HomeMy WebLinkAbout1765 SANTA ANA AVE - Building Permits (12) • BY' DATE \T \ .. SI IEET NO. OF - ry
N
CHECKED BY: DATE • F`C W JOB NO. i II
} m
ERCT. DUAN. TRAP WASTE T.W.U. C.W. TCWU H.W. TIIWU II.W. TOPH T1EMAT1KS ^�
SIZE UNITS LUNITS UNITS O.P.II. 1 i
W.C. (F.V.) tNT. G 10
e PNI „�
W.C. (F.T.) t% 3 INT. 2 �` p
0
LAV (PUB) 1-1/4" 1 2
LAV (PVT) e 1-1/4" 1 I g
U INT. 2 S
6- 1'1/4" I
,..2„.............< 8
C.WSHR ..4 1-1/2" 2 4 2j (CA
SHWRS. 1-I/2" 2 _ /
2
DT. CO 1-1/2" 2 4 2 12
8K. 4— 1-1/2" 2 2- g
148 . 3 CO -.
I
TOTAL. , ^€i�-A':i;� . 3 4r l.:i�lti� 1--'y� 1r..?;;15.n: I f imi,'".f, I 1 +?,.. � _ ' i.'a: -
•
. . 8l-4::e. 1✓ SY
FTS ovv N 1 (lI-• wcr-Ar i==.. •
11-07-1997 9, 15AM FROM F 9
4*Cit II
•
• TRI-11 ENVIRONMENTAL SERVICES, INC.
. Engineering 8 Environmental Services
Memo
To: Joe Sanfilippo
From: Judy Homer
CC: Ken Pruett
Due: September 29, 1997
Re: Final Clearance Building 09
This memo is to confirm that final clearance air samples for the asbestos abatement in Building 09 were collected
on Au piss 7, 1997. Air samples were analyzed in general accordance with the National Institute for
Occupational Safety and Health(NIOSH) Method 7400. This method describes air sampling parameters and
a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400
describes a procedure which provides results that Indicate approximate concentrations of any type of airborne
particulate matter which meet specified asprc.t ratio and size criteria. Particulate matter which meas the
specified criteria are classified as fibers. The method does nut count all fibers in all size ranges nor does it
differentiate asbestos fibers from other types of fibers. PCM analysis of air samples wa performed at Tri-
H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met
final air clearance criteria were collected and analyzed in general accordance with the Environmental
Protection Agency's (EPA) Recommended clearance criterion of 0.01 f/cc.
Based on the laboratory results and our visual observations, this building is able to be occupied without respiratory
puteaion. If further asbestos abatement is performed in this building Tri-H should be notified to maniple the air
• • r to occupancy of the area.
A.. �r
• AES c9 6
/Judith L. Hower Q.' �'c
Rmcipal Engineer cwi: APR 0 1 1998 X
NO.93-0930
STATE Of GP
7007 Greenleaf Avenue, Suite 203 • Whittler, CA 90602 • Tel: 562-464-2420 • Fax: 562.464-2422
8-14-1997 6:08AM FROM P. 7
08-13-91 05:45PM FROM P08
9
TRI-H ENVIRONMENTAL SERVICES, INC. T��T
�H EEng/nearing a Environments,Services
Memo
ToJoe SCdILPPo
From: Judy Hover
CC: Ken P[uctt
Dae: August 13. 1997
Re: Final Clearance Building N9-Drywall Installation
• This memo is to confirm that final clearance air samples for the drywall installation in Building S9 were collected
on August 7. 1947. Au samples were analyzed in general accordance with the National institute for
Occupational Safety and Health(NIOSH) Method 7400. This method describes air sampling parameters and
a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400
describes a procedure which provides results that indicate approximate concentrations of any type of Stint
particulate matter which meet specified aspect ratio and size criteria. Particulate matter which meets the
specified criteria are classified as fibers. The method does not count all fibers in all site ranges nor dos it
differentiate asbestos fibers from other types of fibers. PCM analysis of air samples was performed at Tri-
H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met
final air clearance criteria were collected and analyzed in general accordance with the Environmental
Protection Agency's (EPA) Recommended clearance criterion of 0.01 ficc.
