential Project Final EIR Ho. 1054 Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by inclusion of the following standard condition of approval and adoption of the following mitigation measures, as identified in the Final EIR. Standard Condition SC 3.3-1 Where studies indicate that buildings may be subject to substantial damage during earthquakes, the structure shall be designed and/or retrofitted for seismic resistance in compliance with all relevant recommendations for seismic design and seismic safety in the most recent editions of the Uniform Building Code and the California Building Code. Mitigation Measures MM 3.3-1 Prior to the issuance of a grading permit, the Applicant shall prepare a site-specific final geotechnical investigation, including an evaluation, analysis, and mitigation recommendations for the issues identified in the Zeiser Kling Consultants' Geotechnical Evaluation (March 2007), including appropriate dust control measures and waterproof building designs with hydrostatic pressure resistive properties and a site specific probabilistic seismic hazard analysis for ground motion. All recommendations shall be incorporated into the final grading plan for the project. The project shall incorporate all recommendations of the detailed Geotechnical Report into the plans and specifications as required by the City Engineer. MM 3.3-2 During grading operations, special handling of on-site soils shall be required due to high moisture content of the soils. The City shall monitor the Grading Contractor to ensure stabilization of the soils during grading and excavation activities, as recommended by the Zeiser Kling Consultants' Geotechnical Evaluation (March 2007). MM 3.3-3 Prior to the Issuance of the first demolition and/or grading permit, the Applicant shall ensure that pile foundations or other appropriate design be incorporated into the project design to mitigate potential settlement hazards and liquefaction beneath the proposed structures. MM 3.3-4 Prior to the issuance of building permits, the Applicant shall submit a project design to ensure that any proposed subterranean portion of the structures are waterproofed and designed and installed to resist hydrostatic pressures associated with the shallow groundwater table in the area. HAZARDS AND HAZARDOUS MATERIALS Significant Impact Demolition and/or renovation of existing structures have the potential to expose workers to asbestos -containing materials. kwoiewWwuw+sawnpsceummc S Findings ofFecl and Slelament o/ Ovemtlmg Considerations WYntlhsm anullaoe HnfalMgh-Rlae Realdenfial Roj t Final EIR No. 1054 Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts In Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by adoption of the following mitigation measure, as identified in the Final EIR. Mitigation Measure MM 3.9-1 All asbestos-related work, including demolition and renovation, shall be performed by a licensed Asbestos -abatement Contractor under the supervision of a certified Asbestos Consultant. Asbestos shall be removed and disposed of in compliance with notification and asbestos -removal procedures outlined"in South Coast Air Quality Management District Rule 1403 to reduce asbestos-related health risks. HYDROLOGY AND WATER QUALITY Significant Impact Site development could introduce pollutants into storm water runoff during construction and operation of the project. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by inclusion of the following project design feature and adoption of the following mitigation measures, as identified in the Final EIR. Proiecl Design Feature PDF 3.4-1 The Water Quality Management Plan (WQMP) prepared for the proposed project includes the following project -specific water quality Best Management Practices (BMPs) which shall be implemented as part of the project: Site Design BMPs a Permeable surface area has been kept the same as the existing condition. • Drive aisle has been minimized to least acceptable dimension for Fire Access and access to the proposed truck dock. aW,gagsGwla101ePlMrqs09twiex 10 Findings o/Fad and Slalenrenl of Ovemding Considerations Wyndham 6oufpue Hof V ,gh-Rhie ReddenImf Pm*d FMaf EIR No. 1054 • All areas available for landscaping have been utilized. Planter boxes will also be included on the design of the top story of the parking structure to help minimize impervious surfaces. • All parking is within a structure and covered. Non-structural Source Control BMPs • Homeowner -Tenant education, activity restriction, common area landscape management, BMP maintenance, Title 22 CCR Compliance, local water quality permit compliance, uniform fire code implementation, common area litter control, employee training, housekeeping of loading docks, catch basin inspection, street sweeping of private streets and parking lots. Routine Structural BMPs • Storm drain stenciling and signage, proper trash storage and loading dock design, efficient irrigation, and landscape design. Treatment Control BMPs • CONTECH StormFiker will be used in the three on-site manhole installations. • Media filters will be used in the CONTECH Storm Filters. Mitioation Measures MM 3.4-1 Prior to the issuance of grading permits, the Applicant shall verify that structural BMPs have been permanently incorporated into the project plans. Such BMPs shall ensure that pollutants from project -related storm water runoff are mitigated consistent with applicable State and local standards. MM 3.4-2 The Applicant shall assume all BMP inspection and maintenance responsibilities for the project. The Property -owners Association (POA) fees will provide the funding mechanism for long-term BMP maintenance. MM 3.4-3 Prior to the Issuance of any grading permits, the Applicant shall submit to the Development Services Department for review and approval a WQMP that: • Addresses site design BMPs such as minimizing impervious areas, maximizing permeability, minimizing directly connected impervious areas, creating reduced or "zero discharge" areas, and conserving natural areas; • Incorporates the applicable Routine Source Control BMPs as defined in the DAMP; • Incorporates Treatment Control BMPs as defined in the Drainage Area Management Plan (DAMP); • Generally describes the long-term operation and maintenance requirements for the Treatment Control BMPs; k8iaa[eK.wiaW1PF•WnA�11 Rodings of Fed and 5lefemenl of oma dMg cwsidem.. Wyndham 6ouflgue HarelMlgh-Rise Resldenhal Pryecf Final SR Ho. 1054 • Identifies the entity that will be responsible for long-term operation and maintenance of the Treatment Control BMPs; and • Describes the mechanism for funding the long-term operation and maintenance of the Treatment Control BMPs. Sionlficant Impact The project site could be subject to erosion during grading and construction activities, resulting in transport of sediments off the site via storm water runoff. Finding Changes or akerations have been required In, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by inclusion of project design feature PDF 3.4-1 (listed above) and adoption of the following mitigation measures, as identified in the Final EIR. Mitigation Measures MM 3.4-4 Prior to the issuance of grading permits, the Applicant shall demonstrate that coverage has been obtained under California's General Permit for Storm Water Discharges Associated with Construction Activity by providing a copy of the Notice of Intent (NOI) submitted to the Regional Water Quality Comml Board (RWQCB) and a copy of the subsequent notification of the issuance of a Waste Discharge Identification (WDID) Number. The Applicant shall prepare and implement a Storm Water Pollution Prevention Plan (SWPPP). A copy of the current SWPPP shall be kept at the project site and be available for review on request. MM 3.4-5 Prior to Issuance of building permits, the Applicant shall provide proof of an NPDES permit from the RWQCB—consistent with Order No. R8-20040021 and NPDES No. CAG998002—to the City of Costa Mesa for dewatering activities. Significant Impact Project implementation would not alter the volume of storm water draining from the project site; however, it would contribute storm flows to an already deficient system. