Loading...
HomeMy WebLinkAbout1765 SANTA ANA AVE - Building Permits (12) • BY' DATE \T \ .. SI IEET NO. OF - ry N CHECKED BY: DATE • F`C W JOB NO. i II } m ERCT. DUAN. TRAP WASTE T.W.U. C.W. TCWU H.W. TIIWU II.W. TOPH T1EMAT1KS ^� SIZE UNITS LUNITS UNITS O.P.II. 1 i W.C. (F.V.) tNT. G 10 e PNI „� W.C. (F.T.) t% 3 INT. 2 �` p 0 LAV (PUB) 1-1/4" 1 2 LAV (PVT) e 1-1/4" 1 I g U INT. 2 S 6- 1'1/4" I ,..2„.............< 8 C.WSHR ..4 1-1/2" 2 4 2j (CA SHWRS. 1-I/2" 2 _ / 2 DT. CO 1-1/2" 2 4 2 12 8K. 4— 1-1/2" 2 2- g 148 . 3 CO -. I TOTAL. , ^€i�-A':i;� . 3 4r l.:i�lti� 1--'y� 1r..?;;15.n: I f imi,'".f, I 1 +?,.. � _ ' i.'a: - • . . 8l-4::e. 1✓ SY FTS ovv N 1 (lI-• wcr-Ar i==.. • 11-07-1997 9, 15AM FROM F 9 4*Cit II • • TRI-11 ENVIRONMENTAL SERVICES, INC. . Engineering 8 Environmental Services Memo To: Joe Sanfilippo From: Judy Homer CC: Ken Pruett Due: September 29, 1997 Re: Final Clearance Building 09 This memo is to confirm that final clearance air samples for the asbestos abatement in Building 09 were collected on Au piss 7, 1997. Air samples were analyzed in general accordance with the National Institute for Occupational Safety and Health(NIOSH) Method 7400. This method describes air sampling parameters and a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400 describes a procedure which provides results that Indicate approximate concentrations of any type of airborne particulate matter which meet specified asprc.t ratio and size criteria. Particulate matter which meas the specified criteria are classified as fibers. The method does nut count all fibers in all size ranges nor does it differentiate asbestos fibers from other types of fibers. PCM analysis of air samples wa performed at Tri- H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met final air clearance criteria were collected and analyzed in general accordance with the Environmental Protection Agency's (EPA) Recommended clearance criterion of 0.01 f/cc. Based on the laboratory results and our visual observations, this building is able to be occupied without respiratory puteaion. If further asbestos abatement is performed in this building Tri-H should be notified to maniple the air • • r to occupancy of the area. A.. �r • AES c9 6 /Judith L. Hower Q.' �'c Rmcipal Engineer cwi: APR 0 1 1998 X NO.93-0930 STATE Of GP 7007 Greenleaf Avenue, Suite 203 • Whittler, CA 90602 • Tel: 562-464-2420 • Fax: 562.464-2422 8-14-1997 6:08AM FROM P. 7 08-13-91 05:45PM FROM P08 9 TRI-H ENVIRONMENTAL SERVICES, INC. T��T �H EEng/nearing a Environments,Services Memo ToJoe SCdILPPo From: Judy Hover CC: Ken P[uctt Dae: August 13. 1997 Re: Final Clearance Building N9-Drywall Installation • This memo is to confirm that final clearance air samples for the drywall installation in Building S9 were collected on August 7. 1947. Au samples were analyzed in general accordance with the National institute for Occupational Safety and Health(NIOSH) Method 7400. This method describes air sampling parameters and a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400 describes a procedure which provides results that indicate approximate concentrations of any type of Stint particulate matter which meet specified aspect ratio and size criteria. Particulate matter which meets the specified criteria are classified as fibers. The method does not count all fibers in all site ranges nor dos it differentiate asbestos fibers from other types of fibers. PCM analysis of air samples was