Basal on the enacted laboratory results and our visual observacioas. this buddies is able to be occupied without
respiratory protec un. If further asbestos abatement is performed in this building Tire should be notified ro
resampk the air prior to occupancy of the area.
. Cp
j/i` "PIPES 6'9 0
L.
Hower mg;
Principal Engirt �
I =
t
! a!
;4c'.93-0930
7007 Greenleaf Avenue. Suite 203 • Whittler. CA 90502 • Tel: 562-464-2420 • Fax:562.464.2422
LAFAYETTE PLACE V
Formerly Martinique Gardens
Updated
09/25/97
Costa Mesa
Bldg. # Units Start Complete
Phase 1 11 9 04/24 I 08/22/97
(21) 12 8 04/29 I 08/22/97
10 4 05/05 I 08/22/97 I
15 4 05/16 j 09/27/97
Phase 2 14 4 I 05/22 I 09/27/97
(36) 17 8 05/08 10/04/97
16 8 05/12 10/11/97
13 12 05/30 I 10/18/97
23 3 06/06 I 10/25/97
22 3 06/16 I 11/01/97
Phase 3 21 5 I 06/25 11/08/97
(26) 20 5 I 07/07 11/15/97
19 5 07/14 11/22/97
18 5 07/21 11/29/97
9 I 4 07/31 12/06/97
8 4 I 08/1112/13/97
Phase 4 7 4 08/18 12/20/97
(30) 6 4 I 08/26 12/27/97 I
3 7 09/05 01/10/98
2 I 7 09/15 01/17/98 I
5 12 09/25 I 01/24/98 •
Phase 5 4 12 10/01 01/31/98 I
(32) 1 8 10/09 I 02/07/98
Rec/LO 05/05 09/27/97
9-29-1997 12:02PM FROM P. 8
•
09-29-97 11:57AM FROM F07
T TR1-H ENVIRONMENTAL SERVICES, INC. ____ - _ ►�v
—THEN Engineering&Environments!Services
Memo
,b: Joe Sanfilippo
From: Judy Horner
CC: Ken Pruat
Date: September 29. 1997
Re: Final Clearance Building/9
This memo is to confirm that final clearance air samples tor the asbestos abatement in Building rt9 were collected
on August 7, 1997. Air samples were analyzed in general accordance with the National Institute flit
Occupational Safety and Health (NIOSH) Method 7400. This method describes air sampling parameter and
a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400
describes a procedure which provides results that Indicate approximate concentrations of any type of airborne
particulate matter which meet specified aspect ratio and size criteria. Particulate matter which meets the
specified criteria are classified as fibers. The method does nut count all fibers in all size ranges nor does it
differentiate asbestos fibers from other types rrf fibers. PCM analysis of air samples was performed at Tri-
H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met
final air clearance criteria were collected and analyzed in general accordance with the Environmental
Protection Agency's(EPA) Recommended clearance criterion ut' 0.01 ffcc.
Based on the laboratory results and our visual observations. this building is able to be otzxrpied without respiratory
protection. If further asbestos abatement is performed in this building Tri-H should be notified to=sample the air
. ' to txxxtpancy of the area.
iN
P`r 573 t
• s
Q4,4‘0A
':'"PIES °N ,.
Hamerith L. Her
Principal Engineer °} APR 0 1 1998 74
zee).93-0830
sT47FOpOP
•
7007 Greenleaf Avenue, Suite 203 • Whittler. CA 90602 • Tel: 562464-2420 • Fax: 562-464-2422
• 9398 02:25."1f FROM P02
HT\ TRI-H ENV�. .ONMENTAL SERVICES, INC.
H E
Engineering&Environmental Services
Memo
To: Joe Sanfilippo
From: Judy Hostler
CC: Ken Pruett
Dare: September 29. 1997
Re: Final Clearance Building#9
This memo is to confirm that final clearance air samples for the asbestos abatement in Building#9 were collected
on August 7. 1997. Air samples were analyzed in general accordance with the National Institute for
Occupational Safety and Health (NIOSH) Method 7400. This method describes air sampling parameters and
a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400
describes a procedure which provides results that indicate approximate concentrations of any type of airborne
particulate matter which meet specified aspect ratio and size criteria. Particulate matter which meets the
specified criteria are classified as fibers. The method does not count all fibers in all size ranges nor does it
differentiate asbestos fibers from other types of fibers. PCM analysis of air samples was performed at Tri-
H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met
final air clearance criteria were collected and analyzed in general accordance with the Environmental
Protection Agency's (EPA) Recommended clearance criterion of 0.01 f/cc.