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by inclusion of the following project design feature and adoption of the following mitigation measures, as identified in the Final EIR. Rwgwincwuwfasinenxwexesr.a: 12 Findings aFes1 aM 51e(emanr of Ovenidbig Consklamlb s K" mBanta eHdok%gh-Rise Re&dantial Ptapd Final EIR No. 1054 Prolect Design Feature PDF 3.4-2 Prior to approval of the first mass grading plan, the Applicant shall submit a Proposed Storm Drain Improvement Plan to the Public Services Department for review and approval. The plan shall demonstrate substantial conformance with the Orange County Hydrology Manual for design of lateral storm drains and catch basins. Proposed storm drain improvements include: Line "A' — One new catch basin is proposed and the relocation of an existing catch basin to accommodate widening and re -alignment of the on-site drive aisle. Line °B" — No new facilities are proposed. The Line B system will drain to an existing lateral located on the northern side of the properly or directly to an Avenue of the Arts lateral. The tie-in location will be decided as building plans progress. • Line "C" — One new Avenue of the Arts storm drain connection is proposed to drain the southern portion of the site. The new line will include two on-site inlets. Mitigation Measures MM 3.4-6 Prior to the issuance of grading permits, the Applicant shall prepare drainage plans for the Public Services Department's review and approval. The Drainage Plan shall define the exact size and location of drainage facilities, and shall address standing water on the project site during project grading. MM 3.4-7 Prior to the issuance of grading permits, the Applicant shall pay drainage impact fees. The Project Developer shall be responsible for the drainage impact fees that are in place at the time grading permits are issued. LAND USE AND PLANNING Significant Impact Project implementation, as conditioned, would be consistent with the City's General Plan and the North Costa Mesa Specific Plan and no amendments to the Zoning Code would be required. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, standard conditions of approval, as identified in the Final EIR, have been incorporated into the project to ensure that development is consistent with the City's land use development policies. a W,WbYb"twhenp2QlY . 13 Fln&ngs or Fad and Slafemenl of Ommding ConsidenWons Wyn h. Bouhque HdOHigh-Pose Standard Conditions SC 3.1-1 Master Plan approval Is contingent upon City Council final approval of General Plan Amendment GP -06-03 and North Costa Mesa Specific Plan Amendment SP -07-01. Master Plan approval shall not become effective until these other discretionary approvals are final and become effective. SC 3.1-2 Prior to site plan approval, the Applicant shall submit to the Planning Division, for review and approval, project plans that comply with the Development Standards as set forth in the North Costa Mesa Speck Plan and Zoning Code. In addition, all site development shall be subject to all standard conditions of approval imposed by the City. NOISE SlaniFlcant Impact Construction noise could be a nuisance to nearby land uses, although it would be temporary and is exempted by the City's Noise Ordinance; therefore, it was not identified as a significant impact. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, the following standard conditions of approval, as identified in the Final EIR, have been Incorporated into the project to minimize construction noise. Standard Conditions SC 3.7-1 The City of Costa Mesa Noise Ordinance exempts several categories of noise sources—Including construction activities—which take place between the hours of 7:00 AM and 8:00 PM, seven days a week. SC 3.7-2 The Applicant shall prepare a truck route plan for review and approval by the City of Costa Mesa Transportation Services Division prior to the approval of the construction access permit. The truck route plan shall preclude truck routes through residential areas, including Avenue of the Arts north of the project site and Sunflower Avenue. The total truck trips to the site shall not exceed 200 trucks per day (i.e., 100 truck trips to the site plus 100 truck trips from the site). Significant Impact Activities and equipment on the project site, including parking lot activity, delivery trucks, and mechanical equipment, may significantly impact off-site residences with project implementation. Traffic generated by the proposed project would not result in a significant Impact to off-site land uses. nvyxisruwwtxhprgwexeor.eu 14 Ri d gs o/Fad an Slal.m a OvenRlMg conaitlerelbna Wyndham 6 W ue HofY igh-Rias RealdeWW R.j I Final BR Ro. 1054 Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by adoption of the following mitigation measures, as identified in the Final EIR. Mitigation Measures MM 3.7-1 The Applicant shall submit detailed plans for the parking structure prior to the issuance of a grading or building permit for the structure. Said plans shall be accompanied by an acoustical study prepared by a qualified Acoustical Consultant. The acoustical study shall demonstrate that all feasible sound attenuation in compliance with the Noise Ordinance has been incorporated into parking structure design, including but not limited to brushed driving surfaces (textured), limited openings oriented toward sensitive noise sources, etc. MM 3.7-2 Prior to issuance of the first building permit, a detailed acoustical study using architectural plans shall be prepared by a qualified Acoustical Consultant and shall be submitted to the Planning Division addressing delivery truck/loading dock operations adjacent to residences. The measures described in the report shall be incorporated into the architectural plans for the delivery/truck loading dock area to ensure compliance with the Noise Ordinance. MM 3.7-3 Prior to issuance of the first building permit, a detailed acoustical study using architectural plans shall be prepared by a qualified Acoustical Consultant and shall be submitted to the Planning Division addressing mechanical equipment. This study shall address any mechanical equipment to be sited within 71 feet of off-site residences. The measures described in the report shall be incorporated into the architectural plans for mechanical equipment to ensure compliance with the Noise Ordinance. Significant Impact Proposed residential units may be subject to interior noise levels in excess of 45 CNEI. Finding Changes or alterations have been required in, or incorporated into, the pmject