performed at Tri- H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met final air clearance criteria were collected and analyzed in general accordance with the Environmental Protection Agency's (EPA) Recommended clearance criterion of 0.01 ficc. Basal on the enacted laboratory results and our visual observacioas. this buddies is able to be occupied without respiratory protec un. If further asbestos abatement is performed in this building Tire should be notified ro resampk the air prior to occupancy of the area. . Cp j/i` "PIPES 6'9 0 L. Hower mg; Principal Engirt � I = t ! a! ;4c'.93-0930 7007 Greenleaf Avenue. Suite 203 • Whittler. CA 90502 • Tel: 562-464-2420 • Fax:562.464.2422 LAFAYETTE PLACE V Formerly Martinique Gardens Updated 09/25/97 Costa Mesa Bldg. # Units Start Complete Phase 1 11 9 04/24 I 08/22/97 (21) 12 8 04/29 I 08/22/97 10 4 05/05 I 08/22/97 I 15 4 05/16 j 09/27/97 Phase 2 14 4 I 05/22 I 09/27/97 (36) 17 8 05/08 10/04/97 16 8 05/12 10/11/97 13 12 05/30 I 10/18/97 23 3 06/06 I 10/25/97 22 3 06/16 I 11/01/97 Phase 3 21 5 I 06/25 11/08/97 (26) 20 5 I 07/07 11/15/97 19 5 07/14 11/22/97 18 5 07/21 11/29/97 9 I 4 07/31 12/06/97 8 4 I 08/1112/13/97 Phase 4 7 4 08/18 12/20/97 (30) 6 4 I 08/26 12/27/97 I 3 7 09/05 01/10/98 2 I 7 09/15 01/17/98 I 5 12 09/25 I 01/24/98 • Phase 5 4 12 10/01 01/31/98 I (32) 1 8 10/09 I 02/07/98 Rec/LO 05/05 09/27/97 9-29-1997 12:02PM FROM P. 8 • 09-29-97 11:57AM FROM F07 T TR1-H ENVIRONMENTAL SERVICES, INC. ____ - _ ►�v —THEN Engineering&Environments!Services Memo ,b: Joe Sanfilippo From: Judy Horner CC: Ken Pruat Date: September 29. 1997 Re: Final Clearance Building/9 This memo is to confirm that final clearance air samples tor the asbestos abatement in Building rt9 were collected on August 7, 1997. Air samples were analyzed in general accordance with the National Institute flit Occupational Safety and Health (NIOSH) Method 7400. This method describes air sampling parameter and a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400 describes a procedure which provides results that Indicate approximate concentrations of any type of airborne particulate matter which meet specified aspect ratio and size criteria. Particulate matter which meets the specified criteria are classified as fibers. The method does nut count all fibers in all size ranges nor does it differentiate asbestos fibers from other types rrf fibers. PCM analysis of air samples was performed at Tri- H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met final air clearance criteria were collected and analyzed in general accordance with the Environmental Protection Agency's(EPA) Recommended clearance criterion ut' 0.01 ffcc. Based on the laboratory results and our visual observations. this building is able to be otzxrpied without respiratory protection. If further asbestos abatement is performed in this building Tri-H should be notified to=sample the air . ' to txxxtpancy of the area. iN P`r 573 t • s Q4,4‘0A ':'"PIES °N ,. Hamerith L. Her Principal Engineer °} APR 0 1 1998 74 zee).93-0830 sT47FOpOP • 7007 Greenleaf Avenue, Suite 203 • Whittler. CA 90602 • Tel: 562464-2420 • Fax: 562-464-2422 • 9398 02:25."1f FROM P02 HT\ TRI-H ENV�. .ONMENTAL SERVICES, INC. H E Engineering&Environmental Services Memo To: Joe Sanfilippo From: Judy Hostler CC: Ken Pruett Dare: September 29. 1997 Re: Final Clearance Building#9 This memo is to confirm that final clearance air samples for the asbestos abatement in Building#9 were collected on August 7. 