Based on the laboratory results and our visual observations, this building is able to be occupied without respiratory
protection. If further asbestos abatement is performed in this building Tri-H should be notified to resamplc the air
r—i•sr to occupancy of the area.
. c'�E.57Cn G
_ F
_ ot�ES 9 r s ��Juditlt L. Rosnertty c2,,
Principal Engineer u4 APR 0 1 1998 n,�
A
NO.T 93-0930
STATE OF CP
At
7007 Greenleaf Avenue, Suite 203 • Whittier, CA 90602 • Tel: 562-464-2420 • Fax: 562-464-2422
ADDRESS Of BUILDING: .1765 SANTA ANA AV UNT: BLD-9` CITY OF COSTA MESA - BUILDING PERMIT
•
DWNEWSNAMEIFINavw: BAY APARTMENT COMMUNITIES PERM NO: B 082647
ADDRESS: 4340 STEVENS CREEK 4275
VI
el r .. SAN JOSE, CA 95129 PERMIT NO: B 082647 PLAN CHECK NO: 01225-97 A GOVT: N SUPP: N
APDL.MARINO ADDRESS CONSTRUCTION TYPE: V-N PERMIT TYPE: STR PURPOSE: ALT
ARCNRECTOR'DKMIEER: MUSSER ARCHITECTS uC.IC. C15234 JOB DESCRIPTION ; APARTMENT FACADE UPGRADE SQ FT: 29 , 233
ARCM OR ENG.'S ADDRESS: 151 KALMUS DR 11111: D-103
C .M. CA 92626 CLAIM VALUE; 29 , 232 . 64 CALC-VALUE : 29, 233 , 00 GROUP OCC : R-1 /
CONTRACTORS NAME
CONTRACTORS MAIUNG COMMENTS : "MARTINIQUE GARDENS" FACADE UPGRADE
ADDRESS: DC NO.: 3E3E3E3EjEiF3E3E3E3E3E#3E3Eik3EjE3E 3EjEjEjEjE3E3E3E3E3Eif3EiFiFlElFlflflElElEkiElFik1E1E1E1EIF#3EiEif)EiE)tiEitiflF#1E*f6ifiEliit#1E9EiflkiE**4*if
WIT; ZONING REQUIREMENTS
LICENSED CONTRACTORS DECLARATION:I hereby affirm under penally of perjury That I am licensed under provisions of Chapter a SETBACKS
(commencing with Section 7000)of Division 3 of the Business and Professions Code,and my license is in lull force end Sled.
Cm LIC.NO.: LIC.CLASS: UC.No.: EXP : MAIN BUILDING ACCESSORY BUILDING
Date: comrad«: FRNT; FT IN REAR; FT IN FRNT: FT IN REAR: FT IN
LEFT: FT IN RGHT: FT IN LEFT : FT IN RGHT; FT IN
WNER BUILDER DECLARATION:I hereby affirm under sanely of perjury Thal I em exempt from the Contractors License Law for the
.lovng reason(Section 70315 Buskers and Professions Code:Any cityor corny which requires a panne to construct Mt,improve. PARKING REQ: PROV: PARCEL; 42546217 ZNE; R2MD REF NO; PA9705
w
dish,or repel any structure.prior to As balance.also requires the applicant for such permit to file a signed statement that he or she
licensed pursuani to the provisions of the Contractors License Law[Chapter 9(commencing with Section 7000)of Daision 3 of the PLANNING NOTES> UPGRADES/IMPROVEMENTS (NO ADDL Sp FT OR BDRMS) TO EX ..APT
-'ness and Prdesskm Code)«that heoshe is exempt therefrom end the basis for the alleged exemption.AnY violation of Sion > BLDG AT MARTINIQUE GARDENS APTS COMPLEX
70 , "-
31.5 by any applicant fore permit subjects the applicant nt to a civil penally of nmore than fire hundred dollars MOOD. #*******3E*******3EjE3EjE#3EjE3E3Ek3E3E3E3E3k ***************w***Rifkit**lkf ***********)(,-)EtlF1E***
❑r as I. owner of Me property a my or empfoyeee will wagerers their sole compensation.will do rho work,and the structure is notinleded DEVELOPMENT V E L O P M E N T S E R V I C E S R E U I R E M E N T •S-
«offered for sale Business(ned
on 7044. andProfession%Code:The Contrads License Lew does not apply to an Owner of property Q
who buildsor inpmves thereon,end who does such work himself or herself or through his or her own employees,presided that such 'L'
improvements are notintended
orofferd for asia.f,however.the building or improvement is sold withinwithinptea
one year of completion,the ZONING APPROVED BY Cc'P DATE: • --
owner-builder will have the burden of proving he or she did not build or improve for the purpose d sold).