which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by adoption of the following mitigation measure, as identified in the Final EIR. rtwWeuewonew�ssine gsoneo�.mc 15 FMdirgsoffa and&ateorenloi Overrldbp Consldereflona Wyndham Boutique HdeWgh-Rise Residenfiai %Jad Final EIR No. 1054 Mitigation Measures MM 3.7-4 Prior to Issuance of the first building permit, a detailed acoustical study using architectural plans shall be prepared by a qualified Acoustical Consultant and shall be submitted to the Planning Division for all living units on the west side of the residential tower facing Avenue of the Arts. This report shall describe and quantify the noise sources impacting the building(s), the amount of outdoor -to - indoor noise reduction provided by the design in the architectural plans, and any upgrades required to meet the interior noise standards (45 CNEL for residences). Noise standards shall be met with all doors and windows closed. Alternatively, the Applicant can show that based on the building location relative to the roadway and any intervening topography and structures that it meets the appropriate interior noise standard with open windows. The measures described in the report shall be incorporated Into the architectural plans for the buildings and implemented with building construction. The person preparing the report shall, under the direction of a person experienced in the field of acoustical engineering, perform an inspection of the project prior to or at the time of the framing inspection to certify that construction techniques comply with the recommendations within the acoustical analysis. Upon completion of the subject structures, field tests may be required under the provisions of Title 25. PUBLIC SERVICES Significant Impact: Fire Protection The Costa Mesa Fire Department has indicated that the project would result in an increase of service calls to the project area, including an increase in call load, simultaneous responses in the area, building inspections, training, and education regarding the best safe exit and evacuation procedures for tenants living in high rises. The Fire Department has identified this demand would require additional staff and equipment to ensure adequate fire protection services. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by inclusion of the following standard conditions of approval and adoption of the following mitigation measure, as identified In the Final EIR. Standard Conditions SC 3.11-1 Prior to the issuance of building permits, the Applicant shall submit project designs and specifications for review and approval by the Fire Department with respect to compliance with all standard conditions for building design regarding public safety, including but not limited to, fire flow capacity, fire hydrant location, vehicular access, and sprinkler systems. nvmynecui.uoiamm"oeem,da 18 Flntlings or Fecl entl Slelemenf o/ OvenldiM Consid..Wds WpO.h aourqus Hof MQh-Rise ft.Wtl WW P,*d Fmsl EIR ft. 1054 SC 3.11-2 Emergency vehicle parking areas shall be designated within proximity to buildings to the satisfaction of the Fire Marshal. SC 3.11-3 Each project component shall provide sufficient capacity for fire Flows required by the Fire Department. SC 3.11-4 Vehicular access shall be provided and maintained as serviceable, throughout construction, to all required fire hydrants. SC 3.11-5 All high-rise project developments shall be equipped with an automatic fire sprinkler system. SC 3.11-6 The Applicant shall comply with standard building and fire regulations for high- rise buildings to the satisfaction of the Fire Marshal and Building Official. Mitigation Measures MM 3.11-1 Prior to the issuance of building permits, the Applicant shall pay its pro rata share of a new, fully equipped paramedic engine, equal to $469.35 per unit to the Fire Department. Significant Impact: Police Protection The Costa Mesa Police Department has indicated that the project would result in additional service calls based on the projected increase in population (300 persons) and vehicle traffic to the area. Site development would also increase the number of visitors and employees to the project site and surrounding area, thereby generating an increase in service calls during both construction and long-term operation of the project. However, the Police Department has concluded that the project would not significantly impact the project area or require additional staffing levels. However, a significant impact based on the increase in service calls. was identified. Finding Changes or alterations have been required in, or incorporated into, the project, which mitigate or avoid the significant effects on the environment. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant with inclusion of the following standard conditions of approval and adoption of the following mitigation measures, as identified In the Final EIR. Standard Conditions SC 3.11-7 The Applicant shall comply with the Public Safety Radio System Coverage Ordinance (included In the standard building and fire regulations for high-rise buildings) to the satisfaction of the Police Chief. nwo�ecur uaw�rxwa mausm.aoo 17 ftdWso/Fw1md Slslsmenlof Overrltlmg Con&d lbns Wyndham Boutique Hofe4High-Ria. R .ldendel Project F/nal EIR No. 1054 SC 3.11-8 Prior to the issuance of building permits, the Applicant shall submit project designs and specifications for review and receive approval by the Police Department with respect to compliance with all standard conditions for building design regarding public safety, including but not limited to, lighting, address numbers, building standards, live media cameras with direct feed, landscaping, and emergency vehicle parking. SC 3.11-9 Required building address numbers shall be readily apparent from the street, and rooftop building identification shall be readily apparent from police helicopters for emergency response agencies. Mitioation Measures MM 3.11-2 Prior to the issuance of a grading permit, a construction security service shall be established at the construction site. Initially, the service shall ensure that no unauthorized entry is made into the construction area. For the duration of each phase of construction, the Applicant shall provide sufficient on-site security personnel on a 24-hour, 7-day-a-week basis to patrol all areas of construction and to prohibit unauthorized entry. MM 3.11-3 During project construction and operation, the Applicant shall ensure that private on-site security is provided. MM 3.11-4 Prior to issuance of building permits, the Applicant shall pay pro rata shares of fees to the Police Department for the increased service capacity necessary to accommodate the development site, if such a police impact fee program is established. MM 3.11-5 Prior to issuance of building permits, the Applicant shall comply with direct media feeding devices required by the Police Department for increased safety necessary to serve the development site, if such a police program is established. Significant Impact: Schools A total of 26 students would be generated by the project. The project would not result in the need to expand existing or construct new school facilities. No significant impacts would occur. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, the following standard condition of approval, as identified in the Final EIR, has been incorporated into the project to minimize effects on schools. Standard Condition SC 3.11-10 The Applicant shall pay school impact fees. rtwopn.wwa�oixsimnnwezwr.eoc is FMMnge of Fed and Stafso of of O. Ir ng Coneidei.fMn. Wyndham Boutlevs HdeW igh-Rise Reetdentlal SlonHicant Impact: Parks and Recreation The project would result in an increase in use of existing recreational facilities in the city based on the projected increase in population. The City of Costa Mesa has initiated a program to facilitate dedication of parkland and/or payment of in -lieu fees for new development projects to enable development and improvement of City -maintained recreation facilities. Finding Changes or alterations have been required In, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding The significant effect has been eliminated or substantially lessened to a level that is less than significant by inclusion of the following standard condition of approval, as identified in the Final EIR. Standard Condition SC 3.11-11 The Applicant shall pay park impact fees in the amount of $10,829.00 per multi -family unit prior to the approval of the final map by the City Council. TRANSPORTATION AND CIRCULATION Significant Impact The project is estimated to generate 771 new trips per day from the project site, with approximately 33 new trips occurring during the AM peak hour (35 outbound) and 73 new trips occurring during the PM peak hour (50 inbound). The "new' trips represent the net increase in traffic based on consideration of both existing uses that would be removed and new uses that would be developed. The project was determined not to result in significant traffic impacts under any of these analyzed scenarios including the project: Existing Plus Traffic, Short-range Plus Project, or Long-range Plus Project. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, the following standard conditions of approval, as identified in the Final EIR, have been incorporated into the project to minimize traffic effects. Standard Conditions SC 3.5-1 The Applicant shall be responsible for the payment of fees in accordance with the Traffic Impact Fee program. awgeenr u�o,sara,rwmemew is F &VsofFedend Sletementof Oromdmg Conslderet Wyndham Bovlip HWeMlgh-Rise Resitl WWPrged FineIEIRHo 1054 SC 3.5-2 The Applicant shall be responsible for the payment of fees in accordance with the San Joaquin Hills Transportation Corridor Fee Ordinance. Fees shall be paid to the Planning Division prior to the issuance of building permits. SC 3.5-3 The Applicant shall be responsible for complying with the Transportation Demand Ordinance. UTILITIES Significant Impact: Solid Waste Demolition and construction of the project would require disposal of the debris generated, and the additional residences (120 units) are expected to generate 267.8 tons of waste annually. The Orange County Integrated Waste Management District has indicated that adequate capacity for the project is available. No significant impacts would occur. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, the following standard condition of approval, as identified in the Final EIR, has been incorporated into the project to minimize construction solid waste generation. Standard Condition Please refer to SC 3.7-2 under Noise above regarding the requirement for a haul route plan. SC 3.12-1 Prior to the issuance of a demolition/grading permit, the Applicant shall demonstrate to the Public Services Department that all construction waste generated on site would be recycled where feasible as the first choice of disposal method, leaving the option of landfill disposal as a last alternative. Sionificant Impact: Electricity The project would not require construction of electrical distribution facilities beyond those anticipated during the construction period. Implementation of the project would not result in a significant impact on electrical services or facilities. Finding Changes or alterations have been required In, or Incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, inclusion of the following standard conditions of approval and adoption of the following mitigation measure, as identified in the Final EIR, would ensure that necessary facilities are installed during construction and in coordination with affected utility agencies. FWgeaslCOWw1eFIMnWWteol.ds 20 Fmdngs of Faci antl Slelemeel or OveMtlMg Conoltlere ' Wyndham aouWgw Hd.YHgh-Rise Res .MW Pm/enl Final EIR No. 1054 Standard Conditions SC 3.12-2 Prior to the issuance of a demolition/grading permit, the Applicant shall submit grading plans to the Development Services Department that reflect the undergrounding of utilities serving the proposed project site. SC 3.12-3 Prior to the issuance of demolition/grading penults, the Applicant shall coordinate with Southern Calffomla Edison to determine the exact location of all underground and overhead electrical facilities. All electrical facilities and associated structures that will remain on the project site shall be protected from damage by the Applicant. Mitigation Measure MM 3.12-1 Prior to the initiation of project grading, the Applicant shall ensure that all existing utilities shall be relocated, abandoned, and removed, rerouted, or protected in coordination with the Applicant and affected utility companies. Sionificant Impact: Electricity The project would be consistent with applicable goals and policies and governing regulations regarding energy use and efficiency. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, the following project design features identified in the Final EIR has been incorporated into the project to increase energy conservation. Project Design Feature PDF 3.12-1 The project assumes the implementation of the following energy conservation actions: • The use of drought tolerant planting • Reduced water consumption • Optimize energy performance beyond Title 24 • Compliance with ASHRAE 55-1992/2004 • Storage and collection of recyclables • Construction waste management to salvage and recycle • Use of recycled building materials • Use of low -emitting materials • Use of locally manufactured materials awm�xnroww+armnawazem.aoc 21 Fa ngaofFadmdSlalemenlof Cwe ing ConaMerWlona Wyndham Boutique HoteMigh-Rise Residential Pnyad Rnai EIRAb. 1050 • Use of carbon dioxide monitoring • Use of indoor air quality management plan during construction • Minimum 50 percent drought tolerant planting to reduce water consumption. • Low flow drip irrigation system to mitigate water runoff and water loss • Smart irrigation controllers to alter irrigation timing and flow due to weather and wind patterns • Areas of pervious concrete to absorb stone and irrigation water runoff • Minimal use of turf— Use turf block in turf areas to help with drainage • Rainwater collection system for irrigation reuse • Using bioswale planters on the pool deck to filter/store rain water • Salt water pool — minimal use of chemicals • Solar heating for swimming pools • Alternative Fueling Facilities — Parking garage to have electric vehicle recharging stations • Green roof planting at top of residential tower between decks to collect storm water Sianificant Imoact: Natural Gas The project would not require construction of natural gas distribution facilities beyond those anticipated during the construction period. Implementation of the project would not result in a significant impact on natural gas services or facilities. Finding Changes or afterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, inclusion of the following standard condition of approval and adoption of the following mitigation measure, as identified in the Final EIR, would ensure that necessary facilities are installed during construction and in coordination with affected utility agencies. Standard Condition SC 3.12.4 Prior to the issuance of a demolition/grading permit, the Applicant shall - coordinate with the Southern California Gas Company to determine exact locations of all underground natural gas facilities. The Applicant shall ensure that all remaining gas pipelines and associated structures on the project site shall be protected from damage. 