1997. Air samples were analyzed in general accordance with the National Institute for Occupational Safety and Health (NIOSH) Method 7400. This method describes air sampling parameters and a protocol for analyzing air samples via Phase Contract Microscopy (PCM). The NIOSH Method 7400 describes a procedure which provides results that indicate approximate concentrations of any type of airborne particulate matter which meet specified aspect ratio and size criteria. Particulate matter which meets the specified criteria are classified as fibers. The method does not count all fibers in all size ranges nor does it differentiate asbestos fibers from other types of fibers. PCM analysis of air samples was performed at Tri- H's field laboratory located at the site. Air samples obtained to determine if the abatement work areas met final air clearance criteria were collected and analyzed in general accordance with the Environmental Protection Agency's (EPA) Recommended clearance criterion of 0.01 f/cc. Based on the laboratory results and our visual observations, this building is able to be occupied without respiratory protection. If further asbestos abatement is performed in this building Tri-H should be notified to resamplc the air r—i•sr to occupancy of the area. . c'�E.57Cn G _ F _ ot�ES 9 r s ��Juditlt L. Rosnertty c2,, Principal Engineer u4 APR 0 1 1998 n,� A NO.T 93-0930 STATE OF CP At 7007 Greenleaf Avenue, Suite 203 • Whittier, CA 90602 • Tel: 562-464-2420 • Fax: 562-464-2422 ADDRESS Of BUILDING: .1765 SANTA ANA AV UNT: BLD-9` CITY OF COSTA MESA - BUILDING PERMIT • DWNEWSNAMEIFINavw: BAY APARTMENT COMMUNITIES PERM NO: B 082647 ADDRESS: 4340 STEVENS CREEK 4275 VI el r .. SAN JOSE, CA 95129 PERMIT NO: B 082647 PLAN CHECK NO: 01225-97 A GOVT: N SUPP: N APDL.MARINO ADDRESS CONSTRUCTION TYPE: V-N PERMIT TYPE: STR PURPOSE: ALT ARCNRECTOR'DKMIEER: MUSSER ARCHITECTS uC.IC. C15234 JOB DESCRIPTION ; APARTMENT FACADE UPGRADE SQ FT: 29 , 233 ARCM OR ENG.'S ADDRESS: 151 KALMUS DR 11111: D-103 C .M. CA 92626 CLAIM VALUE; 29 , 232 . 64 CALC-VALUE : 29, 233 , 00 GROUP OCC : R-1 / CONTRACTORS NAME CONTRACTORS MAIUNG COMMENTS : "MARTINIQUE GARDENS" FACADE UPGRADE ADDRESS: DC NO.: 3E3E3E3EjEiF3E3E3E3E3E#3E3Eik3EjE3E 3EjEjEjEjE3E3E3E3E3Eif3EiFiFlElFlflflElElEkiElFik1E1E1E1EIF#3EiEif)EiE)tiEitiflF#1E*f6ifiEliit#1E9EiflkiE**4*if WIT; ZONING REQUIREMENTS LICENSED CONTRACTORS DECLARATION:I hereby affirm under penally of perjury That I am licensed under provisions of Chapter a SETBACKS (commencing with Section 7000)of Division 3 of the Business and Professions Code,and my license is in lull force end Sled. Cm LIC.NO.: LIC.CLASS: UC.No.: EXP : MAIN BUILDING ACCESSORY BUILDING Date: comrad«: FRNT; FT IN REAR; FT IN FRNT: FT IN REAR: FT IN LEFT: FT IN RGHT: FT IN LEFT : FT IN RGHT; FT IN WNER BUILDER DECLARATION:I hereby affirm under sanely of perjury Thal I em exempt from the Contractors License Law for the .lovng reason(Section 70315 Buskers and Professions Code:Any cityor corny which requires a panne to construct Mt,improve. PARKING REQ: PROV: PARCEL; 42546217 ZNE; R2MD REF NO; PA9705 w dish,or repel any structure.prior to As balance.also requires the applicant for such permit to file a signed statement that he or she licensed pursuani to the provisions of the Contractors License Law[Chapter 9(commencing with Section 7000)of Daision 3 of the PLANNING NOTES> UPGRADES/IMPROVEMENTS (NO ADDL Sp FT