❑ I.es owner of the properly,am exclusively contracting with licensed contractors to concave the.4.;.(Section 7044,Business and . l
Professions Code:The Contractors License Law does net appy b en owner of property or improves thereon ed who BUILDING APPROVED BY ; 's) VP DATE: J
contracts for such pmjeds wth 9999000009)599n90,1 Pursuant to the Common Licer's
i am exemptuderSecon:. EL&PG.,for +. reason: / / APPLICATION ISSUED BY; DATE: � �
5 -l/ ?7 _ .,: ****************************************** ****************,�****** *****(**
-wratter``'' " / LEGALIZATION: N F E E S U M M A R Y STRUCTURAL SEGMENT;Y
do hereby cddy that I en%were d arid understand 1 ,d eeonde Heath and .- end.747- •.and
25534,and Mm I or any Mur building occupant . b ma)need to comply with codes and ems for
pa permit roaIl«drdtrmknormdifmknfromthe m Distra.Reakenrir rd •roneppketionsare exempinmthese BLDG PMT PLUMBING ELECTRIC MECHANIC FIRE SMIP/RES GRADING
provisions. PERMIT 394 . 75 2 . 92
Date: App am: SMIP/NON-RES
WORKER'S COMPENSATION DECLARATION:I hereby affirm under penalty el pedeclensions:one of the following declsons: P LAN 64 , 15
ISSUE FEE
❑ Ihave and wil maintain acertificate ofconsetoSessaalSuiten'canpenedin,mpwkedi«bySasicn3700of the Laker BUILDING-DIV-> PERMIT ISSUE PLAN-CHECK TOTAL PAID DUE
Code.res the performance d the work 1r'which this permit is issued.
• Ihave and wmenworkers'compensation performance TOTALS----> 397, 67 0 . 00 00 64 , 15 461 . 82 461 . 82 . 00
will madman
work for which this permit is issued.My workers'compensation insurance wrier and policy number are:
Carrier: REVENUE DIVISION TOTALS--> COLLECTED: 397 , 67 OVER/SHORT: . 00
Polity Number BLDG PMT PLUMBING ELECTRIC MECHANIC FIRE SMIP/TOT GRADING PLAN-CHECK
'-smorn.ednabeadndsedrmewme;.mrcehtmdreddolianRlmlor,ts..) 394 , 75 2 . 92
❑ I comity that in the performance of the work for which this permit S issued,I shall not employ any person in any manner eo es to
become subject to the laws of California,and agree that dbecome should beme sdndto the Workers' 3F3F3kiE1k1E3E*) jE**********lis*3E*9E3E*3E**3EIE3Eklf3E3f**********3E*3E*3E*iE***3E*3E***3E3E****df*3E***3E**
v
compensation prdone d Sedon 3700 of the Labor Code.I,hall Whet comply with the provisions. INDIVIDUAL F E E BREAKDOWN
Date: Appfam:
Warning:Failure to secure workers'compensation avenge Is unlawful,and atoll ate/ot an employer to criminal penalties and TYPE QTY DESCRIPTIO N UNIT COST TOTAL COST
civil fines uP to one hundred thousand dollars(7104000A In addition to the coal of compensation,denspn as provided for In
section 3706 of the tabor Cotler,Interest and attorney's fSs, SFR 29233 ALTER BY VALUE RESIDENTIAL NOZONE 1 . 00 29, 233 , 00
CONSTRUCTION LENDING AGENCY: I hereby affirm under pleahy of perjury the there is a construction lending agency for the END OF FEES
perimnarva of the work for which this permit is baud(Sedipn 3097.Cil.C).