22 Findings of Fed and Statement of ovegVeq, Consdererrons Wyndham aoutque R (&Wigh-Rise RewIenrul Ptojeat Final EIR na ION Mitigation Measure MM 3.12-1 Prior to the initiation of project grading, the Applicant shall ensure that all existing utilities shall be relocated, abandoned, and removed, rerouted, or protected In coordination with the Applicant and affected utility companies. Significant Impact: Natural Gas The project would be consistent with applicable goals and policies and governing regulations regarding energy use and efficiency. Finding Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, the following project design feature identified in the Final EIR have been incorporated into the project to increase energy conservation. Proiect Design Feature See PDF 3.12-1 above. Sianiffcant Impact: Cable Television The project would not require construction of cable television facilities beyond those anticipated during the construction period. Implementation of the project would not result in a significant impact on cable television services or facilities. Finding Changes or alterations have been required In, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, inclusion of the following standard condition of approval, as identified in the Final EIR, would ensure that necessary facilities are installed during construction and in coordination with affected utility agencies. Standard Condition SC 3-12-5 Prior to the issuance of a demolition/grading permit, the Applicant shall coordinate with Time Warner Cable to determine exact locations of all underground cable facilities. The Applicant shall ensure that all remaining cable lines and associated structures on the project site shall be protected from damage. Rvmp,.wmawisruwgwam7e 23 Findings ofFacf amt SYatemmt of Overriding Conslderefbna Wyndham Boufque Hot&MQh- iso Res&ngel Pro d Roal EIR Ho. 1054 Significant Impact: Telephone The project would not require construction of telephone facilities beyond those anticipated during the construction period. Implementation of the project would not result in a significant impact on telephone services or facilities. Finding Changes or alterations have been required In, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR. Facts in Support of Finding Although no significant impacts have been identified, inclusion of the following standard condition of approval, as identified in the Final EIR, would ensure that necessary facilities are installed during construction and in coordination with affected utility agencies. Standard Condition SC 3.12-6 Prior to the issuance of a demolition/grading permit, the Applicant shall coordinate with AT&T California to determine exact locations of all underground telephone facilities. The Applicant shall ensure that all remaining telephone lines and associated structures on the project site shall be protected from damage. 4.2 SIGNIFICANT UNAVOIDABLE IMPACTS The potentially significant impacts identified in Final EIR No. 1054 that cannot be mitigated to less than significant levels through the implementation of project design features, standard conditions of approval, and/or mitigation measures are set forth in this section and include: aesthetics (shade and shadow); air quality; and public services (library services). This section also sets forth the City's findings with respect to each of the significant impacts, the facts in support of those findings, and those changes and alterations that have been made to the project to reduce significant effects to the maximum extent practicable. In accordance the State CECIA Guidelines §15093, a Statement of Overriding Considerations has been prepared to substantiate the City's decision to accept these significant unavoidable adverse environmental impacts because of the benefits afforded by the proposed project. Following is a discussion of the significant impacts of the project that cannot be mitigated to a level considered less than significant. AESTHETICS Significant Impact The project would cast some degree of shadow on 100 to 120 residential units in The Lakes at South Coast apartment community between the hours of 10:00 AM and 3:00 PM for 5 hours, as modeled for the Winter Solstice. Findings Specific economic, legal, social, technological, or other considerations, including considerations for the provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or alternatives identified in the environmental impact report. rtwgsis .tatx enasmzmzex 24 Fiodngs of Fact ext Slalemenlo( Ovemddg cons rofions WyM . Boutique HdeNigh-Rise Realdential PmJegl Fhal EIR No. 1054 There Is no feasible mitigation available to avoid or substantially lessen the significant environmental effect, as identified in the Final EIR. This impact would remain significant and unavoidable with project implementation. Additionally, the alternative that would reduce this impact (the No Development Alternative) would not meet the project objectives. As described in the Statement of Overriding Considerations, the City has determined that these impacts are acceptable because of specific overriding considerations. AIR QUALITY Significant Impact Short-term, construction -related pollutant emissions of nitrogen oxides (NOx) and reactive organic gas (ROG) associated with demolition and painting, and asphalt paving (respectively) would exceed the South Coast Air Quality Management Districrs (SCAQMD) significance thresholds. Findings Changes or alterations have been required in, or incorporated into, the project, which substantially lessen the significant environmental effect as identified In the Final EIR. Specific economic, legal, social, technological, or other considerations, including considerations for the provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or alternatives identified in the environmental impact report Implementation of the mitigation program would minimize emissions to the maximum extent feasible; but short-term construction -related emissions would exceed SCAQMD thresholds resulting in a significant and unavoidable impact. Facts in Support of Finding The significant short-term effect has been substantially lessened but cannot be reduced to a less than significant level with inclusion of the following standard condition of approval and adoption of the following mitigation measures as identified in the Final EIR. Standard Condition SC 3.6-1 During construction of the proposed project, the Applicant and its Contractors shall be required to comply with SCAQMD Rules 402 and 403, which shall assist in reducing short-term air pollutant emissions. SCAQMD Rule 402 requires that air