OR BDRMS) TO EX ..APT -'ness and Prdesskm Code)«that heoshe is exempt therefrom end the basis for the alleged exemption.AnY violation of Sion > BLDG AT MARTINIQUE GARDENS APTS COMPLEX 70 , "- 31.5 by any applicant fore permit subjects the applicant nt to a civil penally of nmore than fire hundred dollars MOOD. #*******3E*******3EjE3EjE#3EjE3E3Ek3E3E3E3E3k ***************w***Rifkit**lkf ***********)(,-)EtlF1E*** ❑r as I. owner of Me property a my or empfoyeee will wagerers their sole compensation.will do rho work,and the structure is notinleded DEVELOPMENT V E L O P M E N T S E R V I C E S R E U I R E M E N T •S- «offered for sale Business(ned on 7044. andProfession%Code:The Contrads License Lew does not apply to an Owner of property Q who buildsor inpmves thereon,end who does such work himself or herself or through his or her own employees,presided that such 'L' improvements are notintended orofferd for asia.f,however.the building or improvement is sold withinwithinptea one year of completion,the ZONING APPROVED BY Cc'P DATE: • -- owner-builder will have the burden of proving he or she did not build or improve for the purpose d sold). ❑ I.es owner of the properly,am exclusively contracting with licensed contractors to concave the.4.;.(Section 7044,Business and . l Professions Code:The Contractors License Law does net appy b en owner of property or improves thereon ed who BUILDING APPROVED BY ; 's) VP DATE: J contracts for such pmjeds wth 9999000009)599n90,1 Pursuant to the Common Licer's i am exemptuderSecon:. EL&PG.,for +. reason: / / APPLICATION ISSUED BY; DATE: � � 5 -l/ ?7 _ .,: ****************************************** ****************,�****** *****(** -wratter``'' " / LEGALIZATION: N F E E S U M M A R Y STRUCTURAL SEGMENT;Y do hereby cddy that I en%were d arid understand 1 ,d eeonde Heath and .- end.747- •.and 25534,and Mm I or any Mur building occupant . b ma)need to comply with codes and ems for pa permit roaIl«drdtrmknormdifmknfromthe m Distra.Reakenrir rd •roneppketionsare exempinmthese BLDG PMT PLUMBING ELECTRIC MECHANIC FIRE SMIP/RES GRADING provisions. PERMIT 394 . 75 2 . 92 Date: App am: SMIP/NON-RES WORKER'S COMPENSATION DECLARATION:I hereby affirm under penalty el pedeclensions:one of the following declsons: P LAN 64 , 15 ISSUE FEE ❑ Ihave and wil maintain acertificate ofconsetoSessaalSuiten'canpenedin,mpwkedi«bySasicn3700of the Laker BUILDING-DIV-> PERMIT ISSUE PLAN-CHECK TOTAL PAID DUE Code.res the performance d the work 1r'which this permit is issued. • Ihave and wmenworkers'compensation performance TOTALS----> 397, 67 0 . 00 00 64 , 15 461 . 82 461 . 82 . 00 will madman work for which this permit is issued.My workers'compensation insurance wrier and policy number are: Carrier: REVENUE DIVISION TOTALS--> COLLECTED: 397 , 67 OVER/SHORT: . 00 Polity Number BLDG PMT PLUMBING ELECTRIC MECHANIC FIRE SMIP/TOT GRADING PLAN-CHECK '-smorn.ednabeadndsedrmewme;.mrcehtmdreddolianRlmlor,ts..) 394 , 75 2 . 92 ❑ I comity that in the performance of the work for which this permit S issued,I shall not employ any person in any manner eo es to become subject to the laws of California,and agree that dbecome should beme sdndto the Workers' 3F3F3kiE1k1E3E*) jE**********lis*3E*9E3E*3E**3EIE3Eklf3E3f**********3E*3E*3E*iE***3E*3E***3E3E****df*3E***3E** v compensation prdone d Sedon 3700 of the Labor Code.I,hall Whet comply with the provisions. INDIVIDUAL F E E BREAKDOWN Date: Appfam: Warning:Failure to secure workers'compensation avenge Is unlawful,and atoll ate/ot an employer to criminal penalties and TYPE QTY DESCRIPTIO N UNIT COST TOTAL COST civil fines uP to one hundred thousand dollars(7104000A In addition to the coal of compensation,denspn as provided for In section 3706 of the tabor Cotler,Interest and attorney's fSs, SFR 29233 ALTER BY VALUE RESIDENTIAL NOZONE 1 . 