LENDER'S NAME ) C'
LENDER'S ADDRESS: I .,,... ] n� `^.
^v �_"i_ ti 3 .I
I certify Mud I have read this application end pate that the above information is coned.I agree to comply with erg dryad county ordinances J( t
end state laws machg to buildng.. •:• end hereby adhoree representatives of this thy to enter upon the above-mentioned properly -~
f«icrmkn purposes. 11'.4't? HFILTPPO v_) �e�`�. G1 4997 JJ'
Pmt E..
_OIL Ct.recta✓a.�//� - Dale: �=/- J CI TY pF C���A P�f �A
• . ..and•�y',Y ., ..y..�hv:_« / •vi�
(5151<6.WP) White-Buidi g A Safety Green-Fre:Cavy-Appicam:Pink-Revenue:Goldenrod-Assessor \,
CONSTRUCTION AND PLANNING..
APPROVALS Permit # One Inspector APPROVALS Permit # Date I Inspector
1, Tempora•y•Electrical Service or Pole 52. Pool & Equipment Location
2. ;oil Pipe•Undrgrnd. 53. Steel Reinforcement
3. Electrical Conduit Utility-Undrgrnd. . 54. Forms
4. Electrical Conduit-Undrgrnd. ' 55. Electrical Bonding
5. Steel Reinforcement 56. Rough Plumbing & Pressure Test •
6. Electrical UF ER Grnd. 57. APPROVAL TO COVER-GUNITE
•
7. Footings 58. Electrical Conduit-Undrgrnd.
8. Foundation 59. Gas Pipe, 0 Undrgrnd„ Test
9. Water Pipe-Undrgrnd. 60. Backwash Lines,P-Trap, 0 Undrgrnd.
10. Structural Floor System 61. APPROVAL TO DECK
11. Property Sewer Line & House Connection 62, Backwash & Receptor-Final
12. Sewer Cap 63. Heater& Vent-Final
13. Roof Drains •
' 64. Plumbing System - Final
14. Rough Plumbing 65. Electrical-Final
•
15. Rough Electrical-Conduit 66. Solar System-Final
16. Rough Electric Wiring 67. Fencing & Access Approval
17. Rough Wiring Sign 1 68. APPROVED FOR PLASTERING
18. Rough Electrical•T Bar Ceiling 69. POOL/SPA SYSTEMS FINAL
19. Rough Heating& Air Conditioning FIRE DEPT. REQUIREMENT
20. Rough Factory Fireplace APPROVALS Permit
21. Ducts,in Structure 70. Underground Hydro
22. Ducts, Ventilating 71. Product Piping 0 Gas 0 Oil
23. Gas Pipe-Rough& Test 72. Underground Flush
24. Roof Framing 73, Undergrnd.Storage Tank 0 Gas 0 Oil
25. Roof Sheathing 74. Overhead Hydro
26. T-Bar Ceiling (Structural) & Monocoat 75. Dry Chemical
27. Frame and Flashing 76. Dry Standpipe
28. Lathing &Siding 77. FIXED SYSTEM FINAL
29. Insulation 78, FIRE PREV. FINAL
30. Drywall Nailing HEALTH DEPT. REQUIREMENT
31. Plaster Brown Coat 79. FINAL INSPECTION
32. Electrical Power Meter-Final 80. FOOD CERTIFICATE ISSUED
33. Final Electric Notes:
34. Final Heating& Air Conditioning
35. Final Gas Pipe-Test
' 36. Hood or Canopy •
37. Final Factory Fireplace
38. Final Plumbing
39. Water Service-Final
40. Gas Service-Final
41. Solar Domestic-Final
42. Backflow Preventer
43. Backflow Irrigation
44. Landscape Irrigation System
45. Sound Attenuation
46. Handicap Regulations
47. FINAL STRUCTURE & BUILDING //y/'g
48. FINAL PLANNING
3�is�jp
49. Electric Release to Edison
50. Gas Release to Southern California Gas Co
51. CERTIFICATE OF OCCUPANCY
No Date