pollutant emissions not be a nuisance off site. SCAQMD Rule 403 (Tables 1, 2, and 3 of Rule 403) requires that fugitive dust be controlled with the best available control measures so that the presence of such dust does not remain visible in the atmosphere beyond the property line of the emission source. This requirement shall be included as notes on the Contractor Specifications. Mitigation Measures MM 3.6-1 During construction and grading activities, the Applicant shall comply with measures set forth in the Storm Water Pollution Prevention Plan (SWPPP) to ensure that airborne dust is kept to a minimum. angaisrusmw,arm,a:oezm,as 25 F Inp of Fad end alelen lof Oven wConsiderations Wyndham Boutique t foteWgh-Rise Remi nflel Prcyeof Flnel EIR No. 1054 MM 3.6-2 Prior to commencement of constmction activities, the Applicant shall identify to the Development Services Department, a Construction -Relations Officer to act as a community liaison concerning on-site activity, Including resolution of issues related to dust generation from grading/paving activities. MM 3.6-3 Prior to approval of grading plans, the Applicant shall include the following notes on the Contractor Specifications submitted for review and approval by the Development Services Department: To reduce construction equipment emissions, the following measures shall be implemented when feasible: • Use low -emission mobile construction equipment. The Property Owner/Developer shall comply with California Air Resources Board (CARS) requirements for heavy construction equipment. • Maintain construction equipment engines by keeping them tuned. • Use low sulfur fuel for stationary construction equipment. This is required by South Coast Air Quality Management District (SCAQMD) Rules 431.1 and 431.2. • Use existing power sources (i.e., power poles) when available. This measure would minimize the use of higher polluting gas or diesel generators. • Configure constriction parking to minimize traffic interference. • Minimize obstruction of through -traffic lanes. Construction should be planned so that lane closures on existing streets are kept to a minimum. • Schedule construction operations affecting traffic for off-peak hours to the greatest extent practicable. • Develop a traffic plan to minimize traffic flow interference from construction activities (the plan may include advance public notice of routing, use of public transportation and satellite parking areas with a shuttle service). Several types of advanced emissions control technologies were considered (such as the use of aqueous diesel fuel) but are currently not commercially available. Aqueous diesel fuel reduces formation of nitrogen oxides (NOx) by reducing combustion temperatures, which results In lower NOx emissions. According to the SCAQMD, the current availability of this fuel technology is limited, and it may not be available for use before the project terminates construction. In addition, with exhaust gas recirculation diesel engines, a small amount of hot exhaust gas Is routed through a cooler and is mixed with fresh air entering the engine. The exhaust gas helps reduce the temperature during combustion, which lowers the formation of thermal NOx. Exhaust gas recirculation technology is in the development phase and has not been fully commercialized. To the extent that the advanced emissions control technologies awq.c,slcowwxmugsaxeoi.aoc 26 FM&gs of Feaf and Stalenrenl or Ovmdmg consdenroons Wyndham Boutique HoleUHgh-Rise Residedld Pr*d Final EIR No. 1054 become reasonably commercially available or are required by the CARB for Grading Contractors, such advanced emissions -control technologies shall be used. MM 3.6.4 Reduce ROG emissions from painting activities. Painting activities from the project would result in a significant air quality impact. The following measures should be implemented when feasible. Prior to issuance of the first building permit, the Applicant shall provide evidence to the Development Services Development that the following measures shall be incorporated into project construction to the greatest extent feasible and the following measures should be provided as notes on the Contractor Specifications: • The project shall comply with SCAQMD Rule 1113, which limits the ROG content of architectural coatings used in the South Coast Air Basin or shall allow the averaging of such coatings, as specified, so that actual emissions do not exceed the allowable emissions H all the averaged coatings had complied with the specified limits. • Use high transfer efficiency painting methods such as HVLP (High Volume Low Pressure) sprayers and brushestrollers where possible. PUBLIC SERVICES Significant Impact: Library Services The project's increased demand for library services in the City of Costa Mesa, based on the projected population increase, would be individually less than significant but cumulatively significant. Findings Changes or alterations have been required in, or incorporated into, the project, which substantially lessen the significant environmental effect as identified in the Final EIR. Implementation of the mitigation program would minimize cumulative impacts on the City of Costa Mesa's library services to the maximum extent feasible, but the project's contribution to cumulative demand for libraries would remain a signfcant and unavoidable impact. Facts in Support of Finding The significant cumulative impact has been substantially lessened but cannot be reduced to a less than significant level with inclusion of the following standard condition of approval, as identified in the Final EIR. Standard Condition SC 3.11-12 Prior to issuance of building permits, the Applicant shall pay a library services impact fee for the development costs for expanded or new library facilities pursuant to the Library Services Impact Fee Program, 'd such a program is established. ewmpencweuorsn,c„�osm+.eac 27 Fmdingsof FadwdStdemenfof Ove ing Considerations Wyndham Boutique Hdoi4figh-Rise Residenfiel Pnyed Final EIR No. 1054 5.0 FINDINGS REGARDING ALTERNATIVES TO PROPOSED PROJECT Section 15126.6 of the CEQA Guidelines requires that an EIR analyze a reasonable range of alternatives, and that the project alternatives should be capable of avoiding or substantially lessening of any of the significant project effects. The Final EIR identified three impacts that could not be mitigated to a level that is less than significant: 1. The project would cast a shadow on the adjacent sensitive residential land use (the Lakes at South Coast apartment community) for five hours during the Winter Solstice. 2. Short-term air quality impacts during construction related to grading and demolition (NOx) and painting and asphalt paving (ROG). 3. Cumulative impacts to the City of Costa Mesa's library services. The Final EIR analyzed the following two alternatives that would be capable of reducing or avoiding significant project impacts: the No Project/No Action Alternative and the Design Alternative. 