00 29, 233 , 00 CONSTRUCTION LENDING AGENCY: I hereby affirm under pleahy of perjury the there is a construction lending agency for the END OF FEES perimnarva of the work for which this permit is baud(Sedipn 3097.Cil.C). LENDER'S NAME ) C' LENDER'S ADDRESS: I .,,... ] n� `^. ^v �_"i_ ti 3 .I I certify Mud I have read this application end pate that the above information is coned.I agree to comply with erg dryad county ordinances J( t end state laws machg to buildng.. •:• end hereby adhoree representatives of this thy to enter upon the above-mentioned properly -~ f«icrmkn purposes. 11'.4't? HFILTPPO v_) �e�`�. G1 4997 JJ' Pmt E.. _OIL Ct.recta✓a.�//� - Dale: �=/- J CI TY pF C���A P�f �A • . ..and•�y',Y ., ..y..�hv:_« / •vi� (5151<6.WP) White-Buidi g A Safety Green-Fre:Cavy-Appicam:Pink-Revenue:Goldenrod-Assessor \, CONSTRUCTION AND PLANNING.. APPROVALS Permit # One Inspector APPROVALS Permit # Date I Inspector 1, Tempora•y•Electrical Service or Pole 52. Pool & Equipment Location 2. ;oil Pipe•Undrgrnd. 53. Steel Reinforcement 3. Electrical Conduit Utility-Undrgrnd. . 54. Forms 4. Electrical Conduit-Undrgrnd. ' 55. Electrical Bonding 5. Steel Reinforcement 56. Rough Plumbing & Pressure Test • 6. Electrical UF ER Grnd. 57. APPROVAL TO COVER-GUNITE • 7. Footings 58. Electrical Conduit-Undrgrnd. 8. Foundation 59. Gas Pipe, 0 Undrgrnd„ Test 9. Water Pipe-Undrgrnd. 60. Backwash Lines,P-Trap, 0 Undrgrnd. 10. Structural Floor System 61. APPROVAL TO DECK 11. Property Sewer Line & House Connection 62, Backwash & Receptor-Final 12. Sewer Cap 63. Heater& Vent-Final 13. Roof Drains • ' 64. Plumbing System - Final 14. Rough Plumbing 65. Electrical-Final • 15. Rough Electrical-Conduit 66. Solar System-Final 16. Rough Electric Wiring 67. Fencing & Access Approval 17. Rough Wiring Sign 1 68. APPROVED FOR PLASTERING 18. Rough Electrical•T Bar Ceiling 69. POOL/SPA SYSTEMS FINAL 19. Rough Heating& Air Conditioning FIRE DEPT. REQUIREMENT 20. Rough Factory Fireplace APPROVALS Permit 21. Ducts,in Structure 70. Underground Hydro 22. Ducts, Ventilating 71. Product Piping 0 Gas 0 Oil 23. Gas Pipe-Rough& Test 72. Underground Flush 24. Roof Framing 73, Undergrnd.Storage Tank 0 Gas 0 Oil 25. Roof Sheathing 74. Overhead Hydro 26. T-Bar Ceiling (Structural) & Monocoat 75. Dry Chemical 27. Frame and Flashing 76. Dry Standpipe 28. Lathing &Siding 77. FIXED SYSTEM FINAL 29. Insulation 78, FIRE PREV. FINAL 30. Drywall Nailing HEALTH DEPT. REQUIREMENT 31. Plaster Brown Coat 79. FINAL INSPECTION 32. Electrical Power Meter-Final 80. FOOD CERTIFICATE ISSUED 33. Final Electric Notes: 34. Final Heating& Air Conditioning 35. Final Gas Pipe-Test ' 36. Hood or Canopy • 37. Final Factory Fireplace 38. Final Plumbing 39. Water Service-Final 40. Gas Service-Final 41. Solar Domestic-Final 42. Backflow Preventer 43. Backflow Irrigation 44. Landscape Irrigation System 45. Sound Attenuation 46. Handicap Regulations 47. FINAL STRUCTURE & BUILDING //y/'g 48. FINAL PLANNING 3�is�jp 49. Electric Release to Edison 50. Gas Release to Southern California Gas Co 51. CERTIFICATE OF OCCUPANCY No Date