5.1 NO PROJECTINO ACTION ALTERNATIVE DESCRIPTION The No Project/No Action Alternative assumes the retention of the site in its existing condition. The 3 -acre project site is currently developed with a 238 -room hotel with meeting facilities and a restaurant. Adjacent to the hotel, there is a 3 -level, 240 -space packing structure. On-site vegetation is limited to ornamental species associated with landscaping at the building perimeters. Therefore, the No Project/No Action Alternative assumes retention of the project site as a hotel facility. Findings The City finds that specific economic, legal, social, technological, or other considerations make the No ProjectlNo Action Alternative infeasible. The No Project/No Action Alternative would avoid potential impacts resulting from the proposed project. However, with the exception of short -tens air quality impacts, shade and shadow impacts, and a cumulative contribution to library service impacts, all proposed project impacts would be less than significant or mitigated to a level considered less than significant. This alternative would preclude significant unavoidable impacts related to shade and shadow effects, short-term air quality impacts, and cumulative impacts to library services. Because no new development would be implemented on the project site under this alternative scenario, no additional funds would be collected to upgrade the storm drain system. This alternative would not meet the Applicant's project objectives for the Wyndham Boutique Hotel/High-Rise Residential Tower site, as listed below, • Reposition the existing hotel into a boutique -style hotel, in line with the boutique hotels of Los Angeles, San Francisco, and New York. • With a boutique hotel operator at the site, reinforce the existing and proposed high quality development in the South Coast Metro area including the Segerstrom Center for the Arts and South Coast Plaza. avmpaecw,awnarwasaezeoz.eoc 29 Flnniep of Fad aM statement of otemlding consdenatide, wpdham aauffgus H&.Mlgh-Rise Residanfiaf ProjsW rinw EIR No. 1054 • Increase Transient Occupancy Tax (TOT) to the City with increased room rates and revenues on an annual basis. • Enhance pedestrian connectivity between the proposed project and the Segerstrom Center for the Arts with creative streetscape and landscaping. • Provide high-rise residential units for homeownership proximate to the major employment, retail, cultural, and arts uses of South Coast Town Center. • Provide diverse land uses that fit within the infrastructure capacity of the Costa Mesa 2000 General Plan and provide new and innovative planning. • Expand pedestrian activity along Avenue of the Arts and increase accessibility to the Performing Arts Center. • Exhibit excellence in architecture, landscaping, public art, outdoor/indoor amenities, technology, public access and circulation, and land use in a culturally advanced and dynamic City. • Construct a world-class, boutique hotel defined by its luxurious accommodations, architectural design, and affluent clientele. The boutique hotel differentiates itself from larger chain/branded hotels and motels by providing personalized level accommodation, recreational amenities, and services/facilities. CONCLUSION The City hereby finds that specific economic, social, or other considerations make this alternative infeasible. The project altemative does not meet any of the project objectives. 5.2 DESIGN ALTERNATIVE DESCRIPTION The Design Alternative assumes the renovation of the existing six -story Wyndham Hotel. As with the proposed project, the number of hotel rooms would be reduced from 238 to 200; the hotel entrance would be relocated; the hotel lobby, restaurant, and rooms would be renovated; and a spa would be constructed within the hotel. Additionally, the Design Alternative assumes that the existing hotel parking structure would be demolished and a mid -rise, 12 -story residential tower would be constructed in its place. The mid -rise residential tower is assumed to have 66 dwelling units compared to 120 units associated with the proposed project. A new parking structure just east of the proposed residential tower would be constructed to serve the hotel and mid -rise structure. Findings The City finds that specific economic, legal, social, technological, or other considerations make the Design Alternative infeasible. Based on the anticipated characteristics of the Design Altemative, all impacts would be similar to, or less than, the proposed project. This alternative would reduce but not eliminate unavoidable shadow impacts. Specifically, the reduced height (from 23 stories to 12 stories) would result in Winter Solstice shadows affecting 70 to 80 dwelling units (du) rather than 100 to 120 du. Similar to the proposed project, the Design Alternative would still result in significant short-term air quality emissions over established zwq:isrwaw+sn+a ywe Mft 29 Findings or FW a Sfafemanf or O riM6ig ConslderafPo s Wrdham aoulque HWe @h-Rlse ReWenhal Rood F WEIR%.. 1054 SCAQMD's thresholds even after mitigation. Cumulative impacts to library services would be reduced commensurate with the reduction in dwelling units under this alternative. This alternative would not meet one of the nine identified project objectives. Specifically, development of this alternative would not provide a high-rise residential project close to the major employment, retail, and cultural arts uses of South Coast Town Center. CONCLUSION The Design Alternative would lessen but not eliminate the unavoidable impacts identified for the proposed project. The City hereby finds that specific economic, social, or other considerations make this alternative infeasible for the following reasons: • The Design Aftemative would not substantially reduce or eliminate the unavoidable impacts to aesthetics, air quality, or library services that would occur with the proposed pmject. • The Design Alternative would not provide a high-rise residential project close to the major employment, retail, and cultural arts uses of South Coast Town Center. a]PyxbY.oa.WlaAVR,eoaNBerAw 30 Flnfts of Fad Md SlalemeM of omm gConsltlem5ons Exhibit "C" Statement of Overriding Considerations Mitigation Monitoring Program Wyndham 9 fque HWBMlgh-Rise Re�WW Retied %81 EIR ft. tom STATEMENT OF OVERRIDING CONSIDERATIONS 1.0 SIGNIFICANT ENVIRONMENTAL EFFECTS WHICH CANNOT BE AVOIDED IF THE PROPOSED PROJECT IS IMPLEMENTED The proposed project, as described in Final EIR No. 1054, will have significant unavoidable impacts in the areas of air quality, aesthetics, and public services, as described in the Statement of Facts and Findings and summarized below. • Air Quality (Short -Term Impact) — Pmject emissions from construction activities would exceed the South Coast Air Quality Management District's (SCAQMD) thresholds of significance for NOx and would expose sensitive receptors to these pollutants. Therefore, NOx construction emissions would exceed SCAQMD's thresholds after mitigation and short-term construction air quality impacts would remain significant and unavoidable. • Air Quality (Short -Term Impact) — ROG emissions associated with painting and asphalt paving would exceed the SCAQMD's thresholds of significance. Therefore, ROG emissions would exceed SCAQMD thresholds after mitigation, and short-term construction air quality impacts would remain significant and unavoidable. • Air Quality (Cumulative Impact) — the proposed project's impacts associated with the excesdance of the SCAQMD's NOx and ROG thresholds would be considered cumulatively significant. Mitigation would reduce these pollutant emissions but not to a level below SCAQMD's thresholds. Therefore, cumulative air quality impacts would remain significant and avoidable. Aesthetics (Long -Term Impact) — The proposed project would cast a shadow on adjacent sensitive uses between the hours of 10:00 AM and 3:00 PM for more than 3 hours during the Winter Solstice. Therefore, the established aesthetics threshold of significance would be exceeded and this impact would be considered significant and unavoidable. Library Services (Cumulative Impact) — All libraries in the City are operated by the Orange County Public Library (OCPL). The OCPL sets a standard of 0.2 square feet (sf) per capita of library space. The 2000 General Plan EIR states that library services impacts through Year 2020 are considered less than significant despite the fact that the city currently does not meet the OCPL standard. Using the OCPL ratio and the projected Year 2025 population of 128,483 people, the City would need to have 25,697 sf of library space to serve the projected residential population. The city currently has approximately 16,360 sf of library space. Therefore, along with the reasonably foreseeable high-rise residential projects in North Costa Mesa, the proposed project would result in a cumulatively significant impact on the library system. The Final EIR has identified all feasible project design features, standard conditions of approval and/or mitigation measures with respect to the above Impacts. Although these mitigation measures may substantially lessen these significant impacts, adoption of the measures will not fully avoid the impacts. As a result, to approve the project, the City must make a Statement of Overriding Considerations pursuant to State CEQA Guidelines §15043 and §15093. This Statement of Overriding Considerations allows a lead agency to determine that a project's general economic, xp,y.mcow�mss"mpmxm�.mc 31 F dngsofFadand Stafvmenld OverMing ConsMmdfons Wyndham Bwligw HdoMigh-Rim Residendal Pm)od R eEIR No. 1054 social, or other benefits justify choosing to approve a project despite the occurrence of specified significant environmental effects that cannot be avoided. The Statement explains why, in the City's judgment, the project's benefits outweigh the unavoidable significant effects. CEQA does not require lead agencies to analyze beneficial impacts in an EIR. Rather, an EIR focuses on potential significant impacts on the environment, defined to be adverse impacts (Public Resources Code §21068). However, these benefits can be cited, if necessary, in a Statement of Overriding Considerations (CEQA Guidelines §15093). 2.0 IDENTIFIED PUBLIC BENEFITS The City, in its review and consideration of the proposed Wyndham Boutique Hotel/High-Rise Residential Project and in consideration of the significant unavoidable impacts in the areas of air quality, aesthetics and library services, hereby finds that the following public benefits of the proposed project override the above -referenced Unavoidable Adverse Impacts: 1. The City of Costa Mesa, through its General Plan, has established population and housing projections for growth in the city. The city's nearly built -out status results in the need to provide alternative housing styles to accommodate the lack of available vacant land. This project would result in the development of 120 residential units in the city's South Coast Plaza Town Center area; an area where residential development was not previously anticipated. 2. The hotel component included in the proposed project increases the Transient Occupancy Tax (TOT) revenues for the city with increased room rates and annual monetary gain. The hotel component would also add to the vitality and viability of the Wyndham Boutique Hotel/High-Rise Residential project as a successful mixed-use development in the city. 3. The project creates a unique housing type targeted to urban professionals. It will complement the existing cultural and entertainment arts venues at the South Coast Plaza Town Center and reinforce the identity of this premier urban center as a world- class, major destination point for the arts in southern California. 4. The project creates a world-class boutique hotel which will be the first of its kind in the city. The boutique hotel will be defined by its luxurious accommodations, architectural design, and affluent clientele which will differentiate itself from existing hotels in the South Coast Plaza area. This boutique hotel reinforces the City's goal of providing diverse land uses. 5. The project provides new ownership housing opportunities that improve the jobs -to - housing ratio in the city and increase the number of owner -occupied housing units in the city's housing stock. Additionally, the proposed project would meet the housing needs of the high-income segments of the community. 6. The North Costa Mesa Specific Plan supports and encourages high intensity mixed use developments such as the proposed pmject. Additional residential development in this established urban area of the city contributes to a more sustainable urban community with a diverse base of mixed uses. aw,}uravumwlm:,o.u¢emmc M Flndinga or Fed amt Sldemenf of Omiddfng C..de .l Wyndham Boutique HdetMoh-Hbe Hesde W 7. The City is desirous of providing high-rise residential projects within proximity to the major employment, retail, and cultural center of North Costa Mesa, in accordance with the city's infrastructure capacity. Such development would enhance the city's urban core and provide high-rise residential dwelling units that would appeal to a wide range of potential residents. B. The recent trend of high-rise residential development within key areas of Orange County has confirmed the general public's acceptance of urban Irving environments in limited areas. This type of development allows the city to exhibit urban architectural and landscaping styles, utilizing state-of-the-art technologies that reinforce the area's image of a dynamic city center. 9. The EIR traffic study concluded that the proposed residential, retail, and commercial uses are within the development capacity of the roadway network. The project generally Involves demolition of an existing parking structure, renovation of an existing hotel, and construction of a new parking structure and high-rise residential condominium building with ancillary commercial/retail uses. Therefore, the project contributes new housing in the community at a level no greater than that which can be supported by planned infrastructure improvements. 10. The Developer of the proposed project shall pay pro -rata shares of a new fully equipped paramedic engine for the Costa Mesa Fire Department. The Developer shall also be responsible for any library or police impact feels) if such fee program(s) are in place prior to issuance of building permits. This fee revenue would contribute to offsetting the cost of the provision of public services to the proposed project. 3.0 CONCLUSION The City finds that there are specific considerations associated with the pmject that override and outweigh the project's significant environmental impacts and the existence of any environmentally superior alternative that meets some of the project's objectives. Therefore, the project's unavoidable environmental impacts and the City's decision not to adopt the environmentally superior alternative are considered acceptable and in compliance with State law. evrvNnacw�uuo+umnpweuor.mc 33 F &d p or Fad end Stetemeda Over .g considmetmns